N.R.C. OPERATING DATA REPORT DOCKET NO.                       50-315 l
N.R.C. OPERATING DATA REPORT DOCKET NO.
DATE             4/3/87 COMPLETED BY                         CLIMER l
50-315 DATE 4/3/87 l
COMPLETED BY CLIMER l
TELEPHONE 616-465-5901 OPERATING STATUS
TELEPHONE 616-465-5901 OPERATING STATUS
: 1. Unit Name                                 D. C. Cook Unit 1                       ------------------- ---
: 1. Unit Name D.
: 2. Reporting Period                                                 MAR 87 l notes                                             ;
C. Cook Unit 1
: 3. Licensed Thermal Power (MWt)                                             3250 l                                             l
: 2. Reporting Period MAR 87 l notes
: 4. Name Plate Rating (Gross MWe)                                         1152 l                                             l S. Design Electrical Rating (Net MWe)-                                     1030 l                                               l
: 3. Licensed Thermal Power (MWt) 3250 l l
: 6. Maximum Dependable Capacity (GROSS MWe) 1056 l                                                                               l:
4.
: 7. Maximum Dependable Capacity (Net MWe)                                   1020 --- ---- --------------
Name Plate Rating (Gross MWe) 1152 l l
S. Design Electrical Rating (Net MWe)-
1030 l l
: 6. Maximum Dependable Capacity (GROSS MWe) 1056 l l:
: 7. Maximum Dependable Capacity (Net MWe) 1020 --- ---- --------------
l
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since I
{
Last Report Give Reasons i
{
I l
I l
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons                                                                                                                {
i
{
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 9. Power Level To Which Restricted. If Any (Net MWe)
I l
: 10. Reasons For Restrictions. If Any:
: 10. Reasons For Restrictions. If Any:
This Mo.                 Yr. to Date                 Cumm.
This Mo.
11     Hours in Reporting Period                                     744.0                 2160.0               107352.0                   4
Yr. to Date Cumm.
: 12. No. of Hrs. Reactor Was Critical                                   744.0                 2160.0               77985.8                   i 0.0                     0.0               463.0
11 Hours in Reporting Period 744.0 2160.0 107352.0 4
: 13. Reactor Reserve Shutdown Hours
: 12. No. of Hrs. Reactor Was Critical 744.0 2160.0 77985.8 i
: 14. Hours Generator on Lire                                           744.0                 2160.0               76478.6
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
: 15. Unit Recerve Shutdown Hours                                             0.0                     0.0               321.0
: 14. Hours Generator on Lire 744.0 2160.0 76478.6
: 16. Gross Therm. Energy Gen. (MWH)                                 2099286                   6161811           222794319
: 15. Unit Recerve Shutdown Hours 0.0 0.0 321.0
: 17. Gross Elect. Energy Gen. (MWH)                                   678430                 1998540               72894410
: 16. Gross Therm. Energy Gen. (MWH) 2099286 6161811 222794319
: 18. Net Elect. Energy Gen. (MWH)                                     651027                 1918993               70116224                   ;
: 17. Gross Elect. Energy Gen. (MWH) 678430 1998540 72894410
: 19. Unit Service Factor                                               100.0                   100.0                   72.6
: 18. Net Elect. Energy Gen. (MWH) 651027 1918993 70116224
: 20.     Unit Availability Factor                                     100.0                   100.0                   72. 6 85.8                   87.1                 65.3
: 19. Unit Service Factor 100.0 100.0 72.6
: 21.     Unit ca pacity Factor (MDC Net)                                                                                                      l
: 20. Unit Availability Factor 100.0 100.0
: 22.     linit Capacity Factor (DER Net)                                   95.0                   36.3                 63.0
: 72. 6 c pacity Factor (MDC Net) 85.8 87.1 65.3 l
: 23.     Unit Forced Outage Rate                                             0.0                   0.0                     8.3               1
: 21. Unit a
: 24. Shutdowns Scheduled over Next Six Months (Type,Date.and Duration)'                                                                         l Refueling outage to sta rt July 87.                       Expected duration 45 days
: 22. linit Capacity Factor (DER Net) 95.0 36.3 63.0
                    . Shut dpyn._d.ye_ t_o_ lUgttlr.imny _.__S.yStesr-- Leak. Rate._on 4 D _EskJ.eturn .to service
: 23. Unit Forced Outage Rate 0.0 0.0 8.3 1
: 25. If shut Down At End of keport Period. Estimated Date of Startup:                                                           on 4-18-87
: 24. Shutdowns Scheduled over Next Six Months (Type,Date.and Duration)'
            .6.       units in Test o,tatus (:crior
l Refueling outage to sta rt July 87.
                    --y.---.                                  o Commercial Ope r a r, ion ) .                                                           !
Expected duration 45 days
F<:reast             Acaleved                       l INITIAL CRITICALI /
. Shut dpyn._d.ye_ t_o_ lUgttlr.imny _.__S.yStesr-- Leak. Rate._on 4 D
_EskJ.eturn.to service
: 25. If shut Down At End of keport Period. Estimated Date of Startup:
on 4-18-87
--y.---.
.6. units in Test o,tatus (:crior o Commercial Ope r a r, ion ).
F<:reast Acaleved l
INITIAL CRITICALI /
INITIAL ELECThD ITY COMMERCIAL OFERAT ON
INITIAL ELECThD ITY COMMERCIAL OFERAT ON
                                                                                                                                  ,L__ 6 f N.     '
__ 6 f N.
              $ggei;gggg g38o             3 8                                                                                                                               sr
,L
                                                                                                                                                  /
$ggei;gggg g38o 3
sr 8
/


