ML20154E762: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:'     -
{{#Wiki_filter:'
        \,     -
\\,
(
(
e                                                              (
(
fh9         '$                            UNITED STATES 1 .
e fh9 UNITED STATES ATOMIC ENERGY COMMISSION 3
j.
j.
y i
i 1.
ATOMIC ENERGY COMMISSION g+                                   civistos or coMPM ANCE
g+
                                                            =casow v
y civistos or coMPM ANCE
                #fa allt SANCMort WAY Branstry, C AuroMNI A 94704                     ts=> m stat E.rt, M t October 10, 1969 C. S. Spencer, Senior Reactor Inspector Region V, Division of Compliance DIABLO CANYON UNIT NO.1, PACIFIC CAS AND El.ECTRIC COMPANY DOCKET NO. 50-275 The attached report contains the details of a recent visit to PG&E's home offices on September 16, 1969. The purpose of the visit was to review QC procedures concerning construction of the containment building and other Class I civil structures.
=casow v
#fa allt SANCMort WAY Branstry, C AuroMNI A 94704 ts=> m stat E.rt, M t October 10, 1969 C. S. Spencer, Senior Reactor Inspector Region V, Division of Compliance DIABLO CANYON UNIT NO.1, PACIFIC CAS AND El.ECTRIC COMPANY DOCKET NO. 50-275 The attached report contains the details of a recent visit to PG&E's home offices on September 16, 1969. The purpose of the visit was to review QC procedures concerning construction of the containment building and other Class I civil structures.
The reviewed procedures, if properly implemented, should provide us with the reasonable assurance necessary to conclude that the containment building will be constructed in conformance with the requirements contained in the PSAR.
The reviewed procedures, if properly implemented, should provide us with the reasonable assurance necessary to conclude that the containment building will be constructed in conformance with the requirements contained in the PSAR.
f ht.   ' f.'ovs W A.D..![hnson i
ht. ' f.'ovs W i
Reac tot / Ins pec tor                 l I
f A.D..![hnson Reac tot / Ins pec tor i
i i
i 1
1                                                                                                            1 0
1 0
i i
i i
l 8805200315 000510 PDR       FOIA J
l 8805200315 000510 PDR FOIA J
MCMILL ANBO-156 PDR                                                                 .
MCMILL ANBO-156 PDR w a i}}
;                                                                                          w a       #
i}}

Latest revision as of 01:03, 11 December 2024

Forwards Insp Rept 50-275/69-07 on 690916.No Nonconformance Noted
ML20154E762
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 10/10/1969
From: Andrea Johnson
US ATOMIC ENERGY COMMISSION (AEC)
To: Spencer G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20154C370 List:
References
FOIA-88-156 NUDOCS 8805200315
Download: ML20154E762 (1)


Text

'

\\,

(

(

e fh9 UNITED STATES ATOMIC ENERGY COMMISSION 3

j.

i 1.

g+

y civistos or coMPM ANCE

=casow v

  1. fa allt SANCMort WAY Branstry, C AuroMNI A 94704 ts=> m stat E.rt, M t October 10, 1969 C. S. Spencer, Senior Reactor Inspector Region V, Division of Compliance DIABLO CANYON UNIT NO.1, PACIFIC CAS AND El.ECTRIC COMPANY DOCKET NO. 50-275 The attached report contains the details of a recent visit to PG&E's home offices on September 16, 1969. The purpose of the visit was to review QC procedures concerning construction of the containment building and other Class I civil structures.

The reviewed procedures, if properly implemented, should provide us with the reasonable assurance necessary to conclude that the containment building will be constructed in conformance with the requirements contained in the PSAR.

ht. ' f.'ovs W i

f A.D..![hnson Reac tot / Ins pec tor i

i 1

1 0

i i

l 8805200315 000510 PDR FOIA J

MCMILL ANBO-156 PDR w a i