| Line 13: |
Line 13: |
| | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC |
| | page count = 2 | | | page count = 2 |
| | | project = TAC:63534 |
| | | stage = Other |
| }} | | }} |
|
| |
|
Revision as of 07:30, 9 December 2021
Letter Sequence Other |
|---|
|
Results
Other: ML20195H593, ML20196A791, ML20206C051, ML20213G384, ML20213G443, ML20214J058, ML20214J923, ML20214K398, ML20214K734, ML20214L962, ML20214M147, ML20216C555, ML20234C237, ML20235R591, ML20236H213, ML20238A152
|
MONTHYEARML20214J9231986-08-0808 August 1986 Forwards Response to Item in Technical Evaluation Rept Re Testing Program,Per SER Open Item 9 Project stage: Other ML20206C0511987-04-0606 April 1987 Forwards Revised FSAR Section 14.2.12.8.13, Pressurizer Heater Spray Capability Test (Ist), Scheduled to Be Included in FSAR Amend 17 (May 1987).Rev Describes Contents of IST-2.06.2 & Incorporates Previous Ref Commitment Project stage: Other ML20213G3841987-05-12012 May 1987 Advises That Exception on FSAR Table 1.8-1,Amend 5,revised in Amend 10 to Resolve NRC Question 640.10 Requesting List of air-operated Valves to Be Excluded from Loss of Instrument Air Test Project stage: Other ML20213G4431987-05-12012 May 1987 Submits Resolution of NRC Comments on Changes Made to FSAR Section 14.2, Initial Test Program, in Amend 13 Project stage: Other ML20214M1471987-05-21021 May 1987 Informs That Util Will Amend FSAR Section 14.2.12.66.2, Containment Air Recirculation Sys Test, to State That Containment Air Temp Will Be Recorded at 5%,50% & 100% Reactor Power Levels Using Installed Sensor Sys Project stage: Other ML20214L9621987-05-21021 May 1987 Informs That SER Confirmatory Item 52C Re Plant Performance Following MSIV Closure Will Be Completed W/Reactor Producing 30% Rather than 100% Power Due to Possibility of High Power Level Leading to Unnecessary Sys Conditions Project stage: Other ML20214K7341987-05-21021 May 1987 Provides Clarification of Util 870512 Response to NRC 870311 Questions Re Changes to FSAR Section 14.2 on Initial Test Program.Table 1, Equivalent Tests, Encl Project stage: Other ML20214J0581987-05-25025 May 1987 Advises That Util Does Not Consider NRC Concern Re Cycling Open Safety Injection Accumulator Isolation Valves,Valid Per Reg Guide 1.79.Util Administrative Controls Require Valves to Be Open W/Power Removed from Control Circuit Project stage: Other ML20214J0301987-05-25025 May 1987 Submits Supplemental Info to Items 4 & 8 of Util 870521 Response to NRC Comments Re Changes Made in FSAR Section 14.2, Initial Test Program. Air Receiver Vol Test Not Required Since Instrument Air Sys Not safety-related Project stage: Supplement ML20214K3981987-05-26026 May 1987 Informs of Tests to Be Performed After Core Loading Prior to Criticality in Order to Resolve Preoperational Testing Issues Project stage: Other ML20216C5551987-06-23023 June 1987 Informs That Util Completed Test STP-2.11.01 Which Verified That Accumulator Isolation Valves Open Against Max Differential Pressure (SER Confirmatory Item 51A) Project stage: Other ML20235R5911987-07-14014 July 1987 Forwards Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14,per 10CFR50.59 Project stage: Other ML20238A1521987-08-17017 August 1987 Forwards Second Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance W/Provisions of 10CFR50.59 Project stage: Other ML20204J3111987-08-28028 August 1987 Discusses Request for NRC Approval of Revised Power Ascension Test Schedule,Per 870825,26 & 27 Discussions.Rev Required Temporary Deferral of IST 2.21.A.02, MSIV & IST 2.04.03, Turbine Trip W/Loss of Offsite.. Project stage: Request ML20234C2371987-09-15015 September 1987 Forwards Third Status Rept Identifying Changes to Initial Test Program as Described in FSAR Chapter 14.Changes Made Per Provisions of 10CFR50.59(b) Project stage: Other ML20236H2131987-10-27027 October 1987 Forwards Fourth Status Rept,Identifying Changes to Initial Test Program Described in Fsar,Chapter 14,per 10CFR50.59(b) Project stage: Other ML20195H5931988-01-0707 January 1988 Forwards Sixth Status Rept Identifying Changes to Initial Test Program as Described in Chapter 14 of FSAR Project stage: Other ML20196A7911988-01-29029 January 1988 Fowards Seventh Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance w/10CFR50.59 within 1 Month of Initiating Changes Per OL Condition C.(3) Project stage: Other 1987-05-26
[Table View] |
Text
i
'Af M T.iephon. 9:2) m4ooo Nucl.u Group January 29, 1988 l InSppYd,' ort.PA 15077 0004 2NRC-8-002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Reference:
Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen:
Forwarded to NRC is the seventh status report identifying changes to the Initial Test Program as described in Chapter 14, of the FSAR.
These changes are made in accordance with the provisions of 10 CFR 50.59 and reported to NRC in accordance with 50.59(b) within one month of initiating changes per BVPS-2 Facility Operating License condition C.(3). ,
l l Ve y truly yours, h i
. . Carey Senior Vice President i Nuclear Group '
1 Attachment cc: Mr. J. Beall, Sr. Resident Inspector (Unit 2)
Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Project Manager INPO Records Conter l
l l
i 8002050162 ADOCK890129 OS000412 ,
i PDR 1 P PDR t f I W !
_ - _ _ - _ .1
n e
BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT l
References:
(a) DLC Letter 2NRC-7-205 dated September 30, 1987, Mr. J. J. Carcy to U. S. Nuclear Regulatory Commission (b): DLC Letter dated December 31, 1987, Mr.-J. D.
Sieber to U. S. Nuclear Regulatory Commission '
FSAR SECTION TITLE
- 1) 14.2.12.48.01 Main Plant Carbon Dioxide Protection System (SOV-2.33A.01) Test (SOV) ;
Reference (a) identified this testing was deferred until December 31, 1987 due to the inability to complete modifications on time. Compensatory measures were provided until the primary Carbon Dioxide System was successfully tested and placed in !
service by the scheduled date. Reference (b) indicated the backup CO2 storage tank which provides adequate reserve capacity has been installed. Final tecting for this backup !
supply system is expected to be completed by January 31, 1988.
- 2) 14.2.12.70.01 Condensate Polishing Building Heating (SOV-2.44G.01) Ventilation and Air-Conditioning System Test (SOV) '
This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration ,
Exhaust Fan did not meet the acceptance criteria. Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator. These items have since been resolved.
b
- 3) 14.2.12.61.02 Effluent Radiation Monitor Test (IST)
(IST-2.43.01)
This test was completed prior to Commercial Operations except for obtaining a representative grab sample from the Gaseous Waste '
Surge Tank Transfer Monitor to enable grab sample analysis / monitor readout comparisons. The grab sampic has been ,
obtained with satisfactory results. 1 I
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - - - _ - _ _0