f.,                                                           APPENDIX B
f.,
                                                U. S. NUCLEAR REGULATORY CONNISSION
APPENDIX B
                                                                REGION IV
U. S. NUCLEAR REGULATORY CONNISSION
REGION IV
'
'
      '
I
I
                    NRC Inspection Report:         50-313/85-15                 License:   DPR-51
'
                                                    50-368/85-16                           NPF-6
NRC Inspection Report:
                    Dockets:     50-313
50-313/85-15
I                                 S0-368
License:
,                    Licensee:     Arkansas Power and Light Coepany
DPR-51
                                  P. O. Box 511
50-368/85-16
                                  Little Rock, Arkansas         72203
NPF-6
                    Facility Name:       Arkansas Nuclear One (ANO), Units 1 and 2
Dockets:
                    Inspection At:       ANO Site, Russellville, Arkansas
50-313
                    Inspection Conducted:         May 20-24, 1985
I
S0-368
Licensee:
Arkansas Power and Light Coepany
,
P. O. Box 511
Little Rock, Arkansas
72203
Facility Name:
Arkansas Nuclear One (ANO), Units 1 and 2
Inspection At:
ANO Site, Russellville, Arkansas
Inspection Conducted:
May 20-24, 1985
l
l
                    Inspector:                         _            -                        7     /r.f~~
Inspector:
                                    M. E. MurVFy, Refc W nspector                             Date '
7
                                                                                                    ~
/r.f~~
_
-
M. E. MurVFy, Refc W nspector
Date '
~
l
l
                                      Special Projects and Engineering Section
Special Projects and Engineering Section
f
f
Approved:
[A
I
7//7 MS'
l
l
                    Approved:                  [A
R. E. Irniand, Chief
                                      R. E. Irniand, Chief
~
                                                              I    ~
'
                                                                          '
Dafte
                                                                                                7//7'MS'
' ~
                                                                                              Dafte      ~
l
l                                     Special Projects and Engineering Section
Special Projects and Engineering Section
!
!
l
l
                                    -         l
-
                                          E. Harfin7 CNTef/ Project Section A
l
                                                                                              7 3 lPJ''
7 3 lPJ''
                                                                                              Fate'
h L'. E. Harfin7 CNTef/ Project Section A
                      ,
Fate'
                              h  L'.Reactor   Project Branch 2
Reactor Project Branch 2
                    Inspection Summary
,
                    Inspection conducted May 20 24. 1985 (Report 50 313/85-15: 50 368/85 16)
Inspection Summary
Inspection conducted May 20 24. 1985 (Report 50 313/85-15: 50 368/85 16)
i
i
                    Areas Inspected           Noutine, unannounced inspection of fire protection / prevention ,
Areas Inspected
                    program implementation; review of actions on previously identified inspection
Noutine, unannounced inspection of fire protection / prevention
,                  findings and actions taken on fire protection / prevention related LERs.
,
l                  The inspection involved 30 Inspector hours onsite by one NHC inspector.
program implementation; review of actions on previously identified inspection
!                  Results      Within the three areas inspected, one violation was identified
findings and actions taken on fire protection / prevention related LERs.
l                  [failuretomaintainprocedures, paragraph 4).
,
l
l
                            N           3
The inspection involved 30 Inspector hours onsite by one NHC inspector.
            _ _               --           _                  _        -
!
Results
Within the three areas inspected, one violation was identified
l
[failuretomaintainprocedures, paragraph 4).
l
N
3
_ _
--
-


