ML20148E265: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ ____
{{#Wiki_filter:_ _ ____
        .* .t         ,
.*
          ,     i-
.t
                      ,
,
                                                        MAR 2 21988
,
            .
i-
                  In Reply Refer To:                                                                     ,
MAR 2 21988
                                                                                                          '
,
                -Dockets:     50-072/88-01
.
                              50-407/88-01
In Reply Refer To:
                .'EA 88-64
,
                  Dr. James J. Brophy-
'
                  Vice President of Research
-Dockets:
                  University of Utah
50-072/88-01
                  Salt Lake City, Utah 84112-
50-407/88-01
                  Gentlemen:
.'EA 88-64
                  This refers to the Special Team Inspection conducted by Messrs. H. Chaney,
Dr. James J. Brophy-
                  R. Evans, and D. Powers of this office during the period February 16-19, 1988,
Vice President of Research
                  of activities authorized by NRC Operating Licenses R-25 and R-126 for the
University of Utah
                  University of Utah's AGN-201 and TRIGA reactors, respectively, and to the
Salt Lake City, Utah 84112-
                  discussion of our findings with Messrs. R. E. Stephenson and G. M. Sandquist,
Gentlemen:
                  and other members of your staff at the conclusion of the inspection.
This refers to the Special Team Inspection conducted by Messrs. H. Chaney,
                  Areas examined during the inspection involved reactor operation, emergency
R. Evans, and D. Powers of this office during the period February 16-19, 1988,
                  planning, physical security, and radiological controls associated with the
of activities authorized by NRC Operating Licenses R-25 and R-126 for the
                  TRIGA reactor, and the physical security and decommissioning status of the
University of Utah's AGN-201 and TRIGA reactors, respectively, and to the
                  AGN-201 reactor. Within these areas, the inspection consisted of selective
discussion of our findings with Messrs. R. E. Stephenson and G. M. Sandquist,
                  examination of procedures and representative records, interviews with
and other members of your staff at the conclusion of the inspection.
                  personnel, and observations by the NRC inspectors. The inspection findings are
Areas examined during the inspection involved reactor operation, emergency
                  documented in the enclosed inspection report.
planning, physical security, and radiological controls associated with the
                  During this inspection, it was found that certain of your activities appeared
TRIGA reactor, and the physical security and decommissioning status of the
                  to be in violation of NRC requirements. Also curing this inspection, it was
AGN-201 reactor. Within these areas, the inspection consisted of selective
                  found that certain of your activities appeared to deviate from commitments made
examination of procedures and representative records, interviews with
                  to the NRC.     As discussed in our telephone conversation of February 24, 1988,
personnel, and observations by the NRC inspectors.
                  between Mr. R. E. Hall of this office and yourself, we have scheduled an
The inspection findings are
                  enforcement conference in our office at 10 a.m. on March 28, 1988, to discuss
documented in the enclosed inspection report.
                  your understanding of these apparent violations, the reasons for occurrence,
During this inspection, it was found that certain of your activities appeared
                  and your corrective actions. We will also discuss any potential enforcement
to be in violation of NRC requirements.
                  options available to the NRC, if appropriate.
Also curing this inspection, it was
                  Should you have any questions concerning this inspection, we will be pleased to
found that certain of your activities appeared to deviate from commitments made
                  discuss them with you.
to the NRC.
                                                              Sincerely,
As discussed in our telephone conversation of February 24, 1988,
                                                              ORIGINAL SIGNED BY:
between Mr. R. E. Hall of this office and yourself, we have scheduled an
                                                              L. A. Yandell, Chief
enforcement conference in our office at 10 a.m. on March 28, 1988, to discuss
                                                              Radiological Protection and
your understanding of these apparent violations, the reasons for occurrence,
                                                                Safeguards Branch
and your corrective actions.
                  Enclosure:   (see next page)
We will also discuss any potential enforcement
                  RIV:FRPSj       C:FRPS     C:NMIS         OPS:DR         C:0PS:D      AE0 7/
options available to the NRC, if appropriate.
                                                                      [-
Should you have any questions concerning this inspection, we will be pleased to
                                                                                      _
discuss them with you.
                  H0Chan g                  DAPowers                        JEGagl' rdo   HScott
Sincerely,
                                  JMurr                                                     .3 ////88
ORIGINAL SIGNED BY:
              l //,(/88         7 /(//88   3 /2) /88             8
L. A. Yandell, Chief
                                                            f3 kiREvans$    3/2lE
Radiological Protection and
                  D:0Rh/           C:RPSB
Safeguards Branch
                                    LAYand
Enclosure:
                  RL8ahV&t
(see next page)
                  ()Y)$88             h/g/88
C:0PS:D
                8803250043 880322                                                                       8
AE0 7/
                PDR
[-
                O
RIV:FRPSj
                          ADOCK 05000072
C:FRPS
                                      DCD
C:NMIS
                                                                                                      d
OPS:DR
                                                                                                      7
_
JEGagl'
rdo
HScott
f3 kiREvans$
H0Chan g
JMurr
DAPowers
8
3/2lE
.3 ////88
l //,(/88
7 /(//88
3 /2) /88
D:0Rh/
C:RPSB
RL8ahV&t
LAYand
()Y)$88
h/g/88
8
8803250043 880322
d
PDR
ADOCK 05000072
O
DCD
7


