                                                        May 21,1999
May 21,1999
            Mr. J. E. Cross
Mr. J. E. Cross
            Generation Group
Generation Group
      '
Duquesne Light Company
            Duquesne Light Company
'
            Post Office Box 4
Post Office Box 4
            Shippingport, Pennsylvania 15077
Shippingport, Pennsylvania 15077
            SUBJECT:       ~ NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99 4 2,
SUBJECT:
                              50-412/99-02
~ NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99 4 2,
          . Dear Mr. Cross:
50-412/99-02
            This refers to the inspection conducted from March 21 to May 1,1999, at the Beaver Valley
. Dear Mr. Cross:
            Power Station facility. The enclosed report represents the results of this inspection.
This refers to the inspection conducted from March 21 to May 1,1999, at the Beaver Valley
            During the 6-week inspection period, your conduct of activities at the Beaver Valley Power
Power Station facility. The enclosed report represents the results of this inspection.
            Station facility was characterized by safe conduct of activities, especially during the Unit 2
During the 6-week inspection period, your conduct of activities at the Beaver Valley Power
            refueling outage and the Unit 1 surveillance outage. Your staff's human performance improved
Station facility was characterized by safe conduct of activities, especially during the Unit 2
            as compared to the 1998 extended outages. This improvement was attributed to the strong
refueling outage and the Unit 1 surveillance outage. Your staff's human performance improved
            response to lower safety significant problems at the beginning of the Unit 2 outage and initiatives
as compared to the 1998 extended outages. This improvement was attributed to the strong
            such as the one-stop-shop outage work management concept. Surveillance procedure
response to lower safety significant problems at the beginning of the Unit 2 outage and initiatives
            deficiencies continue to challenge your operating staff. However, surveillance testing and
such as the one-stop-shop outage work management concept. Surveillance procedure
            maintenance activities were generally performed well, in part, due to strong proevolution
deficiencies continue to challenge your operating staff. However, surveillance testing and
            briefings.' Emergent issues were properly addressed with good root-cause assessment by
maintenance activities were generally performed well, in part, due to strong proevolution
            system engineers and maintenance personnel.
briefings.' Emergent issues were properly addressed with good root-cause assessment by
            The radiation' protechon program was effective during the Unit 2 refueling outage. Enhanced
system engineers and maintenance personnel.
            informational postings, especially in the containment, aided in maintaining occupational
The radiation' protechon program was effective during the Unit 2 refueling outage. Enhanced
            exposures as low as is reasonably achievable (ALARA). The scope and depth of Quality
informational postings, especially in the containment, aided in maintaining occupational
            Services Unit surveillances conducted for the outage, and as part of the annual health physics
exposures as low as is reasonably achievable (ALARA). The scope and depth of Quality
            program audit, were adequate to identify and document program deficiencies.
Services Unit surveillances conducted for the outage, and as part of the annual health physics
          L No reply to this letter is necessary. Your cooperation is appreciated.
program audit, were adequate to identify and document program deficiencies.
                                                                                                                    1
L No reply to this letter is necessary. Your cooperation is appreciated.
                                                                                                                  .
1
                                                                                                              \
.
        9906090167 990521
\\
                                                  ,                                        lh '0(               \
lh '0(
                                                                                                                    '
\\
        PDR     ADOCK 05000334
,
        g                       PDR
9906090167 990521
'
PDR
ADOCK 05000334
g
PDR


