ML20196C890: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:____ _ _ - - _ _ _ _ _ _ - _ _ _ - _ _
{{#Wiki_filter:____ _ _ - - _ _ _ _ _ _ - _ _ _ - _ _
: o.                    .
o.
              .                                O
O Docket Nos.: 50-424 Distrubution 50 425
  ,            Docket Nos.: 50-424                                               Distrubution 50 425                   -6                           NRC pDR Local PDR     DEG w 21988 OGC 15-B-18         ;
-6 NRC pDR Local PDR DEG w 21988 OGC 15-B-18 Mr. Robert Scherer Reading File V0GTLE Chief Executive Officer MRood JHopkins Georgia Power Company DMatthews SVarga P. O. Box 4545 Glainas EJordan HNBB-3302 i
Mr. Robert Scherer                         Reading File               V0GTLE Chief Executive Officer                   MRood                       JHopkins Georgia Power Company                     DMatthews                   SVarga P. O. Box 4545                           Glainas                     EJordan HNBB-3302 i Atlanta, Georgia 30302                     ACRS(10)       H-1016     BGrimes 9-A-2     l DCrutchfield 12-G-18       TMurley 12-G-18
Atlanta, Georgia 30302 ACRS(10)
H-1016 BGrimes 9-A-2 l
DCrutchfield 12-G-18 TMurley 12-G-18


==Dear Mr. Scherer:==
==Dear Mr. Scherer:==
Line 26: Line 28:


==SUBJECT:==
==SUBJECT:==
LOSS OF DECAY HMAT REMOVAL                                                     i We have just issued Generuc Letter 88-17 which addresses the loss of decay heat removal (DHR) during nonpower operation.
LOSS OF DECAY HMAT REMOVAL i
This letter was issued because of the potential serious consequence of loss             ,
We have just issued Generuc Letter 88-17 which addresses the loss of decay heat removal (DHR) during nonpower operation.
of shutdowr, cooling concurrent with significant core decay heat. Further, it is our belief that the industry as a whole has not aggressively responded to resolve the concern following its identification in our earlier Generic Letter 87-12. In particular, the industry's response to the Generic Letter 87-12 was deficient in the areas of (1) prevention of accident initiation.             -
This letter was issued because of the potential serious consequence of loss of shutdowr, cooling concurrent with significant core decay heat.
: Further, it is our belief that the industry as a whole has not aggressively responded to resolve the concern following its identification in our earlier Generic Letter 87-12.
In particular, the industry's response to the Generic Letter 87-12 was deficient in the areas of (1) prevention of accident initiation.
(2) mitigation of accidents before they potentially progress to core damage, and (3) control of radioactive material if a core damage accident snould occur.
(2) mitigation of accidents before they potentially progress to core damage, and (3) control of radioactive material if a core damage accident snould occur.
Generic Letter 88-17 prescribes expeditious actions which should issediately ease the concerns; and parallel, but longer term, progranr.ed enhancements which effectively address the root cause of the problems and permit greater flexibility in operation.
Generic Letter 88-17 prescribes expeditious actions which should issediately ease the concerns; and parallel, but longer term, progranr.ed enhancements which effectively address the root cause of the problems and permit greater flexibility in operation.
We consider this issue to be of high priority and requast that you assure that ycur organization addresses it accordingly.
We consider this issue to be of high priority and requast that you assure that ycur organization addresses it accordingly.
Sincerely.
Sincerely.
Oririnal signed ty i                                                                                           nm.a I. Marley.
Oririnal signed ty i
I Thomas E. Purley, Director i                                                                                         Office of Nuclear Reactor Regulation
nm.a I. Marley.
,                                            cc:   See next page IA/ l               }                 ll FDL133          (011-3         @D,1-3           AD;   R2:HRR         Jd)h
I Thomas E. Purley, Director i
!                                             MRUdd           JHopkins:sw   Watthws           Grairias                   a lbl.N/88         J0lyllE8         l;Ql88       lpigl88             /l!iVirg88 D Eb b>@ 1             j@
Office of Nuclear Reactor Regulation cc:
eld               ek         u ey
See next page IA l
((/4   8               /j 88       fth'/88 L
}
88120S0111 891202 PDR                         ADOCK 05000424 P                                       FDC
ll
/
Jd)h FDL1 3 (011-3
@D,1-3 AD; R2:HRR 3
/l!iVirg88 MRUdd JHopkins:sw Watthws Grairias a
D Eb lbl.N/88 J0lyllE8 l;Ql88 lpigl88 b>@ 1 j@
eld ek u ey
((/4 8
/j 88 fth'/88 L
88120S0111 891202 PDR ADOCK 05000424 P
FDC


