OPERATING DATA REPORT DOCKET NO. _50-369 DATE l-14-83 CO)1PLETED BY             J. A. Reavis
OPERATING DATA REPORT DOCKET NO. _50-369 DATE l-14-83 CO)1PLETED BY J. A. Reavis TELEPil0NE 704-17b7567 OPERATING STATUS Notes
                                                    -                                                                      TELEPil0NE 704-17b7567 OPERATING STATUS McGuire Unit 1                                                Notes
* NOTE: Nameplate Rating McGuire Unit 1
* NOTE: Nameplate Rating
: 1. Unit Name:
: 1. Unit Name:
(Gross MWe) calculated as
(Gross MWe) calculated as
: 2. Reporting Period: . December 1.19R2 - nocomhar 11 1982                       '
: 2. Reporting Period:. December 1.19R2 - nocomhar 11 1982 3411 1450.000 MVA x.90 power
1450.000 MVA x .90 power 3411
: 3. Licensed Thennal Power istWti:
: 3. Licensed Thennal Power istWti:                                                           factor per Page 111,
factor per Page 111, 1305*
  !                4. Nameplate Itating (Grow .slWe):           1305*                                          NUREG-0020.
: 4. Nameplate Itating (Grow.slWe):
: 5. Design Electrical Ratina,(Net .\lWel:       1180
NUREG-0020.
1180
: 5. Design Electrical Ratina,(Net.\\lWel:
: 6. Staximom Deper ' '' Capacity (Gross 31We):
: 6. Staximom Deper ' '' Capacity (Gross 31We):
: 7. Alasimum Depencable Capacity INet alwe l.                 1180 S. If Changes Occur in Capacity Ratinp titems Number 3 Through 7) Since Last Report.Gise Reasons:
1180
None
: 7. Alasimum Depencable Capacity INet alw l.
: 9. Power Level To Which Restricted. If Any (Net alwe):                       None
e S. If Changes Occur in Capacity Ratinp titems Number 3 Through 7) Since Last Report.Gise Reasons:
None None
: 9. Power Level To Which Restricted. If Any (Net alwe):
: 10. Reasons For Restrictions. lf Any:
: 10. Reasons For Restrictions. lf Any:
This alonth                 Yr..to Date                 Cumulative 8 760.0                     9 504.0
This alonth Yr..to Date Cumulative 744.0 8 760.0 9 504.0
: 11. Ilours in Reporting Pened                                     744.0
: 11. Ilours in Reporting Pened
: 12. Number Of itemrs Resetor Was Critical                         740.0                       7 092.5                     7 118.1
: 12. Number Of itemrs Resetor Was Critical 740.0 7 092.5 7 118.1
;                  13. Reactor Reserve Shutdown llours
: 13. Reactor Reserve Shutdown llours 738.0 7 046.6 7 092.3
;,                14. Ilours Generator On.Line                                      738.0                       7 046.6                     7 092.3 l                 15. Unit Reserse Shutdown ilours
: 14. Ilours Generator On.Line l
: 16. Gross Thermal Energy Generated (31Wil)                    1 265 980                   13 417 463                 13 502 418                   .
: 15. Unit Reserse Shutdown ilours 1 265 980 13 417 463 13 502 418
: 17. Gross Electrical Energy Generated l>!WH)                   433       363     ,_,
: 16. Gross Thermal Energy Generated (31Wil) 433 363 4 598 155 4 626 591
4 598 155                   4 626 591
: 17. Gross Electrical Energy Generated l>!WH) 405 269 4 302 267 4 321 323
: 13. Net Electrical Energy Generated (SIWil)                     405 269                   4 302 267                   4 321 323
: 13. Net Electrical Energy Generated (SIWil) 99.2 80.4 74.6
: 19. Unit Service Factor                                          99.2                           80.4                         74.6
: 19. Unit Service Factor 99.2 80.4 74.6
: 20. Unit Availability Factor                                     99.2                           80.4                         74.6
: 20. Unit Availability Factor
: 21. Unit Capacity Factor (Using SIDC Nett                         46.2                           41.6                         38.5
: 21. Unit Capacity Factor (Using SIDC Nett 46.2 41.6 38.5 46.2 41.6 38.5
: 22. Umt Capacity Factor IUsing DER Net)                           46.2                            41.6                          38.5
: 22. Umt Capacity Factor IUsing DER Net)
: 23. Unit Forced Outage Rate                                         0.8                         16.0                         2 2. t.
: 23. Unit Forced Outage Rate 0.8 16.0 2 2. t.
: 24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date.and Duration of Eacht:                                                                     l Steam Generator Modification - January 21, 1983 - 11 Weeks 2.i. If Shut Down At End Of Report INriod. Estimated Date of Startup:
: 24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date.and Duration of Eacht:
: 26. Units In Test Status (Prior to Commercul Operation 1:                                     Forecast                   Achiesed INITI AL CRITICALITY INITI A L 1.LLT l RICliY                                                                           _ _ _
l Steam Generator Modification - January 21, 1983 - 11 Weeks 2.i. If Shut Down At End Of Report INriod. Estimated Date of Startup:
CO\lNil RCIT L OPER A IlON 8301180386 830114 (9/771
: 26. Units In Test Status (Prior to Commercul Operation 1:
{DRADOCK 05000369           PDR
Forecast Achiesed INITI AL CRITICALITY INITI A L 1.LLT l RICliY CO\\lNil RCIT L OPER A IlON 8301180386 830114 (9/771
{DRADOCK 05000369 PDR