                                  __ _                                           _ _-
__ _
  *
_
_-
*
.
.
                                            2
2
                                          DETAILS
DETAILS
    1.   Persons Contacted
1.
      *B. Baker, Operations Manager
Persons Contacted
        P. Campbell, Plant Licensing Engineer
*B. Baker, Operations Manager
      *T. Cogburn, Special Projects Manager
P. Campbell, Plant Licensing Engineer
        L. Gulick, Operations Soperintendent, Unit 2
*T. Cogburn, Special Projects Manager
      *R. Hargrove, Lead Trainer, Classroom
L. Gulick, Operations Soperintendent, Unit 2
        L. Humphrey, Administration Manager
*R. Hargrove, Lead Trainer, Classroom
      *J. Lamb, Safety & Fire Prevention Coordinator
L. Humphrey, Administration Manager
      *J. Levine, General Manager, ANO
*J. Lamb, Safety & Fire Prevention Coordinator
      *D. Lomax, Plant Licensing Supervisor
*J. Levine, General Manager, ANO
        J. McWilliams, Operations Superintendent, Unit 1
*D. Lomax, Plant Licensing Supervisor
        J. Montgomery, Human Resources Supervisor
J. McWilliams, Operations Superintendent, Unit 1
      *M. Pendergrass, General Manager, Technical Services
J. Montgomery, Human Resources Supervisor
      *R. Rispoli, Fire Protection Specialist
*M. Pendergrass, General Manager, Technical Services
      *L. Sanders, Maintenance Manager
*R. Rispoli, Fire Protection Specialist
        C. Shively, Plant Engineering Superintendent
*L. Sanders, Maintenance Manager
      *G. Storey, Safety and Fire Prevention Coordinator
C. Shively, Plant Engineering Superintendent
                                                                                      i
*G. Storey, Safety and Fire Prevention Coordinator
      * Denotes those present at the exit interview.
i
    2. Licensee Action on Previous Inspection Findinas
* Denotes those present at the exit interview.
        (0 pen) Deviation 50-313/8215-03; 50-368/8212-02: This deviation identified
2.
        electrical conduit installations, which had unsealed air gaps external to
Licensee Action on Previous Inspection Findinas
        the conduits, penetrating the lintels above fire doors 46, 259, 260,
(0 pen) Deviation 50-313/8215-03; 50-368/8212-02:
        and 271. The NRC inspector determined that the air gaps have been
This deviation identified
        sealed. However, subsequent to the original inspection, a generic issue
electrical conduit installations, which had unsealed air gaps external to
        was raised concerning modifications to UL rated fire door assembifes.
the conduits, penetrating the lintels above fire doors 46, 259, 260,
        There are cases where UL has a110wed the ratin0 to stand where minor
and 271.
        modifications have occurred if they are inspected by a UL representative
The NRC inspector determined that the air gaps have been
        and it is documented that the existing condition is acceptable. The
sealed.
        Ilconsee has determined that fire Door 46 is no longer in a Technical
However, subsequent to the original inspection, a generic issue
        Specification fire barrier and should be deleted from this item.     The
was raised concerning modifications to UL rated fire door assembifes.
        licensen informed the NRC inspector that UL representativos have reviewed
There are cases where UL has a110wed the ratin0 to stand where minor
        the remaining door configurations and deemed them acceptable, however,
modifications have occurred if they are inspected by a UL representative
        supporting documentation from UL was not available. Pending receipt and
and it is documented that the existing condition is acceptable.
        availability for review in a future inspection, this deviation will remain
The
        open.
Ilconsee has determined that fire Door 46 is no longer in a Technical
        (Closed) Open Item 50 313/0215-04; $0-368/8212 03:     This item was open
Specification fire barrier and should be deleted from this item.
        pending resolution of the followin0 specific items and completion of the
The
        licensee's review for 10 CFR 50, Appendix R, Item !!! 0:
licensen informed the NRC inspector that UL representativos have reviewed
the remaining door configurations and deemed them acceptable, however,
supporting documentation from UL was not available.
Pending receipt and
availability for review in a future inspection, this deviation will remain
open.
(Closed) Open Item 50 313/0215-04; $0-368/8212 03:
This item was open
pending resolution of the followin0 specific items and completion of the
licensee's review for 10 CFR 50, Appendix R, Item !!! 0:


    *
*
  .
.
                                          3
3
      a.   Barrier material not yet accepted as a "3-hour barrier."
a.
      b.   Terminal boxes not covered by barrier material in conduit runs
Barrier material not yet accepted as a "3-hour barrier."
            already covered.
b.
      c.   Conduit above door 57 only covered for half its length.
Terminal boxes not covered by barrier material in conduit runs
      The licensee has completed the 10 CFR 50, Appendix R, review and is now
already covered.
      resolving exemption requests. Appendix R compliance inspection is to be
c.
      scheduled at a later date.
Conduit above door 57 only covered for half its length.
      Specific item resolution was inspected and it was found that the
The licensee has completed the 10 CFR 50, Appendix R, review and is now
      installation of barrier material had been significantly redefined.   The
resolving exemption requests.
      separation criteria requires only a "1-hour barrier" and this has been
Appendix R compliance inspection is to be
      installed on conduits with cables of concern and is the Hemyc Barrier
scheduled at a later date.
      System. Terminal boxes in the conduit runs were covered. The conduit
Specific item resolution was inspected and it was found that the
      above Door 57 was determined not to contain any cables of concern.
installation of barrier material had been significantly redefined.
      Adequacy of the review and determination of the cables of concern will
The
      be addressed and inspected during the inspection for Appendix R
separation criteria requires only a "1-hour barrier" and this has been
      compliance. This item is closed.
installed on conduits with cables of concern and is the Hemyc Barrier
      (0pon) Open Item 50-313/8215-05: Thic item is open pending final action
System.
      by NRR on the final test results for cable penetration fire stop design.
Terminal boxes in the conduit runs were covered.
      This item remains open.
The conduit
      (Closed) Open Item 50-368/8212-04:   This item was open pending
above Door 57 was determined not to contain any cables of concern.
      determination by the Itcensee that Motor Control Center 2051 would not be
Adequacy of the review and determination of the cables of concern will
      subject to flooding because of the location of the water suppression
be addressed and inspected during the inspection for Appendix R
      system spray head. The NRC inspector determined that the licensee has
compliance.
      installed a deflector spray shield between the spray head and the panel.
This item is closed.
      It has also been confirmed that the panel accesses are all rubber
(0pon) Open Item 50-313/8215-05:
      gasketed. This item is closed.
Thic item is open pending final action
      (Closed) Open Item 50-368/0212-05:   This item was open pending repair or
by NRR on the final test results for cable penetration fire stop design.
      replacement of damaged fire retardant board installed on a cable tray in
This item remains open.
      the electrical equfpment room. After the Appendix R, evaluation it was
(Closed) Open Item 50-368/8212-04:
      found that separation was met and that it was not necessary to take
This item was open pending
      credit for the board. This item is closed.
determination by the Itcensee that Motor Control Center 2051 would not be
      (Closed) Vlointion 50-368/8325-02: This violation identified that two
subject to flooding because of the location of the water suppression
      designated fire doors. Doors 267 and 340, had gaps from door to floor in
system spray head.
      excess of 3/4-inch and that no fire watches were estab11shed. The
The NRC inspector determined that the licensee has
      licensens immediate corroative action, establishing a fire watch and
installed a deflector spray shield between the spray head and the panel.
      initiating a station wide inspection of all fire doors is considered
It has also been confirmed that the panel accesses are all rubber
      adequate.   Doors 267 and 340 now have air gaps of less than 3/4-inch.
gasketed.
!     Other doors identified in LERs 50 313/83-023 and 50 360/83 045 have also
This item is closed.
i     been corrected. The air gap criteria is now in Surveillanco Procedure
(Closed) Open Item 50-368/0212-05:
j     1300.05 and is checked every 18 months. This item la closed.
This item was open pending repair or
replacement of damaged fire retardant board installed on a cable tray in
the electrical equfpment room.
After the Appendix R, evaluation it was
found that separation was met and that it was not necessary to take
credit for the board.
This item is closed.
(Closed) Vlointion 50-368/8325-02:
This violation identified that two
designated fire doors. Doors 267 and 340, had gaps from door to floor in
excess of 3/4-inch and that no fire watches were estab11shed.
The
licensens immediate corroative action, establishing a fire watch and
initiating a station wide inspection of all fire doors is considered
adequate.
Doors 267 and 340 now have air gaps of less than 3/4-inch.
!
Other doors identified in LERs 50 313/83-023 and 50 360/83 045 have also
i
been corrected.
The air gap criteria is now in Surveillanco Procedure
j
1300.05 and is checked every 18 months.
This item la closed.
I
I
                                                                                i
i
.
.
. .
.
.
.
.