  \     . ,.
\\
tir. Robert Scherer Georgia Power Company                 Vogtle Electric Generating Plant CC:
tir. Robert Scherer Georgia Power Company Vogtle Electric Generating Plant CC:
Mr. J. P. Kane                       Resident Inspector Manager, Licensing and Engineering   Nuclear Regulatory Commission Georgia Power Company                 P.O. Box 572 P.O. Box 4545                         Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Deppish Kirkland, !!!, Counsel Mr. Ruble A. Thomas                   Office of the Consumers' Utility Executive Consultant                   Council Southern Company Services, Inc.       Suite 225 P.O. Box P625                         32 Peachtree Street, N.E.
Mr. J. P. Kane Resident Inspector Manager, Licensing and Engineering Nuclear Regulatory Commission Georgia Power Company P.O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Deppish Kirkland, !!!, Counsel Mr. Ruble A. Thomas Office of the Consumers' Utility Executive Consultant Council Southern Company Services, Inc.
Birmingham, Alabama 35202             Atlanta, Georgia 30302 Mr. Paul D. Rice                     James E. Joiner Vice President & Project Director     Troutman, Sanders, Lockerman, Georgia Power Lompany                   & Ashmore Post Office Box 282                   1400 Candler Building Waynesboro, Georgia 30830             127 Peachtree Street, N.E.
Suite 225 P.O. Box P625 32 Peachtree Street, N.E.
Atlanta, Georgia 30303 Mr. J. A. Bailey Project Licensing Manager             Danny Feig Southern Company Services, Inc.       1130 Alta Avenue P.O. Box 2625                         Atlanta, Georgia 30307 Birmingham, Alabama 35202 Carol Stangler Ernest L. Blake, Jr.                 Georgians Against Nuclear Energy Bruce W. Churchill, Esq.             425 Euclid Terrace Shaw, Pittman, Potts and Trowbridge   Atlanta, Georgia 30307 2300 N Street, N. W.
Birmingham, Alabama 35202 Atlanta, Georgia 30302 Mr. Paul D. Rice James E. Joiner Vice President & Project Director Troutman, Sanders, Lockerman, Georgia Power Lompany
Washington, D. C. 20037               Mr. R. P. Mcdonald Executive Vice President -
& Ashmore Post Office Box 282 1400 Candler Building Waynesboro, Georgia 30830 127 Peachtree Street, N.E.
Mr. G. Bockhold, Jr.                   Nuclear Operations General Manager, Nuclear Operations   Georgia Power Company Georgia Power Company                 P.O. Box 4545 P.O. Box 1600                         Atlanta, Georgia 30302 Waynesboro, Georgia 30830 Regional Administrator, Region 11     Mr. W. G. Hairston, III U.S. Nuclear Regulatory Conrission   Nuclear Operations 101 Marietta Street, N.W., Suite 2900 Georgia Power Company Atlanta, Georgia 30323               P. O. Box 4545 Atlanta, Georgia 30302}}
Atlanta, Georgia 30303 Mr. J. A. Bailey Project Licensing Manager Danny Feig Southern Company Services, Inc.
1130 Alta Avenue P.O. Box 2625 Atlanta, Georgia 30307 Birmingham, Alabama 35202 Carol Stangler Ernest L. Blake, Jr.
Georgians Against Nuclear Energy Bruce W. Churchill, Esq.
425 Euclid Terrace Shaw, Pittman, Potts and Trowbridge Atlanta, Georgia 30307 2300 N Street, N. W.
Washington, D. C.
20037 Mr. R. P. Mcdonald Executive Vice President -
Mr. G. Bockhold, Jr.
Nuclear Operations General Manager, Nuclear Operations Georgia Power Company Georgia Power Company P.O. Box 4545 P.O. Box 1600 Atlanta, Georgia 30302 Waynesboro, Georgia 30830 Regional Administrator, Region 11 Mr. W. G. Hairston, III U.S. Nuclear Regulatory Conrission Nuclear Operations 101 Marietta Street, N.W., Suite 2900 Georgia Power Company Atlanta, Georgia 30323 P. O. Box 4545 Atlanta, Georgia 30302}}

Latest revision as of 17:08, 10 December 2024

Requests That Util Addresse Generic Ltr 88-17 Re Loss of DHR During Nonpower Operation
ML20196C890
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/02/1988
From: Murley T
Office of Nuclear Reactor Regulation
To: Scherer R
GEORGIA POWER CO.
References
GL-88-17, NUDOCS 8812080111
Download: ML20196C890 (2)


Text

____ _ _ - - _ _ _ _ _ _ - _ _ _ - _ _

o.