DOCKET NO.        50-369 UNITSilUTDOWNS AND POWER REI)UCT10NS UNIT NAstE McGuire 1           .
50-369 UNITSilUTDOWNS AND POWER REI)UCT10NS DOCKET NO.
DATE     l-14-83 COMPLETED HY        J. A. Reavis REPORT Af 0NTl! December. 1962                     TELEPIIONE -
UNIT NAstE McGuire 1 DATE l-14-83 J. A. Reavis REPORT Af 0NTl! December. 1962 COMPLETED HY TELEPIIONE -
w.
w.
                            ,      .5 g     3-           E       Licensee     ,E-r,         ,                Cause & Corrective No.         Date H
.5 g 3-E Licensee
                            ;.-    3g         j     ,j g c2       Even:       3y         eT                       Action en yE       e2     5 g?, g     Report =     (4 0       8' u
,E-r, Cause & Corrective No.
Prevent Recurrence g
Date 3g j
C 16-P         82-12-01     F       --
,j g c2 Even:
H       --
3y eT Action en yE e2 5 g?, g Report =
CB       HTEXCH   Limited to 50% power while awaiting modification to steam generator design.
(4 0 8'
21           82-12-22     F     6.02     A         1                     CJ       VALVEX   RCS leakage over 1 GPM due to partially open vent valve on BIT line. Valve shut and pipe cap installed.
Prevent Recurrence H
I                       2                                                   3                                 4 F: Forced             Reason:                                             Methigt:                           Exhibit G -Instructions S Schedaled           A Equipment Failure (Explain)                       1 Manual                           for Preparation of Data B Maintenance or Test                               2 Manual Seram.                   Entry Sheets for Licensee C Refueling             .
g u
1 Automatic Scram.               Event Report ILER) File INtIREG.
C 16-P 82-12-01 F
D Regulatory Restrietion                             4-Ot her (Explain)                 01bl)
H CB HTEXCH Limited to 50% power while awaiting modification to steam generator design.
E Ope.stor Training & License Examination F Administrative                                                                   S G-Opesational Error (Explain) -                                 .                      Exhibit I-Same Sousee                  .
21 82-12-22 F
19/77)                   Il Other IExplain)                                                         *
6.02 A
                                                                                                                                                    ..v
1 CJ VALVEX RCS leakage over 1 GPM due to partially open vent valve on BIT line. Valve shut and pipe cap installed.
I 2
3 4
F: Forced Reason:
Methigt:
Exhibit G -Instructions S Schedaled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Seram.
Entry Sheets for Licensee C Refueling 1 Automatic Scram.
Event Report ILER) File INtIREG.
D Regulatory Restrietion 4-Ot her (Explain) 01bl)
E Ope.stor Training & License Examination F Administrative S
G-Opesational Error (Explain) -
19/77)
Il Other IExplain)
Exhibit I-Same Sousee
..v


DOCKET NO.       50-369 UNIT McGu b 1 1-14-83 DATE AVERAGE DAILY UNIT POWER LEVEL December,1982 MONTil AVERAGE D AILY POWER LEVEL                           AVERAGE D AILY POWER LEVEL DAY                 (MWe net)                       DAY                   (MWe. net)           ,
DOCKET NO.
558                             17               557 1
50-369 UNIT McGu b 1 1-14-83 DATE AVERAGE DAILY UNIT POWER LEVEL MONTil December,1982 AVERAGE D AILY POWER LEVEL AVERAGE D AILY POWER LEVEL DAY (MWe net)
557                                               558 2                                                   18 556                             19               556 3
DAY (MWe. net) 558 17 557 1
560                                               555 4                                                   20 SER                             21               556 5
557 558 2
554                             22               345                                ,
18 556 19 556 3
6 543                             23               559 7
555 560 20 4
553                               24               557 8
5 SER 21 556 345 554 22 6
556                               25               523 9
543 23 559 7
                      ' 554                               26             478 10 554                                               557 11                                                   27 551                               28               557 12 553                                               556 13                                                   29 553                             30               550 14 553                               31             555 15 556 16 DAILY UNrr POWER LEVEL FORst INSTRlRTIONS On this fonn, hst ths .iverare d.iity unit power lesel in M'Ne-net for each day m the reporting n.onth.
8 553 24 557 556 25 523 9
' 554 26 478 10 557 554 27 11 551 28 557 12 556 553 29 13 14 553 30 550 555 553 31 15 556 16 DAILY UNrr POWER LEVEL FORst INSTRlRTIONS On this fonn, hst ths.iverare d.iity unit power lesel in M'Ne-net for each day m the reporting n.onth.
Compute to the ne.irest w nole megawatt.
Compute to the ne.irest w nole megawatt.
These figures will I e used to plot 2 graph l'or each reportint; month. Note that by using ma.timun.
These figures will I e used to plot 2 graph l'or each reportint; month. Note that by using ma.timun.
                                                                                      ..s easions when the dady dependable ccpacit/ lor the net electrical ratin: of the unit thers: may be average power levet enceds the Itm kne f or the restristed power lesel knel, in such c.ises, the average daily umt power output sheet should be footnoted to (splam the app.uent anomaly.
dependable ccpacit/ lor the net electrical ratin: of the unit thers: may be..s easions when the dady average power levet enceds the Itm kne f or the restristed power lesel knel, in such c.ises, the average daily umt power output sheet should be footnoted to (splam the app.uent anomaly.


DOCKET NO:     50-369 UNIT:     McGuire 1 DATE:     1/14/83 6
DOCKET NO:
NARRATIVE SU) DIARY Month:     December, 1982 __
50-369 UNIT:
McGuire 1 DATE:
1/14/83 6
NARRATIVE SU) DIARY Month:
December, 1982 __
McGuire Unit 1 entered the month limited to 50% power until modifications have been completed on the steam generator.
McGuire Unit 1 entered the month limited to 50% power until modifications have been completed on the steam generator.
The unit was manually shutdown on December 22 in order to identify and repair a reactor coplant leak of over 1 GP.M through a partially open vent valve on a BIT line. The valve was shut and a pipe cap installed. The unit returned to service later the same day.
The unit was manually shutdown on December 22 in order to identify and repair a reactor coplant leak of over 1 GP.M through a partially open vent valve on a BIT line.
The valve was shut and a pipe cap installed. The unit returned to service later the same day.
Power was reduced on December 25 and 26 in order to reach system minimum load.
Power was reduced on December 25 and 26 in order to reach system minimum load.
McGuire Unit 1 operated through the end of the year at 50% power.
McGuire Unit 1 operated through the end of the year at 50% power.
,                                                                                          i A
i A
B V
B V
e
e
                                                                                                \
\\
  ,,,                                                                                          l l
e
e