                      _ _ _ . _ _ - - - - - - - - . - - - - -
,
,
  '
_ _ _ . _ _ - - - - - - - - . - - - - -
                                                                  ,
'
                                                                    4
,
        -
4
    3. Licensee Event Report (LER) Followup (Unit I and 2)
-
      Through direct observation, discussions with licensee personnel, and
3.
      review of records, the following fire protection / fire prevention related
Licensee Event Report (LER) Followup (Unit I and 2)
      LERs were reviewed to determine that reportability requirements were
Through direct observation, discussions with licensee personnel, and
      fulfilled, immediate corrective action was accomplished, and corrective
review of records, the following fire protection / fire prevention related
      action to prevent recurrence has been accomplished.
LERs were reviewed to determine that reportability requirements were
      Unit 1
fulfilled, immediate corrective action was accomplished, and corrective
      LER 83-021 dealt with the discovory that cross wiring had occurred on two
action to prevent recurrence has been accomplished.
      deluge valves. The specific problem was corrected and similar
Unit 1
      installations were checked for the same problem. This LER is considered
LER 83-021 dealt with the discovory that cross wiring had occurred on two
      closed.
deluge valves.
      LERs 82-018 and 83-023 dealt with degradation of fire barriers and
The specific problem was corrected and similar
      resulted in an extensive walkdown of all fire barriers, identification
installations were checked for the same problem.
      and correction of all de0raded conditions. The licensee is presently
This LER is considered
      conducting the first 18-month surveillance of fire barriers since the
closed.
      implementation of the extensive review program.                           Subsequent inspections
LERs 82-018 and 83-023 dealt with degradation of fire barriers and
      will review the results of corrective actions taken.                           The LERs are
resulted in an extensive walkdown of all fire barriers, identification
      considered closed.
and correction of all de0raded conditions.
      Unit 2                                                                                               i
The licensee is presently
                                                                                                            i
conducting the first 18-month surveillance of fire barriers since the
      LERs 81-042, 82-039, 83-004, 83-008, 83-021, 83-026, 83-032,                                         i
implementation of the extensive review program.
      83-042, 83-045, 84-015, and 84-017 dealt with degradation of fire
Subsequent inspections
      barriers and resulted in an extensive walkdown of all fire barriers,
will review the results of corrective actions taken.
      identification and correction of all degraded conditions. The licensee
The LERs are
      will conduct the first 18-month surveillance of fire barriers following
considered closed.
      this extensive review program after completion of the Unti 1
Unit 2
      surveillance. Adequacy of corrective actions will be reviewed in future
i
      inspections.   These LENS are considered closed.
i
      LER 82-029 dealt with the pulling of cable through a fire damper
LERs 81-042, 82-039, 83-004, 83-008, 83-021, 83-026, 83-032,
      openin0     Immediate and long term corrective action was adequate.                           This
i
      LER is considered closed.
83-042, 83-045, 84-015, and 84-017 dealt with degradation of fire
      LER 83-033 dealt with the floor to door air gap problem. This item is
barriers and resulted in an extensive walkdown of all fire barriers,
      addressed in detall in paragraph 2 of this report under Violation
identification and correction of all degraded conditions.
      50 368/8325 02.                             This LER la considered closed.
The licensee
      LER 83 035 dealt with the potentini for flooding in certain areas
will conduct the first 18-month surveillance of fire barriers following
      protected by deluge systems because of inadequate drain capacity.                             This
this extensive review program after completion of the Unti 1
      item is still under review by the Itconsee's engineering organlantion.
surveillance.
      LER 83 037 dealt with the penetration of fire door lintels by conduit.
Adequacy of corrective actions will be reviewed in future
      This item was addressed in detail in paragraph 2 of this report under
inspections.
      Deviation 50 368/8212 02.
These LENS are considered closed.
                                                                                    ..
LER 82-029 dealt with the pulling of cable through a fire damper
                                                              __                                  .     .
openin0
Immediate and long term corrective action was adequate.
This
LER is considered closed.
LER 83-033 dealt with the floor to door air gap problem.
This item is
addressed in detall in paragraph 2 of this report under Violation
50 368/8325 02.
This LER la considered closed.
LER 83 035 dealt with the potentini for flooding in certain areas
protected by deluge systems because of inadequate drain capacity.
This
item is still under review by the Itconsee's engineering organlantion.
LER 83 037 dealt with the penetration of fire door lintels by conduit.
This item was addressed in detail in paragraph 2 of this report under
Deviation 50 368/8212 02.
__
..
.
.