O Docket Nos.: 50-424 Distrubution 50 425

-6 NRC pDR Local PDR DEG w 21988 OGC 15-B-18 Mr. Robert Scherer Reading File V0GTLE Chief Executive Officer MRood JHopkins Georgia Power Company DMatthews SVarga P. O. Box 4545 Glainas EJordan HNBB-3302 i

Atlanta, Georgia 30302 ACRS(10)

H-1016 BGrimes 9-A-2 l

DCrutchfield 12-G-18 TMurley 12-G-18

Dear Mr. Scherer:

l l

SUBJECT:

LOSS OF DECAY HMAT REMOVAL i

We have just issued Generuc Letter 88-17 which addresses the loss of decay heat removal (DHR) during nonpower operation.

This letter was issued because of the potential serious consequence of loss of shutdowr, cooling concurrent with significant core decay heat.

Further, it is our belief that the industry as a whole has not aggressively responded to resolve the concern following its identification in our earlier Generic Letter 87-12.

In particular, the industry's response to the Generic Letter 87-12 was deficient in the areas of (1) prevention of accident initiation.

(2) mitigation of accidents before they potentially progress to core damage, and (3) control of radioactive material if a core damage accident snould occur.

Generic Letter 88-17 prescribes expeditious actions which should issediately ease the concerns; and parallel, but longer term, progranr.ed enhancements which effectively address the root cause of the problems and permit greater flexibility in operation.

We consider this issue to be of high priority and requast that you assure that ycur organization addresses it accordingly.

Sincerely.

Oririnal signed ty i

nm.a I. Marley.

I Thomas E. Purley, Director i

Office of Nuclear Reactor Regulation cc:

See next page IA l

}

ll

/

Jd)h FDL1 3 (011-3

@D,1-3 AD; R2:HRR 3

/l!iVirg88 MRUdd JHopkins:sw Watthws Grairias a

D Eb lbl.N/88 J0lyllE8 l;Ql88 lpigl88 b>@ 1 j@

eld ek u ey

((/4 8

/j 88 fth'/88 L

88120S0111 891202 PDR ADOCK 05000424 P

FDC

\\

tir. Robert Scherer Georgia Power Company Vogtle Electric Generating Plant CC:

Mr. J. P. Kane Resident Inspector Manager, Licensing and Engineering Nuclear Regulatory Commission Georgia Power Company P.O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Deppish Kirkland, !!!, Counsel Mr. Ruble A. Thomas Office of the Consumers' Utility Executive Consultant Council Southern Company Services, Inc.

Suite 225 P.O. Box P625 32 Peachtree Street, N.E.

Birmingham, Alabama 35202 Atlanta, Georgia 30302 Mr. Paul D. Rice James E. Joiner Vice President & Project Director Troutman, Sanders, Lockerman, Georgia Power Lompany

& Ashmore Post Office Box 282 1400 Candler Building Waynesboro, Georgia 30830 127 Peachtree Street, N.E.

Atlanta, Georgia 30303 Mr. J. A. Bailey Project Licensing Manager Danny Feig Southern Company Services, Inc.

1130 Alta Avenue P.O. Box 2625 Atlanta, Georgia 30307 Birmingham, Alabama 35202 Carol Stangler Ernest L. Blake, Jr.

Georgians Against Nuclear Energy Bruce W. Churchill, Esq.

425 Euclid Terrace Shaw, Pittman, Potts and Trowbridge Atlanta, Georgia 30307 2300 N Street, N. W.

Washington, D. C.

20037 Mr. R. P. Mcdonald Executive Vice President -

Mr. G. Bockhold, Jr.

Nuclear Operations General Manager, Nuclear Operations Georgia Power Company Georgia Power Company P.O. Box 4545 P.O. Box 1600 Atlanta, Georgia 30302 Waynesboro, Georgia 30830 Regional Administrator, Region 11 Mr. W. G. Hairston, III U.S. Nuclear Regulatory Conrission Nuclear Operations 101 Marietta Street, N.W., Suite 2900 Georgia Power Company Atlanta, Georgia 30323 P. O. Box 4545 Atlanta, Georgia 30302