MONTHLY REFUELING INFORMATION REQbTST
MONTHLY REFUELING INFORMATION REQbTST McGuire Unit 1 l.
: l.             Facility name:           McGuire Unit 1                                                                  ,
Facility name:
: 2.             Scheduled next refueling shutdown:                   January 1984                                       ,
2.
: 3.             Scheduled restart following refueling:                                                                   .
Scheduled next refueling shutdown:
: 4.           Will refueling or recumption of operation thereaf ter require a technical specification change or other license amendment?                                   N/A           .
January 1984 3.
If yes, what will these be?
Scheduled restart following refueling:
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?                                           N/A   .
4.
: 5.            Schedried date(s) for submitting proposed licensing action and supporting information:             N/A                                                                             .
Will refueling or recumption of operation thereaf ter require a technical specification change or other license amendment?
: 6.            Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).                             N/A 4
N/A If yes, what will these be?
: 7.           Nunber of fuel assemblies (a) in the core:                             193                 .
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
(b) in the spent fuel pool:                         27     .          )
N/A 5.
: 8.           Present licensed fuel pe,o1 capacity:                             500                                     .
Schedried date(s) for submitting proposed licensing action and supporting information:
Size of requested or planned increase:                                                                     .
N/A 6.
: 9.           Projected date of last refueling which can be accommodated by present licensed capacity:                                                                                       .
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Date:        January 14, 1983 DUKE POWER COMPANY                                                                                         ,        ,
N/A 4
7.
Nunber of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
27
)
8.
Present licensed fuel pe,o1 capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
January 14, 1983 DUKE POWER COMPANY Date:
Name of
Name of


==Contact:==
==Contact:==
J. A. Reavis                             Phone: 704-373-7567 i
J. A. Reavis Phone: 704-373-7567 i


McGUIRE NUCLEAR STATION Operating Status Report
McGUIRE NUCLEAR STATION Operating Status Report 1.
: 1. Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose 1 Lait.
Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose 1 Lait.
: 2. The total station liquid release contribution to whole body dose for November has been compared with the Technical Specifications annual value of 3 mrem; the total release for November was less than 10 percent.
2.
The total station liquid release contribution to whole body dose for November has been compared with the Technical Specifications annual value of 3 mrem; the total release for November was less than 10 percent.
The total station gaseous release contribution to any organ dose for November has been compared with the Technical Specifications annual value of 15 mrem; the total release for November was less than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for November has been compared with the Technical Specifications annual value of 15 mrem; the total release for November was less than 10 percent of this limit.
l}}
l}}

Latest revision as of 20:29, 16 December 2024

Monthly Operating Rept for Dec 1982
ML20064K397
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/14/1983
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20064K393 List:
References
NUDOCS 8301180386
Download: ML20064K397 (6)


Text

-.

. w.

OPERATING DATA REPORT DOCKET NO. _50-369 DATE l-14-83 CO)1PLETED BY J. A. Reavis TELEPil0NE 704-17b7567 OPERATING STATUS Notes

  • NOTE: Nameplate Rating McGuire Unit 1
1. Unit Name:

(Gross MWe) calculated as

2. Reporting Period:. December 1.19R2 - nocomhar 11 1982 3411 1450.000 MVA x.90 power
3. Licensed Thennal Power istWti:

factor per Page 111, 1305*

4. Nameplate Itating (Grow.slWe):

NUREG-0020.

1180

5. Design Electrical Ratina,(Net.\\lWel:
6. Staximom Deper ' Capacity (Gross 31We):

1180

7. Alasimum Depencable Capacity INet alw l.

e S. If Changes Occur in Capacity Ratinp titems Number 3 Through 7) Since Last Report.Gise Reasons:

None None

9. Power Level To Which Restricted. If Any (Net alwe):
10. Reasons For Restrictions. lf Any:

This alonth Yr..to Date Cumulative 744.0 8 760.0 9 504.0

11. Ilours in Reporting Pened
12. Number Of itemrs Resetor Was Critical 740.0 7 092.5 7 118.1
13. Reactor Reserve Shutdown llours 738.0 7 046.6 7 092.3
14. Ilours Generator On.Line l
15. Unit Reserse Shutdown ilours 1 265 980 13 417 463 13 502 418
16. Gross Thermal Energy Generated (31Wil) 433 363 4 598 155 4 626 591
17. Gross Electrical Energy Generated l>!WH) 405 269 4 302 267 4 321 323
13. Net Electrical Energy Generated (SIWil) 99.2 80.4 74.6
19. Unit Service Factor 99.2 80.4 74.6
20. Unit Availability Factor
21. Unit Capacity Factor (Using SIDC Nett 46.2 41.6 38.5 46.2 41.6 38.5
22. Umt Capacity Factor IUsing DER Net)
23. Unit Forced Outage Rate 0.8 16.0 2 2. t.
24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date.and Duration of Eacht:

l Steam Generator Modification - January 21, 1983 - 11 Weeks 2.i. If Shut Down At End Of Report INriod. Estimated Date of Startup:

26. Units In Test Status (Prior to Commercul Operation 1:

Forecast Achiesed INITI AL CRITICALITY INITI A L 1.LLT l RICliY CO\\lNil RCIT L OPER A IlON 8301180386 830114 (9/771

{DRADOCK 05000369 PDR

50-369 UNITSilUTDOWNS AND POWER REI)UCT10NS DOCKET NO.

