4 dkA PROJECT | 4 dkA PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 Client: Northeast Utilities Station: Millstone Unit 3 | ||
==Title:== | ==Title:== | ||
REVIEW OF SYSTEM DESIGN FOR COMPLIANCE WITH THE DESIGN AND LICENSING BASIS - | REVIEW OF SYSTEM DESIGN FOR COMPLIANCE WITH THE DESIGN AND LICENSING BASIS - | ||
h Safety-Related | h Safety-Related Non-Safety-Related Reviewed By: | ||
Non-Safety-Related Reviewed By: | Approved By: | ||
I | I System Leoo Programmatic O&M Lead Accident QA Engineer Internal Review Veriflesaco isum Lead Mitigation Committee Manager Lead Chairman Date: 8@T7 j_ | ||
System Leoo | de JN2% | ||
[Y ((kn kmk h | |||
Date: 8@T7 de | A'?, | ||
s | |||
'4 DQscription | |||
/ [/ | |||
@) | |||
Clarified scope of I&C Interface review Rev.2 Clarified purpose of system review processes covered by this procedure Revised instructins for development of system reference list and system requirements list to reflect use of database l | |||
'I i | 'I i | ||
9705210014 970516 | 9705210014 970516 PDR ADOCK 05000423 P | ||
PDR | PDR Page 1 of 19 | ||
Page 1 of 19 | |||
i | i 8 | ||
PROJECT v "" | |||
review will verify technical adequacy of design process documents. This review process in conjunction with the modification review process (PI-MP3-03) operating, maintenance and testing review process (PI-MP3-06) and plant configuration walkdowns (PI-MP3-05) will verify that the current as modified system is capable of the functional requirements contained in the design and licensing basis documentation. | INSTRUCTION PI-MP3-02 REV. 2 INSTRUCTION 1.0 PURPOSE This instruction establishes the requirements for the design review of systems included in the scope of the Independent Corrective Action Verification Program (ICAVP). The purpose of the design review is to verify the system design as reflected on design output documents and design process documents is consistent with the plant's Design and Licensing Basis. Additionally, the design review will verify technical adequacy of design process documents. This review process in conjunction with the modification review process (PI-MP3-03) operating, maintenance and testing review process (PI-MP3-06) and plant configuration walkdowns (PI-MP3-05) will verify that the current as modified system is capable of the functional requirements contained in the design and licensing basis documentation. | ||
2.0 REFERENCE 2.1 | 2.0 REFERENCE 2.1 NRC Inspection Manual Procedure 93801, Safety System Functional Inspection 2.2 NRC Inspection Manual, Chapter 2535, Design Verification Programs 2.3 10CFR50.2, Definitions 2.4 NRC Confirmatory Order Establishing Independent Correction Action Verification Program - Millstone Nuclear Power Station, Units 1,2, and 3 | ||
2.2 | 2.5 NUMARC 90-12, Design Basis Program Guidelines 2.6 PI-MP3-06, Operations and Maintenance and Testing Procedures and Training Documentation Reviews 2.7 PI-MP3-07, Review of System Design for Compliance with the Design and Licensing Basis 1 | ||
Verification Program - Millstone Nuclear Power Station, Units 1,2, and | 2.8 PI-MP3-09, Preparation and Approval of Checklists 2.9 PI-MP3-11 Discrepancy Report Submittal and Closure 2.10 PI-MP3-12, Project File Index Pace 2 of i9 | ||
2.5 | |||
Design and Licensing Basis 1 | |||
2.8 | |||
A w | A w | ||
PROJECT- | PROJECT-D"" | ||
CK-MP3-02-01 | INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 2.11 CK-MP3-02 Series Checklists as follows: | ||
3.0 DEFINITIONS | CK-MP3-02-01 System Reference List CK-MP3-02-02 System Requirements List CK-MP3-02-03 Design Process Document Review Checklist CK-MP3-02-04.1 P&lD Review Checklist CK-MP3-02-04.2 Logic Diagram Review Checklist CK-MP3-02-04.3 Electrical Schematic Review Checklist CK-MP3-02-05.1 Mechanical Component Review CK-MP3-02-05.2 Electrical Component Review CK-MP3-02-05.3 l&C Component Review CK-MP3-02-06 Topical Area Review N.g.ta: Checklists used in the performance of this Pl are not included as attachments to the Pl. Checklists are prepared and controlled as separate documents per PI-MP3-09. | ||
3.1 | 3.0 DEFINITIONS 3.1 Accident Mitigation Systems Review Group (ARG) - The subgroup of the ICAVP Verification Team responsible for review of critical characteristics of accident mitigation systems to ensure those systems can perform their required safety functions. | ||
3.2 | 3.2 Operations & Maintenance and Testing Review Group (ORG) The subgroup of the ICAVP Verification Team responsible for the review of the operating, maintenance and testing procedures, and training materials for the systems within the scope of the ICAVP. | ||
3.3 | 3.3 System Review Group (SRG)-The subgroup of the ICAVP Verification Team responsible for performing an in-depth review of the design of the systems in the scope of the ICAVP. | ||
3.4 | 3.4 Configuration R3 view Group (CRG)- The subgroup of the SRG Verification Team responsible for walkdowns to verify the current as-built conditions are in conformance with the design output documents. | ||
Paoe 3 of 19 | Paoe 3 of 19, | ||
. ~ | |||
/g"" | |||
PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 1 | |||
4 3.5 Design Bases - The information which identifies the specific functions ' | |||
i to be performed by a structure, system or component of a facility, and. | |||
to be performed by a structure, system or component of a facility, and. | s the specific values or ranges of values chosen for controlling | ||
the specific values or ranges of values chosen for controlling | ) | ||
parameters as reference bounds for design. These values may be (1) | parameters as reference bounds for design. These values may be (1) restraints derived from generally accepted " state of the art" practices for achieving functional goals or (2) requirements derived from analysis of the effects of a postulated accident for which a structure, system or component must meet its functional goals (Reference 2.3). | ||
3.6 | 3.6 Design Output Documents - Controlled plant documents such as specifications, drawings, vendor drawings, datasheets, lists and l | ||
specifications, drawings, vendor drawings, datasheets, lists and | databases (Reference 2.5). | ||
3.7 | 3.7 Design Process Documents - Documents such as calculations, analysis, evaluations or other documented engineering activities that substantiate the final design (Reference 2.5). | ||
l 3.8 Current Licensing Basis (CLB)- The set of NRC requirements applicable to a specific plant, and a licensee's written commitments for assuring compliance with and operation within applicable NRC l | |||
applicable to a specific plant, and a licensee's written commitments for | requirements and the plant-specific design basis (including all modifications and additions to such commitments over the life of the license) that are docketed and are in effect. The CLB includes the NRC regulations contained in 10 CFR Parts 2,19, 20, 21, 30, 40, 50, 51, 55, 72, 73,100 and appendices thereto; orders; license conditions; exemptions, and Technical Specifications (TS). It also includes the plant-specific design basis information defined in 10 CFR 50.2 as documented in the most recent Final Safety Analysis Report (FSAR) as required by 10 CFR 50.71 and the licensee's commitments remaining in effect that were made in docketed licensing correspondence such as licensee responses to NRC bulletins, generic letters, and enforcement actions, as well as licensee commitments i | ||
assuring compliance with and operation within applicable NRC | documented in NRC safety evaluations or licensee event reports. | ||
(Reference 2.7) 1 3.9 Verifier - The individual assigned to review engineering attributes within his area of responsibility. | |||
exemptions, and Technical Specifications (TS). It also includes the | .. Mm e L1a o | ||
documented in the most recent Final Safety Analysis Report (FSAR) | |||
(Reference 2.7) | |||
3.9 | |||
4 PROJECT | 4 PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 4.0 RESPONSIBILITIES l | ||
4.0 RESPONSIBILITIES | 4.1 | ||
4.1 | ~ The Verification Team Manager shall be responsible for overall management of the Verification Team. | ||
management of the Verification Team. | 4.2 The SRG Lead shall be responsible for assigning the Lead Verifier for each system in the ICAVP scope and for overall coordination of the SRG effort. | ||
4.2 | 4.3 The Lead Verifier shall be responsible for performing system reviews i | ||
for the attributes within his area of expertise and for assigning verifiers with appropriate background for review of remaining attributes. | |||
4.4 The Verifiers shall be responsible for performing reviews of engineering attributes within their area of expertise in accordance with l | |||
4.4 | this instruction. | ||
engineering attributes within their area of expertise in accordance with | 5.0 PROCEDURE 5.1 General The Nuclear Regulatory Commission (NRC) Confirmatory Order referenced in Section 2.0 of this PI requires Northeast Utilities (NU) to implement the ICAVP. The Confirmatory order also defines the scope l | ||
5.0 PROCEDURE | i of the ICAVP. Item 2 of the scope of the ICAVP described on page 13 l | ||
5.1 | of the Confirmatory order requires the Licensee to verify the current as-modified plant conditions against design basis and licensing basis documentation. This procedure describes one aspect of the process needed to perform the verification described above. Spofically, this procedure will determine if the current system design as reflected on design output documents and design process documents is consistent with the system design basis and licensing basis documentation. This review is not intended to verify the design basis as stated in the Licensing Basis Documentation is consistent with the Licensing Basis. | ||
For example, a design basis consideration that may be described in i | |||
the FSAR is that the system is designated a Quality Class 1 system in accordance with RG1.26. This review will verify the design of the system was performed to Quality Class 1 standards. This review will not verify that the Quality Class 1 designation was applied correctly per the guidelines of RG1.26 In other words, this procedure verifies the design basis requirement is properly incorporated in the design Page 5 of 19 | |||
with the system design basis and licensing basis documentation. This review is not intended to verify the design basis as stated in the | |||
Licensing Basis Documentation is consistent with the Licensing Basis. | |||
For example, a design basis consideration that may be described in | |||
Page 5 of 19 | |||
l 1 | |||
i d | i d | ||
PROJECT | PROJECT 7 ""' | ||
INSTRUCTION PI-MP3-02 | |||
licensing basis. Verification of conformance between licensing basis | [ | ||
detail as part of the modification review process (PI-MP3-03). | REV.2 l | ||
l The systems to be included in the scope of the ICAVP program will be | INSTRUCTION and does not verify the design basis is in conformance with the 4 | ||
licensing basis. Verification of conformance between licensing basis l | |||
been identified in general, S&L's review for the vertical slice system | and design basis was performed by NRC prior to issuance of the i | ||
4 | operating license. Changes subsequently issued will be reviewed in detail as part of the modification review process (PI-MP3-03). | ||
l The systems to be included in the scope of the ICAVP program will be defined by the Nuclear Regulatory Commission. A meeting will be held with the NRC, NEAC and NU to finalize the boundaries of tho selected systems and interfacing systems after the systems have been identified in general, S&L's review for the vertical slice system i | |||
reviews will address interfaces as follows: | |||
required to support the vertical slice review system were | 4 Mechanical Interfaces - S&L will review the interfacing system calculations to the extent needed to verify that the functions required to support the vertical slice review system were addressed in the design of the interfacing system. We will review the interfacing systems drawings and procedures to the i | ||
