ML20154H832: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:. .. | ||
CONTAINMENT SYSTEMS SVRVEILLANCE RE0VIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE: | |||
: a. 1) Within 72 hours following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours, by verifying no detectable seal leakage by pressure decay when the volume between the door seals is pressurized to greater than or equal to Pa , 54.1 psia (39.4 psig), for at least 15 minutes; or | |||
: 2) Within 72 hours following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours, by verifying that the seal leakage is less than 0.01 L as determined by precision flow measurements when measured f8r at least 30 seconds with the volume beween the seals at a constant pressure of 54.1 psia (39.4 psig); | |||
or | |||
: 3) Within 72 hours following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours, by completing an overall air lock leakage test per 4.6.1.3.b. | |||
b. | |||
By 54.1 conducting psia (39.4overall air lock psig), and leakage verifying thetests at not overall less than air lock leakaP@e, rate is within its limit: | |||
: 1) At least once per 6 months,* and | |||
: 2) Prior to establishing CONTAINMENT INTEGRITY when maintenance has been performed on the air lock that could affect the air lock sealing capability.** | |||
: c. At least once per 6 months by verifying that only one door in each air lock can be opened at a time. | |||
*The provisions of Specification 4.0.2 are not applicable. | |||
**This represents an exemption to Appendix J, paragraph III.D.2.(b)(ii), of 10 CFR Part 50. | |||
un i cmur . IINIT '4 3/4 6-6 8805260081 880519 PDR ADOCK 05000423 P EqCTal}} | |||
Revision as of 01:35, 4 November 2020
| ML20154H832 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/19/1988 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20154H808 | List: |
| References | |
| NUDOCS 8805260081 | |
| Download: ML20154H832 (1) | |
Text
. ..
CONTAINMENT SYSTEMS SVRVEILLANCE RE0VIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
- a. 1) Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying no detectable seal leakage by pressure decay when the volume between the door seals is pressurized to greater than or equal to Pa , 54.1 psia (39.4 psig), for at least 15 minutes; or
- 2) Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that the seal leakage is less than 0.01 L as determined by precision flow measurements when measured f8r at least 30 seconds with the volume beween the seals at a constant pressure of 54.1 psia (39.4 psig);
or
- 3) Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following each closing, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by completing an overall air lock leakage test per 4.6.1.3.b.
b.
By 54.1 conducting psia (39.4overall air lock psig), and leakage verifying thetests at not overall less than air lock leakaP@e, rate is within its limit:
- 1) At least once per 6 months,* and
- 2) Prior to establishing CONTAINMENT INTEGRITY when maintenance has been performed on the air lock that could affect the air lock sealing capability.**
- c. At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- This represents an exemption to Appendix J, paragraph III.D.2.(b)(ii), of 10 CFR Part 50.
un i cmur . IINIT '4 3/4 6-6 8805260081 880519 PDR ADOCK 05000423 P EqCTal