    '
'
.       r                                           .
.
                                                            ,
r
  ,. -1
.
            s
,
      .
,.
          University of Utah                   -2-
-1
          Enclosure:
s
          Appendix - NRC Inspection Report
.
            50-072/88-01
University of Utah
            50-407/88-01
-2-
          cc w/ enclosure:
Enclosure:
          L. F. Anderson, Director
Appendix - NRC Inspection Report
          Bureau of Radiation Health
50-072/88-01
          Utah Department of Health
50-407/88-01
          288 North 1460 West
cc w/ enclosure:
          P.O. Box 16700
L. F. Anderson, Director
          - Salt Lake City, Utah 84116-0700
Bureau of Radiation Health
          K. J. Schiager
Utah Department of Health
          Radiation Safety Officer
288 North 1460 West
          Radiological Health Department
P.O. Box 16700
          University of Utah
- Salt Lake City, Utah 84116-0700
          100 Orson Spencer Hall
K. J. Schiager
          Salt Lake City, Utah 83112
Radiation Safety Officer
          R. E. Turley
Radiological Health Department
          Reactor Administrator
University of Utah
          Merrill Engineering Building
100 Orson Spencer Hall
          Department of Mechanical Engineering
Salt Lake City, Utah 83112
          University of Utah
R. E. Turley
          Salt Lake City, Utah 84112
Reactor Administrator
          Gary Sandquist, Reactor Supervisor
Merrill Engineering Building
          Merrill Engineering Building
Department of Mechanical Engineering
          Department of Mechanical Engineering
University of Utah
          University of Utah
Salt Lake City, Utah 84112
          Salt Lake City, Utah 84112
Gary Sandquist, Reactor Supervisor
          R. E. Stephenson, Reactor Administrator
Merrill Engineering Building
          Merrill Engineering Building
Department of Mechanical Engineering
          Department of Mechanical Engineering
University of Utah
          University of Utah
Salt Lake City, Utah 84112
          Salt Lake City, Utah 84112
R. E. Stephenson, Reactor Administrator
          W. Shepherd
Merrill Engineering Building
          Chief of Police
Department of Mechanical Engineering
          University of Utah
University of Utah
          Salt Lake City, Utah 84112
Salt Lake City, Utah 84112
          bcc:   (see next page)
W. Shepherd
                                                      _. ..
Chief of Police
University of Utah
Salt Lake City, Utah 84112
bcc:
(see next page)
_. ..


      . .       ,                   .-             -               . .             . - . . -
. .
                                                                                              _.. . ,, - -                       .               . . _ . _ - . . _ .. . . , , -
,
                                                                                                      i.
.-
  r
-
    ..,.
. .
              .
. - . . -
                    . ,.
_.. . ,, - -
                  '
.
          - 2e       -
. . _ . _ -
                          ,l,
. .
                                                                                                                                                                                  I
_ .. . . , ,
                                                                                                                                                                                  i
-
                        ,                                                                                                                                                   .c
i.
                            -University of Utah                                                     '
r
                                                                                                            3-
.
                                bec:to DM8           .IE-01
. . , .
                                bec:
. ,.
                                  R. Martin                                                             Inspector (s)~-
- 2e
                                *C:RPSB-DRSS                                                         *DRP
-
                                  Lisa Shea,'RM/ALF.~                                                   RIV File
,l,
                                  MIS Coordinator                           p                       *0RS
'
                                  RSTS Operator                                                     *C:FRPS
I
                                  R.'   L. Bangart, DRSS                                             *R. Hall-DRSS                                                           ,
i
                                *RPSB-0RSS                                                             H. Scott
,
                                *TSS.     .
. c
                                                                                                        A. Adams, NRR, Project Manager
-University of Utah
                                .J.' Lieberman
'
                                                                                                                                                                                  ,
3-
            { ,'
bec:to DM8
                                                                                                                                                                                  '
.IE-01
                                                                                          )
bec:
                                                                                          i
R. Martin
                                                                                                            U
Inspector (s)~-
                                                                                                                                                                                  >
*C:RPSB-DRSS
                                                          %
*DRP
                                                                                                          k
Lisa Shea,'RM/ALF.~
                                                                                                                  '
RIV File
MIS Coordinator
p
*0RS
RSTS Operator
*C:FRPS
R.' L. Bangart, DRSS
*R.
Hall-DRSS
,
*RPSB-0RSS
H. Scott
*TSS.
.
A. Adams, NRR, Project Manager
.J.'
Lieberman
,
{ ,'
'
)
i
U
>
%
k
4
4
                                                                                                                                                            L
'
                                                                                  s
L
                                                                                                                            )
s
                                                                                                                                                                            b
)
b
*
*
W
W
  ..ww.,-,tr''T-           '' ~
..ww.,-,tr''T-
                                        #   ~~'-'r   '''-*'-'n=-e -***+t*   -'*'''7''                               '-*"Y   v'-*~*~N+- - *"~d'-+v-+Nww
'' ~
#
~~'-'r
'''-*'-'n=-e
-***+t*
-'*'''7''
eeet'N'"*'v=*****'''+'**W-tr
'-*"Y
v'-*~*~N+- - *"~d'-+v-+Nww
e--'*ew'*"*---t*"
*C''---T'
}}
}}

