{{#Wiki_filter:ES-301                                             Operating Test Quality Checklist                                                               Form ES-301-3 Facilitv: {) <.. C.oo       u ... 'I,,;.   \ "l..         Date of Examination:                           -,/1,0/ Cl1.0   Operating Test Number: \
{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: {) <..
Initials
C.oo 
: 1. General Criteria a     b*     c*
u... 'I,,;.  
: a.           The operating test conforms to the previously approved ouUine; changes are consistent with                                                             dwr samplina reauirements (e.a .. 10 CFR 55.45, operational importance. safetv function distribution).                                     -1'
\\  "l..
: b.           There is no day-to-day repetition between this and other operating tests to be administered dwr durino this examination.                                                                                                               -v'
Date of Examination:  
: c.           The ooeratino test shall not duplicate items from the aoolicants' audit test(sl (see Section D.1.a.).                                 -v J           dwr
-,/1,0/ Cl1.0 Operating Test Number: \\
                                                                                                                                                      -v
: 1. General Criteria Initials a
: d.           Overlap with the written examination and between different parts of the operating test is within acceptable limits.                                                                                                                           .,_.J dwr
b*
: e.           It appears that lhe operating lest will differentiate between competent and less-than-competent aoolicants at the desianated license level.                                                                                           -V'             dwr
c*
: 2. Walkthrough Criteria                                                                       I -- I - I I      --
a.
: a.         Each JPM includes the following, as applicable:
The operating test conforms to the previously approved ouUine; changes are consistent with samplina reauirements (e.a.. 10 CFR 55.45, operational importance. safetv function distribution). -1' 
            .. initial conditions
b.
            .. initialing cues references and tools, including associated procedures reasonable and validated time limits (average lime allowed for completion) and specific
There is no day-to-day repetition between this and other operating tests to be administered
              . designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-dwr

                  -      detailed expected actions with exact criteria and nomenclature
durino this examination.
                  -      system response and other examiner cues
-v' c.
                  -      statements describing important observations to be made by the applicant
The ooeratino test shall not duplicate items from the aoolicants' audit test(sl (see Section D.1.a.). -v J
                  -      criteria for successful completion of the task identification of critical steps and their associated performance standards
: d.
                  -     restrictions on the seauence of steos, if annllcable                                                                       -,/
Overlap with the written examination and between different parts of the operating test is within acceptable limits.  
: b.         Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC                                                                 dwr examinations) specified on those forms and Form ES-201-2.                                                                               -ti ..J
-v., _.J e.
: 3. Simulator Criteria                                                                         --    -      -
It appears that lhe operating lest will differentiate between competent and less-than-competent aoolicants at the desianated license level.  
The associated simulator operating tests (scenario sets) have been reviewed tn accordance with Form ES-301-4, and a coov is attached.                                                                                                               -,/
-V'
                                                                                                                                                          --e..)    dwr Printed Name/Signature                                                             Date
: 2. Walkthrough Criteria I -- I - I --
                                            !J:_61 Volt:::-
: a.
                                              .                                  ::S-zz,    L&#xa5;' .
Each JPM includes the following, as applicable:
                                                                                                                                                            't'h,/-ic
initial conditions initialing cues references and tools, including associated procedures reasonable and validated time limits (average lime allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards
: a. Author
-,/
: b. Facility Reviewer (*)                 1,111,rrt,'J! t.J. -                                                                                         s-f&/io
restrictions on the seauence of steos, if annllcable b.
: c. NRC Chief Examiner (#)               David W. Reeser        Digitally signed by David W. Reeser Date: 2020.07.28 11:01:31 -05'00'
Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC  
: d. NRC Supervisor                           Patricia J. Pelke                            Digitally signed by Patricia J. Pelke Date: 2020.07.28 15:52:53 -05'00'
-ti ..J examinations) specified on those forms and Form ES-201-2.
: 3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed tn accordance with  
-,/ --e..)
Form ES-301-4, and a coov is attached.
Printed Name/Signature Date
: a.
Author
!J:_61 Volt:::-
L&#xa5;'
't'h,/-ic b.
Facility Reviewer (*)
1,111,rrt, 'J! t.J. -
s-f&/io
::S-zz,
: c.
NRC Chief Examiner (#)
d.
NRC Supervisor
* The facility licensee signature is not applicable for NRC-developed tests.
* The facility licensee signature is not applicable for NRC-developed tests.
# The independent NRC reviewer initials items in column *c*: the chief examiner concurrence is reauired.}}
# The independent NRC reviewer initials items in column *c*: the chief examiner concurrence is reauired.
I dwr dwr dwr dwr dwr dwr dwr dwr David W. Reeser Digitally signed by David W. Reeser Date: 2020.07.28 11:01:31 -05'00' Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2020.07.28 15:52:53 -05'00'}}

Latest revision as of 11:49, 29 November 2024

2020 DC Cook Ile Operating Test Quality Checklist ES-301-3
ML20356A074
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/25/2020
From:
Indiana Michigan Power Co
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML19121A511 List:
References
Download: ML20356A074 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: {) <..

C.oo 

u... 'I,,;.

\\  "l..

Date of Examination:

-,/1,0/ Cl1.0 Operating Test Number: \\

1. General Criteria Initials a

b*

c*

a.

The operating test conforms to the previously approved ouUine; changes are consistent with samplina reauirements (e.a.. 10 CFR 55.45, operational importance. safetv function distribution). -1' 

b.

There is no day-to-day repetition between this and other operating tests to be administered



durino this examination.

-v' c.

The ooeratino test shall not duplicate items from the aoolicants' audit test(sl (see Section D.1.a.). -v J

d.

Overlap with the written examination and between different parts of the operating test is within acceptable limits.

-v., _.J e.

It appears that lhe operating lest will differentiate between competent and less-than-competent aoolicants at the desianated license level.

-V'

2. Walkthrough Criteria I -- I - I --
a.

Each JPM includes the following, as applicable:

initial conditions initialing cues references and tools, including associated procedures reasonable and validated time limits (average lime allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards

-,/

restrictions on the seauence of steos, if annllcable b.

Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC

-ti ..J examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed tn accordance with

-,/ --e..)

Form ES-301-4, and a coov is attached.

Printed Name/Signature Date

a.

Author

!J:_61 Volt:::-

L¥'

't'h,/-ic b.

Facility Reviewer (*)

1,111,rrt, 'J! t.J. -

s-f&/io

S-zz,
c.

NRC Chief Examiner (#)

d.

NRC Supervisor

  • The facility licensee signature is not applicable for NRC-developed tests.
  1. The independent NRC reviewer initials items in column *c*: the chief examiner concurrence is reauired.

I dwr dwr dwr dwr dwr dwr dwr dwr David W. Reeser Digitally signed by David W. Reeser Date: 2020.07.28 11:01:31 -05'00' Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2020.07.28 15:52:53 -05'00'