extent needed to verify the support functions are addressed. | |||
This review will not1nclude technical verification of the adequacy of the interfacing systems calculations, procedures or drawings. For example, if a vertical slice system requires support of a cooling water system, we will verify the cooling water system's hydraulic analysis, operating procedure, P&lD 4 | |||
This review will not1nclude technical verification of the adequacy of the interfacing systems calculations, procedures | and piping drawings support the vertical slice system functional l | ||
or drawings. For example, if a vertical slice system requires support of a cooling water system, we will verify the cooling | requirements. | ||
water system's hydraulic analysis, operating procedure, P&lD | l l&C Interfaces - l&C interfaces will be treated in a slightly different manner compared to mechanical interfaces section above. We will review input signals from interfacing systems through to its signal source to verify that the functions required to support the system | ||
and piping drawings support the vertical slice system functional | ( | ||
under review were addressed in the design of the interfacing system. We will review the output l&C signals for the system under i | |||
source to verify that the functions required to support the system | review through to the input point of the interfacing system. The | ||
under review were addressed in the design of the interfacing | { | ||
system. We will review the output l&C signals for the system under | |||
extent of these reviews is described in Attachment 6.3. | extent of these reviews is described in Attachment 6.3. | ||
Electrical Interfaces - Electrical interfaces will be treated in a slightly different manner. A detailed review of the electrical distribution system from the motor control center or switchgear, Pace 6 of 19 | |||
J 4 | |||
I PROJECT | I PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 as applicable, to the load is included as part of the vertical slice system review. A load path review will be performed for the remainder of the electrical distribution system (diesel generator to switchgear or MCC). The extent of this review is described in | ||
INSTRUCTION PI-MP3-02 INSTRUCTION | ,.2. | ||
REV. 2 as applicable, to the load is included as part of the vertical slice system review. A load path review will be performed for the remainder of the electrical distribution system (diesel generator | |||
1 i | 1 i | ||
Once the systems and boundaries have been identified, the following tasks shall be performed in order to determine if the system's design is | Once the systems and boundaries have been identified, the following tasks shall be performed in order to determine if the system's design is consistent with the plant's design and licensing basis: | ||
i a. | |||
i | Document Retrieval & Review b. | ||
Identification of System Requirements c. | |||
Techrdcal Review of Design Process Documents d. | |||
Upper Tier Drawing Review e. | |||
Component Review f. | |||
Topical Review g. | |||
Reconciliation of Design vs. Design & Licensing Basis i | |||
h. | |||
Discrepancy Report Preparation and Closure i. | |||
Final Report Preparation The detailed instructions for performing these tasks are provided in the subsections 5.2 through 5.11 below. References 2.1,2.2 and 2.4 were used to develop these instructions. Attachment 6.1 is a flow chart illustrating the system review process. | |||
5.2 Document Retrieval & Review | |||
^ | ^ | ||
5.2.1 | 5.2.1 Since there may be duplication between documents required by the i | ||
various review groups, the following division of responsibility has been established: | |||
l. | |||
5.2.1.1 The SRG shall gather, as a minimum, the following licensing and design bases documents and system specific documents: | |||
a. | |||
Design & Licensing Basis Documents (Applicable Sections Only) a.1 NRC Regulations | |||
. a.2 Technical Specifications a.3 Updated Safety Analysis Report l | |||
a.4 NRC Safety Evaluation Report | |||
~ | ~ | ||
a.5 | a.5 MP3 Commitments to NRC included in Docketed Correspondence P ae.7 of 19- | ||
P | ? | ||
1 | 1 | ||
/ | |||
6% | 6% | ||
PROJECT | PROJECT | ||
*If ""' | |||
INSTRUCTION PI-MP3-02 t | |||
INSTRUCTION | |||
/ | |||
REV. 2 a.6 Design Basis Documentation Package (DBDP) b. | |||
System Specific Documents b.1 Engineering Calculations (Mech, Elect, Struct, I&C and Piping Analysis) b.2 Equipment Procurement Specifications b.3 Modification Packages b.4 System Descriptions b.5 Equipment List b.6 Environmental and Seismic Qualification Reports b.7 Findings and corrective actions identified by NU during the implementation of their Configuration Management Plan (CMP) 5.2.1.2 The ORG Shall gather, as a minimum, the documents listed below-a. | |||
Operating Procedures including Emergency Operating Procedures b. | |||
Maintenance Procedures c. | |||
Surveillance Test Procedures d. | |||
Vendor Manuals-e. | |||
System Training Procedures f. | |||
Necessary Support and/or Related Procedures g. | |||
Operational Data Needed To Support Review of Design Process Documents 5.2.1.3 The CRG shall gather, as a minimum, the following system specific drawings: | |||
a. | |||
P&lDs b. | |||
Logic Drawings c. | |||
Electrical Schematics d. | |||
Piping Drawings e. | |||
Electrical Single Line Drawings f. | |||
Panel Wiring Drawings g. | |||
Dag 8 of 10 | Cable Routing Drawings and Databases h. | ||
Pipe Support Drawings 1. | |||
Structural Equipment Mounting Details J. | |||
General Arrangement / Equipment Location Drawings k. | |||
Instrument Location Drawings 1. | |||
Zone Maps (Environment / Fire Protection, etc). | |||
Dag 8 of 10 | |||
d | |||
~ " 7"" | |||
INSTRUCTION Pl-MP3-02 PROJECT | |||
5.2.2 | ./ | ||
5.2.3 | REV. 2 INSTRUCTION t | ||
i 5.2.2 Design and Licensing Basis documents are available in the S&L lCAVP Library. System specific documents shall be obtained from NU. Requests for documentation from NU shall be submitted in accordance with subsection 3.1 of PI-MP3-01. | |||
5.2.5 | 5.2.3 Once the documents have been gathered, esach group shall complete the applicable section of the System Reference List (SRL) Checklist CK-MP3-02-01 and an Access Database shall be used to develop the SRL. | ||
possible and achieve an ina$epth understanding of the system as it relates to their area of expertise. Each member shall also review the findings and corrective actions that resulted from NU's CMP. S&L shall not duplicate findings identified by the NU CMP. | 5.2.4 The Lead Verifier from the SRG, CRG and ORG shall be responsible 3 | ||
5.2.6 | for ensuring, the SRL is prepared per checklist CK-MP3-02-01. | ||
5.2.7 | 5.2.5 Each member of the ORG, SRG and CRG assigned to review the system shall study the documentation to become as familiar as possible and achieve an ina$epth understanding of the system as it relates to their area of expertise. Each member shall also review the findings and corrective actions that resulted from NU's CMP. S&L shall not duplicate findings identified by the NU CMP. | ||
5.2.8 | l 5.2.6 If the need for additional documents is identified during the review process, these documents shall be requested in accordance with j | ||
subsection 5.2.2 of this Pl. | |||
5.3.2 | 5.2.7 Updates to the SRL shall be made in the same manner as initial input. | ||
5.2.8 The SRG Lead shall file a hardcopy of the completed SRL in accordance with Pl-MP3-12. | |||
5.3 ' | |||
identification of System Reauirements 5.3.1 The SRG shall review the licensing and design basis documents to identify the functional, performance, and other design requirements for the system being reviewed. | |||
5.3.2 The SRG Lead shall assign a Lead Verifier for each of the systems being reviewed. The Lead Verifier shall be from the related discipline (Mechanical for Mechanical System, Electrical for Electrical System, etc). The SRG Lead shall also assign verifiers from other disciplines as needed to support the system review process. | |||
j m | |||
i | i g( "" | ||
~ | |||
"pi INSTRUCTION Pl-MP3-02 PROJECT INSTRUCTION REV. 2 E | |||
5.3.3 The Verifier (s) shall review the Licensing and Design Basis Documents for the system being reviewed to identify design, t | |||
Documents for the system being reviewed to identify design, | performance and functional requirements. Each requirement shall be j | ||
entered into the System Requirements List. Checklist (Checklist CK- | |||
~ MP3-02-02) shaii be used to develop the System Requirements i | |||
Checklist. | |||
~ Note: The System Requirements Checklist shall be developed i | |||
5.3.4 | electronically using an Access Database. Checklist CK-MP302-02 i | ||
documents in order to develop the system requirements checklist: | provides the instructions for using the database. | ||
5.3.4 The Verifier (s) shall as a minimum, perform a review of the following documents in order to develop the system requirements checklist: | |||
a. | |||
FSAR b. | |||
SER i | |||
c. | |||
documents) | Technical Specifications d. | ||
Licensing Commitments contained in docketed correspondence (from NU's Licensing Commitment List) e. | |||
contained in the DBDP which are plant controlled documents | Design Criteria Documents (including NSSS Vendor documents) f. | ||
or correspondence shall be considered valid for the purpose | Design Basis Document Package (only those documents contained in the DBDP which are plant controlled documents or correspondence shall be considered valid for the purpose j | ||
of defining system requirements). | |||
i The review of the FSAR for functional, performance and design requirements shall focus on the following system specific and area topics as a minimum. | |||
a. | |||
Applicable Regulatory Guides b. | |||
Conformance to the Standard Review Plan c. | |||
2 | TMI Action items d. | ||
Design of Structures, Components, Equipment and Systems | |||
.t (Chapter 3). | |||
e. | |||
Engineered Safety Features (Chapter 6). | |||
J. | 2 f. | ||
I&C (Chapter 7) i g. | |||
Electrical Power (Chapter 8) h. | |||
N,.1b ob19 | System Design (Chapter 4,5,9 or 10 as applicable). | ||
l l. | |||
Accident Analysis (Chapter 15) | |||
J. | |||
Human Factors Engineering (Chapter 18) | |||
{ | |||
k. | |||
Fire Protection l | |||
-. _.;._n | |||
.n... | |||
-m... | |||
N,.1b ob19 | |||
l 4 | l | ||
.(I 4 | |||
f"" | |||
INSTRUCTION PI-MP3-02 PROJECT REV. 2 INSTRUCTION a | |||
This review shall define functional, performance and design requirements related to the following system specific topics: | |||
a. | |||
Mechanical Design b. | |||
Electrical Design c. | |||
l&C Design d. | |||
The review shall also define requirements for the vertical slice | Structural Design Piping Design (including identification of postulated break e. | ||
systems related to the following topical areas: | locations.) | ||
f. | |||
Equipment Qualification (limited to seismic and environmental qualification of system components, does not include verification of seismic response spectra or environmental parameters.) | |||
The review shall also define requirements for the vertical slice systems related to the following topical areas: | |||
5.3.5 | 4 a. | ||
requirements into the System Requirements Checklist per PI-MP3-06. | Hazards including pipe whip, jet impingement, missiles and flooding. | ||
b. | |||
5 3.7 | Station Blackout-c. | ||
and Licensing Basis documentation. The DR shall be processed in | Appendix R Safe Shutdown Analysis. | ||
5.3.8 The SRG or ORG Lead, as Applicable, will review each entry into the | 5.3.5 The ORG shall identify and enter operating, maintenance and testing requirements into the System Requirements Checklist per PI-MP3-06. | ||
Systems Requirements Checklist for completeness. This review shall | The ARG shall enter critical characteristics required for accident mitigation identified per PI-MP3-07 into the system requirement j | ||