AVERAGE DAILY POWER LEVEL   (MWe-Net)
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.         50-315 l
DOCKET NO.
UNIT                 ONE DATE               4/3/87                                                     ;
50-315 UNIT ONE DATE 4/3/87 COMPLETED BY CLIMER TELEPHONE 616-465-5901 MONTH MAR 87 j
'                                  COMPLETED BY       CLIMER TELEPHONE   616-465-5901 MONTH           MAR 87 j                       AVERAGE DAILY                         AVERAGE DAILY POWER LEVEL             DAY           POWER LEVEL l            DAY 917             17                   915 1
AVERAGE DAILY AVERAGE DAILY l
916             18                   916 2
DAY POWER LEVEL DAY POWER LEVEL 1
917             19                   918                                       1 3
917 17 915 2
917             20                   916 4
916 18 916 3
917             21                   918 5
917 19 918 1
913             22                   916 6
4 917 20 916 5
7                521             23                   917 274             24                   916 8
917 21 918 6
670             25                   916 9
913 22 916 7
911             26                   916 10 l
521 23 917 8
913             27                   915 11 913             28                   915 12 914             29                   913 13 915             30                   914 l             14 914             31                   950 l              15 i             16               915 l
274 24 916 9
: m.                                                                           _..._._._____..____.______._.-__a
670 25 916 l
10 911 26 916 11 913 27 915 12 913 28 915 13 914 29 913 l
14 915 30 914 l
15 914 31 950 i
16 915 l
m.
_..._._._____..____.______._.-__a


