ML20205A867: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
JUL 311986 C | = | ||
JUL 311986 C rolina Power and Light Company A | |||
and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen: | ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen: | ||
==SUBJECT:== | ==SUBJECT:== | ||
DOCKET NO. 50-261 - H. B. ROBINSON STEAM ELECTRIC PLANT EMERGENCY PLAN REVIEW We have completed our review of Revision 12 of H. B. Robinson Steam Electric Plant Emergency Response Plan. | DOCKET NO. 50-261 - H. B. ROBINSON STEAM ELECTRIC PLANT EMERGENCY PLAN REVIEW We have completed our review of Revision 12 of H. B. Robinson Steam Electric Plant Emergency Response Plan. | ||
Our review indicated that your H. B. Robinson Steam Electric Plant Emergency Response Plan continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. | Our review indicated that your H. B. Robinson Steam Electric Plant Emergency Response Plan continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. | ||
I Please be reminded that 10 CFR 50.47(b) requires NRC approval of any changes to your Plan that may decrease the effectiveness of the Plan. | I Please be reminded that 10 CFR 50.47(b) requires NRC approval of any changes to your Plan that may decrease the effectiveness of the Plan. | ||
However, if your safety review indicates no decrease in emergency preparedness, then changes can be made without NRC approval. | |||
In all cases, you should furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V (Implementing Procedures). | |||
Should you have any questions regarding this letter, please contact Mr. Thomas R. | Should you have any questions regarding this letter, please contact Mr. Thomas R. | ||
Decker of the Region II staff at 404/331-2600. | Decker of the Region II staff at 404/331-2600. | ||
Sincerely, David M. Verrelli, Chief f | Sincerely, David M. Verrelli, Chief f | ||
Reactor Projects Branch 2 i | |||
Division of Reactor Projects cc: g. P. Beatty, Jr., Manager Robinson Nuclear Project I. Department E. Morgan, Plant General Manager bec: (See page 2) 8608110467 860731 PDR ADOCK 05000261 PDR gg F | |||
kh | |||
.a Carolina Power and Light Company 2 | |||
p1 AT aka | bcc:J RC Resident Inspector State of North Carolina Document Control Desk I | ||
p1 AT aka T0ecker DCollins JieTTeh 9@Frec r ckson 7/ | |||
86 7/ 4/86 7p/86 1/;t/86 7/30/86 | |||
.....}} | |||
Latest revision as of 19:20, 7 December 2024
| ML20205A867 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/31/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8608110467 | |
| Download: ML20205A867 (2) | |
Text
.
=
JUL 311986 C rolina Power and Light Company A
ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
DOCKET NO. 50-261 - H. B. ROBINSON STEAM ELECTRIC PLANT EMERGENCY PLAN REVIEW We have completed our review of Revision 12 of H. B. Robinson Steam Electric Plant Emergency Response Plan.
Our review indicated that your H. B. Robinson Steam Electric Plant Emergency Response Plan continues to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
I Please be reminded that 10 CFR 50.47(b) requires NRC approval of any changes to your Plan that may decrease the effectiveness of the Plan.
However, if your safety review indicates no decrease in emergency preparedness, then changes can be made without NRC approval.
In all cases, you should furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V (Implementing Procedures).
Should you have any questions regarding this letter, please contact Mr. Thomas R.
Decker of the Region II staff at 404/331-2600.
Sincerely, David M. Verrelli, Chief f
Reactor Projects Branch 2 i
Division of Reactor Projects cc: g. P. Beatty, Jr., Manager Robinson Nuclear Project I. Department E. Morgan, Plant General Manager bec: (See page 2) 8608110467 860731 PDR ADOCK 05000261 PDR gg F
kh
.a Carolina Power and Light Company 2
bcc:J RC Resident Inspector State of North Carolina Document Control Desk I
p1 AT aka T0ecker DCollins JieTTeh 9@Frec r ckson 7/
86 7/ 4/86 7p/86 1/;t/86 7/30/86
.....