checklist. Entries shall be per this procedure. | |||
t 5.3.6 Each entry into the system requirements list shall be independently reviewed by a verifier form the same group and discipline. The i | |||
Verifier (s) performing the independent review shall review each entry for accuracy with the source document. Review shall be performed in accordance with CK-MP3-02-02. | |||
5 3.7 The independent Verifier (s) and/or the Verifier (s) who initially prepared the systems requirements checklist shall initiate a DR for any conflicting requirement identified during the review of the Design and Licensing Basis documentation. The DR shall be processed in l | |||
accordance with Section 5.10 of this procedure. | |||
5.3.8 The SRG or ORG Lead, as Applicable, will review each entry into the Systems Requirements Checklist for completeness. This review shall Pace 1.1 of 19 | |||
dk | dk "f *" | ||
5.4 | PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION PEV. 2 be performed per Checklist CK-MP3 02-02. The SRG Lead shall distribute the checklist to the project file in accordance with PI-MP3-12. | ||
5.4 Technical Review of Desian Process Documents 5.4.1 The SRG shall perform a detailed review of applicable design process documents to verify technical adequacy and that the conclusions of the calculations support the system requirements. | |||
5.4.2 Applicable design process documents shall include: | 5.4.2 Applicable design process documents shall include: | ||
a. | |||
Mechanical calculations (hydraulic calculations, component sizing calculations, design pressure and temperature calculations, NPSH calculations, etc. | |||
b. | |||
Electrical calculations (load calculations, voltage drop, etc.) | |||
c. | |||
l&C calculations (setpoint calculations) d. | |||
Structural calculations (equipment mounting, pipe supports, cable tray supports, conduit supports, etc.) | |||
i e. | |||
Piping Analysis - | |||
f. | |||
EQISO Reports The review of interfacing system calculations to the extent described in Section 5.1 of this Project Instruction shall be included in the scope of this section. | |||
5.4.3 Checklist CK-MP3-02-03 shall be used to document the design process document review. The applicable subject specific checklists from Pl-MP3-03 shall also be used in conjunction with CK-MP3-02-03. | 5.4.3 Checklist CK-MP3-02-03 shall be used to document the design process document review. The applicable subject specific checklists from Pl-MP3-03 shall also be used in conjunction with CK-MP3-02-03. | ||
5.4.4 The Verifier (s) shall review the adequacy of the following attributes: | 5.4.4 The Verifier (s) shall review the adequacy of the following attributes: | ||
a. | |||
I | Numerical Accuracy - The numerical aspects and mathematical operations shall be error free. The number of significant figures shall be consistent with the input data, assumptions and design methodology. Transposed or transferred numbers are correct. | ||
I b. | |||
Modeling Accuracy - Analytical models shall be consistent with the degree of accuracy of the input data, assumptions and design methodology. | |||
l I | l I | ||
_ _ _________________ 95snt 51>214 5NL_-- _--__ j | _ _ _________________ 95snt 51>214 5NL_-- _--__ j | ||
..) | |||
o 6 | o 6 | ||
"f "" | |||
INSTRUCTION Pl-MP3-02 REV. 2 | PROJECT INSTRUCTION Pl-MP3-02 INSTRUCTION REV. 2 c. | ||
Assumptions and Engineering Judgment - Assumptions and engineering judgment shall be consistent with the design approach and methodology. | |||
- i d. | |||
Design inputs - Design inputs shall be based on the latest controlled design documents. | |||
e. | |||
Methodology - The method shall be appropriate for the purpose and scope of the calculation. | |||
Hgig During the review of design process documents, operational data, where available, shall be used to confirm calculation - | Hgig During the review of design process documents, operational data, where available, shall be used to confirm calculation - | ||
assumptions and/or conclusions. | assumptions and/or conclusions. | ||
5.4.5 The Verifier (s) shall note any comments identified during the reWew on the Design Process Document Review Checklist (CK-MP3-02-03). | 5.4.5 The Verifier (s) shall note any comments identified during the reWew on the Design Process Document Review Checklist (CK-MP3-02-03). | ||
5.4.6 The Verifier (s) shall evaluate the comments to determine if they affect the conclusion of the Design Process Document. The evaluation shall be documented on the Design Process Document Review Checklist (CK-MP3-02-03). | 5.4.6 The Verifier (s) shall evaluate the comments to determine if they affect the conclusion of the Design Process Document. The evaluation shall be documented on the Design Process Document Review Checklist (CK-MP3-02-03). | ||
5.4.7 The Verifier (s) shall indicate on the checklist coversheet (CK-MP3 | 5.4.7 The Verifier (s) shall indicate on the checklist coversheet (CK-MP3 03) whether the conclusions are acceptable with comments or unacceptable, and shall sign and date the coversheet. | ||
5.4.8 For acceptable with comments or unacceptable dispositions, the Verifier shall generate a Discrepancy Report per subsection 5.10 of this Pl. The Verifier (s) shall also evaluate the unacceptable disposition for impact on other documents that may use the conclusion as input. The Verifier (s) shall consult other SRG members while evaluating the impact. | 5.4.8 For acceptable with comments or unacceptable dispositions, the Verifier shall generate a Discrepancy Report per subsection 5.10 of this Pl. The Verifier (s) shall also evaluate the unacceptable disposition for impact on other documents that may use the conclusion as input. The Verifier (s) shall consult other SRG members while evaluating the impact. | ||
Note: Calculation results are typically used as input in other documents. If a Discrepancy is identified which affects the result of the calculation, it is important to define where those results were used and evaluate those documents for impact. The review should be done | Note: Calculation results are typically used as input in other documents. If a Discrepancy is identified which affects the result of the calculation, it is important to define where those results were used and evaluate those documents for impact. The review should be done prior to generating a Discrepancy Report so that the Discrepancy Report describes the full extent of the condition. | ||
prior to generating a Discrepancy Report so that the Discrepancy | 5.4.9 The Lead Ver:.ler shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall F-)eraa1ML19 I | ||
Report describes the full extent of the condition. | |||
5.4.9 The Lead Ver:.ler shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall F-)eraa1ML19 | |||
f? | f? | ||
PROJECT | PROJECT | ||
*[f"~ | |||
INSTRUCTION PI-MP3-02 REV. 2 | INSTRUCTION PI-MP3-02 l | ||
INSTRUCTION | |||
/ | |||
F | REV. 2 compile and file the design process document review checklists prepared by the Verifier (s) to the project file in accordance with Pl-MP3-12. | ||
F 5.5 Uooer Tier Document Review 5.5.1 The SRG shall perform a functional review of the upper tier drawings as one of the steps necessary to verify the system is capable of performing required functions as described in the design and ' | |||
licensing basis. This review includes the vertical slice system drawings as well as interfacing system drawings to the extent described in Section 5.1. The SRG shall also perform a technical review of the drawings to verify conformance to design calculations and classification criteria. | licensing basis. This review includes the vertical slice system drawings as well as interfacing system drawings to the extent described in Section 5.1. The SRG shall also perform a technical review of the drawings to verify conformance to design calculations and classification criteria. | ||
5.5.2 | 5.5.2 The Verifier (s) shall utilize drawing review checklists CK-MP3-02-4.1, | ||
-4.2, -4.3 for the review of the P&lDs, logic diagrams and electrical drawings (i.e. schematics, single lines and instrument loop diagrams), respectively. These checklists define the attributes to be reviewed. In general, review attributes will include flow paths, interlocks, automatic actuations, permissives, redundancy and separation, safety classification, component sizes, pressure class, overpressure protection, adequacy of interfacing system tie-ins, etc. | |||
The review is not intended to identify drafting or style errors. | The review is not intended to identify drafting or style errors. | ||
4 5.5.3 | 4 5.5.3 The Verifier (s) shall note any comments on the applicable checklists (C K-MP3-02-4.1, -4.2, -4.3).' | ||
5.5.4 | 5.5.4 Upon completion of the review, the Verifier (s) shall sign and date the coversheet of the applicable checklists. | ||
5.5.5 | 5.5.5 The Verifier (s) shall generate a Discrepancy Report per Subsection 5.10 of this PI for any discrepancies not previously identified by the NU CMP. | ||
~ | ~ | ||
5.5.6 | 5.5.6 The Lead Verifier shall verify.the checklists have been properly completed, indicate his concurrence with signature and date, and shall compile and file all drawing review checklists prepared by the Verifier (s) in the project file per Pl-MP3-12. | ||
5.6 | 5.6 | ||
- Component Review i | |||
--.s | |||
,a s.- | |||
i | i | ||
/ | |||
s!& | |||
h"" | h"" | ||
INSTRUCTION PI-MP3-02 PROJECT INSTRUCTION | |||
/ | |||
REV. 2 5.6.1 The SRG shall perform a detailed review of system components. This review shall verify the design data included in the design and licensing basis, the vendor drawings, the procurement specifications, eqaipment list and calculations are consistent. | |||
1 5.6.2 The scope of this review shall include all major mechanical, electrical and I&C components. | |||
5.6.3 Detailed component checklists are included in the CK-MP3-02-05 series checklists. These checklists verify attributes such as classification, design conditions, operating conditions, functiorial requirements, applicable codes and standards, performance requirements, and qualification requirements, etc. | 5.6.3 Detailed component checklists are included in the CK-MP3-02-05 series checklists. These checklists verify attributes such as classification, design conditions, operating conditions, functiorial requirements, applicable codes and standards, performance requirements, and qualification requirements, etc. | ||
5.6.4 The Verifier (s) shall complete individual Component Review Checklists (CK-MP3-02-05 series) for each component within the scope of review. Discrepancies noted shall be indicated in the appropriate blocks on the checklists. | 5.6.4 The Verifier (s) shall complete individual Component Review Checklists (CK-MP3-02-05 series) for each component within the scope of review. Discrepancies noted shall be indicated in the appropriate blocks on the checklists. | ||
| Line 319: | Line 342: | ||
5.6.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.8 of this PI for any discrepancies not previously identified by the NU CMP. | 5.6.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.8 of this PI for any discrepancies not previously identified by the NU CMP. | ||
5.6.7 The Lead Verifier shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall file all completed checklists in the project file per PI-MP3-12. | 5.6.7 The Lead Verifier shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall file all completed checklists in the project file per PI-MP3-12. | ||
5.7 | 5.7 Topical Area Reviews 5.7.1 The SRG shall perform a review of the following topical areas: | ||
a. | |||
Hazards including pipe whip, jet impingement, mist!Ies and flooding b. | |||
Station Blackout c. | |||
Dm6p 15 of 19 | Appendix R Safe Shutdown Analysis 5.7.2 The Verifier shall document the review of topical areas using Dm6p 15 of 19 | ||
i | i p"" | ||
INSTRUCTION PI-MP3-02 | |||
p"" | ~ | ||