_                    d n1 a0                                           on                 d                                   G m9                                         t ip                 e A5 ams
d n1 a0 on d
                                                                  %Muupo s
G m9 t ip e
a t
A5 ams s
t t
%Muu a
t i
t i
t g       . 5                                     3                 oer                                   I
g
_                    t6 S4 3 t sd r i     t re cw                             e e N
. 5 3
I 7                                                oaea           d no                     s     a el si 8     .)                                       tE ev             eip                                 nI                        c.
po oer I
m.
t6 3 t i
t
t re N
                  -      6                                            f           n                             a      i                      m
I S4 sd r cw e e 7
_                9        1                                      d e       r     rre                   i snl D1etI
oaea d no el c.
                  - L_6.
s si a
e                          ehhi             uev 1 '
8
n.l S
.)
o
tE ev eip m.
              , 4JT                    v            c.          ct t a         t wi                     in nli                        <
t nI L_6 6
n           u     op         eot                     is                                     n nemis i
f n
l Yg      ;          i            e           d ob e           rpa                                     e                     u.
m 1
I I t       n ci    e nim              et        r              r              I ue a c i n                     S i
d e r
A Dg o t
rre s D1etI S
                                                      -s   _
a i
r    n      . ert                                      p I          I is Cne     nt c eaos         r os           _      G i    n. et  i c t                  i I :I       g
9 i
                              .                    I
o ehhi uev nl 1 '
_      scetk           et i                   i cpS I                               ts I            I g
c.
:- g
ct t a t wi in n.l 4JT e
                                      &e       t s anl wacd e a   wcn ai9
v nl n
                                                                                                .            i i yt lops n1 I
i n
lu i
u op eot is mi i
l        .
l e
cA      ne                                                                    i    e6                  l n
d ob e rpa ne e
g                                                                            f s                                  nl     sem0                                                           s rp i
u.
t j i
I Yg i
s a
s i
v e           reoa             prd3                   :sfi::I 1          nnv1 I          0             I I             k              f              s et t         g   m       a0 P
i ni et r
O                                            wn         ,n   ud pn%8 7
r ue n S
5 C                                           oi     ,si                         l -
c I
P aprp                 a0 9 n mmei        d r   usp       ee         o otP n           ece ti       em     fiht cmdd a               vti arene           er         m eeeot           h eoi R pF cs           T stl S                                                                                                                    .
I t n t
N                                                      Z e
e m
n O
a c i r
l                                                      Z                                                     is
n ert i c i
                                                                                                                          .a u   l 3O                                                                       n           t Z
p G n. et t A
l tr             7
o is
                                  .          g                 Z                                                     a&lap ci c i
-s Dg Cne c eaos r os i pS I ts I
l 8        .                            Z                                                            m D              9                                     Z                                                   St al   i
I scetk et i i c I :I nt g
:           1                                                                                 : tl l
I I
l a a      m (s H               h                                                                                    a nn uei nnns t
&e anl a
I                c             *,
wcn I
yO                                                       t i a a nil l l I                r
i I g i i yt lu l
* Z                                           sekkAO W               a         [gn                       Z                                         l kI 21 - - l O               M                           i P
cA n wacd e ai9 lops n1 l
l               l                                                                         ).
t s
_        i                 l         '
:- g e6 i
N                 i
i e
_        A               N S l
n nl sem0 f
f t            c           e c e s N                k            t ne W                i t
i g
s o
s rp s
c     e v up A'
e reoa prd3
                                                                /
:s nnv1 s
O                 t             c!           c        N                                                                        m l
v 1 fi::I 0
I I
t j a
s et t g
m a0 I
k f
P O
wn
,n ud 7
C oi
,si pn%8 5
l P aprp a0 mmei d
9 n r
usp ee o
otP n ece ti em fiht cmdd a vti arene er m
eeeot h eoi R pF cs T stl SN e
Z n
O Z
.a l
is u l
, 3O Z
n t
a&l l
a tr 7
Z g
Z ci m p
i 8
c lD 9
Z St i al l
: tl 1
m (s a a l
H a nn uei h
nnns i a a nil t
c
*, yO t
I l l sekkAO r
Z I
W a
[gn Z
l
- l kI 21 -
O M
i P
l l
).
i l
N i
A N
l S
f c
e e
t N
k c
e s i
o ne A'
t s
e u W
c v p
/
t O
i l c
N m
t c!
o l
t I
I i
l i
r t
ta l
i n
l H
l i
l i
o r        I i l t
m iS I
I                                                                                 t t
a T
i l                i                                                                                                            a l                                                                                                                              n
e 6
_        l i
:m "t
H                                                                                                          i S                                                                                      I                                      m a
I I
T                                                                                                                              m I
N
                                  "t ksg,       e        6                                                                              I N                                                                                                      )
: ksg,
e       t l
)
l                                                      4                                                in                      s e         n
l 4
                                                  ,j                                                             l a
in e
p                    c i i a
t l
a c       l p
s n
ni            x L                inl              :
e a
(t                              1
,j l
                                              %J               B                                                                   t &
i i c
s           t 1
a p
ei e           i g             s luT i f sn isi           su)
c l
:mo               teiv1 nee i: n I e             i ai                 a l
a ni p
c                s yI la       a lp jjI                                                                         tnn e a goimis i       s         x h gg                       0                                                  nnnt oi i i                     s l
L x
ieli at nt a e
%J B
:si  p t cl ai s c nnif      nn uime     gc               i s il    a e e pl pl o
s inl (t
i kHHOA.OUl
1 t
_                                                          l
1 ei e t
.                                                            .                                                a? I
s i g luT isi su) s n i f
                                              ,Qe           .
: n
e
:mo e nee i t iv1 a
                                          -                _ S                                             HA11 C D 'l !l                       G1  1 2
I e i ai lp s
6 t
l c
e               0 a                3 D                0                                                 I.
yI la a jjI tnn goimi i
7                                                 e 8                                           l a  lu ef c
s x
s ci i al i 0                                           71S                                        )
0 e a h gg nnnt oi i i s
i..             6                                           7.     :                                  7 H                                                            1 S                                       1 2'                                                                                   /
s ieli at nt l
1                                               lP
:sipt cl ai s c a e nn uime i nnif gc o
.                                                                                                                                                          i
l a e e pl pl kHHOA.OUl s i i
a?
l I
,Qe
_ S HA11 C D 'l ! G1 e
l 1
2 6
e 0
t 3
aD 0
I.
7 e
8 lu l aef c i s ci al i 71S 0
)
i..
6 7.
7 1 S 1
H 2'
/
lP 1
i


