ML20203N642: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:A',   c
{{#Wiki_filter:A',
. - . .                                                                 6/w~\
c
                                                                          4
. - . .
              -
6/w~\\
        .
4
                                    nFRttans
-
    A)abama Power Company
.
  /TTN: Mr. R. P. Mcdonald
nFRttans
            Senior Vice President
A)abama Power Company
    P. O. Box 2641
/TTN: Mr. R. P. Mcdonald
    Birmingham, AL 35291
Senior Vice President
    Gentlemen:
P. O. Box 2641
    SUBJECT: REPORT NOS. 50-348/86-06 AND 50-364/86-06
Birmingham, AL 35291
    On March 11 - April 10, 1986, NRC inspected activities authorized by NRC
Gentlemen:
    Operating License Nos. NPF-2 e-d NPF-8 for your Farley facility. At the
SUBJECT: REPORT NOS. 50-348/86-06 AND 50-364/86-06
    conclusion of the inspection, the findings were discussed with those members of
On March 11 - April 10, 1986, NRC inspected activities authorized by NRC
    your staff identified in the enclosed inspection report.
Operating License Nos. NPF-2 e-d NPF-8 for your Farley facility.
    Areas examined during the inspection are identified in the report. Within these
At the
    areas, the inspection consisted of selective examinations of procedures and
conclusion of the inspection, the findings were discussed with those members of
    representative records, interviews with personnel, and observation of activities
your staff identified in the enclosed inspection report.
    in progress.
Areas examined during the inspection are identified in the report. Within these
    Within the scope of the inspection, no violations or deviations were identified.
areas, the inspection consisted of selective examinations of procedures and
    Should you have any questions concerning this letter, please contact us.
representative records, interviews with personnel, and observation of activities
                                              Sincerely,
in progress.
                                            ORIGINAL SIC *O BT
Within the scope of the inspection, no violations or deviations were identified.
                                            DAVID M. VERRELU
Should you have any questions concerning this letter, please contact us.
                                              David M. Verrelli, Chief
Sincerely,
                                              Reactor Projects Branch 2
ORIGINAL SIC *O BT
                                              Division of Reactor Projects
DAVID M. VERRELU
    Enclosure:
David M. Verrelli, Chief
    Inspection Report Nos. 50-348/86-06 and
Reactor Projects Branch 2
        50-364/86-06
Division of Reactor Projects
    cc w/ encl: (See page 2)
Enclosure:
                                  g
Inspection Report Nos. 50-348/86-06 and
      sta'
50-364/86-06
      G
cc w/ encl:
            iBan "t88)he                                                   '
(See page 2)
                                                                              I
g
                                                                                  .T.Eo I
sta' iBan "t88)he
G
'
I
.T.Eo I


n-
n-
      s~   .4                                 ,                                           -
s~
                    '
.4
            Alabama-Power' Company                       2                         EI
,
                                                                                              .
-
            cc w/ encl:
EI
          (4. O. Whitt, Executive Vice President
Alabama-Power' Company
          /.D.Woodard, General-Manager-
2
              Nuclear Plant
'
        g. G. Hairston, III, General Manager -
.
              -
cc w/ encl:
                                                                                              ;
(4. O. Whitt, Executive Vice President
              Nuclear Support
/.D.Woodard, General-Manager-
          /.W.McGowan, Manager-SafetyAudit
Nuclear Plant
              and Engineering Review
g. G. Hairston, III, General Manager -
          vd. K. Osterholtz, Supervisor-Safety
-
              Audit and Engineering Review
;
            bec w/ encl:
Nuclear Support
          14)RC Resident Inspector
/.W.McGowan, Manager-SafetyAudit
          4. Reetes, Project Manager, NRR
and Engineering Review
            Document Control Desk
vd. K. Osterholtz, Supervisor-Safety
            State of Alabama
Audit and Engineering Review
                                                                                              P
bec w/ encl:
                                                          .
14)RC Resident Inspector
              Y18                   ftD
4. Reetes, Project Manager, NRR
            LModenos:bhg         HCDance
Document Control Desk
            4/1]/86               4/tt/86
State of Alabama
c-_-__--_-_-__----__-_____-______-__-_---____-__-_-_--_______---_-_____-_--__-____________.
P
.
Y18
ftD
LModenos:bhg
HCDance
4/1]/86
4/tt/86
c- -
-- - -
----
-
-
-
- ---
-
- - --
--- -
- --
-
.
}}
}}

Latest revision as of 21:02, 7 December 2024

Forwards Insp Rept 50-348/86-06 & 50-364/86-06 on 860311-0410.No Violation or Deviation Noted
ML20203N642
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/22/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Macdonald R
ALABAMA POWER CO.
Shared Package
ML20203N644 List:
References
NUDOCS 8605050573
Download: ML20203N642 (2)


See also: IR 05000348/1986006

Text

A',

c

. - . .

6/w~\\

4

-

.

nFRttans

A)abama Power Company

/TTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/86-06 AND 50-364/86-06

On March 11 - April 10, 1986, NRC inspected activities authorized by NRC

Operating License Nos. NPF-2 e-d NPF-8 for your Farley facility.

At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIC *O BT

DAVID M. VERRELU

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/86-06 and

50-364/86-06

cc w/ encl:

(See page 2)

g

sta' iBan "t88)he

G

'

I

.T.Eo I

n-

s~

.4

,

-

EI

Alabama-Power' Company

2

'

.

cc w/ encl:

(4. O. Whitt, Executive Vice President

/.D.Woodard, General-Manager-

Nuclear Plant

g. G. Hairston, III, General Manager -

-

Nuclear Support

/.W.McGowan, Manager-SafetyAudit

and Engineering Review

vd. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

14)RC Resident Inspector

4. Reetes, Project Manager, NRR

Document Control Desk

State of Alabama

P

.

Y18

ftD

LModenos:bhg

HCDance

4/1]/86

4/tt/86

c- -

-- - -


-

-

-

- ---

-

- - --

--- -

- --

-

.