PROJECT INSTRUCTION REV. 2 i | |||
checklist CK-MP3-02-06. Tnis review shall verify the following: | checklist CK-MP3-02-06. Tnis review shall verify the following: | ||
a. | |||
That the p pe whip and jet impingement effects of postulated breaks in the vertical slice system have been analyzed. | |||
b. | |||
Tnat potential missiles from the vertical slice system have been waluated. | |||
c. | |||
5.7.? Upon completion of theteview, the Verifier (s) shall sign and date the applicable portion of the checklists. | That the flooding analysis considers the vedical slice system's I | ||
5.7.4 The Verifier (s) shall generate a Discrepancy Report in accordance | contribution to area flood levels. | ||
with subsection 5.10 of this PI for any discrepancies not previously | d. | ||
identified by the NU CMP. | The vertical slice system components, if credit for operation was taken in the station blackout coping assessment, are capable of performing tF.L requ' red functions, e. | ||
51.5 | The vertical slice system has been adequately addressed in the Appendix R Analysis if credit for system operation was taken in the safe shutdown analysis. | ||
5.8 | 5.7.? | ||
be completed by dispositioning each requirement on the System | Upon completion of theteview, the Verifier (s) shall sign and date the applicable portion of the checklists. | ||
Requirements Checklist (Checklist CK-MP3-02-02). | 5.7.4 The Verifier (s) shall generate a Discrepancy Report in accordance with subsection 5.10 of this PI for any discrepancies not previously identified by the NU CMP. | ||
51.5 The Lead Verifier shall verify the checklist has been properly completed, indicate this concurrence with signature and riate, and shall file all completed checklists in the project file ps. ' MP3-12. | |||
5.8 Reconciliation of Desian vs. Desian and Licensina Basis 5.8.1 The SRG will complete the verification of the system design versus the design and licensing basis documentation. The verification shall | |||
) | |||
be completed by dispositioning each requirement on the System Requirements Checklist (Checklist CK-MP3-02-02). | |||
P%R 16 of 19 | P%R 16 of 19 | ||
d | d "" | ||
PROJECT | PROJECT | ||
/" | |||
INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 5.8.2 Where applicable, the Verifier (s) shall identify on the System Requirements Checklist, the design process documents which verify the restraints imposed by the system requirement are not exceeded. | |||
The Verifier (s) shall either indicate the design process document either supports the requirement or describe any deficiencies. | |||
5.8.3 The Verifier (s) shall identify on the System Requirements Checklist, the design output documents related to the system requirement. The Verifier shall indicate whether the technical requirements contained in the design output documents are consistent with the system requirements or shall identify the discrepancy. | 5.8.3 The Verifier (s) shall identify on the System Requirements Checklist, the design output documents related to the system requirement. The Verifier shall indicate whether the technical requirements contained in the design output documents are consistent with the system requirements or shall identify the discrepancy. | ||
5.8.4 The Verifie as) shall complete the dispositions in the System Requirements Checklist, using the Access Database in accordance with CK-MP3-02-02. | 5.8.4 The Verifie as) shall complete the dispositions in the System Requirements Checklist, using the Access Database in accordance with CK-MP3-02-02. | ||
5.8.5 Dispositions to the system requirements shall be independently reviewed by a Verifier from the same group and discipline. The independent review shell be in accordance with CK-MP3-02-02. | 5.8.5 Dispositions to the system requirements shall be independently reviewed by a Verifier from the same group and discipline. The independent review shell be in accordance with CK-MP3-02-02. | ||
5.8.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.10 of this Pl for any discrepancies not previously identified in Subsection 5.4,5.5, and 5.6 of this procedure. | 5.8.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.10 of this Pl for any discrepancies not previously identified in Subsection 5.4,5.5, and 5.6 of this procedure. | ||
5.8.7 The SRG Lead shall review the dispositions in the system require- | 5.8.7 The SRG Lead shall review the dispositions in the system require-j ments checklist (CK-MP3-02-02) for completeness and technical accuracy. The SRG Lead shall notify the ARG Lead that either all critical characteristics for accident mitigation systems have been satisfied or he shall identify which are not. | ||
5.8.8 The Lead Verifier shall file a hardcopy of the completed checklist in | 5.8.8 The Lead Verifier shall file a hardcopy of the completed checklist in j | ||
the project file per PI-MP3-12. | |||
j 5.9 SRG Support for ORG Procedure Review Process 5.9.1 During the implementation of the Procedure Review Process described in PI-MP3-06, the ORG will highlight all performance parameters including operating ranges and/or limitations described in the procedures. These parameters will be submitted to the SRG Paoe 17 of 19 | |||
4 l | 4 l | ||
PROJECT INSTRUCTION Pl-MP3-02 INSTRUCTION | |||
i to the SRG for review via checklist CK-MP3-06-10 to verify the | ? - | ||
design and analysis suppott operation in this mode. | REV. 2 for verification via checklist CK-MP3-06-10. The ORG may also identify operating modes which are not explicitly identified in the system requirements checklist. The ORG will submit these modes 2 | ||
i to the SRG for review via checklist CK-MP3-06-10 to verify the design and analysis suppott operation in this mode. | |||
5.9.2 ' | |||
The SRG Lead Verifier or assigned Verifier shall review these i | |||
to ensure it is within the system's design basis. The SRG Verifier | i parameters to ensure they are correct. Ths Verifier shall complete the CK-MP3-06-10 checklist by identifying the basis for the l | ||
shall enter his conclusions on checklist CK-MP3-06-10, sign and | parameter, if correct, and/or preparation of a DR per Section 5.10 of this procedure for incorrect parameters. Once all parameters have l | ||
been r9 viewed the Verifier shall sign and date checklist l | |||
date the checklist and return it to the ORG. If the evaluated mode is | CK-MP3-06-10 and shall return the completed checklist to the ORG. | ||
5.10 | 5.9.3 The SRG will review any operating modes submitted by the ORG per i | ||
accordance with PI-MP3-11. Discrepancy reports shall not be initiated for findings already identified by NU during implementation of the i | checklist CK-MP3-06-10. The SRG Verifier shall review the mode to ensure it is within the system's design basis. The SRG Verifier shall enter his conclusions on checklist CK-MP3-06-10, sign and | ||
~ | |||
date the checklist and return it to the ORG. If the evaluated mode is f | |||
outside the system's design basis, the SRG Verifier shall prepare a DR per Section 5.10 of this procedure. | |||
5.10 Discrepancy Reoort Preparation ano Closure j | |||
5.10.1 Discrepancy Reports for discrepant conditions identified during the system review process shall be prepared and processed in accordance with PI-MP3-11. Discrepancy reports shall not be initiated for findings already identified by NU during implementation of the i | |||
CMP. | CMP. | ||
5.10.2 Review of NU dispositions for the Discrepancy Reports generated during the review cycle shall be in accordance with PI-MP3-11. | 5.10.2 Review of NU dispositions for the Discrepancy Reports generated during the review cycle shall be in accordance with PI-MP3-11. | ||
5.11 | 5.11 Final Report 5.11.1 The Lead Verifier shall draft a finct report summarizing the results of the system review. | ||
i 5.11.2 The report format shall be determined by the Verification Team Manager. | i 5.11.2 The report format shall be determined by the Verification Team Manager. | ||
1 i | 1 l | ||
i | |||
~ | |||
Page 18 of 19 | |||
~ | |||
PROJECT | PROJECT INSTRUCTION PI-MP3-02 1 | ||
i | INSTRUCTION REV. 2 i | ||
5.11.3 The report shall be reviewed and approved by the VT Lead, VT | 5.11.3 The report shall be reviewed and approved by the VT Lead, VT j | ||
Manager and IRC prior to extemal distribution. | |||
i | i | ||
. 6.0 A_TTACHMENTS | |||
( | |||
6.1 | 6.1 ICAVP Process Flowchart, " System Review" (1 page) 6.2 | ||
~ Scope of Electrical Support System Review (3 pages) i 6.3 Scope of l&C Interfacing Signal Review (1 page) 4 e | |||
i i | |||
i | ) | ||
~ | |||
l Daca 19 f 19 i | |||
O | |||
l Daca | |||
~.,._ | |||
c " | |||
w | |||
J:emity systems in icAvP | ) | ||
7 J:emity systems in icAvP o | |||
i | Sccpe | ||
' PI MP3-02, REV. 2 J CAVP PROCESS FLOWCH' ART.: | |||
ATTACHMENT 6.1 | |||
.j i | |||
b L SYSTEM REWEW | |||
- _ 'NRC | |||
] | |||
i 3-j | |||
{ | |||
Define! Review System - | |||
j Boundaries | |||
.j NRC/NEAC/NU/SRG - | |||
I-J v | |||
i Gather Design & Licens!c.g ; | |||
.i Basis Documents & Design - | |||
e Output Documents i | |||
SRG,CRG,ORG l | |||
I Y | |||
i Prepare System Reference x | |||
List | |||
.l i | |||
SRG,CRG.ORG i | |||
j | j | ||
. ~ | |||
_____.___.J v | |||
Define System Design & | |||
Distnbute cr* cal System Reference Licensing Basis / Prepare | |||
$,Nd'$,"f-- | |||
I | |||
[ | |||
.i List for Use System Ftequirement Ust '* | |||
pimun l SRG SRG I | |||
j s | |||
.. j v | |||
.u %.--..~,,. | |||
.1 | |||
._.-....J-V 2 | |||
k | |||
[ Perform Component. : | |||
Perform Detailed Review for 4 | |||
[ | |||
SRG | |||
s | |||
[ Perform Component . : | |||
Submit Des /Lic. | Submit Des /Lic. | ||
Perform Functional Basis List to Review Perform Topical Area Calc Review j Consistency (Lic & | |||
I P&lD/ Logics /Elecincal Review (M/ Ell / Piping Analysis. | |||
ORG for Use Des Basis /Dwg/ | |||
j Consistency (Lic & | Diagrams - | ||
I | & EQ/SQ Rept.) | ||
Des Basis /Dwg/ | i a es/ Specs SRG SRG | ||
Diagrams - | ~ | ||
SRG SRG SRG r | |||
SRG | ?. | ||
? | |||
Y | |||
Y..- | .__L_.-._..___.. | ||
Dispondson of Cntical | Y Y.. - | ||
l Disposition System._ | |||
i Requirements List | |||
?' | |||
Dispondson of Cntical SRG | |||
~ ~----~ | |||
* cna,ac,.rraie. | * cna,ac,.rraie. | ||
to ARG v | to ARG v | ||
^ | |||
4 | 4 Were liSCrepanCtes No | ||
* identified? | |||
f i | |||
identified? | f 4 | ||
4 | f OroceSS OtscrepanCV 3 | ||
f | s i | ||
OroceSS OtscrepanCV | Reports l | ||
I' PI-MP3-11) l SRG e | |||
.i 1 | |||
3repare Review Repen | 3repare Review Repen i | ||
'c | |||
) | |||
1 | |||
_ SRG - | |||
Pi-MP3-02, Rev. 2 | Pi-MP3-02, Rev. 2.2 Page 1 of 3 Scope of Electrical Support System Review This verification will consist of identifying the buses that feed all the components used in the systems under review and determine the " load-time' profile for these components. The " path" from these buses are to be identified up to the electrical onsite source (i.e. diesel-generator, battery & charger, inverter, etc.) | ||
This is explained in Pages 2 and 3 of this Attachment. The loading time profile on each bus for the components of the system under review shall be verified for the calculations that use this information as input. The bus voltage will also be identified from the voltage drop calculations to verify that the correct bus voltage was used to determine voltage drop to the components of the system under review. | This is explained in Pages 2 and 3 of this Attachment. The loading time profile on each bus for the components of the system under review shall be verified for the calculations that use this information as input. The bus voltage will also be identified from the voltage drop calculations to verify that the correct bus voltage was used to determine voltage drop to the components of the system under review. | ||