        ,                                                    DOCKET NO: 50-315                 l
DOCKET NO:
    +
50-315 l
UNIT NAME: D.~C. Cook Unit 1 COMPLETED BY: J. L. St. Amand TELEPHONE: (616)'465-5901 DATE: April 9, 1987 PAGE: 1 of 1 l
UNIT NAME:
MONTHLY OPERATING ACTIVITIES - MARCH 1987 HIGHLIGHTS:                                                                   ,
D.~C. Cook Unit 1
+
COMPLETED BY:
J. L. St. Amand TELEPHONE:
(616)'465-5901 DATE:
April 9, 1987 PAGE:
1 of 1 l
l MONTHLY OPERATING ACTIVITIES - MARCH 1987 HIGHLIGHTS:
The reporting raeriod began with the Unit in Mode 1 at 90% power, the administrative limit to minimize steam generator tube degradation.
The reporting raeriod began with the Unit in Mode 1 at 90% power, the administrative limit to minimize steam generator tube degradation.
Power was reduced to 57% on March 7,1987, for feedpump maintenance, and was further reduced to 33% to repair a leak at the joint of the high pressure turbine 1st stage drain and the 2nd stage extraction.
Power was reduced to 57% on March 7,1987, for feedpump maintenance, and was further reduced to 33% to repair a leak at the joint of the high pressure turbine 1st stage drain and the 2nd stage extraction.
Following repairs, power was increased to 90% on March _9, 1987, where it remained until March 31, 1987, when the unit was placed on operating reserve with a power increase requested to 100%. The reporting period ended with the unit in Mode 1 at approximately 99% power, increasing to     i 100%.                                                                       3 Gross Electrical Generation for the month of March was 678,430 MWH.
Following repairs, power was increased to 90% on March _9, 1987, where it remained until March 31, 1987, when the unit was placed on operating reserve with a power increase requested to 100%. The reporting period ended with the unit in Mode 1 at approximately 99% power, increasing to i
100%.
3 Gross Electrical Generation for the month of March was 678,430 MWH.