                                                                  _ _ _ _ _ _ _ . _ _ -------
_ _ _ _ _ _ _ . _ _ -------
  ,
..
    ..
,
                                              5
5
          LER 84-016 dealt with the discovery of an inoperable fire damper.                     The
LER 84-016 dealt with the discovery of an inoperable fire damper.
          licensee's investigation of this item is continuing.
The
          LER 84-029 dealt with a fire door automatic closure mechanism that failed
licensee's investigation of this item is continuing.
          to work.   The licensee has increased the frequency of inspection of high
LER 84-029 dealt with a fire door automatic closure mechanism that failed
          usage doors. This LER is considered closed.
to work.
      4. Fire Protection / Prevention Program Implementation
The licensee has increased the frequency of inspection of high
          This inspection was conducted to determined that the licensee is
usage doors.
          implementing a program for fire protection and prevention that is in
This LER is considered closed.
          conformance with regulatory requirements and industry guides and
4.
          standards.                                                                                 l
Fire Protection / Prevention Program Implementation
          The NRC inspector toured accessible areas of the plant site for general
This inspection was conducted to determined that the licensee is
          area condition, work activities in progress, and visual condition
implementing a program for fire protection and prevention that is in
          of fire protection systems and equipment. It was found that combustible
conformance with regulatory requirements and industry guides and
          materials, flammable and combustible liquid and gas usage is restricted or
standards.
          properly controlled in areas containing safety-related equipment and
l
          components.
The NRC inspector toured accessible areas of the plant site for general
          There were no welding, cutting, or use of open flame ignition sources
area condition, work activities in progress, and visual condition
          found in the areas toured. General housekeeping conditions were found to
of fire protection systems and equipment.
          be very good. There were no construction or maintenance activities in
It was found that combustible
          progress in the toured areas.
materials, flammable and combustible liquid and gas usage is restricted or
          Fire protection systems and equipment installed for protection of safety
properly controlled in areas containing safety-related equipment and
          related areas were found to be functional, and tested in accordance with
components.
          the requirements specified in the Technical Specifications. Fire brigade
There were no welding, cutting, or use of open flame ignition sources
          equipment including emergency breatising apparatus was found to be
found in the areas toured.
          properly stored and maintained.
General housekeeping conditions were found to
          However, the isolation valve, 2FS-106, for the pre-action valve for
be very good.
          Corridor 2139 suppression system was found shut. Discussion with the
There were no construction or maintenance activities in
          licensee's representative confirmed that this valve was shut because the
progress in the toured areas.
          exemption request to delete the requirement for a suppression systea for
Fire protection systems and equipment installed for protection of safety
          Corridor 2139 had been granted. Subsequent review shows that
related areas were found to be functional, and tested in accordance with
          Procedure 2203.09, Revision 0, dated June 26, 1981, " Fire Protection
the requirements specified in the Technical Specifications.
          System Annunciator Corrective Action," in Attachment A, 1-5-5 " Corridor by
Fire brigade
          Emergency Control Room Chillers Zone Module" still assumes that the
equipment including emergency breatising apparatus was found to be
          pre-action valve is available for remote operation in the control room.
properly stored and maintained.
          This procedure should have been revised to reflect the system status
However, the isolation valve, 2FS-106, for the pre-action valve for
i         change and insure the operator had an operable action for this area.
Corridor 2139 suppression system was found shut.
          Failure to maintain procedures covering activities in the area of fire
Discussion with the
          protection program implementation is an apparent violation.
licensee's representative confirmed that this valve was shut because the
          (50-368/8516-01)
exemption request to delete the requirement for a suppression systea for
          The NRC inspector also reviewed fire brigade training and drill records
Corridor 2139 had been granted.
          and reviewed the current roster of qualified brigade members. TF9
Subsequent review shows that
          records were in order and confirmed that training and drills are being
Procedure 2203.09, Revision 0, dated June 26, 1981, " Fire Protection
          conducted at the specified intervals.
System Annunciator Corrective Action," in Attachment A, 1-5-5 " Corridor by
Emergency Control Room Chillers Zone Module" still assumes that the
pre-action valve is available for remote operation in the control room.
This procedure should have been revised to reflect the system status
i
change and insure the operator had an operable action for this area.
Failure to maintain procedures covering activities in the area of fire
protection program implementation is an apparent violation.
(50-368/8516-01)
The NRC inspector also reviewed fire brigade training and drill records
and reviewed the current roster of qualified brigade members.
TF9
records were in order and confirmed that training and drills are being
conducted at the specified intervals.
f
f
                                          .
.
                                                                                              .
.


