In Reply Refer To: | |||
Docket: | |||
50-267/86-20 | |||
AUG 2 01986 | |||
Public Service Company of Colorado | |||
ATTN: | |||
R. O. Williams, Vice President | |||
Nuclear Operations | |||
P. O. Box 840 | |||
Denver, Coloradu | |||
80201 | |||
Gentlemen: | |||
This refers to the inspection conducted by Messrs. R. E. Farrell and P. Michuad | |||
of this office during the period June 16 through August 15, 1986, of activities | |||
authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear | |||
Generating Station, and to the discussion of our findings with Mr. J. W. Gahm | |||
and other members of your staff at the conclusion of the inspection. | |||
Areas examined during the inspection included operational safety verification, | |||
surveillances, engineered safety features, maintenance, security, and regional | |||
peaking factor. *Within these areas, the inspection consisted of selective | |||
examinatinn of procedures and representative records, interviews with personnel | |||
and observations by the inspector. | |||
The inspection findings are documented in | |||
the enclosed inspection report. | |||
Within the scope of the inspection, no violations or deviations were identified. | |||
Should you have any questions concerning this inspection, we will be pleased to | |||
discuss them with you. | |||
Sincerely, | |||
J. E. Gagliardo, Chief | |||
Reactor Projects Branch | |||
Enclosu | |||
(see n xt age) {f | |||
f | |||
- | |||
,/ | |||
4i SI | |||
RPB | |||
C: RP 1/A | |||
C:RPB | |||
e' e' | |||
arrell/cg | |||
PMic ud | |||
JP)dudon | |||
JEGagli | |||
do | |||
g66 | |||
[/)j86 | |||
y/bf/ | |||
86 | |||
0609030229 860029 | |||
PDR | |||
ADOCK ObOOO267 | |||
O{s | |||
PDR | |||
G | |||
9 | |||
g | |||
-- | |||
; | , | ||
; | |||
, . , | |||
l | l | ||
t | t | ||
l | l | ||
Public Service Company of Colorado | |||
-2- | |||
; | ; | ||
l | l | ||
Enclosure: | |||
Appendix - NRC Inspection Report | |||
i | i | ||
50-267/86-20 | |||
cc'w/ enclosure: | |||
J. WJ Gahm, Manager, Nuclear | |||
i | i | ||
Production Division | |||
l' | |||
l' | Fort St. Vrain Nuclear Generating Station | ||
16805 WCR 19 1/2 | |||
[ | [ | ||
l- | Platteville, Colorado | ||
80651 | |||
! | l- | ||
L. Singleton, Manager, Quality | |||
Assurance Division | |||
l | ! | ||
! | (Same Address) | ||
Colorado Radiation Control Program Director | |||
bec distrib by RIV: | |||
l | |||
*RPB- | |||
R. D. Martin, RA | |||
! | |||
* Resident Inspector | |||
DRSP | |||
*Section Chief (RPB/A) | |||
*RIV Flie | |||
I | I | ||
*Section Chief (RSB/ES) | |||
*R&SPB | |||
l | *RSTS OPERATOR | ||
* MIS System | |||
l | |||
*RSB | |||
. | |||
; | *w/766 | ||
, | |||
l | |||
' | |||
. | |||
; | |||
. | |||
> | |||
A | |||
I | |||
4 | |||
. | |||
$ | |||
4 | |||
! | ! | ||
' | |||
' | |||
l | l | ||
t | |||
; | ; | ||
. | |||
. | |||
., | |||
{ | |||
' | |||
, | |||
i | i | ||
i | i | ||
! | ! | ||
l | l | ||
l | l | ||
u | |||
}} | }} | ||
Latest revision as of 04:21, 4 December 2024
| ML20212P658 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/29/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20212P660 | List: |
| References | |
| NUDOCS 8609030225 | |
| Download: ML20212P658 (2) | |
See also: IR 05000267/1986020
Text
i
-
'
In Reply Refer To:
Docket:
50-267/86-20
AUG 2 01986
Public Service Company of Colorado
ATTN:
R. O. Williams, Vice President
Nuclear Operations
P. O. Box 840
Denver, Coloradu
80201
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Farrell and P. Michuad
of this office during the period June 16 through August 15, 1986, of activities
authorized by NRC Operating License DPR-34 for Fort St. Vrain Nuclear
Generating Station, and to the discussion of our findings with Mr. J. W. Gahm
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
surveillances, engineered safety features, maintenance, security, and regional
peaking factor. *Within these areas, the inspection consisted of selective
examinatinn of procedures and representative records, interviews with personnel
and observations by the inspector.
The inspection findings are documented in
the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosu
(see n xt age) {f
f
-
,/
4i SI
RPB
C: RP 1/A
C:RPB
e' e'
arrell/cg
PMic ud
JP)dudon
JEGagli
do
g66
[/)j86
y/bf/
86
0609030229 860029
ADOCK ObOOO267
O{s
G
9
g
--
,
, . ,
l
t
l
Public Service Company of Colorado
-2-
l
Enclosure:
Appendix - NRC Inspection Report
i
50-267/86-20
cc'w/ enclosure:
J. WJ Gahm, Manager, Nuclear
i
Production Division
l'
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
[
Platteville, Colorado
80651
l-
L. Singleton, Manager, Quality
Assurance Division
!
(Same Address)
Colorado Radiation Control Program Director
bec distrib by RIV:
l
- RPB-
R. D. Martin, RA
!
- Resident Inspector
DRSP
- Section Chief (RPB/A)
- RIV Flie
I
- Section Chief (RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
l
- RSB
.
- w/766
,
l
'
.
.
>
A
I
4
.
$
4
!
'
'
l
t
.
.
.,
{
'
,
i
i
!
l
l
u