==SUMMARY==
==SUMMARY==
 
l 3-6-87 At 2200, started decreasing power from 90% to 57% at 6%/hr.
l
!                    3-6-87   At 2200, started decreasing power from 90% to 57% at 6%/hr.
for main feedpump maintenance.
for main feedpump maintenance.
3-7-87   At 0730, stopped power reduction at 57%.
3-7-87 At 0730, stopped power reduction at 57%.
At 1330, continued decreasing power to 33% to allow repair of a steam leak at the intersection of the high pressure turbine 1st stage drain and the 2nd stage extraction.
At 1330, continued decreasing power to 33% to allow repair of a steam leak at the intersection of the high pressure turbine 1st stage drain and the 2nd stage extraction.
3-8-87   At 0240 stabilized at 33% power.
3-8-87 At 0240 stabilized at 33% power.
3-9-87   At 0135, began increasing power at 6% an hour.
3-9-87 At 0135, began increasing power at 6% an hour.
At 0415, stopped power increase at 48% for chemical hold point.
At 0415, stopped power increase at 48% for chemical hold point.
At 0520, continued increasing power.
At 0520, continued increasing power.
At 1740, stabilized power at 90%.
At 1740, stabilized power at 90%.
;                  3-31-87   At 1045, began increaeing power to 100% at 2% an hour due to system on operating reserve.                                       1 At 1445, held power at 98% to dampen negative flux shift.
3-31-87 At 1045, began increaeing power to 100% at 2% an hour due to system on operating reserve.
1 At 1445, held power at 98% to dampen negative flux shift.
l At 2148, continued power increase at approximately 2% an hour.
l At 2148, continued power increase at approximately 2% an hour.
L______-___--_-__.---_-___--
L______-___--_-__.---_-___--
Line 194: Line 315:
a a
a a
i l
i l
ll DOCKET NO. 50-215-UNIT NAME     D. C. Cook - Unit No. 1
l DOCKET NO.
(                                               DATE         _ April 9, 1987 l
50-215-UNIT NAME D. C. Cook - Unit No. 1
COMPLETED BY J. L. St. Amand TELEPHONE-     (616) 465-590J             l d
(
PAGE-         1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MARCH,1987                                     3 M-1   The Shaft Seal was found' leaking on the #2 Boric Acid Transfer Pump.
DATE
The pump was replaced, tested successfully for operability and returned to service.                                                   j{
_ April 9, 1987 l
COMPLETED BY J. L. St. Amand TELEPHONE-(616) 465-590J d
PAGE-1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MARCH,1987 3
M-1 The Shaft Seal was found' leaking on the #2 Boric Acid Transfer Pump.
The pump was replaced, tested successfully for operability and j{
returned to service.
4 I&C-1 Loop 1 T-Hot was alarming on the P-250 Saturation Margin (NTR-110).
4 I&C-1 Loop 1 T-Hot was alarming on the P-250 Saturation Margin (NTR-110).
The indicator instrument wire was found damaged, and the R/I module     l drifting. Replaced both, and calibrated before returning to             j service.                                                                 i j
The indicator instrument wire was found damaged, and the R/I module l
I&C-2 The Babcock & Wilcox Saturation Meter was indicating greater than       )
drifting. Replaced both, and calibrated before returning to j
15* F difference between the auctioneered high temperature and Loop     j 2 T-Hot indication. The R/I Converter (ITY-413A) was found to be         j defec     e. The converter was replaced, calibrated, and proper         L operi . , of the saturation meter verified prior to returning to ser    .
service.
                                                                                          )
i j
I&C-3 The Pressure Switch (CPS-101) on the North Hotwell Pump was found broken (linkage disconnected). The mercoid was replaced, calibrated, and returned to service.                                     j i
I&C-2 The Babcock & Wilcox Saturation Meter was indicating greater than
,                                                                                          1
)
<                                                                                          1 J
15* F difference between the auctioneered high temperature and Loop j
l
2 T-Hot indication. The R/I Converter (ITY-413A) was found to be j
!                                                                                          1 i
defec e.
The converter was replaced, calibrated, and proper L
operi., of the saturation meter verified prior to returning to
)
ser I&C-3 The Pressure Switch (CPS-101) on the North Hotwell Pump was found broken (linkage disconnected). The mercoid was replaced, calibrated, and returned to service.
j i
1 1
l J
1 i
i I
i I
i                                                                                           .
i 1
1
\\
                                                                                            \
\\
\
l c
l c