                                                                              a
af
                                                                              f                                a
a
                                                                        c
c
      , . . .                                                                     .
. .
                                                        6
.
                  The'NRC inspector;also observed a bands on training session at the
, .
                  recently completed " burn building." Continued development of the use of
6
                  this facility' as presently planned should;enchance the practical factors
The'NRC inspector;also observed a bands on training session at the
                        -
recently completed " burn building." Continued development of the use of
    ;              of the training program.
this facility' as presently planned should;enchance the practical factors
              5.~ Exit-Interview
-
                  'An exit interview.was conducted May 24, 1985, with those personnel denoted
of the training program.
                  in paragraph 1 of this' report. The senior resident inspector also
;
                  attended this exit meeting.     At this exit interview, the NRC inspector
5.~
                  -summarized the scope and findings of the inspection.
Exit-Interview
'An exit interview.was conducted May 24, 1985, with those personnel denoted
in paragraph 1 of this' report.
The senior resident inspector also
attended this exit meeting.
At this exit interview, the NRC inspector
-summarized the scope and findings of the inspection.
I
I
.
.
  '
'
      .
.
o
o
l
l
                                                                                                                          .
.
                                N
N
                          ,
,
                                                                    ---         _-   _ _ _ _ . _ _ - _ - - - - - _ _ _ _ _
---
_-
_ _ _ _ . _ _ - _ - - - - - _ _ _ _ _
}}
}}

Latest revision as of 08:25, 12 December 2024

Insp Repts 50-313/85-15 & 50-368/85-16 on 850520-24. Violation Noted:Failure to Maintain Procedure Re Fire Protection Program Implementation Activities
ML20133F638
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/23/1985
From: Ireland R, Martin L, Murphy M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20133F585 List:
References
50-313-85-15, 50-368-85-16, NUDOCS 8508080367
Download: ML20133F638 (6)


See also: IR 05000313/1985015

Text

,

- -

, , . .

J

f.,

APPENDIX B

U. S. NUCLEAR REGULATORY CONNISSION

REGION IV

'

I

'

NRC Inspection Report:

50-313/85-15

License:

DPR-51

50-368/85-16

NPF-6

Dockets:

50-313

I

S0-368

Licensee:

Arkansas Power and Light Coepany

,

P. O. Box 511

Little Rock, Arkansas

72203

Facility Name:

Arkansas Nuclear One (ANO), Units 1 and 2

Inspection At:

ANO Site, Russellville, Arkansas

Inspection Conducted:

May 20-24, 1985

l

Inspector:

7

/r.f~~

_

-

M. E. MurVFy, Refc W nspector

Date '

~

l

Special Projects and Engineering Section

f

Approved:

[A

I

7//7 MS'

l

R. E. Irniand, Chief

~

'

Dafte

' ~

l

Special Projects and Engineering Section

!

l

-

l

7 3 lPJ

h L'. E. Harfin7 CNTef/ Project Section A

Fate'

Reactor Project Branch 2

,

Inspection Summary

Inspection conducted May 20 24. 1985 (Report 50 313/85-15: 50 368/85 16)

i

Areas Inspected

Noutine, unannounced inspection of fire protection / prevention

,

program implementation; review of actions on previously identified inspection

findings and actions taken on fire protection / prevention related LERs.

,

l

The inspection involved 30 Inspector hours onsite by one NHC inspector.

!

Results

Within the three areas inspected, one violation was identified

l

[failuretomaintainprocedures, paragraph 4).

l

N

3

_ _

--

-

__ _

_

_-

.

2

DETAILS

1.

Persons Contacted

  • B. Baker, Operations Manager

P. Campbell, Plant Licensing Engineer

  • T. Cogburn, Special Projects Manager

L. Gulick, Operations Soperintendent, Unit 2

  • R. Hargrove, Lead Trainer, Classroom

L. Humphrey, Administration Manager

  • J. Lamb, Safety & Fire Prevention Coordinator
  • J. Levine, General Manager, ANO
  • D. Lomax, Plant Licensing Supervisor

J. McWilliams, Operations Superintendent, Unit 1

J. Montgomery, Human Resources Supervisor

  • M. Pendergrass, General Manager, Technical Services
  • R. Rispoli, Fire Protection Specialist
  • L. Sanders, Maintenance Manager

C. Shively, Plant Engineering Superintendent

  • G. Storey, Safety and Fire Prevention Coordinator

i

  • Denotes those present at the exit interview.