Once the loads are verified, the load carrying components in the " path" will be checked for design sizing based on the total operating load of the bus as shown in the bus loading calculations. Loading for components of systems not under review will be accepted (without verification) as shown in the bus loading calculations as input. Coordination of protective devices (relays, breakers, fuses, etc.) for the " paths" required to supply the components of the systeris under review will be verified to confirm acceptabte coordination and that the required bus operating loading is addressed. | Once the loads are verified, the load carrying components in the " path" will be checked for design sizing based on the total operating load of the bus as shown in the bus loading calculations. Loading for components of systems not under review will be accepted (without verification) as shown in the bus loading calculations as input. Coordination of protective devices (relays, breakers, fuses, etc.) for the " paths" required to supply the components of the systeris under review will be verified to confirm acceptabte coordination and that the required bus operating loading is addressed. | ||
The onsite source load-time profile will be checked to determine that the source input is properly included for the components of the systems under review (including transient loading) . The overall source sizing will also be checked against totalloading of the source, however, verification of other systems loading will not be done but simply accepted as input. In addition, the battery charger (or inverter) and its continuous loading profile will be similarly checked to confirm the size, that the " path" is corn 'e to the diesel-generator, and load profile matches or envelopes the diesel-gmerator loading input from the charger (inverter). | The onsite source load-time profile will be checked to determine that the source input is properly included for the components of the systems under review (including transient loading). The overall source sizing will also be checked against totalloading of the source, however, verification of other systems loading will not be done but simply accepted as input. In addition, the battery charger (or inverter) and its continuous loading profile will be similarly checked to confirm the size, that the " path" is corn 'e to the diesel-generator, and load profile matches or envelopes the diesel-gmerator loading input from the charger (inverter). | ||
If the system under review has components credited for Appendix R/ Safe shutdown use, verify that the electrical support system components (equipment and cabling) in the " path" to the onsite source are not in the fire zones which are identified as needing the components of the system under review for safe shutdown during the postulated fire. | If the system under review has components credited for Appendix R/ Safe shutdown use, verify that the electrical support system components (equipment and cabling) in the " path" to the onsite source are not in the fire zones which are identified as needing the components of the system under review for safe shutdown during the postulated fire. | ||
When all of the systems under review have been identified. along with most of the components that are fed from MCCs, two MCCs with non-duplicate load components will be selected for review of all design sizing and cocrdination for all loads on these two MCCs. The load input from other systems not under review will not be verified. but the design of the MCC will be venfied based on the component input. | When all of the systems under review have been identified. along with most of the components that are fed from MCCs, two MCCs with non-duplicate load components will be selected for review of all design sizing and cocrdination for all loads on these two MCCs. The load input from other systems not under review will not be verified. but the design of the MCC will be venfied based on the component input. | ||
AC SYSTEM SUPPORT M. V. SWGR | AC SYSTEM SUPPORT M. V. SWGR b | ||
b | )w w | ||
w a | |||
- ELEC SYSTEM SUPPORT REVIEW PART OF MECH. SYSTEM REVIEW | |||
- RLY lIRLY lI RLY lI FOR MECH. SYSTEM. | |||
ww | ww | ||
- APPLICABi L 1 ICEtJSitiG REQ' MIS | - APPLICABi L 1 ICEtJSitiG REQ' MIS | ||
[S/R Nm | |||
-MECH. ~ SYSTEM LOADING ACCOUNIED I OR o g, | |||
\\M | |||
- GROutJDING | -OPERATING VOLTAGE RANGL | ||
- GROutJDING (IOut i t.i SYSILM) | |||
- APP. R ltJLl ill,ED | PROILCIIVE SLillNG COORulNAliUN l'M LOUll' Sli1rs v) | ||
-SAFE SifutuOwil it2ct.UDED | PATH (OVERLOAD, FAULT, Et LC. LGillP n | ||
- APP. R ltJLl ill,ED LV. SWGR PROTECllON) f)DC f)DC | |||
-CABLE Silli:G (IRAY,FIRESTOP AMB.) | -SAFE SHUTDOWN SUPPORl INCLUDLD | ||
-VOLI DROP (POWLR & COfflHOI-) | -SAFE SifutuOwil it2ct.UDED r | ||
-PROTECllVL Stilit1GS | FOR MECH SYSTEM | ||
-CABLE Silli:G (IRAY,FIRESTOP AMB.) | |||
{ | |||
-APP. R ANALYSIS INCL UDED FOR - | |||
]> | |||
p | |||
-VOLI DROP (POWLR & COfflHOI-) | |||
1 MECH SYSTEM | |||
-PROTECllVL Stilit1GS S/R | |||
-ALL RELATED SYSTEM COMPONENIS H D FROM SAME SOURCE (DIVISION) | |||
M | |||
-OPERAlif4G VOITAGL HANGE | -OPERAlif4G VOITAGL HANGE | ||
-COMPOfiErli E.O. | |||
c | |||
") | |||
CONT | CONT | ||
-H S/R | |||
'.o > 'u g; | |||
LOAD emE S/R Q.3 C.V. DISTR g 3g u | |||
un- | |||
*I o) o) | |||
a Y | a Y | ||
S/R | S/R | ||
k | ' MISC PNL s | ||
k t | |||
u Y-a m | |||
b | |||
+ | |||
w-e- | |||
w w | |||
9-C--u | |||
-C-a - | |||
'h | |||
~w | ~w s- | ||
_..v. | |||
CONTROL DC SYSTEM SUPPORT AC | CONTROL DC SYSTEM SUPPORT AC BAT CHRG T | ||
BAT CHRG T | a-n--- | ||
{ | { | ||
1_ | 1_ | ||
M. V. SWGR | 1_ | ||
M. V. SWGR PART OF MECil SYSTEM REVIEW | |||
-d ELEC SYSTEM SUPPORT REVIEW FOR MECH SYSTEM DC CONT API'l lCAhi t llCl flSING RLO'MEtJIS | |||
-MECH SYSTEM CONTROL LOADING i | |||
i OtilPMI I11 RAllt1GS 1 | |||
ACCOUNTED FOR | ACCOUNTED FOR | ||
--APP R ltACLUDED (INCLUDING T! MING / REPETITION) | |||
SAFE SiluTDOWil tilCLUDED | SAFE SiluTDOWil tilCLUDED L V. SWGR | ||
-DISTR. VOLT DROP TO BUS /SWGR CABI E SIZilJG (ItJCLUDING 1 RAY' | |||
-PROTECTIVE SETTINGS COORDINATION LIRE STOP DUCI, AMBIEllT) | |||
FOR PATH | FOR PATH | ||
'" ' ACI | |||
""U" I | |||
I) | |||
DC CONT (OVERLOAD, FAULT, ELEC. EQUIP PROlECliVL SLIiltlGS PROTECTION) r | |||
FOR MECH SYSTEM | -VOLI AGE RANGE cOuPoNrr1r E.o | ||
-SAFE SHUTDOWN ' SUPPORT INCLUDED FOR MECH SYSTEM | |||
PANEL | *E3 u | ||
- APP. R ANALYSIS INCLUDED FOR R | |||
h S/R PANEL MECH SYSTEM pg 4 | |||
SOL | SOL | ||
} | |||
-ALL RELATED SYSTEM COMPONENTS CONTACT FED FROM SAME SOURCE (DIVISION) | |||
RLY SOL | |||
-~ | |||
l | ..-.- ~ -. | ||
l i | |||
PI-MP3-02 Rev. 2.3 Scone of I&C Interfacine Sienal Review (I name) | |||
Scone of I&C Interfacine Sienal Review (I name) | This review will consist ofidentifying the instrumentation that provides signal inputs to the system under review. The review includes the interfacing system instrument signal paths to their signal source to verify that the functions required to support the vertical slice review l | ||
This review will consist ofidentifying the instrumentation that provides signal inputs to the | were addressed in the design of the intedacing system. | ||
system under review. The review includes the interfacing system instrument signal paths to | This review will also consist ofidentifying I&C signals from the system under review going to an interfacing system. The review includes the system output I&C signals from the system l | ||
their signal source to verify that the functions required to support the vertical slice review | under review through to the input point of the' interfacing system to verify that the functions required to support the vertical slice review were addressed in the design of the interfacing system. | ||
I The review includes the signal path as it appears on interfacing system P& ids, logic diagrams, schematics and wiring diagrams. This review will verify signal parameters, divisional source, setpoint, range and accuracy. Setpoint and loop accuracy calculations will be reviewed for technical adequacy for the affected instrumentation. | |||
If the interfacing system I&C signal inputs or outputs are covered by the vertical shee review of another system included in the review then the review of the affected instrumentation will not be duplicated. | |||
an interfacing system. The review includes the system output I&C signals from the system | i i | ||
I | |||
If the interfacing system I&C signal inputs or outputs are covered by the vertical shee review | |||
of another system included in the review then the review of the affected instrumentation will not be duplicated. | |||
i | i | ||
) | ) | ||
3 i | 3 i | ||
l l | l l | ||
,}} | |||
Latest revision as of 15:26, 11 December 2024
| ML20141E472 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/16/1997 |
| From: | Neri A, Schopfer D SARGENT & LUNDY, INC. |
| To: | |
| Shared Package | |
| ML20141E462 | List: |
| References | |
| PI-MP3-02, PI-MP3-2, NUDOCS 9705210014 | |
| Download: ML20141E472 (24) | |
Text
.
4 dkA PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 Client: Northeast Utilities Station: Millstone Unit 3
Title:
REVIEW OF SYSTEM DESIGN FOR COMPLIANCE WITH THE DESIGN AND LICENSING BASIS -
h Safety-Related Non-Safety-Related Reviewed By:
Approved By:
I System Leoo Programmatic O&M Lead Accident QA Engineer Internal Review Veriflesaco isum Lead Mitigation Committee Manager Lead Chairman Date: 8@T7 j_
de JN2%
[Y ((kn kmk h
A'?,
s
'4 DQscription
/ [/
@)
Clarified scope of I&C Interface review Rev.2 Clarified purpose of system review processes covered by this procedure Revised instructins for development of system reference list and system requirements list to reflect use of database l
'I i
9705210014 970516 PDR ADOCK 05000423 P
PDR Page 1 of 19
i 8
PROJECT v ""
INSTRUCTION PI-MP3-02 REV. 2 INSTRUCTION 1.0 PURPOSE This instruction establishes the requirements for the design review of systems included in the scope of the Independent Corrective Action Verification Program (ICAVP). The purpose of the design review is to verify the system design as reflected on design output documents and design process documents is consistent with the plant's Design and Licensing Basis. Additionally, the design review will verify technical adequacy of design process documents. This review process in conjunction with the modification review process (PI-MP3-03) operating, maintenance and testing review process (PI-MP3-06) and plant configuration walkdowns (PI-MP3-05) will verify that the current as modified system is capable of the functional requirements contained in the design and licensing basis documentation.
2.0 REFERENCE 2.1 NRC Inspection Manual Procedure 93801, Safety System Functional Inspection 2.2 NRC Inspection Manual, Chapter 2535, Design Verification Programs 2.3 10CFR50.2, Definitions 2.4 NRC Confirmatory Order Establishing Independent Correction Action Verification Program - Millstone Nuclear Power Station, Units 1,2, and 3
2.5 NUMARC 90-12, Design Basis Program Guidelines 2.6 PI-MP3-06, Operations and Maintenance and Testing Procedures and Training Documentation Reviews 2.7 PI-MP3-07, Review of System Design for Compliance with the Design and Licensing Basis 1
2.8 PI-MP3-09, Preparation and Approval of Checklists 2.9 PI-MP3-11 Discrepancy Report Submittal and Closure 2.10 PI-MP3-12, Project File Index Pace 2 of i9
A w
PROJECT-D""
INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 2.11 CK-MP3-02 Series Checklists as follows:
CK-MP3-02-01 System Reference List CK-MP3-02-02 System Requirements List CK-MP3-02-03 Design Process Document Review Checklist CK-MP3-02-04.1 P&lD Review Checklist CK-MP3-02-04.2 Logic Diagram Review Checklist CK-MP3-02-04.3 Electrical Schematic Review Checklist CK-MP3-02-05.1 Mechanical Component Review CK-MP3-02-05.2 Electrical Component Review CK-MP3-02-05.3 l&C Component Review CK-MP3-02-06 Topical Area Review N.g.ta: Checklists used in the performance of this Pl are not included as attachments to the Pl. Checklists are prepared and controlled as separate documents per PI-MP3-09.
