ML20209A857: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
#REDIRECT [[IR 05000327/1986017]]
{{Adams
| number = ML20209A857
| issue date = 08/22/1986
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/86-17 & 50-328/86-17
| author name = Zech G
| author affiliation = NRC - TVA OVERSIGHT GROUP
| addressee name = White S
| addressee affiliation = TENNESSEE VALLEY AUTHORITY
| docket = 05000327, 05000328
| license number =
| contact person =
| document report number = NUDOCS 8609080122
| title reference date = 05-28-1986
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000327/1986017]]
 
=Text=
{{#Wiki_filter:,                                                                                          ,
                                                                                    MEkCV
                                                                                    %
                                                August 22, 1986
                                                                                          #
          Tennessee Valley Authority
          ATTN: Mr. S. A. White
                  Manager of Nuclear Power
          6N 38A Lookout Place
          1101 Market Street
          Chattanooga, TN 37402-2801
          Gentlenen:
          SUBJECT:    NRC INSPECTION REPORT NOS. 50-327/86-17 AND 50-328/86-17
          Thank you for your response of May 28, 1986, to our Inspection Report Numbers
          50-327/86-17 and 50-328/86-17, dated April 28, 1986, for your Sequoyah Nuclear
          Plant. We have evaluated your responses to the NRC's statements of prestartup
          training commitments and find that they are acceptable.
          We appreciate your cooperation in this matter.
                                                    Sincerely,
                                                      (original signed by)
                                                      Gary G. Zech, Director
                                                    TVA Projects
          cc:  H. L. Abercrombie, Sequoyah
                    Nucleai Plant Site Director
        -      P. R. Wallace, Plant Manager
                K. W. Whitt, Director, Nuclear
                  Managers Review Group
                D. L. Williams, Jr., Supervisor
                  Licensing Section
                G. B. Kirk, Compliance Staff Supervisor
                J. E. Wills, Project Engineer
          bec: J. N. Grace
                H. R. Denton, NRR
                H. L. Thompson, NRR
                J. M. Taylor, IE
                B. B. Hayes, 01
                S. R. Connelly, DIA
                G. G. Zech
                _Sp.he' C.\'i we. .
    ,,          NRC Resident Inspector
    4          Document Control Desk
      '
                State of Tennessee
'
          RII                    RI                        RII                  RII
        SMBRd Ison:aw
                                                                                                ;
                                  CA  an                    Gibson              j.ise
!          08/ /86                08/  86                    /      86      / -08 y 6
                            8609090122 860822-
                              DR  ADOCK 0500(    7                                  pro    0
                        __ _            --                    _ - _
}}

Revision as of 11:17, 5 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/86-17 & 50-328/86-17
ML20209A857
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/22/1986
From: Zech G
NRC - TVA OVERSIGHT GROUP
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8609080122
Download: ML20209A857 (1)


See also: IR 05000327/1986017

Text

, ,

MEkCV

%

August 22, 1986

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlenen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-17 AND 50-328/86-17

Thank you for your response of May 28, 1986, to our Inspection Report Numbers

50-327/86-17 and 50-328/86-17, dated April 28, 1986, for your Sequoyah Nuclear

Plant. We have evaluated your responses to the NRC's statements of prestartup

training commitments and find that they are acceptable.

We appreciate your cooperation in this matter.

Sincerely,

(original signed by)

Gary G. Zech, Director

TVA Projects

cc: H. L. Abercrombie, Sequoyah

Nucleai Plant Site Director

- P. R. Wallace, Plant Manager

K. W. Whitt, Director, Nuclear

Managers Review Group

D. L. Williams, Jr., Supervisor

Licensing Section

G. B. Kirk, Compliance Staff Supervisor

J. E. Wills, Project Engineer

bec: J. N. Grace

H. R. Denton, NRR

H. L. Thompson, NRR

J. M. Taylor, IE

B. B. Hayes, 01

S. R. Connelly, DIA

G. G. Zech

_Sp.he' C.\'i we. .

,, NRC Resident Inspector

4 Document Control Desk

'

State of Tennessee

'

RII RI RII RII

SMBRd Ison:aw

CA an Gibson j.ise

! 08/ /86 08/ 86 / 86 / -08 y 6

8609090122 860822-

DR ADOCK 0500( 7 pro 0

__ _ -- _ - _