ML20138H658: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000409/1985016]]
| number = ML20138H658
| issue date = 10/23/1985
| title = Physical Security Insp Rept 50-409/85-16 on 850930-1004. Violations Noted:Failure to Maintain Clear Isolation Zone & Search Hardware & Some Alarm Zones Failed to Perform as Required.Details Withheld (Ref 10CFR73.21)
| author name = Christoffer G, Creed J, Drouin B
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000409
| license number =
| contact person =
| document report number = 50-409-85-16, NUDOCS 8510290115
| package number = ML20138H609
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 2
}}
See also: [[see also::IR 05000930/2010004]]
 
=Text=
{{#Wiki_filter:.                                            _.
    .
  .
                                      U.S. NUCLEAR REGULATORY COMMISSION
                                                    REGION III                                                            j
        Report No. 50-409/8501G(ORSS)
,
        Docket No. 50-409                                                          License No. DPR-45
^
        Licensee:    Dairyland Power Cooperative
4                    2615 East Avenue-South
                      Lacrosse, WI 54601
        Facility Name:      Lacrosse Boiling Water Reactor (LACBWR)
        Inspection At:      LACBWR Site, Genoa, WI
,
        Inspection Conducted:          September 30 through October 4, 1985
        Date of Last Physical Protection Inspection:              November 27-30, 1984
,        Type of Inspection:        Unannounced Physical Security Inspection
,
        Inspectors:h.b
                                          e
                              C Christoffer                                                    Date
                                                                                                  /3/ZI/6f
                        Physical Security Inspector
                                                    *
                          ~
                                            m                                                  js/?'1
                        B. Drafjin/                                                          Dat'e'
                                                                                                        ' -C s'
!                      Physical Security Inspector
;
        Approved By:
                            .  1. Creed, Chief                                                Date
                                                                                                  h/A5k
                              feguards Section
4
'
        Inspection Summary
        Inspection on September 30 through October 4, 1985 (Report No. 50-409/85016(DRSS))
        Areas Inspected: Included a review of the licensee's action on Previous
        Inspection Findings; Security Plan and Implementing Procedures; Management
        Effectiveness; Security Organization, Security Program Audit; Records and
        Reports; Testing and Maintenance; Physical Barriers - Protected and Vital Areas;
        Assessment Aids; Access Control - Persor.nel; re'ection Aids - Protected Areas;
;      Training and Qualifications - General Requirements and Safeguards Contingency
'
        Plan. The inspection involved 64 inspector hours by two NRC inspectors. The
        inspection began during the day shift.
        Results: The licensee was found to be in compliance with NRC requirements
,
        within the areas examined, except as noted below:
                                                                                    EY 10sure contains
                                                                                    SAFECUARDS INFORMATION
                                                                                    Uron sept. ration this
                  B510P90115
                  PDR    ADOCA 0 85        p g ,g                                    p G TG Decontrolled
                  G
      -.        -    -
                                        -                  _
                                                              .-__ - - _ . - _ -                .        . , . - . - , -
 
    - _ .  ..                ..      .        .  ..  - - -    ..    _              _
                                                                                                    -_
              *
  1
          .
                1.  . Physical Barriers - Protected Areas:
;
;                    Failure to maintain a clear isolation zone.
                2.  Physical Barriers - Vital Areas:
t-                    A security screen was inadequately fastened to a vital area structure.
  i              3.  Access Control - Personnel:                                                      '
                                                                                                        :
                      Search hardware failed to perform as required
.
                4.  Detection Aids - Protected Areas:
,
                      Some alarm zones failed to perform as required.
                                                                                                      i
j              (DETAILS: UNCLASSIFIED SAFEGUARD INFCRMATION)
                                                                                                      !
,                                                                                                      t
                                                                                                      :
                                                                                                      .
                                                                      .#.nclosure cor.tains
                                                                      SlEECUARDS I:iFORMATION
                                                                      Upon secaration this
                                                                      page is Decontrolled
                                                              2
                                                                                _.., __..__  ..._ __
}}

Revision as of 04:44, 12 August 2020