3.0 DEFINITIONS 3.1 Accident Mitigation Systems Review Group (ARG) - The subgroup of the ICAVP Verification Team responsible for review of critical characteristics of accident mitigation systems to ensure those systems can perform their required safety functions.
3.2 Operations & Maintenance and Testing Review Group (ORG) The subgroup of the ICAVP Verification Team responsible for the review of the operating, maintenance and testing procedures, and training materials for the systems within the scope of the ICAVP.
3.3 System Review Group (SRG)-The subgroup of the ICAVP Verification Team responsible for performing an in-depth review of the design of the systems in the scope of the ICAVP.
3.4 Configuration R3 view Group (CRG)- The subgroup of the SRG Verification Team responsible for walkdowns to verify the current as-built conditions are in conformance with the design output documents.
Paoe 3 of 19,
. ~
/g""
PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 1
4 3.5 Design Bases - The information which identifies the specific functions '
i to be performed by a structure, system or component of a facility, and.
s the specific values or ranges of values chosen for controlling
)
parameters as reference bounds for design. These values may be (1) restraints derived from generally accepted " state of the art" practices for achieving functional goals or (2) requirements derived from analysis of the effects of a postulated accident for which a structure, system or component must meet its functional goals (Reference 2.3).
3.6 Design Output Documents - Controlled plant documents such as specifications, drawings, vendor drawings, datasheets, lists and l
databases (Reference 2.5).
3.7 Design Process Documents - Documents such as calculations, analysis, evaluations or other documented engineering activities that substantiate the final design (Reference 2.5).
l 3.8 Current Licensing Basis (CLB)- The set of NRC requirements applicable to a specific plant, and a licensee's written commitments for assuring compliance with and operation within applicable NRC l
requirements and the plant-specific design basis (including all modifications and additions to such commitments over the life of the license) that are docketed and are in effect. The CLB includes the NRC regulations contained in 10 CFR Parts 2,19, 20, 21, 30, 40, 50, 51, 55, 72, 73,100 and appendices thereto; orders; license conditions; exemptions, and Technical Specifications (TS). It also includes the plant-specific design basis information defined in 10 CFR 50.2 as documented in the most recent Final Safety Analysis Report (FSAR) as required by 10 CFR 50.71 and the licensee's commitments remaining in effect that were made in docketed licensing correspondence such as licensee responses to NRC bulletins, generic letters, and enforcement actions, as well as licensee commitments i
documented in NRC safety evaluations or licensee event reports.
(Reference 2.7) 1 3.9 Verifier - The individual assigned to review engineering attributes within his area of responsibility.
.. Mm e L1a o
4 PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 4.0 RESPONSIBILITIES l
4.1
~ The Verification Team Manager shall be responsible for overall management of the Verification Team.
4.2 The SRG Lead shall be responsible for assigning the Lead Verifier for each system in the ICAVP scope and for overall coordination of the SRG effort.
4.3 The Lead Verifier shall be responsible for performing system reviews i
for the attributes within his area of expertise and for assigning verifiers with appropriate background for review of remaining attributes.
4.4 The Verifiers shall be responsible for performing reviews of engineering attributes within their area of expertise in accordance with l
this instruction.
5.0 PROCEDURE 5.1 General The Nuclear Regulatory Commission (NRC) Confirmatory Order referenced in Section 2.0 of this PI requires Northeast Utilities (NU) to implement the ICAVP. The Confirmatory order also defines the scope l
i of the ICAVP. Item 2 of the scope of the ICAVP described on page 13 l
of the Confirmatory order requires the Licensee to verify the current as-modified plant conditions against design basis and licensing basis documentation. This procedure describes one aspect of the process needed to perform the verification described above. Spofically, this procedure will determine if the current system design as reflected on design output documents and design process documents is consistent with the system design basis and licensing basis documentation. This review is not intended to verify the design basis as stated in the Licensing Basis Documentation is consistent with the Licensing Basis.
For example, a design basis consideration that may be described in i
the FSAR is that the system is designated a Quality Class 1 system in accordance with RG1.26. This review will verify the design of the system was performed to Quality Class 1 standards. This review will not verify that the Quality Class 1 designation was applied correctly per the guidelines of RG1.26 In other words, this procedure verifies the design basis requirement is properly incorporated in the design Page 5 of 19
l 1
i d
PROJECT 7 ""'
INSTRUCTION PI-MP3-02
[
REV.2 l
INSTRUCTION and does not verify the design basis is in conformance with the 4
licensing basis. Verification of conformance between licensing basis l
and design basis was performed by NRC prior to issuance of the i
operating license. Changes subsequently issued will be reviewed in detail as part of the modification review process (PI-MP3-03).
l The systems to be included in the scope of the ICAVP program will be defined by the Nuclear Regulatory Commission. A meeting will be held with the NRC, NEAC and NU to finalize the boundaries of tho selected systems and interfacing systems after the systems have been identified in general, S&L's review for the vertical slice system i
reviews will address interfaces as follows:
4 Mechanical Interfaces - S&L will review the interfacing system calculations to the extent needed to verify that the functions required to support the vertical slice review system were addressed in the design of the interfacing system. We will review the interfacing systems drawings and procedures to the i
extent needed to verify the support functions are addressed.
This review will not1nclude technical verification of the adequacy of the interfacing systems calculations, procedures or drawings. For example, if a vertical slice system requires support of a cooling water system, we will verify the cooling water system's hydraulic analysis, operating procedure, P&lD 4
and piping drawings support the vertical slice system functional l
requirements.
l l&C Interfaces - l&C interfaces will be treated in a slightly different manner compared to mechanical interfaces section above. We will review input signals from interfacing systems through to its signal source to verify that the functions required to support the system
(
under review were addressed in the design of the interfacing system. We will review the output l&C signals for the system under i
review through to the input point of the interfacing system. The
{
extent of these reviews is described in Attachment 6.3.
Electrical Interfaces - Electrical interfaces will be treated in a slightly different manner. A detailed review of the electrical distribution system from the motor control center or switchgear, Pace 6 of 19
J 4
I PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 as applicable, to the load is included as part of the vertical slice system review. A load path review will be performed for the remainder of the electrical distribution system (diesel generator to switchgear or MCC). The extent of this review is described in
,.2.
1 i
Once the systems and boundaries have been identified, the following tasks shall be performed in order to determine if the system's design is consistent with the plant's design and licensing basis:
i a.
Document Retrieval & Review b.
Identification of System Requirements c.
Techrdcal Review of Design Process Documents d.
Upper Tier Drawing Review e.
Component Review f.
Topical Review g.
Reconciliation of Design vs. Design & Licensing Basis i
h.
Discrepancy Report Preparation and Closure i.
Final Report Preparation The detailed instructions for performing these tasks are provided in the subsections 5.2 through 5.11 below. References 2.1,2.2 and 2.4 were used to develop these instructions. Attachment 6.1 is a flow chart illustrating the system review process.
5.2 Document Retrieval & Review
^
5.2.1 Since there may be duplication between documents required by the i
various review groups, the following division of responsibility has been established:
l.
5.2.1.1 The SRG shall gather, as a minimum, the following licensing and design bases documents and system specific documents:
a.
Design & Licensing Basis Documents (Applicable Sections Only) a.1 NRC Regulations
. a.2 Technical Specifications a.3 Updated Safety Analysis Report l
a.4 NRC Safety Evaluation Report
~
a.5 MP3 Commitments to NRC included in Docketed Correspondence P ae.7 of 19-
?
1
/
6%
PROJECT
- If ""'
INSTRUCTION PI-MP3-02 t
INSTRUCTION
/
REV. 2 a.6 Design Basis Documentation Package (DBDP) b.
System Specific Documents b.1 Engineering Calculations (Mech, Elect, Struct, I&C and Piping Analysis) b.2 Equipment Procurement Specifications b.3 Modification Packages b.4 System Descriptions b.5 Equipment List b.6 Environmental and Seismic Qualification Reports b.7 Findings and corrective actions identified by NU during the implementation of their Configuration Management Plan (CMP) 5.2.1.2 The ORG Shall gather, as a minimum, the documents listed below-a.
Operating Procedures including Emergency Operating Procedures b.
Maintenance Procedures c.
Surveillance Test Procedures d.
Vendor Manuals-e.
System Training Procedures f.
Necessary Support and/or Related Procedures g.
Operational Data Needed To Support Review of Design Process Documents 5.2.1.3 The CRG shall gather, as a minimum, the following system specific drawings:
a.
P&lDs b.
Logic Drawings c.
Electrical Schematics d.
Piping Drawings e.
Electrical Single Line Drawings f.
Panel Wiring Drawings g.
Cable Routing Drawings and Databases h.
Pipe Support Drawings 1.
Structural Equipment Mounting Details J.
General Arrangement / Equipment Location Drawings k.
Instrument Location Drawings 1.
Zone Maps (Environment / Fire Protection, etc).
Dag 8 of 10
d
~ " 7""
INSTRUCTION Pl-MP3-02 PROJECT
./
REV. 2 INSTRUCTION t
i 5.2.2 Design and Licensing Basis documents are available in the S&L lCAVP Library. System specific documents shall be obtained from NU. Requests for documentation from NU shall be submitted in accordance with subsection 3.1 of PI-MP3-01.
5.2.3 Once the documents have been gathered, esach group shall complete the applicable section of the System Reference List (SRL) Checklist CK-MP3-02-01 and an Access Database shall be used to develop the SRL.
5.2.4 The Lead Verifier from the SRG, CRG and ORG shall be responsible 3
for ensuring, the SRL is prepared per checklist CK-MP3-02-01.
5.2.5 Each member of the ORG, SRG and CRG assigned to review the system shall study the documentation to become as familiar as possible and achieve an ina$epth understanding of the system as it relates to their area of expertise. Each member shall also review the findings and corrective actions that resulted from NU's CMP. S&L shall not duplicate findings identified by the NU CMP.
l 5.2.6 If the need for additional documents is identified during the review process, these documents shall be requested in accordance with j
subsection 5.2.2 of this Pl.
5.2.7 Updates to the SRL shall be made in the same manner as initial input.
5.2.8 The SRG Lead shall file a hardcopy of the completed SRL in accordance with Pl-MP3-12.
5.3 '
identification of System Reauirements 5.3.1 The SRG shall review the licensing and design basis documents to identify the functional, performance, and other design requirements for the system being reviewed.
5.3.2 The SRG Lead shall assign a Lead Verifier for each of the systems being reviewed. The Lead Verifier shall be from the related discipline (Mechanical for Mechanical System, Electrical for Electrical System, etc). The SRG Lead shall also assign verifiers from other disciplines as needed to support the system review process.
j m
i g( ""
~
"pi INSTRUCTION Pl-MP3-02 PROJECT INSTRUCTION REV. 2 E
5.3.3 The Verifier (s) shall review the Licensing and Design Basis Documents for the system being reviewed to identify design, t
performance and functional requirements. Each requirement shall be j
entered into the System Requirements List. Checklist (Checklist CK-
~ MP3-02-02) shaii be used to develop the System Requirements i
Checklist.
~ Note: The System Requirements Checklist shall be developed i
electronically using an Access Database. Checklist CK-MP302-02 i
provides the instructions for using the database.