    .                                                                                                      A9cS 7
A9cS 1
1 A    '**a c).Yj b"*"r;*LJN0lANAJLMlCHlGAN_ ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106                                               .
7 c).Yj A
(616) 465-5901
'**a b"*"r;*LJN0lANAJLMlCHlGAN_ ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901
                                                                                                                  ]
]
I April 10, 1987 t
I April 10, 1987 t
I                                                                                                                 i Director, Office Of Management Information                                                           j and Program Control i
I i
U. S. Nuclear Rt.gulatory Commission Washington, D. C. 20555 l
Director, Office Of Management Information j
and Program Control i
U. S. Nuclear Rt.gulatory Commission Washington, D. C.
20555 l
Gentlemen:
Gentlemen:
1 l
1 l
l           Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the Month of l
l Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the Month of l
March, 1967 is submitted.
March, 1967 is submitted.
Sincerely, N
Sincerely, N
ff W. G. Smith, Jr.
ff W. G. Smith, Jr.
Plant Manager i
Plant Manager i
WGS/j d                                                                                             I cc:     J. E. Dolan M. P. Alexich R. W. Jurgensen R. O. Bruggee R. C. Callen C. A. Erikson D. W. Paul D. R. Hahn J. J. Markowsky E. A. Morse PNSRC File INP0 Records Center ANI Nuclear Engineering Department T. R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake I
WGS/j d I
9"\\
cc:
                                                                                                            \
J. E. Dolan M. P. Alexich R. W. Jurgensen R. O. Bruggee R. C. Callen C. A. Erikson D. W. Paul D. R. Hahn J. J. Markowsky E. A. Morse PNSRC File INP0 Records Center ANI Nuclear Engineering Department T. R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake 9"\\\\
I
\\
_}}
_}}

Latest revision as of 06:46, 2 December 2024

Monthly Operating Rept for Mar 1987
ML20237K629
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/31/1987
From: Climer, Will Smith, St Amand J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC
References
NUDOCS 8708190341
Download: ML20237K629 (6)


Text

'

I:

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 4/3/87 l

COMPLETED BY CLIMER l

TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C. Cook Unit 1

2. Reporting Period MAR 87 l notes
3. Licensed Thermal Power (MWt) 3250 l l

4.

Name Plate Rating (Gross MWe) 1152 l l

S. Design Electrical Rating (Net MWe)-

1030 l l

6. Maximum Dependable Capacity (GROSS MWe) 1056 l l:
7. Maximum Dependable Capacity (Net MWe) 1020 --- ---- --------------

l

8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since I

{

Last Report Give Reasons i

{

I l

9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11 Hours in Reporting Period 744.0 2160.0 107352.0 4

12. No. of Hrs. Reactor Was Critical 744.0 2160.0 77985.8 i
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Lire 744.0 2160.0 76478.6
15. Unit Recerve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2099286 6161811 222794319
17. Gross Elect. Energy Gen. (MWH) 678430 1998540 72894410
18. Net Elect. Energy Gen. (MWH) 651027 1918993 70116224
19. Unit Service Factor 100.0 100.0 72.6
20. Unit Availability Factor 100.0 100.0
72. 6 c pacity Factor (MDC Net) 85.8 87.1 65.3 l
21. Unit a
22. linit Capacity Factor (DER Net) 95.0 36.3 63.0
23. Unit Forced Outage Rate 0.0 0.0 8.3 1
24. Shutdowns Scheduled over Next Six Months (Type,Date.and Duration)'

l Refueling outage to sta rt July 87.

