ML20128Q366: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Awana:w | ||
=. | |||
~ | |||
o; | |||
((y | , ((y BROOKHAVEN NATIONAL LABORATORY F | ||
'?E]7 ASSOCIATED UNIVERSITIES, INC. | |||
Upton, Long is!cnd. New York 11973 (516)282s Department of Nuclear Energy | L{0 L' a | ||
Dr. Ashok Thadani Reliability and Risk Assessment Branch Division of Safety Technology Office of Nuclear Reactor Regulation | Upton, Long is!cnd. New York 11973 (516)282s Department of Nuclear Energy FTS 666 2363 June 12, 1984 Dr. Ashok Thadani Reliability and Risk Assessment Branch Division of Safety Technology Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 | ||
==Dear Dr. Thadani:== | ==Dear Dr. Thadani:== | ||
As per the conference call held on June 12, 1984, between yourself and R. A. Bari, R. W. Youngblood, and K. Shiu, it will be necessary to revise the schedule for the Shoreham PRA Review (FIN A-3740). The new schedule is as follows: | As per the conference call held on June 12, 1984, between yourself and R. A. Bari, R. W. Youngblood, and K. Shiu, it will be necessary to revise the schedule for the Shoreham PRA Review (FIN A-3740). The new schedule is as follows: | ||
Draft Report | Draft Report October 15, 1984 Final Report 2 months after receipt of appropriate NRC Comments. | ||
This has been necessitated by the diversion of key personnel from the Shoreham project to work on Gessar (FIN A-3366), which per your instruc-tions, has a higher priority. Specifically, BNL will contribute to prepara-tion of the SER, and will provide technical assistance to NRC in treating | This has been necessitated by the diversion of key personnel from the Shoreham project to work on Gessar (FIN A-3366), which per your instruc-tions, has a higher priority. Specifically, BNL will contribute to prepara-tion of the SER, and will provide technical assistance to NRC in treating design improvements and possibly Unresolved Safety Issues. Additional funds needed for work going beyond the present requirements of FIN A-3366 will be l | ||
design improvements and possibly Unresolved Safety Issues. Additional funds | identified shortly. This schedule for the Shoreham review assumes that there will be no substantial diversion of key personnel to provide technical sup-c, port for the Limerick hearings. | ||
needed for work going beyond the present requirements of FIN A-3366 will be identified shortly. This schedule for the Shoreham review assumes that there | |||
will be no substantial diversion of key personnel to provide technical sup-port for the Limerick hearings. | |||
If you have any questions, please do not hesitate to call me. | If you have any questions, please do not hesitate to call me. | ||
Sinc rely ou r , | Sinc rely ou r, | ||
8507130419 850426 PDR | 8507130419 850426 PDR FOIA BELAIR85-199 PDR Robert You gblood RY/nn cc: | ||
R. Bari W. Kato E. Chow | K. Shiu R. Hall R. Bari W. Kato E. Chow | ||
A. Busiik | \\ | ||
A. Busiik | |||
.}} | |||
Latest revision as of 12:33, 12 December 2024
Text
Awana:w
=.
~
o;
, ((y BROOKHAVEN NATIONAL LABORATORY F
'?E]7 ASSOCIATED UNIVERSITIES, INC.
L{0 L' a
Upton, Long is!cnd. New York 11973 (516)282s Department of Nuclear Energy FTS 666 2363 June 12, 1984 Dr. Ashok Thadani Reliability and Risk Assessment Branch Division of Safety Technology Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Dr. Thadani:
As per the conference call held on June 12, 1984, between yourself and R. A. Bari, R. W. Youngblood, and K. Shiu, it will be necessary to revise the schedule for the Shoreham PRA Review (FIN A-3740). The new schedule is as follows:
Draft Report October 15, 1984 Final Report 2 months after receipt of appropriate NRC Comments.
This has been necessitated by the diversion of key personnel from the Shoreham project to work on Gessar (FIN A-3366), which per your instruc-tions, has a higher priority. Specifically, BNL will contribute to prepara-tion of the SER, and will provide technical assistance to NRC in treating design improvements and possibly Unresolved Safety Issues. Additional funds needed for work going beyond the present requirements of FIN A-3366 will be l
identified shortly. This schedule for the Shoreham review assumes that there will be no substantial diversion of key personnel to provide technical sup-c, port for the Limerick hearings.
If you have any questions, please do not hesitate to call me.
Sinc rely ou r,
8507130419 850426 PDR FOIA BELAIR85-199 PDR Robert You gblood RY/nn cc:
K. Shiu R. Hall R. Bari W. Kato E. Chow
\\
A. Busiik
.