5.3.4 The Verifier (s) shall as a minimum, perform a review of the following documents in order to develop the system requirements checklist:
a.
FSAR b.
SER i
c.
Technical Specifications d.
Licensing Commitments contained in docketed correspondence (from NU's Licensing Commitment List) e.
Design Criteria Documents (including NSSS Vendor documents) f.
Design Basis Document Package (only those documents contained in the DBDP which are plant controlled documents or correspondence shall be considered valid for the purpose j
of defining system requirements).
i The review of the FSAR for functional, performance and design requirements shall focus on the following system specific and area topics as a minimum.
a.
Applicable Regulatory Guides b.
Conformance to the Standard Review Plan c.
TMI Action items d.
Design of Structures, Components, Equipment and Systems
.t (Chapter 3).
e.
Engineered Safety Features (Chapter 6).
2 f.
I&C (Chapter 7) i g.
Electrical Power (Chapter 8) h.
System Design (Chapter 4,5,9 or 10 as applicable).
l l.
Accident Analysis (Chapter 15)
J.
Human Factors Engineering (Chapter 18)
{
k.
Fire Protection l
-. _.;._n
.n...
-m...
N,.1b ob19
l
.(I 4
f""
INSTRUCTION PI-MP3-02 PROJECT REV. 2 INSTRUCTION a
This review shall define functional, performance and design requirements related to the following system specific topics:
a.
Mechanical Design b.
Electrical Design c.
l&C Design d.
Structural Design Piping Design (including identification of postulated break e.
locations.)
f.
Equipment Qualification (limited to seismic and environmental qualification of system components, does not include verification of seismic response spectra or environmental parameters.)
The review shall also define requirements for the vertical slice systems related to the following topical areas:
4 a.
Hazards including pipe whip, jet impingement, missiles and flooding.
b.
Station Blackout-c.
Appendix R Safe Shutdown Analysis.
5.3.5 The ORG shall identify and enter operating, maintenance and testing requirements into the System Requirements Checklist per PI-MP3-06.
The ARG shall enter critical characteristics required for accident mitigation identified per PI-MP3-07 into the system requirement j
checklist. Entries shall be per this procedure.
t 5.3.6 Each entry into the system requirements list shall be independently reviewed by a verifier form the same group and discipline. The i
Verifier (s) performing the independent review shall review each entry for accuracy with the source document. Review shall be performed in accordance with CK-MP3-02-02.
5 3.7 The independent Verifier (s) and/or the Verifier (s) who initially prepared the systems requirements checklist shall initiate a DR for any conflicting requirement identified during the review of the Design and Licensing Basis documentation. The DR shall be processed in l
accordance with Section 5.10 of this procedure.
5.3.8 The SRG or ORG Lead, as Applicable, will review each entry into the Systems Requirements Checklist for completeness. This review shall Pace 1.1 of 19
dk "f *"
PROJECT INSTRUCTION PI-MP3-02 INSTRUCTION PEV. 2 be performed per Checklist CK-MP3 02-02. The SRG Lead shall distribute the checklist to the project file in accordance with PI-MP3-12.
5.4 Technical Review of Desian Process Documents 5.4.1 The SRG shall perform a detailed review of applicable design process documents to verify technical adequacy and that the conclusions of the calculations support the system requirements.
5.4.2 Applicable design process documents shall include:
a.
Mechanical calculations (hydraulic calculations, component sizing calculations, design pressure and temperature calculations, NPSH calculations, etc.
b.
Electrical calculations (load calculations, voltage drop, etc.)
c.
l&C calculations (setpoint calculations) d.
Structural calculations (equipment mounting, pipe supports, cable tray supports, conduit supports, etc.)
i e.
Piping Analysis -
f.
EQISO Reports The review of interfacing system calculations to the extent described in Section 5.1 of this Project Instruction shall be included in the scope of this section.
5.4.3 Checklist CK-MP3-02-03 shall be used to document the design process document review. The applicable subject specific checklists from Pl-MP3-03 shall also be used in conjunction with CK-MP3-02-03.
5.4.4 The Verifier (s) shall review the adequacy of the following attributes:
a.
Numerical Accuracy - The numerical aspects and mathematical operations shall be error free. The number of significant figures shall be consistent with the input data, assumptions and design methodology. Transposed or transferred numbers are correct.
I b.
Modeling Accuracy - Analytical models shall be consistent with the degree of accuracy of the input data, assumptions and design methodology.
l I
_ _ _________________ 95snt 51>214 5NL_-- _--__ j
..)
o 6
"f ""
PROJECT INSTRUCTION Pl-MP3-02 INSTRUCTION REV. 2 c.
Assumptions and Engineering Judgment - Assumptions and engineering judgment shall be consistent with the design approach and methodology.
- i d.
Design inputs - Design inputs shall be based on the latest controlled design documents.
e.
Methodology - The method shall be appropriate for the purpose and scope of the calculation.
Hgig During the review of design process documents, operational data, where available, shall be used to confirm calculation -
assumptions and/or conclusions.
5.4.5 The Verifier (s) shall note any comments identified during the reWew on the Design Process Document Review Checklist (CK-MP3-02-03).
5.4.6 The Verifier (s) shall evaluate the comments to determine if they affect the conclusion of the Design Process Document. The evaluation shall be documented on the Design Process Document Review Checklist (CK-MP3-02-03).
5.4.7 The Verifier (s) shall indicate on the checklist coversheet (CK-MP3 03) whether the conclusions are acceptable with comments or unacceptable, and shall sign and date the coversheet.
5.4.8 For acceptable with comments or unacceptable dispositions, the Verifier shall generate a Discrepancy Report per subsection 5.10 of this Pl. The Verifier (s) shall also evaluate the unacceptable disposition for impact on other documents that may use the conclusion as input. The Verifier (s) shall consult other SRG members while evaluating the impact.
Note: Calculation results are typically used as input in other documents. If a Discrepancy is identified which affects the result of the calculation, it is important to define where those results were used and evaluate those documents for impact. The review should be done prior to generating a Discrepancy Report so that the Discrepancy Report describes the full extent of the condition.
5.4.9 The Lead Ver:.ler shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall F-)eraa1ML19 I
f?
PROJECT
- [f"~
INSTRUCTION PI-MP3-02 l
INSTRUCTION
/
REV. 2 compile and file the design process document review checklists prepared by the Verifier (s) to the project file in accordance with Pl-MP3-12.
F 5.5 Uooer Tier Document Review 5.5.1 The SRG shall perform a functional review of the upper tier drawings as one of the steps necessary to verify the system is capable of performing required functions as described in the design and '
licensing basis. This review includes the vertical slice system drawings as well as interfacing system drawings to the extent described in Section 5.1. The SRG shall also perform a technical review of the drawings to verify conformance to design calculations and classification criteria.
5.5.2 The Verifier (s) shall utilize drawing review checklists CK-MP3-02-4.1,
-4.2, -4.3 for the review of the P&lDs, logic diagrams and electrical drawings (i.e. schematics, single lines and instrument loop diagrams), respectively. These checklists define the attributes to be reviewed. In general, review attributes will include flow paths, interlocks, automatic actuations, permissives, redundancy and separation, safety classification, component sizes, pressure class, overpressure protection, adequacy of interfacing system tie-ins, etc.
The review is not intended to identify drafting or style errors.
4 5.5.3 The Verifier (s) shall note any comments on the applicable checklists (C K-MP3-02-4.1, -4.2, -4.3).'
5.5.4 Upon completion of the review, the Verifier (s) shall sign and date the coversheet of the applicable checklists.
5.5.5 The Verifier (s) shall generate a Discrepancy Report per Subsection 5.10 of this PI for any discrepancies not previously identified by the NU CMP.
~
5.5.6 The Lead Verifier shall verify.the checklists have been properly completed, indicate his concurrence with signature and date, and shall compile and file all drawing review checklists prepared by the Verifier (s) in the project file per Pl-MP3-12.
5.6
- Component Review i
--.s
,a s.-
i
/
s!&
h""
INSTRUCTION PI-MP3-02 PROJECT INSTRUCTION
/
REV. 2 5.6.1 The SRG shall perform a detailed review of system components. This review shall verify the design data included in the design and licensing basis, the vendor drawings, the procurement specifications, eqaipment list and calculations are consistent.
1 5.6.2 The scope of this review shall include all major mechanical, electrical and I&C components.
5.6.3 Detailed component checklists are included in the CK-MP3-02-05 series checklists. These checklists verify attributes such as classification, design conditions, operating conditions, functiorial requirements, applicable codes and standards, performance requirements, and qualification requirements, etc.
5.6.4 The Verifier (s) shall complete individual Component Review Checklists (CK-MP3-02-05 series) for each component within the scope of review. Discrepancies noted shall be indicated in the appropriate blocks on the checklists.
5.6.5 Upon completion of thneview, the Verifier (s) shall sign and date the checklists.
5.6.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.8 of this PI for any discrepancies not previously identified by the NU CMP.
5.6.7 The Lead Verifier shall verify the checklists have been properly completed, indicate his concurrence with signature and date, and shall file all completed checklists in the project file per PI-MP3-12.
5.7 Topical Area Reviews 5.7.1 The SRG shall perform a review of the following topical areas:
a.
Hazards including pipe whip, jet impingement, mist!Ies and flooding b.
Station Blackout c.
Appendix R Safe Shutdown Analysis 5.7.2 The Verifier shall document the review of topical areas using Dm6p 15 of 19
i p""
INSTRUCTION PI-MP3-02
~
PROJECT INSTRUCTION REV. 2 i
checklist CK-MP3-02-06. Tnis review shall verify the following:
a.
That the p pe whip and jet impingement effects of postulated breaks in the vertical slice system have been analyzed.
b.
Tnat potential missiles from the vertical slice system have been waluated.
c.
That the flooding analysis considers the vedical slice system's I
contribution to area flood levels.
d.
The vertical slice system components, if credit for operation was taken in the station blackout coping assessment, are capable of performing tF.L requ' red functions, e.
The vertical slice system has been adequately addressed in the Appendix R Analysis if credit for system operation was taken in the safe shutdown analysis.
5.7.?
Upon completion of theteview, the Verifier (s) shall sign and date the applicable portion of the checklists.
5.7.4 The Verifier (s) shall generate a Discrepancy Report in accordance with subsection 5.10 of this PI for any discrepancies not previously identified by the NU CMP.
51.5 The Lead Verifier shall verify the checklist has been properly completed, indicate this concurrence with signature and riate, and shall file all completed checklists in the project file ps. ' MP3-12.
5.8 Reconciliation of Desian vs. Desian and Licensina Basis 5.8.1 The SRG will complete the verification of the system design versus the design and licensing basis documentation. The verification shall
)
be completed by dispositioning each requirement on the System Requirements Checklist (Checklist CK-MP3-02-02).
P%R 16 of 19
d ""
PROJECT
/"
INSTRUCTION PI-MP3-02 INSTRUCTION REV. 2 5.8.2 Where applicable, the Verifier (s) shall identify on the System Requirements Checklist, the design process documents which verify the restraints imposed by the system requirement are not exceeded.
The Verifier (s) shall either indicate the design process document either supports the requirement or describe any deficiencies.
5.8.3 The Verifier (s) shall identify on the System Requirements Checklist, the design output documents related to the system requirement. The Verifier shall indicate whether the technical requirements contained in the design output documents are consistent with the system requirements or shall identify the discrepancy.
5.8.4 The Verifie as) shall complete the dispositions in the System Requirements Checklist, using the Access Database in accordance with CK-MP3-02-02.
