ML20154R234: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter::
  -
M6
      :                                                                            M6
-
            '
,
    .
'
                                        September 21, 1988
.
        Docket No. 50-302
September 21, 1988
        License No. DPR-72
Docket No. 50-302
        Florida Power Corporation
License No. DPR-72
    / Mr. W. S. Wilgus
Florida Power Corporation
        Vice Presidant Nuclear Operations
/ Mr. W. S. Wilgus
        ATTN: Manager, Nuclear Licensing
Vice Presidant Nuclear Operations
        P. O. Box 219
ATTN: Manager, Nuclear Licensing
        Crystal River, FL 32629
P. O. Box 219
        Gentlemen:
Crystal River, FL 32629
        SUBJECT:     NRC INSPECTION REPORT NO. 50-302/88-25
Gentlemen:
        This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT:
        Keith R. Jury on August 22-26, 1988. The inspection included a review of
NRC INSPECTION REPORT NO. 50-302/88-25
        activities authorized for your Crystal River facility.       At the conclusion of
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
        the inspection, the findings were discussed with those members of your staff
Keith R. Jury on August 22-26, 1988.
        identified in the enclosed inspection report.
The inspection included a review of
        Areas examined during the inspection are identified in the report. Within
activities authorized for your Crystal River facility.
        these areas, the inspection consisted of selective examinations of procedures
At the conclusion of
        and representative records, interviews with personnel, and observation of
the inspection, the findings were discussed with those members of your staff
        activities in progress.
identified in the enclosed inspection report.
        Within the scope of the inspection, no violations or deviations were
Areas examined during the inspection are identified in the report.
        identified.
Within
        In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
these areas, the inspection consisted of selective examinations of procedures
        Title 10 Code of Federal Regulations, a copy of this letter and its enclosures
and representative records, interviews with personnel, and observation of
        will be placed in the NRC Public Document Room.
activities in progress.
        Should you have any questions concerning this letter, please contact us.
Within the scope of the inspection, no violations or deviations were
                                                  Sincerely.
identified.
                                                    Original signed by C. Julian
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
                                                  Caudie A. Julian, Chief
Title 10 Code of Federal Regulations, a copy of this letter and its enclosures
                                                  Operations Branch
will be placed in the NRC Public Document Room.
                                                  Division of Reactor Safety
Should you have any questions concerning this letter, please contact us.
        Enclosure:
Sincerely.
        NRC Inspection Report
Original signed by C. Julian
Caudie A. Julian, Chief
Operations Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
I
I
        cc w/ enc 1:   (See page 2)
cc w/ enc 1:
              881004v207 esayjg                                                         i (s
(See page 2)
              $DR     ADOCK 0500o3o2
881004v207 esayjg
                                  PCC
i (
                                                                                              .Iset
$DR
                                                                                        .-______-_w
ADOCK 0500o3o2
s
PCC
.Iset
.
.-
- w


            *
*
    .
.
          ,
,
  .
.
                *
*
      .                                                                               i
.
            Florida Power Corporation           2
i
                                                                  September 21, 1988
Florida Power Corporation
            cc w/ encl:
2
        VP. F. McKee, Director, Nuclear Plant Operations
September 21, 1988
        <E. C. Simpson, Director, Nuclear Site Support
cc w/ encl:
            State of Florida
VP. F. McKee, Director, Nuclear Plant Operations
            bec w/oncl:
<E. C. Simpson, Director, Nuclear Site Support
        viiRC Resident Inspector
State of Florida
              DRS, Technical Assistant
bec w/oncl:
              Document Control Desk                                                     l
viiRC Resident Inspector
                                                                                      ;
DRS, Technical Assistant
Document Control Desk
l
;
4
4
l
l
4
4
                                            %V
%V
                                        GBelisle    '
' ( ff
                                                            ' ( ff
,rlenjak
                                                        ,rlenjak
CAJul an
                                                          '
l
                                                                          CAJul an
KJuryltm
l
Elea
              KJuryltm       Elea
GBelisle
1
'
              09/ 20 /38     09/24/83   09/10/88       093)/88           09/2.//S3
'
                                                                                      ,
09/ 20 /38
09/24/83
09/10/88
093)/88
09/2.//S3
1
-
-
-
-
,
}}
}}

Latest revision as of 23:00, 10 December 2024

Forwards Insp Rept 50-302/88-25 on 880822-26.No Violations or Deviations Noted
ML20154R234
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/21/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20154R236 List:
References
NUDOCS 8810040207
Download: ML20154R234 (2)


See also: IR 05000302/1988025

Text

M6

-

,

'

.

September 21, 1988

Docket No. 50-302

License No. DPR-72

Florida Power Corporation

/ Mr. W. S. Wilgus

Vice Presidant Nuclear Operations

ATTN: Manager, Nuclear Licensing

P. O. Box 219

Crystal River, FL 32629

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-302/88-25

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Keith R. Jury on August 22-26, 1988.

The inspection included a review of

activities authorized for your Crystal River facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10 Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Original signed by C. Julian

Caudie A. Julian, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

I

cc w/ enc 1:

(See page 2)

881004v207 esayjg

i (

$DR

ADOCK 0500o3o2

s

PCC

.Iset

.

.-

- w

.

,

.

.

i

Florida Power Corporation

2

September 21, 1988

cc w/ encl:

VP. F. McKee, Director, Nuclear Plant Operations

<E. C. Simpson, Director, Nuclear Site Support

State of Florida

bec w/oncl:

viiRC Resident Inspector

DRS, Technical Assistant

Document Control Desk

l

4

l

4

%V

' ( ff

,rlenjak

CAJul an

l

KJuryltm

Elea

GBelisle

'

'

09/ 20 /38

09/24/83

09/10/88

093)/88

09/2.//S3

1

-

-

-

-

,