.t.
.t.
      Mr. J. E. Cross                               2
Mr. J. E. Cross
    '
2
'
g
g
      in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
      enclosures will be placed in the NRC Public Document Room.
enclosures will be placed in the NRC Public Document Room.
                                                        Sincerely,
Sincerely,
                                                        Original Signed By Neil Perry for
Original Signed By Neil Perry for
                                                        Peter W. Eselgroth, Chief
Peter W. Eselgroth, Chief
                                                        Projects Branch 7
Projects Branch 7
                                                        Division of Reactor Projects
Division of Reactor Projects
      Docket Nos.: 50-334, 50-412
Docket Nos.: 50-334, 50-412
                                                                                  ~
License Nos.: DRP-66, NPF-73
      License Nos.: DRP-66, NPF-73
~
      Enclosure: Inspection Report Nos. 50-334/99-02, 50-412/99-02
Enclosure: Inspection Report Nos. 50-334/99-02, 50-412/99-02
      cc w/ encl:
cc w/ encl:
      S. Jain, Senior Vice President, Nuclear Services Group
S. Jain, Senior Vice President, Nuclear Services Group
      K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager
      B. Tuite, General Manager, Nuclear Operations Unit -
B. Tuite, General Manager, Nuclear Operations Unit -
      W. Kline, Manager, Nuclear Engineering Department
W. Kline, Manager, Nuclear Engineering Department
      M. Pearson, Manager, Quality Services Unit
M. Pearson, Manager, Quality Services Unit
      M. Ackerman, Manager, Safety & Licensing Department
M. Ackerman, Manager, Safety & Licensing Department
      J. Macdonald, Manager, System and Performance Engineering
J. Macdonald, Manager, System and Performance Engineering
      J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
J. A. Huitz, Manager, Projects and Support Services, FirstEnergy
      M. Clancy, Mayor, Shippingport, PA
M. Clancy, Mayor, Shippingport, PA
      Commonwealth of Pennsylvania .
Commonwealth of Pennsylvania .
      State of Ohio
State of Ohio
      State of West Virginia
State of West Virginia
                                                                                                        ;
;
                                                                                                        ;
.
                                                                                                      .


                                                                            - - _ _ - _ - -                                                   _ _ _ - _ - - _ - _ - _ _ - - _ _ _ - _ _ _ _ _
- - _ _ - _ - -
                                                                                                                                                                                                  i
_ _ _ - _ - - _ - _ - _ _ - - _ _ _ - _ _ _ _ _
          t
i
          t                                                                                       3
t
                          Distribution w/ encl:
t
                          Region i Docket Room (with concurrences)
3
                        Nuclear Safety information Center (NSIC)
Distribution w/ encl:
h                         PUBLIC                               ,
Region i Docket Room (with concurrences)
                        NRC Resident inspector
Nuclear Safety information Center (NSIC)
                        H. Miller, RA/J. Wggins, DRA
h
                        . P. Eselgroth, DRP
PUBLIC
                        N. Derry, DRP
,
  ,
NRC Resident inspector
                        C. O'Daniell, DRP
H. Miller, RA/J. Wggins, DRA
                        Distribution w/enci(VIA E-MAIL):
. P. Eselgroth, DRP
                        M. Tschiltz, OEDO
N. Derry, DRP
                        S. Bajwa, PD1-2, NRR
C. O'Daniell, DRP
                        D. Collins, PDI-2, NRR
,
                        V. Nerses, PDI-2, NRR
Distribution w/enci(VIA E-MAIL):
                        R. Correia, NRR
M. Tschiltz, OEDO
                        DOCDESK
S. Bajwa, PD1-2, NRR
                        Inspection Program Branch, NRR (IPAS)
D. Collins, PDI-2, NRR
                        DOCUMENT NAME: G:\ BRANCH 7\BV\bv990202.WPD
V. Nerses, PDI-2, NRR
                        To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment /erciosure "N" =
R. Correia, NRR
                        No copy
DOCDESK
                          OFFICE           Rl/DRP                       M       Rl/DRP                   /                         l           /                                             l
Inspection Program Branch, NRR (IPAS)
                          NAME                           f '
DOCUMENT NAME: G:\\ BRANCH 7\\BV\\bv990202.WPD
                                          Kern /al 4)V/-AA                     Eselgrothgk,p
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment /erciosure
                          DATE
"N" =
                                                                              OFFICIAL RECORD COPY
No copy
                                                                                                                              .
OFFICE
l   l : .   . . . . . ,
Rl/DRP
                                  .
M Rl/DRP
                                                .
/
                                                        .
l
                                                                                            ..           .
/
                                                                                                                                      .
l
                                                                                                                                                                                                _
NAME
Kern /al 4)V/-AA
Eselgrothgk,p
f
'
DATE
OFFICIAL RECORD COPY
.
l
l : .
.
. . . . ,
.
.
.
..
.
.
_
}}
}}