UNIT NAstE McGuire 1 DATE l-14-83 J. A. Reavis REPORT Af 0NTl! December. 1962 COMPLETED HY TELEPIIONE -

w.

.5 g 3-E Licensee

,E-r, Cause & Corrective No.

Date 3g j

,j g c2 Even:

3y eT Action en yE e2 5 g?, g Report =

(4 0 8'

Prevent Recurrence H

g u

C 16-P 82-12-01 F

H CB HTEXCH Limited to 50% power while awaiting modification to steam generator design.

21 82-12-22 F

6.02 A

1 CJ VALVEX RCS leakage over 1 GPM due to partially open vent valve on BIT line. Valve shut and pipe cap installed.

I 2

3 4

F: Forced Reason:

Methigt:

Exhibit G -Instructions S Schedaled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Seram.

Entry Sheets for Licensee C Refueling 1 Automatic Scram.

Event Report ILER) File INtIREG.

D Regulatory Restrietion 4-Ot her (Explain) 01bl)

E Ope.stor Training & License Examination F Administrative S

G-Opesational Error (Explain) -

19/77)

Il Other IExplain)

Exhibit I-Same Sousee

..v

DOCKET NO.

50-369 UNIT McGu b 1 1-14-83 DATE AVERAGE DAILY UNIT POWER LEVEL MONTil December,1982 AVERAGE D AILY POWER LEVEL AVERAGE D AILY POWER LEVEL DAY (MWe net)

DAY (MWe. net) 558 17 557 1

557 558 2

18 556 19 556 3

555 560 20 4

5 SER 21 556 345 554 22 6

543 23 559 7

8 553 24 557 556 25 523 9

' 554 26 478 10 557 554 27 11 551 28 557 12 556 553 29 13 14 553 30 550 555 553 31 15 556 16 DAILY UNrr POWER LEVEL FORst INSTRlRTIONS On this fonn, hst ths.iverare d.iity unit power lesel in M'Ne-net for each day m the reporting n.onth.

Compute to the ne.irest w nole megawatt.

These figures will I e used to plot 2 graph l'or each reportint; month. Note that by using ma.timun.

dependable ccpacit/ lor the net electrical ratin: of the unit thers: may be..s easions when the dady average power levet enceds the Itm kne f or the restristed power lesel knel, in such c.ises, the average daily umt power output sheet should be footnoted to (splam the app.uent anomaly.

DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

1/14/83 6

NARRATIVE SU) DIARY Month:

December, 1982 __

McGuire Unit 1 entered the month limited to 50% power until modifications have been completed on the steam generator.

The unit was manually shutdown on December 22 in order to identify and repair a reactor coplant leak of over 1 GP.M through a partially open vent valve on a BIT line.

The valve was shut and a pipe cap installed. The unit returned to service later the same day.

Power was reduced on December 25 and 26 in order to reach system minimum load.

McGuire Unit 1 operated through the end of the year at 50% power.

i A

B V

e

\\

e

MONTHLY REFUELING INFORMATION REQbTST McGuire Unit 1 l.

Facility name:

2.

Scheduled next refueling shutdown:

January 1984 3.

Scheduled restart following refueling:

4.

Will refueling or recumption of operation thereaf ter require a technical specification change or other license amendment?

N/A If yes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Schedried date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

N/A 4

7.

Nunber of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

27

)

8.

Present licensed fuel pe,o1 capacity:

500 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

January 14, 1983 DUKE POWER COMPANY Date:

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 i

McGUIRE NUCLEAR STATION Operating Status Report 1.

Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose 1 Lait.

2.

The total station liquid release contribution to whole body dose for November has been compared with the Technical Specifications annual value of 3 mrem; the total release for November was less than 10 percent.

The total station gaseous release contribution to any organ dose for November has been compared with the Technical Specifications annual value of 15 mrem; the total release for November was less than 10 percent of this limit.

l