5.8.5 Dispositions to the system requirements shall be independently reviewed by a Verifier from the same group and discipline. The independent review shell be in accordance with CK-MP3-02-02.
5.8.6 The Verifier (s) shall generate a Discrepancy Report in accordance with Subsection 5.10 of this Pl for any discrepancies not previously identified in Subsection 5.4,5.5, and 5.6 of this procedure.
5.8.7 The SRG Lead shall review the dispositions in the system require-j ments checklist (CK-MP3-02-02) for completeness and technical accuracy. The SRG Lead shall notify the ARG Lead that either all critical characteristics for accident mitigation systems have been satisfied or he shall identify which are not.
5.8.8 The Lead Verifier shall file a hardcopy of the completed checklist in j
the project file per PI-MP3-12.
j 5.9 SRG Support for ORG Procedure Review Process 5.9.1 During the implementation of the Procedure Review Process described in PI-MP3-06, the ORG will highlight all performance parameters including operating ranges and/or limitations described in the procedures. These parameters will be submitted to the SRG Paoe 17 of 19
4 l
PROJECT INSTRUCTION Pl-MP3-02 INSTRUCTION
? -
REV. 2 for verification via checklist CK-MP3-06-10. The ORG may also identify operating modes which are not explicitly identified in the system requirements checklist. The ORG will submit these modes 2
i to the SRG for review via checklist CK-MP3-06-10 to verify the design and analysis suppott operation in this mode.
5.9.2 '
The SRG Lead Verifier or assigned Verifier shall review these i
i parameters to ensure they are correct. Ths Verifier shall complete the CK-MP3-06-10 checklist by identifying the basis for the l
parameter, if correct, and/or preparation of a DR per Section 5.10 of this procedure for incorrect parameters. Once all parameters have l
been r9 viewed the Verifier shall sign and date checklist l
CK-MP3-06-10 and shall return the completed checklist to the ORG.
5.9.3 The SRG will review any operating modes submitted by the ORG per i
checklist CK-MP3-06-10. The SRG Verifier shall review the mode to ensure it is within the system's design basis. The SRG Verifier shall enter his conclusions on checklist CK-MP3-06-10, sign and
~
date the checklist and return it to the ORG. If the evaluated mode is f
outside the system's design basis, the SRG Verifier shall prepare a DR per Section 5.10 of this procedure.
5.10 Discrepancy Reoort Preparation ano Closure j
5.10.1 Discrepancy Reports for discrepant conditions identified during the system review process shall be prepared and processed in accordance with PI-MP3-11. Discrepancy reports shall not be initiated for findings already identified by NU during implementation of the i
CMP.
5.10.2 Review of NU dispositions for the Discrepancy Reports generated during the review cycle shall be in accordance with PI-MP3-11.
5.11 Final Report 5.11.1 The Lead Verifier shall draft a finct report summarizing the results of the system review.
i 5.11.2 The report format shall be determined by the Verification Team Manager.
1 l
i
~
Page 18 of 19
~
PROJECT INSTRUCTION PI-MP3-02 1
INSTRUCTION REV. 2 i
5.11.3 The report shall be reviewed and approved by the VT Lead, VT j
Manager and IRC prior to extemal distribution.
i
. 6.0 A_TTACHMENTS
(
6.1 ICAVP Process Flowchart, " System Review" (1 page) 6.2
~ Scope of Electrical Support System Review (3 pages) i 6.3 Scope of l&C Interfacing Signal Review (1 page) 4 e
i i
)
~
l Daca 19 f 19 i
O
~.,._
c "
w
)
7 J:emity systems in icAvP o
Sccpe
' PI MP3-02, REV. 2 J CAVP PROCESS FLOWCH' ART.:
ATTACHMENT 6.1
.j i
b L SYSTEM REWEW
- _ 'NRC
]
i 3-j
{
Define! Review System -
j Boundaries
.j NRC/NEAC/NU/SRG -
I-J v
i Gather Design & Licens!c.g ;
.i Basis Documents & Design -
e Output Documents i
SRG,CRG,ORG l
I Y
i Prepare System Reference x
List
.l i
SRG,CRG.ORG i
j
. ~
_____.___.J v
Define System Design &
Distnbute cr* cal System Reference Licensing Basis / Prepare
$,Nd'$,"f--
I
[
.i List for Use System Ftequirement Ust '*
pimun l SRG SRG I
j s
.. j v
.u %.--..~,,.
.1
._.-....J-V 2
k
[ Perform Component. :
Perform Detailed Review for 4
Submit Des /Lic.
Perform Functional Basis List to Review Perform Topical Area Calc Review j Consistency (Lic &
I P&lD/ Logics /Elecincal Review (M/ Ell / Piping Analysis.
ORG for Use Des Basis /Dwg/
Diagrams -
& EQ/SQ Rept.)
i a es/ Specs SRG SRG
~
SRG SRG SRG r
?.
?
Y
.__L_.-._..___..
Y Y.. -
l Disposition System._
i Requirements List
?'
Dispondson of Cntical SRG
~ ~----~
- cna,ac,.rraie.
to ARG v
^
4 Were liSCrepanCtes No
- identified?
f i
f 4
f OroceSS OtscrepanCV 3
s i
Reports l
I' PI-MP3-11) l SRG e
.i 1
3repare Review Repen i
'c
)
1
_ SRG -
Pi-MP3-02, Rev. 2.2 Page 1 of 3 Scope of Electrical Support System Review This verification will consist of identifying the buses that feed all the components used in the systems under review and determine the " load-time' profile for these components. The " path" from these buses are to be identified up to the electrical onsite source (i.e. diesel-generator, battery & charger, inverter, etc.)
This is explained in Pages 2 and 3 of this Attachment. The loading time profile on each bus for the components of the system under review shall be verified for the calculations that use this information as input. The bus voltage will also be identified from the voltage drop calculations to verify that the correct bus voltage was used to determine voltage drop to the components of the system under review.
Once the loads are verified, the load carrying components in the " path" will be checked for design sizing based on the total operating load of the bus as shown in the bus loading calculations. Loading for components of systems not under review will be accepted (without verification) as shown in the bus loading calculations as input. Coordination of protective devices (relays, breakers, fuses, etc.) for the " paths" required to supply the components of the systeris under review will be verified to confirm acceptabte coordination and that the required bus operating loading is addressed.
The onsite source load-time profile will be checked to determine that the source input is properly included for the components of the systems under review (including transient loading). The overall source sizing will also be checked against totalloading of the source, however, verification of other systems loading will not be done but simply accepted as input. In addition, the battery charger (or inverter) and its continuous loading profile will be similarly checked to confirm the size, that the " path" is corn 'e to the diesel-generator, and load profile matches or envelopes the diesel-gmerator loading input from the charger (inverter).
If the system under review has components credited for Appendix R/ Safe shutdown use, verify that the electrical support system components (equipment and cabling) in the " path" to the onsite source are not in the fire zones which are identified as needing the components of the system under review for safe shutdown during the postulated fire.
When all of the systems under review have been identified. along with most of the components that are fed from MCCs, two MCCs with non-duplicate load components will be selected for review of all design sizing and cocrdination for all loads on these two MCCs. The load input from other systems not under review will not be verified. but the design of the MCC will be venfied based on the component input.
AC SYSTEM SUPPORT M. V. SWGR b
)w w
w a
- ELEC SYSTEM SUPPORT REVIEW PART OF MECH. SYSTEM REVIEW
- RLY lIRLY lI RLY lI FOR MECH. SYSTEM.
ww
- APPLICABi L 1 ICEtJSitiG REQ' MIS
[S/R Nm
-MECH. ~ SYSTEM LOADING ACCOUNIED I OR o g,
\\M
-OPERATING VOLTAGE RANGL
- GROutJDING (IOut i t.i SYSILM)
PROILCIIVE SLillNG COORulNAliUN l'M LOUll' Sli1rs v)
PATH (OVERLOAD, FAULT, Et LC. LGillP n
- APP. R ltJLl ill,ED LV. SWGR PROTECllON) f)DC f)DC
-SAFE SHUTDOWN SUPPORl INCLUDLD
-SAFE SifutuOwil it2ct.UDED r
FOR MECH SYSTEM
-CABLE Silli:G (IRAY,FIRESTOP AMB.)
{
-APP. R ANALYSIS INCL UDED FOR -
]>
p
-VOLI DROP (POWLR & COfflHOI-)
1 MECH SYSTEM
-PROTECllVL Stilit1GS S/R
-ALL RELATED SYSTEM COMPONENIS H D FROM SAME SOURCE (DIVISION)
M
-OPERAlif4G VOITAGL HANGE
-COMPOfiErli E.O.
c
")
CONT
-H S/R
'.o > 'u g;
LOAD emE S/R Q.3 C.V. DISTR g 3g u
un-
- I o) o)
a Y
S/R
' MISC PNL s
k t
u Y-a m
b
+
w-e-
w w
9-C--u
-C-a -
'h
~w s-
_..v.
CONTROL DC SYSTEM SUPPORT AC BAT CHRG T
a-n---
{
1_
1_
M. V. SWGR PART OF MECil SYSTEM REVIEW
-d ELEC SYSTEM SUPPORT REVIEW FOR MECH SYSTEM DC CONT API'l lCAhi t llCl flSING RLO'MEtJIS
-MECH SYSTEM CONTROL LOADING i
i OtilPMI I11 RAllt1GS 1
ACCOUNTED FOR
--APP R ltACLUDED (INCLUDING T! MING / REPETITION)
SAFE SiluTDOWil tilCLUDED L V. SWGR
-DISTR. VOLT DROP TO BUS /SWGR CABI E SIZilJG (ItJCLUDING 1 RAY'
-PROTECTIVE SETTINGS COORDINATION LIRE STOP DUCI, AMBIEllT)
FOR PATH
'" ' ACI
""U" I
I)
DC CONT (OVERLOAD, FAULT, ELEC. EQUIP PROlECliVL SLIiltlGS PROTECTION) r
-VOLI AGE RANGE cOuPoNrr1r E.o
-SAFE SHUTDOWN ' SUPPORT INCLUDED FOR MECH SYSTEM
- E3 u
- APP. R ANALYSIS INCLUDED FOR R
h S/R PANEL MECH SYSTEM pg 4
SOL
}
-ALL RELATED SYSTEM COMPONENTS CONTACT FED FROM SAME SOURCE (DIVISION)
RLY SOL
-~
..-.- ~ -.
l i
PI-MP3-02 Rev. 2.3 Scone of I&C Interfacine Sienal Review (I name)
This review will consist ofidentifying the instrumentation that provides signal inputs to the system under review. The review includes the interfacing system instrument signal paths to their signal source to verify that the functions required to support the vertical slice review l
were addressed in the design of the intedacing system.
This review will also consist ofidentifying I&C signals from the system under review going to an interfacing system. The review includes the system output I&C signals from the system l
under review through to the input point of the' interfacing system to verify that the functions required to support the vertical slice review were addressed in the design of the interfacing system.
I The review includes the signal path as it appears on interfacing system P& ids, logic diagrams, schematics and wiring diagrams. This review will verify signal parameters, divisional source, setpoint, range and accuracy. Setpoint and loop accuracy calculations will be reviewed for technical adequacy for the affected instrumentation.
If the interfacing system I&C signal inputs or outputs are covered by the vertical shee review of another system included in the review then the review of the affected instrumentation will not be duplicated.
i i
i
)
3 i