Latest revision as of 19:51, 10 December 2024

Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage
ML20195C446
Person / Time
Site: Beaver Valley
Issue date: 05/21/1999
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
Shared Package
ML20195C452 List:
References
50-334-99-02, 50-334-99-2, 50-412-99-02, 50-412-99-2, NUDOCS 9906080167
Download: ML20195C446 (3)


See also: IR 05000334/1999002

Text

r

>

_

.g L

$

May 21,1999

Mr. J. E. Cross

Generation Group

Duquesne Light Company

'

Post Office Box 4

Shippingport, Pennsylvania 15077

SUBJECT:

~ NRC INTEGRATED INSPECTION REPORT NOS. 50-334/99 4 2,

50-412/99-02

. Dear Mr. Cross:

This refers to the inspection conducted from March 21 to May 1,1999, at the Beaver Valley

Power Station facility. The enclosed report represents the results of this inspection.

During the 6-week inspection period, your conduct of activities at the Beaver Valley Power

Station facility was characterized by safe conduct of activities, especially during the Unit 2

refueling outage and the Unit 1 surveillance outage. Your staff's human performance improved

as compared to the 1998 extended outages. This improvement was attributed to the strong

response to lower safety significant problems at the beginning of the Unit 2 outage and initiatives

such as the one-stop-shop outage work management concept. Surveillance procedure

deficiencies continue to challenge your operating staff. However, surveillance testing and

maintenance activities were generally performed well, in part, due to strong proevolution

briefings.' Emergent issues were properly addressed with good root-cause assessment by

system engineers and maintenance personnel.

The radiation' protechon program was effective during the Unit 2 refueling outage. Enhanced

informational postings, especially in the containment, aided in maintaining occupational

exposures as low as is reasonably achievable (ALARA). The scope and depth of Quality

Services Unit surveillances conducted for the outage, and as part of the annual health physics

program audit, were adequate to identify and document program deficiencies.

L No reply to this letter is necessary. Your cooperation is appreciated.

1

.

\\

lh '0(

\\

,

9906090167 990521

'

PDR

ADOCK 05000334

g

PDR

.t.

Mr. J. E. Cross

2

'

g

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By Neil Perry for

Peter W. Eselgroth, Chief

Projects Branch 7

Division of Reactor Projects

Docket Nos.: 50-334, 50-412

License Nos.: DRP-66, NPF-73

~

Enclosure: Inspection Report Nos. 50-334/99-02, 50-412/99-02

cc w/ encl:

S. Jain, Senior Vice President, Nuclear Services Group

K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager

B. Tuite, General Manager, Nuclear Operations Unit -

W. Kline, Manager, Nuclear Engineering Department

M. Pearson, Manager, Quality Services Unit

M. Ackerman, Manager, Safety & Licensing Department

J. Macdonald, Manager, System and Performance Engineering

J. A. Huitz, Manager, Projects and Support Services, FirstEnergy

M. Clancy, Mayor, Shippingport, PA

Commonwealth of Pennsylvania .

State of Ohio

State of West Virginia

.

- - _ _ - _ - -

_ _ _ - _ - - _ - _ - _ _ - - _ _ _ - _ _ _ _ _

i

t

t

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

h

PUBLIC

,

NRC Resident inspector

H. Miller, RA/J. Wggins, DRA

. P. Eselgroth, DRP

N. Derry, DRP

C. O'Daniell, DRP

,

Distribution w/enci(VIA E-MAIL):

M. Tschiltz, OEDO

S. Bajwa, PD1-2, NRR

D. Collins, PDI-2, NRR

V. Nerses, PDI-2, NRR

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\\ BRANCH 7\\BV\\bv990202.WPD

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment /erciosure

"N" =

No copy

OFFICE

Rl/DRP

M Rl/DRP

/

l

/

l

NAME

Kern /al 4)V/-AA

Eselgrothgk,p

f

'

DATE

OFFICIAL RECORD COPY

.