2.

Licensee Action on Previous Inspection Findinas

(0 pen) Deviation 50-313/8215-03; 50-368/8212-02:

This deviation identified

electrical conduit installations, which had unsealed air gaps external to

the conduits, penetrating the lintels above fire doors 46, 259, 260,

and 271.

The NRC inspector determined that the air gaps have been

sealed.

However, subsequent to the original inspection, a generic issue

was raised concerning modifications to UL rated fire door assembifes.

There are cases where UL has a110wed the ratin0 to stand where minor

modifications have occurred if they are inspected by a UL representative

and it is documented that the existing condition is acceptable.

The

Ilconsee has determined that fire Door 46 is no longer in a Technical

Specification fire barrier and should be deleted from this item.

The

licensen informed the NRC inspector that UL representativos have reviewed

the remaining door configurations and deemed them acceptable, however,

supporting documentation from UL was not available.

Pending receipt and

availability for review in a future inspection, this deviation will remain

open.

(Closed) Open Item 50 313/0215-04; $0-368/8212 03:

This item was open

pending resolution of the followin0 specific items and completion of the

licensee's review for 10 CFR 50, Appendix R, Item !!! 0:

.

3

a.

Barrier material not yet accepted as a "3-hour barrier."

b.

Terminal boxes not covered by barrier material in conduit runs

already covered.

c.

Conduit above door 57 only covered for half its length.

The licensee has completed the 10 CFR 50, Appendix R, review and is now

resolving exemption requests.

Appendix R compliance inspection is to be

scheduled at a later date.

Specific item resolution was inspected and it was found that the

installation of barrier material had been significantly redefined.

The

separation criteria requires only a "1-hour barrier" and this has been

installed on conduits with cables of concern and is the Hemyc Barrier

System.

Terminal boxes in the conduit runs were covered.

The conduit

above Door 57 was determined not to contain any cables of concern.

Adequacy of the review and determination of the cables of concern will

be addressed and inspected during the inspection for Appendix R

compliance.

This item is closed.

(0pon) Open Item 50-313/8215-05:

Thic item is open pending final action

by NRR on the final test results for cable penetration fire stop design.

This item remains open.

(Closed) Open Item 50-368/8212-04:

This item was open pending

determination by the Itcensee that Motor Control Center 2051 would not be

subject to flooding because of the location of the water suppression

system spray head.

The NRC inspector determined that the licensee has

installed a deflector spray shield between the spray head and the panel.

It has also been confirmed that the panel accesses are all rubber

gasketed.

This item is closed.

(Closed) Open Item 50-368/0212-05:

This item was open pending repair or

replacement of damaged fire retardant board installed on a cable tray in

the electrical equfpment room.

After the Appendix R, evaluation it was

found that separation was met and that it was not necessary to take

credit for the board.

This item is closed.

(Closed) Vlointion 50-368/8325-02:

This violation identified that two

designated fire doors. Doors 267 and 340, had gaps from door to floor in

excess of 3/4-inch and that no fire watches were estab11shed.

The

licensens immediate corroative action, establishing a fire watch and

initiating a station wide inspection of all fire doors is considered

adequate.

Doors 267 and 340 now have air gaps of less than 3/4-inch.

!

Other doors identified in LERs 50 313/83-023 and 50 360/83 045 have also

i

been corrected.

The air gap criteria is now in Surveillanco Procedure

j

1300.05 and is checked every 18 months.

This item la closed.

I

i

.

.

. .

.

.

.

.

,

_ _ _ . _ _ - - - - - - - - . - - - - -

'

,

4

-

3.

Licensee Event Report (LER) Followup (Unit I and 2)

Through direct observation, discussions with licensee personnel, and

review of records, the following fire protection / fire prevention related

LERs were reviewed to determine that reportability requirements were

fulfilled, immediate corrective action was accomplished, and corrective

action to prevent recurrence has been accomplished.

Unit 1

LER 83-021 dealt with the discovory that cross wiring had occurred on two

deluge valves.

The specific problem was corrected and similar

installations were checked for the same problem.

This LER is considered

closed.

