ML20195H658: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_              -      .  . . . _ . . _  _      _-.      .. _ . _ _ ..
  ~
1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l                        DOCKET NO. 50-302/ LICENSE NO. DPR-72 l
l l
i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i
i Proposed Technical Specification Change Page l
l 9811240067 981117 DR  ADOCK 050003 2 i
I
 
            - . . . ~ .        .- . . - . . . . . - . - . _ - . - - - . - . . ~ . - . . - -              . . ~ . -              .--      =-.. . - .-
Reporting Requirements
      '.'                                                                                                                              5.7 5.7 Reporting Requirements 5.7.2                  Special Reports (continued)
: 5.          .For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.
: 6.          A deterministic assessment for the first span "B" 0TSG pit-like IGA.
Results of 0TSG tube inspections that fall into Category C-3                                        ,
shall be reported to the NRC prior to resumption of plant                                        'l operation. This report shall provide a description of                                              '
investigations conducted to determine cause of the tube l                                                      degradation and corrective measures taken to prevent recurrence.
I II I    I I
l l
l L
i' i
4                  Crystal River Unit 3                                                    5.0-29A                  Amendment No.
                                                  .            ..          .              .  -  -- -      .      .- ---------.--                -,}}

Revision as of 16:56, 13 November 2020

Proposed Improved Tech Specs (Its),Revising 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic
ML20195H658
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/17/1998
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20195H655 List:
References
NUDOCS 9811240067
Download: ML20195H658 (2)


Text

_ - . . . . _ . . _ _ _-. .. _ . _ _ ..

~

1 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 l DOCKET NO. 50-302/ LICENSE NO. DPR-72 l

l l

i ATTACHMENT LICENSE AMENDMENT REQUEST #221, REVISION 2 ONCE THROUGH STEAM GENERATOR TUBE SURVEILLANCE PROGRAM i

i Proposed Technical Specification Change Page l

l 9811240067 981117 DR ADOCK 050003 2 i

I

- . . . ~ . .- . . - . . . . . - . - . _ - . - - - . - . . ~ . - . . - - . . ~ . - .-- =-.. . - .-

Reporting Requirements

'.' 5.7 5.7 Reporting Requirements 5.7.2 Special Reports (continued)

5. .For first span "B" 0TSG pit-like IGA, a summary of analyses performed to determine if estimated leakage based on the projected end-of-cycle perce9t throughwall distribution-exceeds the leak limit (dete'rmined from the licensing basis dose calculation for the main steamline break) for the next operating cycle.
6. A deterministic assessment for the first span "B" 0TSG pit-like IGA.

Results of 0TSG tube inspections that fall into Category C-3 ,

shall be reported to the NRC prior to resumption of plant 'l operation. This report shall provide a description of '

investigations conducted to determine cause of the tube l degradation and corrective measures taken to prevent recurrence.

I II I I I

l l

l L

i' i

4 Crystal River Unit 3 5.0-29A Amendment No.

. .. . . - -- - . .- ---------.-- -,