ML20209A877: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ . _ _ -
{{#Wiki_filter:_. _ _ -
POST OFFICE BOX 69, YORM, PENNSYLVANIA 17405 717 764-5959 CUSTOM CONTROL PANELS April 21, 1987 Mr. J. Taylor, Director Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, DC       20555
POST OFFICE BOX 69, YORM, PENNSYLVANIA 17405 717 764-5959 CUSTOM CONTROL PANELS April 21, 1987 Mr.
J.
Taylor, Director Inspection & Enforcement U.S.
Nuclear Regulatory Commission Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Line 24: Line 27:


==Dear Mr. Taylor:==
==Dear Mr. Taylor:==
 
This is a preliminary notification pursuant to the reporting requirements of 10 CFR Part 21 that selected welds were performed on alternate shutdown panels supplied to Duane Arnold Nuclear Power Plant without the benefit of qualified Weld Procedure Specifications.
This is a preliminary notification pursuant to the reporting requirements of 10 CFR Part 21 that selected welds were performed on alternate shutdown panels supplied to Duane Arnold Nuclear Power Plant without the benefit of qualified Weld Procedure Specifications. The structural integrity of the welds are not deficient; only the qualifications.
The structural integrity of the welds are not deficient; only the qualifications.
We are investigating the matter and are preparing the qualifications. We will notify the results of our investigations as soon as they are complete and inform other customers if they are affected.
We are investigating the matter and are preparing the qualifications.
We will notify the results of our investigations as soon as they are complete and inform other customers if they are affected.
Very truly yours, l
Very truly yours, l
                  . E. Lynch Acting Q.A. Manager PEL/pkh l
E.
f $l'l 8704280300 870421                                                           b O
Lynch Acting Q.A. Manager PEL/pkh l
{DR ADOCK 05000331 PDR i
f l'l 8704280300 870421 b O
l _ _ _ . _                          _                  _}}
{DR ADOCK 05000331 i
PDR l
_}}

Latest revision as of 18:51, 6 December 2024

Part 21 Rept Re Selected Welds Performed on Alternate Shutdown Panels W/O Benefit of Qualified Weld Procedure Specs.Matter Under Investigation & Qualifications Being Prepared
ML20209A877
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/21/1987
From: Lynch P
FRANK ELECTRIC
To:
NRC
References
REF-PT21-87-099-000 PT21-87-099-000, PT21-87-99, NUDOCS 8704280300
Download: ML20209A877 (1)


Text

_. _ _ -

POST OFFICE BOX 69, YORM, PENNSYLVANIA 17405 717 764-5959 CUSTOM CONTROL PANELS April 21, 1987 Mr.

J.

Taylor, Director Inspection & Enforcement U.S.

Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

10 CFR Part 21 Notification

Dear Mr. Taylor:

This is a preliminary notification pursuant to the reporting requirements of 10 CFR Part 21 that selected welds were performed on alternate shutdown panels supplied to Duane Arnold Nuclear Power Plant without the benefit of qualified Weld Procedure Specifications.

The structural integrity of the welds are not deficient; only the qualifications.

We are investigating the matter and are preparing the qualifications.

We will notify the results of our investigations as soon as they are complete and inform other customers if they are affected.

Very truly yours, l

E.

Lynch Acting Q.A. Manager PEL/pkh l

f l'l 8704280300 870421 b O

{DR ADOCK 05000331 i

PDR l

_