==SUBJECT:== | ==SUBJECT:== | ||
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No. PA 0009733 Gentlement-DESCRIPTION OF NONCOMPLIANCE: | Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No. | ||
PA 0009733 Gentlement-DESCRIPTION OF NONCOMPLIANCE: | |||
The pH of a sample from discharge point 301 (Wastewater Settling Basin) exceeded the permit limit. | The pH of a sample from discharge point 301 (Wastewater Settling Basin) exceeded the permit limit. | ||
Date Sample Taken | Date Sample Taken 11/27/85 Date Results Received: | ||
The cause of the noncompliance is unknown. The operator log was reviewed for the period involved - no unusual entires were noted. Shift supervision and operations personnel on duty during this period were also not able to identify any abnormal event which could have caused this condition. | 11/27/85 Results of Analysis: | ||
9.7 Permit Limitation: | |||
6.0 to 9.0 CAUSE OF NONCOMPLIANCE: | |||
The cause of the noncompliance is unknown. | |||
The operator log was reviewed for the period involved - no unusual entires were noted. | |||
Shift supervision and operations personnel on duty during this period were also not able to identify any abnormal event which could have caused this condition. | |||
$#5 gewn 2**$7 8 | |||
. _ _ __,__=. __.. _. | |||
9-i as t. | |||
DURATION OF NONCOMPLIANCE: | DURATION OF NONCOMPLIANCE: | ||
The duration of noncompliance was less than 24 hours. | The duration of noncompliance was less than 24 hours. | ||
The pH of discharge point 301 on November 28, 1985, was 8.7. | |||
+ | |||
g CORRECTIVE ACTION Corrective action was not required. | |||
g | |||
i Very truly yours, i | i Very truly yours, i | ||
i i | i i | ||
fQf//k+& | fQf//k+& | ||
f | f W. T. Ullrich Superintendent Nuclear Generation Division i | ||
JAV/WTUsala l | JAV/WTUsala l | ||
} | cc: | ||
Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WM52 1 | |||
;I Administrator | 841 Chestnut Building | ||
} | } | ||
Philadelphia, Pennsylvania 19107 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commisasion Washington, DC 20555 i | |||
;I Administrator | |||
} | |||
n---------------------------- | Region I i | ||
Office of Inspection and Enforcement US Nuclear Regulatory Commission 631 Park Avenue j | |||
King of Prussia, Pennsylvania 19406 I | |||
l 1 | |||
I - | |||
n---------------------------- | |||
- - - - - - - - - - ^ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - | |||
-~ | |||
-}} | |||
Latest revision as of 00:49, 12 December 2024
| ML20136G541 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/30/1985 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | PENNSYLVANIA, COMMONWEALTH OF |
| References | |
| NUDOCS 8601080322 | |
| Download: ML20136G541 (2) | |
Text
,i-PHILADELPHIA ELECTRIC COMPANY 23ol MARKET STREET P.O. UOX 8699 FHILADELPFH A. PA.19101 2im e4i.4 coo December 30, 1985 Department of Environmental Resources Eureau of Water Quality Management One Ararat Blvd.
Harrisburg, PA 17110
SUBJECT:
Noncompliance with NPDES Permit Peach Bottom Atomic Power Station Permit No.
PA 0009733 Gentlement-DESCRIPTION OF NONCOMPLIANCE:
The pH of a sample from discharge point 301 (Wastewater Settling Basin) exceeded the permit limit.
Date Sample Taken 11/27/85 Date Results Received:
11/27/85 Results of Analysis:
9.7 Permit Limitation:
6.0 to 9.0 CAUSE OF NONCOMPLIANCE:
The cause of the noncompliance is unknown.
The operator log was reviewed for the period involved - no unusual entires were noted.
Shift supervision and operations personnel on duty during this period were also not able to identify any abnormal event which could have caused this condition.
$#5 gewn 2**$7 8
. _ _ __,__=. __.. _.
9-i as t.
DURATION OF NONCOMPLIANCE:
The duration of noncompliance was less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The pH of discharge point 301 on November 28, 1985, was 8.7.
+
g CORRECTIVE ACTION Corrective action was not required.
i Very truly yours, i
i i
fQf//k+&
f W. T. Ullrich Superintendent Nuclear Generation Division i
JAV/WTUsala l
cc:
Environmental Protection Agency Water Permits Branch Pennsylvania Section 3WM52 1
841 Chestnut Building
}
Philadelphia, Pennsylvania 19107 Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commisasion Washington, DC 20555 i
- I Administrator
}
Region I i
Office of Inspection and Enforcement US Nuclear Regulatory Commission 631 Park Avenue j
King of Prussia, Pennsylvania 19406 I
l 1
I -