Expected duration 45 days

. Shut dpyn._d.ye_ t_o_ lUgttlr.imny _.__S.yStesr-- Leak. Rate._on 4 D

_EskJ.eturn.to service

25. If shut Down At End of keport Period. Estimated Date of Startup:

on 4-18-87

--y.---.

.6. units in Test o,tatus (:crior o Commercial Ope r a r, ion ).

F<:reast Acaleved l

INITIAL CRITICALI /

INITIAL ELECThD ITY COMMERCIAL OFERAT ON

__ 6 f N.

,L

$ggei;gggg g38o 3

sr 8

/

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 4/3/87 COMPLETED BY CLIMER TELEPHONE 616-465-5901 MONTH MAR 87 j

AVERAGE DAILY AVERAGE DAILY l

DAY POWER LEVEL DAY POWER LEVEL 1

917 17 915 2

916 18 916 3

917 19 918 1

4 917 20 916 5

917 21 918 6

913 22 916 7

521 23 917 8

274 24 916 9

670 25 916 l

10 911 26 916 11 913 27 915 12 913 28 915 13 914 29 913 l

14 915 30 914 l

15 914 31 950 i

16 915 l

m.

_..._._._____..____.______._.-__a

d n1 a0 on d

G m9 t ip e

A5 ams s

t t

%Muu a

t i

g

. 5 3

po oer I

t6 3 t i

t re N

I S4 sd r cw e e 7

oaea d no el c.

s si a

8

.)

tE ev eip m.

t nI L_6 6

f n

m 1

d e r

rre s D1etI S

a i

9 i

o ehhi uev nl 1 '

c.

ct t a t wi in n.l 4JT e

v nl n

i n

u op eot is mi i

l e

d ob e rpa ne e

u.

I Yg i

s i

i ni et r

r ue n S

c I

I t n t

e m

a c i r

n ert i c i

p G n. et t A

o is

-s Dg Cne c eaos r os i pS I ts I

I scetk et i i c I :I nt g

I I

&e anl a

wcn I

i I g i i yt lu l

cA n wacd e ai9 lops n1 l

t s

- g e6 i

i e

n nl sem0 f

i g

s rp s

e reoa prd3

s nnv1 s

v 1 fi::I 0

I I

t j a

s et t g

m a0 I

k f

P O

wn

,n ud 7

C oi

,si pn%8 5

l P aprp a0 mmei d

9 n r

usp ee o

otP n ece ti em fiht cmdd a vti arene er m

eeeot h eoi R pF cs T stl SN e

Z n

O Z

.a l

is u l

, 3O Z

n t

a&l l

a tr 7

Z g

Z ci m p

i 8

c lD 9

Z St i al l

tl 1

m (s a a l

H a nn uei h

nnns i a a nil t

c

  • , yO t

I l l sekkAO r

Z I

W a

[gn Z

l

- l kI 21 -

O M

i P

l l

).

i l

N i

A N

l S

f c

e e

t N

k c

e s i

o ne A'

t s

e u W

c v p

/

t O

i l c

N m

t c!

o l

t I

I i

l i

r t

ta l

i n

l H

l i

m iS I

a T

e 6

m "t

I I

N

ksg,

)

l 4

in e

t l

s n

e a

,j l

i i c

a p

c l

a ni p

L x

%J B

s inl (t

1 t

1 ei e t

s i g luT isi su) s n i f

n
mo e nee i t iv1 a

I e i ai lp s

l c

yI la a jjI tnn goimi i

s x

0 e a h gg nnnt oi i i s

s ieli at nt l

sipt cl ai s c a e nn uime i nnif gc o

l a e e pl pl kHHOA.OUl s i i

a?

l I

,Qe

_ S HA11 C D 'l ! G1 e

l 1

2 6

e 0

t 3

aD 0

I.

7 e

8 lu l aef c i s ci al i 71S 0

)

i..

6 7.