LERs82-018 and 83-023 dealt with degradation of fire barriers and

resulted in an extensive walkdown of all fire barriers, identification

and correction of all de0raded conditions.

The licensee is presently

conducting the first 18-month surveillance of fire barriers since the

implementation of the extensive review program.

Subsequent inspections

will review the results of corrective actions taken.

The LERs are

considered closed.

Unit 2

i

i

LERs81-042, 82-039,83-004, 83-008,83-021, 83-026,83-032,

i

83-042,83-045, 84-015, and 84-017 dealt with degradation of fire

barriers and resulted in an extensive walkdown of all fire barriers,

identification and correction of all degraded conditions.

The licensee

will conduct the first 18-month surveillance of fire barriers following

this extensive review program after completion of the Unti 1

surveillance.

Adequacy of corrective actions will be reviewed in future

inspections.

These LENS are considered closed.

LER 82-029 dealt with the pulling of cable through a fire damper

openin0

Immediate and long term corrective action was adequate.

This

LER is considered closed.

LER 83-033 dealt with the floor to door air gap problem.

This item is

addressed in detall in paragraph 2 of this report under Violation

50 368/8325 02.

This LER la considered closed.

LER 83 035 dealt with the potentini for flooding in certain areas

protected by deluge systems because of inadequate drain capacity.

This

item is still under review by the Itconsee's engineering organlantion.

LER 83 037 dealt with the penetration of fire door lintels by conduit.

This item was addressed in detail in paragraph 2 of this report under

Deviation 50 368/8212 02.

__

..

.

.

_ _ _ _ _ _ _ . _ _ -------

..

,

5

LER 84-016 dealt with the discovery of an inoperable fire damper.

The

licensee's investigation of this item is continuing.

LER 84-029 dealt with a fire door automatic closure mechanism that failed

to work.

The licensee has increased the frequency of inspection of high

usage doors.

This LER is considered closed.

4.

Fire Protection / Prevention Program Implementation

This inspection was conducted to determined that the licensee is

implementing a program for fire protection and prevention that is in

conformance with regulatory requirements and industry guides and

standards.

l

The NRC inspector toured accessible areas of the plant site for general

area condition, work activities in progress, and visual condition

of fire protection systems and equipment.

It was found that combustible

materials, flammable and combustible liquid and gas usage is restricted or

properly controlled in areas containing safety-related equipment and

components.

There were no welding, cutting, or use of open flame ignition sources

found in the areas toured.

General housekeeping conditions were found to

be very good.

There were no construction or maintenance activities in

progress in the toured areas.

Fire protection systems and equipment installed for protection of safety

related areas were found to be functional, and tested in accordance with

the requirements specified in the Technical Specifications.

Fire brigade

equipment including emergency breatising apparatus was found to be

properly stored and maintained.

However, the isolation valve, 2FS-106, for the pre-action valve for

Corridor 2139 suppression system was found shut.

Discussion with the

licensee's representative confirmed that this valve was shut because the

exemption request to delete the requirement for a suppression systea for

Corridor 2139 had been granted.

Subsequent review shows that

Procedure 2203.09, Revision 0, dated June 26, 1981, " Fire Protection

System Annunciator Corrective Action," in Attachment A, 1-5-5 " Corridor by

Emergency Control Room Chillers Zone Module" still assumes that the

pre-action valve is available for remote operation in the control room.

This procedure should have been revised to reflect the system status

i

change and insure the operator had an operable action for this area.

Failure to maintain procedures covering activities in the area of fire

protection program implementation is an apparent violation.

(50-368/8516-01)

The NRC inspector also reviewed fire brigade training and drill records

and reviewed the current roster of qualified brigade members.

TF9

records were in order and confirmed that training and drills are being

conducted at the specified intervals.

f

.

.

af

a

c

. .

.

, .

6

The'NRC inspector;also observed a bands on training session at the

recently completed " burn building." Continued development of the use of

this facility' as presently planned should;enchance the practical factors

-

of the training program.

5.~

Exit-Interview

'An exit interview.was conducted May 24, 1985, with those personnel denoted

in paragraph 1 of this' report.

The senior resident inspector also

attended this exit meeting.

At this exit interview, the NRC inspector

-summarized the scope and findings of the inspection.

I

.

'

.

o

l

.

N

,

---

_-

_ _ _ _ . _ _ - _ - - - - - _ _ _ _ _