ML20202G149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:,              .        .      ~    . . . - . . .  ...-. - -.~...-              . - . - ~ . . . . . . . . . . , . .
                                                                                                                                    , ,
l.
                . _ ,
                      *
              ./^                                                                                                                      ;
            .+
t.                            '
      .                                                                                                                                t
                                                                            December 16,1998
                        Mr. John F. Franz, Jr.
,                        Vice President, Nuclear
L                      ! Alliant Tower -                                                                                              :
L
                        200 First Street SE
                          P. O; Box 351
                                                                                                                                      j
!
'
                      ' Cedar Rapids, lA 52406-0351
                                                                                                                                        ;
                        SUBJECT:          NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION                                          i
      l'
                                          REPORT 50-331/98018(DRS)
l                      ' Dear Mr. Franz:
!                                    4                                                                                                  r
L
                        On December 8,1998, the NRC completed a security inspection of your Duane Amold
j                        Energy Center reactor facility. The onsite inspection effort was conducted between                            ,
                        November 16-20,-1998. The enclosed report presents the results of that inspection.
                  ~ - No violations of NRC requirements were identified during this inspection. Your security .
!                      ' equipment testing and maintenance program was a performance strength. The dedication
l                        of the maintenance technicians ensured that problems were corrected efficiently and
l                        effectively. JThe cooperation between the security department and various other
L                        maintenance departments resulted in' low equipment outage times and contributed to                            ;
L. .                    improvements in delay barriers. The security force had an aggressive and effective                            ;
                        equipment testing program. We also observed that your security organization implemented
                                                                                                            '
                                                                                                                                        '
                      . their duties and responsibilities in an effective manner.
L                                                                                                                                      ;
,
'
                        .Two' issues were . identified that will require further analysis by us. One issue relates to                  ;
                        .several occasions when the required number of armed response force members were not
                                                                                                                                        {
g                        immediately available, and the reporting requirements for such incidents. The other issue                      :
l                      ' pertains to the unescorted access authorization for a contractor employee. Resolution of                        ,
                        these issues will be addressed by separate correspondence,
o
I    e
          '
                                                                                                                                \
L                                                                                                                                  \
L
.
!:
                                  040138
:
!
                ,!
                                9902050013L981216                            !"
u
''
                                PDR  ADOCK 05000331
                    -
                              .G                            PDR
                                                                              .
                                                                            .-
 
  .      .  .      _    _            _ _ _ . _            -
                                                                    - . .. __.-        _ _ . _  .
                                                                                                  s
                                                                                                  '
    .
                                                                                                  i
.
                                                                                                    l
      J. Franz                                        -2-
                                                                                                    ]
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
      the enclosure will be placed in the NRC Public Document Room (PDR).
                                              Sincerely,
                                              /s/ J. R. Creed
                                              James R. Creed, Chief,
                                              Plant Support Branch 1
      Docket No.: 50-331
      License No.: DPR-49
      Enclosure:    Inspection Report 50-331/98018(DRS)
      cc w/ encl:  E. Protsch, Executive Vice President                                            1
                      Energy Delivery Alliant;
                                                                                                    ]
                      President, IES Utilities, Inc.                                              l
                    G. Van Middlesworth, Plant Manager
                    K. Peveler, Manager, Regulatory Performance                                    j
                    Chairperson, Iowa Utilities Board                                              1
                                                                                                    l
                                                                                                    l
                                                                                                    1
                                                                                                    l
                                                                                                    i
                                                                                                    I
                                                                                                    l
                                                                                                    l
                                                                                                    i
 
                        .                              ._            -                      .-.
    .
  *
i
    ~ J. Franz -                                            -2-                                              l
                                                                                                              l
                                                                                                              I
i
l
      In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
      'the enclosure will be placed in the NRC Public Document Room (PDR).
                                                    Sincerely,                                              ;
l
                                                                                                              i
                                                    James R. Creed, Chief,                                  i
                                                    Plant Support Branch 1
,
                                                                                                              i
l      Docket No.: 50-331
      License No.: DPR-49
      Enclosure:        Inspection Report 50-331/98018(DRS)
      cc w/ encl:        E. Protsch, Executive Vice President
                            Energy Delivery Alliant;
                            President, IES Utilities, Inc.                                                    !
                          G. Van Middlesworth, Plant Manager                                                  l
                          K. Peveler, Manager, Regulatory Performance                                        l
                          Chairperson, Iowa Utilities Board
      Distribution:
      RPC (E-Mail)
      Project Mgr., NRR w/enci
      J. Caldwell, Rlli w/enci
      C. Pederson, Rlli w/enct
      B. Clayton, Rlli w/enct
      SRI Duane Arnold w/enct
      DRP w/ encl
      TSS w/enci
      DRS (2) w/enci
      Rlll PRR w/enct
      PUBLIC IE-01 w/ enc!
      Docket File w/enci
    -GREENS
      LEO (E-Mail)
      DOCDESK (E-Mail)
      DOCUMENT NAME: G:DRS\DUA98018.WPD
      To r.  . c.p, , a. .,c  oi. in.c in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.= w No copy
        OFFICE        Rlli                      Rill                  Rlli                                l
        NAME          Pirtle:jp                  Lanksbury            Creed
        DATE        02/ /99                    02/ /99              02/ /99
}}
}}