7 1 S 1

H 2'

/

lP 1

i

DOCKET NO:

50-315 l

UNIT NAME:

D.~C. Cook Unit 1

+

COMPLETED BY:

J. L. St. Amand TELEPHONE:

(616)'465-5901 DATE:

April 9, 1987 PAGE:

1 of 1 l

l MONTHLY OPERATING ACTIVITIES - MARCH 1987 HIGHLIGHTS:

The reporting raeriod began with the Unit in Mode 1 at 90% power, the administrative limit to minimize steam generator tube degradation.

Power was reduced to 57% on March 7,1987, for feedpump maintenance, and was further reduced to 33% to repair a leak at the joint of the high pressure turbine 1st stage drain and the 2nd stage extraction.

Following repairs, power was increased to 90% on March _9, 1987, where it remained until March 31, 1987, when the unit was placed on operating reserve with a power increase requested to 100%. The reporting period ended with the unit in Mode 1 at approximately 99% power, increasing to i

100%.

3 Gross Electrical Generation for the month of March was 678,430 MWH.

SUMMARY

l 3-6-87 At 2200, started decreasing power from 90% to 57% at 6%/hr.

for main feedpump maintenance.

3-7-87 At 0730, stopped power reduction at 57%.

At 1330, continued decreasing power to 33% to allow repair of a steam leak at the intersection of the high pressure turbine 1st stage drain and the 2nd stage extraction.

3-8-87 At 0240 stabilized at 33% power.

3-9-87 At 0135, began increasing power at 6% an hour.

At 0415, stopped power increase at 48% for chemical hold point.

At 0520, continued increasing power.

At 1740, stabilized power at 90%.

3-31-87 At 1045, began increaeing power to 100% at 2% an hour due to system on operating reserve.

1 At 1445, held power at 98% to dampen negative flux shift.

l At 2148, continued power increase at approximately 2% an hour.

L______-___--_-__.---_-___--

a a

i l

l DOCKET NO.

50-215-UNIT NAME D. C. Cook - Unit No. 1

(

DATE

_ April 9, 1987 l

COMPLETED BY J. L. St. Amand TELEPHONE-(616) 465-590J d

PAGE-1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MARCH,1987 3

M-1 The Shaft Seal was found' leaking on the #2 Boric Acid Transfer Pump.

The pump was replaced, tested successfully for operability and j{

returned to service.

4 I&C-1 Loop 1 T-Hot was alarming on the P-250 Saturation Margin (NTR-110).

The indicator instrument wire was found damaged, and the R/I module l

drifting. Replaced both, and calibrated before returning to j

service.

i j

I&C-2 The Babcock & Wilcox Saturation Meter was indicating greater than

)

15* F difference between the auctioneered high temperature and Loop j

2 T-Hot indication. The R/I Converter (ITY-413A) was found to be j

defec e.

The converter was replaced, calibrated, and proper L

operi., of the saturation meter verified prior to returning to

)

ser I&C-3 The Pressure Switch (CPS-101) on the North Hotwell Pump was found broken (linkage disconnected). The mercoid was replaced, calibrated, and returned to service.

j i

1 1

l J

1 i

i I

i 1

\\

\\

l c

A9cS 1

7 c).Yj A

'**a b"*"r;*LJN0lANAJLMlCHlGAN_ ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901

]

I April 10, 1987 t

I i

Director, Office Of Management Information j

and Program Control i

U. S. Nuclear Rt.gulatory Commission Washington, D. C.

20555 l

Gentlemen:

1 l

l Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the Month of l

March, 1967 is submitted.

Sincerely, N

ff W. G. Smith, Jr.

Plant Manager i

WGS/j d I

cc:

J. E. Dolan M. P. Alexich R. W. Jurgensen R. O. Bruggee R. C. Callen C. A. Erikson D. W. Paul D. R. Hahn J. J. Markowsky E. A. Morse PNSRC File INP0 Records Center ANI Nuclear Engineering Department T. R. Stephens NRC Region III B. L. Jorgensen S. L. Hall D. A. Timberlake 9"\\\\

I

\\

_