L Georgia Power L T. Cucwa
#s ; l' !.i (2
: n.          .
,,)
: r..                                                             SL-257 0274C January 23, 1986 Director of Nuclear Reactor Regulation Attention: lir. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 IMPLEMENT P 0N OF CHANGES TO TECHNICAL SPECIFICATIONS Gentlemen:
T.,
Georgia Power Company's (GPC's) letter of March 5,1985, requested that NRC issue future amendments to the Plant Hatch Unit 1 and 2 Technical Specifications "with an effective date to be no later than 30 days from the date of issuance of the amendment." It was our belief that this time period was adequate for GPC to receive, reproduce, distribute, and insert the amendment into controlled copies.               However, it has been our recent experience that the amendments are not received in this office until approximately two weeks from the date of issuance. Therefore, in order to ensure compliance with our document control procedures, we now request that all future amendments not required to be immediately effective, including those now at NRC, be issued with an effective date to be no later than 60 days from the date of issuance of the amendment. Future GPC submittals wTil reflect this request.
: E o
i 1
!?
L Georgia Power L T. Cucwa n.
: r..
SL-257 0274C January 23, 1986 Director of Nuclear Reactor Regulation Attention: lir. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 IMPLEMENT P 0N OF CHANGES TO TECHNICAL SPECIFICATIONS Gentlemen:
Georgia Power Company's (GPC's) letter of March 5,1985, requested that NRC issue future amendments to the Plant Hatch Unit 1 and 2 Technical Specifications "with an effective date to be no later than 30 days from the date of issuance of the amendment."
It was our belief that this time period was adequate for GPC to receive, reproduce, distribute, and insert the amendment into controlled copies.
However, it has been our recent experience that the amendments are not received in this office until approximately two weeks from the date of issuance.
Therefore, in order to ensure compliance with our document control procedures, we now request that all future amendments not required to be immediately effective, including those now at NRC, be issued with an effective date to be no later than 60 days from the date of issuance of the amendment.
Future GPC submittals wTil reflect this request.
Please contact this office if you have any questions.
Please contact this office if you have any questions.
Very truly yours, cWY &
Very truly yours, cWY &
L. T. Gucwa REB /lc c:               H. C. Nix, Jr.
L. T. Gucwa REB /lc c:
H. C. Nix, Jr.
Dr. J. N. Grace (NRC-Region II)
Dr. J. N. Grace (NRC-Region II)
Senior Resident Inspector, P1 ant Hatch                                     g 0602030200$$h21                                                                                 l D ppg ADOCK                         ppg P}}
Senior Resident Inspector, P1 ant Hatch g
0602030200$$h21 l D ppg ADOCK ppg P}}

Latest revision as of 16:44, 11 December 2024

Requests That All Future Amends Not Required to Be Immediately Effective Be Issued W/Effective Date No Later than 60 Days from Date of Issuance of Amend.Util 850305 Request Cited
ML20140E192
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/23/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
0274C, 274C, SL-257, NUDOCS 8602030200
Download: ML20140E192 (1)


Text

,

' wo t; a R er ( w p ry

. /. g

. p <-

r

  1. s ; l' !.i (2

,,)

T.,

E o

i 1

!?

L Georgia Power L T. Cucwa n.

r..

SL-257 0274C January 23, 1986 Director of Nuclear Reactor Regulation Attention: lir. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 IMPLEMENT P 0N OF CHANGES TO TECHNICAL SPECIFICATIONS Gentlemen:

Georgia Power Company's (GPC's) letter of March 5,1985, requested that NRC issue future amendments to the Plant Hatch Unit 1 and 2 Technical Specifications "with an effective date to be no later than 30 days from the date of issuance of the amendment."

It was our belief that this time period was adequate for GPC to receive, reproduce, distribute, and insert the amendment into controlled copies.

However, it has been our recent experience that the amendments are not received in this office until approximately two weeks from the date of issuance.

Therefore, in order to ensure compliance with our document control procedures, we now request that all future amendments not required to be immediately effective, including those now at NRC, be issued with an effective date to be no later than 60 days from the date of issuance of the amendment.

Future GPC submittals wTil reflect this request.

Please contact this office if you have any questions.

Very truly yours, cWY &

L. T. Gucwa REB /lc c:

H. C. Nix, Jr.

Dr. J. N. Grace (NRC-Region II)

Senior Resident Inspector, P1 ant Hatch g

0602030200$$h21 l D ppg ADOCK ppg P