ML20154F001: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:_ _. | ||
.yy April 14, 1969 l | |||
April 14, 1969 l | |||
J. P. O'Reilly, Chief Reactor Inspection and Enforcement Branch Division of Compliance. Headquarters PACIPIC CAS & ELECIRIC COMPANY (DIABLO CANYON 10. I) - ICCKET No. 50-275 Cat 90WEALTil EDISON COMPANY (DRESDEN II) - DOCKET NO. 50-233 CPPR-18 The attached report of a vendor visit to Electric Steel Company (ESCO), Portland. Oregon, on March 28, 1969 is forwardsd for information. ESCO is manufacturing the fittings to be used in i | J. P. O'Reilly, Chief Reactor Inspection and Enforcement Branch Division of Compliance. Headquarters PACIPIC CAS & ELECIRIC COMPANY (DIABLO CANYON 10. I) - ICCKET No. 50-275 Cat 90WEALTil EDISON COMPANY (DRESDEN II) - DOCKET NO. 50-233 CPPR-18 The attached report of a vendor visit to Electric Steel Company (ESCO), Portland. Oregon, on March 28, 1969 is forwardsd for information. ESCO is manufacturing the fittings to be used in i | ||
the piping of the primary coolant system of PC&E's Diablo Canyon nuclear plant No.1. Since ESCO is also the manufacturer of the primary coolant pump suction covers for the Dresden 11 reactor, a review of the quality control ef forts related to these components was included during the visit at the request of Region III. | the piping of the primary coolant system of PC&E's Diablo Canyon nuclear plant No.1. | ||
Since ESCO is also the manufacturer of the primary coolant pump suction covers for the Dresden 11 reactor, a review of the quality control ef forts related to these components was included during the visit at the request of Region III. | |||
The evaluation of the vendor's quality assurance program (see Appendix A) is presented in what I consider to be a precise and concise fomat which clearly avoids any confusion with quality control programs. This fortsat also affords a uniforts basis for comparison evaluations of the varied quality assurance programe in effect at the construction sites and vendor plants. | The evaluation of the vendor's quality assurance program (see Appendix A) is presented in what I consider to be a precise and concise fomat which clearly avoids any confusion with quality control programs. This fortsat also affords a uniforts basis for comparison evaluations of the varied quality assurance programe in effect at the construction sites and vendor plants. | ||
Based on the information obtained during the visit, it appears that the activities of PG6F Westinghouse and ESCO are suf ficient to provide reasonable assurance that the pipe fittings manufactured by ESCO will be of a quality consistent with the requirements j | Based on the information obtained during the visit, it appears that the activities of PG6F Westinghouse and ESCO are suf ficient to provide reasonable assurance that the pipe fittings manufactured by ESCO will be of a quality consistent with the requirements j | ||
v.: | prescribed in the preliminary safety analysis report for the Diablo Canyon No. I nuclear power station. | ||
emer . | v.: | ||
~ | |||
emer. | |||
:.j./ g.. qi yJ 'lt'/" | .C0: V. | ||
.l. | |||
.y. | |||
:.j./ g.. qi sP4 | |||
: Par im.<, | |||
yJ 'lt'/" | |||
= | |||
= = =. = | |||
. =. = =. | |||
/,. | |||
T | |||
--) | |||
I | I J. P. O'Reilly April 14, 1969 1 | ||
J. P. O'Reilly | I t | ||
You will note that ESCO retains the radiographs of the fittings. | |||
During our next visit to PG&E we will review PG&E's over-all quality assurance-quality control progran and determiae the I | During our next visit to PG&E we will review PG&E's over-all quality assurance-quality control progran and determiae the I | ||
ultimate disposition of the film. | |||
1 I | 1 I | ||
l | l C. S. Spencer I | ||
Senior Reactor Inspector | Senior Reactor Inspector | ||
==Attachment:== | ==Attachment:== | ||
CO Rpt. Nos. 50-275/69-3 50-237/69-5 By A. D. Johnson W. E. Vetter dtd 4/14/69 I | CO Rpt. Nos. 50-275/69-3 50-237/69-5 By A. D. Johnson W. E. Vetter dtd 4/14/69 I | ||
i | i DISTRIBUTION: | ||
J. P. O'Reilly, CO:HQ (Orig, and Jne copy) | J. P. O'Reilly, CO:HQ (Orig, and Jne copy) | ||
E. G. Case, DRS R. S. Boyd, DRL (2) | E. G. Case, DRS R. S. Boyd, DRL (2) | ||
S. Levine. DRL (6) | S. Levine. DRL (6) | ||
D. J. Skovbolt. DRL (3) | D. J. Skovbolt. DRL (3) | ||
L. Kornblith, Jr. , CO HQ Regional Directors REG File l | L. Kornblith, Jr., CO HQ Regional Directors REG File l | ||
I | I M-W}} | ||
M-W}} | |||
Latest revision as of 01:01, 11 December 2024
Text
_ _.
.yy April 14, 1969 l
J. P. O'Reilly, Chief Reactor Inspection and Enforcement Branch Division of Compliance. Headquarters PACIPIC CAS & ELECIRIC COMPANY (DIABLO CANYON 10. I) - ICCKET No. 50-275 Cat 90WEALTil EDISON COMPANY (DRESDEN II) - DOCKET NO. 50-233 CPPR-18 The attached report of a vendor visit to Electric Steel Company (ESCO), Portland. Oregon, on March 28, 1969 is forwardsd for information. ESCO is manufacturing the fittings to be used in i
the piping of the primary coolant system of PC&E's Diablo Canyon nuclear plant No.1.
Since ESCO is also the manufacturer of the primary coolant pump suction covers for the Dresden 11 reactor, a review of the quality control ef forts related to these components was included during the visit at the request of Region III.
The evaluation of the vendor's quality assurance program (see Appendix A) is presented in what I consider to be a precise and concise fomat which clearly avoids any confusion with quality control programs. This fortsat also affords a uniforts basis for comparison evaluations of the varied quality assurance programe in effect at the construction sites and vendor plants.
Based on the information obtained during the visit, it appears that the activities of PG6F Westinghouse and ESCO are suf ficient to provide reasonable assurance that the pipe fittings manufactured by ESCO will be of a quality consistent with the requirements j
prescribed in the preliminary safety analysis report for the Diablo Canyon No. I nuclear power station.
v.:
~
emer.
.C0: V.
.l.
.y.
- .j./ g.. qi sP4
- Par im.<,
yJ 'lt'/"
=
= =.
. =. = =.
/,.
T
--)
I J. P. O'Reilly April 14, 1969 1
I t
You will note that ESCO retains the radiographs of the fittings.
During our next visit to PG&E we will review PG&E's over-all quality assurance-quality control progran and determiae the I
ultimate disposition of the film.
1 I
l C. S. Spencer I
Senior Reactor Inspector
Attachment:
CO Rpt. Nos. 50-275/69-3 50-237/69-5 By A. D. Johnson W. E. Vetter dtd 4/14/69 I
i DISTRIBUTION:
J. P. O'Reilly, CO:HQ (Orig, and Jne copy)
E. G. Case, DRS R. S. Boyd, DRL (2)
S. Levine. DRL (6)
D. J. Skovbolt. DRL (3)
L. Kornblith, Jr., CO HQ Regional Directors REG File l
I M-W