Revision as of 18:03, 1 January 2021

Forwards Insp Rept 50-331/98-18 on 981116-20 Onsite & 1208 NRC Region 3 Ofc.No Violations Noted.Two Issues Were Identified That Will Require Further Analysis by NRC Listed
ML20202G149
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/16/1998
From: Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20202G154 List:
References
50-331-98-18, NUDOCS 9902050013
Download: ML20202G149 (3)


See also: IR 05000331/1998018

Text

, . . ~ . . . - . . . ...-. - -.~...- . - . - ~ . . . . . . . . . . , . .

, ,

l.

. _ ,

./^  ;

.+

t. '

. t

December 16,1998

Mr. John F. Franz, Jr.

, Vice President, Nuclear

L  ! Alliant Tower -  :

L

200 First Street SE

P. O; Box 351

j

!

'

' Cedar Rapids, lA 52406-0351

SUBJECT: NRC DUANE ARNOLD ENERGY CENTER SECURITY INSPECTION i

l'

REPORT 50-331/98018(DRS)

l ' Dear Mr. Franz:

! 4 r

L

On December 8,1998, the NRC completed a security inspection of your Duane Amold

j Energy Center reactor facility. The onsite inspection effort was conducted between ,

November 16-20,-1998. The enclosed report presents the results of that inspection.

~ - No violations of NRC requirements were identified during this inspection. Your security .

! ' equipment testing and maintenance program was a performance strength. The dedication

l of the maintenance technicians ensured that problems were corrected efficiently and

l effectively. JThe cooperation between the security department and various other

L maintenance departments resulted in' low equipment outage times and contributed to  ;

L. . improvements in delay barriers. The security force had an aggressive and effective  ;

equipment testing program. We also observed that your security organization implemented

'

'

. their duties and responsibilities in an effective manner.

L  ;

,

'

.Two' issues were . identified that will require further analysis by us. One issue relates to  ;

.several occasions when the required number of armed response force members were not

{

g immediately available, and the reporting requirements for such incidents. The other issue  :

l ' pertains to the unescorted access authorization for a contractor employee. Resolution of ,

these issues will be addressed by separate correspondence,

o

I e

'

\

L \

L

.

!:

040138

!

,!

9902050013L981216  !"

u

PDR ADOCK 05000331

-

.G PDR

.

.-

. . . _ _ _ _ _ . _ -

- . .. __.- _ _ . _ .

s

'

.

i

.

l

J. Franz -2-

]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

/s/ J. R. Creed

James R. Creed, Chief,

Plant Support Branch 1

Docket No.: 50-331

License No.: DPR-49

Enclosure: Inspection Report 50-331/98018(DRS)

cc w/ encl: E. Protsch, Executive Vice President 1

Energy Delivery Alliant;

]

President, IES Utilities, Inc. l

G. Van Middlesworth, Plant Manager

K. Peveler, Manager, Regulatory Performance j

Chairperson, Iowa Utilities Board 1

l

l

1

l

i

I

l

l

i

. ._ - .-.

.

i

~ J. Franz - -2- l

l

I

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

'the enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,  ;

l

i

James R. Creed, Chief, i

Plant Support Branch 1

,

i

l Docket No.: 50-331

License No.: DPR-49

Enclosure: Inspection Report 50-331/98018(DRS)

cc w/ encl: E. Protsch, Executive Vice President

Energy Delivery Alliant;

President, IES Utilities, Inc.  !

G. Van Middlesworth, Plant Manager l

K. Peveler, Manager, Regulatory Performance l

Chairperson, Iowa Utilities Board

Distribution:

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enct

B. Clayton, Rlli w/enct

SRI Duane Arnold w/enct

DRP w/ encl

TSS w/enci

DRS (2) w/enci

Rlll PRR w/enct

PUBLIC IE-01 w/ enc!

Docket File w/enci

-GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

DOCUMENT NAME: G:DRS\DUA98018.WPD

To r. . c.p, , a. .,c oi. in.c in m. i=: e cm unwi en.cnm.nu.ncew. r cm m n on.nu.new.= w No copy

OFFICE Rlli Rill Rlli l

NAME Pirtle:jp Lanksbury Creed

DATE 02/ /99 02/ /99 02/ /99