Latest revision as of 11:56, 11 December 2024

Forwards Special Team Insp Repts 50-072/88-01 & 50-407/88-01 on 880216-19.Violations Noted
ML20148E265
Person / Time
Site: 05000072, University of Utah
Issue date: 03/22/1988
From: Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Brophy J
UTAH, UNIV. OF, SALT LAKE CITY, UT
Shared Package
ML20148E270 List:
References
EA-88-064, EA-88-64, NUDOCS 8803250043
Download: ML20148E265 (3)


See also: IR 05000072/1988001

Text

_ _ ____

.*

.t

,

,

i-

MAR 2 21988

,

.

In Reply Refer To:

,

'

-Dockets:

50-072/88-01

50-407/88-01

.'EA 88-64

Dr. James J. Brophy-

Vice President of Research

University of Utah

Salt Lake City, Utah 84112-

Gentlemen:

This refers to the Special Team Inspection conducted by Messrs. H. Chaney,

R. Evans, and D. Powers of this office during the period February 16-19, 1988,

of activities authorized by NRC Operating Licenses R-25 and R-126 for the

University of Utah's AGN-201 and TRIGA reactors, respectively, and to the

discussion of our findings with Messrs. R. E. Stephenson and G. M. Sandquist,

and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection involved reactor operation, emergency

planning, physical security, and radiological controls associated with the

TRIGA reactor, and the physical security and decommissioning status of the

AGN-201 reactor. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors.

The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities appeared

to be in violation of NRC requirements.

Also curing this inspection, it was

found that certain of your activities appeared to deviate from commitments made

to the NRC.

As discussed in our telephone conversation of February 24, 1988,

between Mr. R. E. Hall of this office and yourself, we have scheduled an

enforcement conference in our office at 10 a.m. on March 28, 1988, to discuss

your understanding of these apparent violations, the reasons for occurrence,

and your corrective actions.

We will also discuss any potential enforcement

options available to the NRC, if appropriate.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ORIGINAL SIGNED BY:

L. A. Yandell, Chief

Radiological Protection and

Safeguards Branch

Enclosure:

(see next page)

C:0PS:D

AE0 7/

[-

RIV:FRPSj

C:FRPS

C:NMIS

OPS:DR

_

JEGagl'

rdo

HScott

f3 kiREvans$

H0Chan g

JMurr

DAPowers

8

3/2lE

.3 ////88

l //,(/88

7 /(//88

3 /2) /88

D:0Rh/

C:RPSB

RL8ahV&t

LAYand

()Y)$88

h/g/88

8

8803250043 880322

d

PDR

ADOCK 05000072

O

DCD

7

'

.

r

.

,

,.

-1

s

.

University of Utah

-2-

Enclosure:

Appendix - NRC Inspection Report

50-072/88-01

50-407/88-01

cc w/ enclosure:

L. F. Anderson, Director

Bureau of Radiation Health

Utah Department of Health

288 North 1460 West

P.O. Box 16700

- Salt Lake City, Utah 84116-0700

K. J. Schiager

Radiation Safety Officer

Radiological Health Department

University of Utah

100 Orson Spencer Hall

Salt Lake City, Utah 83112

R. E. Turley

Reactor Administrator

Merrill Engineering Building

Department of Mechanical Engineering

University of Utah

Salt Lake City, Utah 84112

Gary Sandquist, Reactor Supervisor

Merrill Engineering Building

Department of Mechanical Engineering

University of Utah

Salt Lake City, Utah 84112

R. E. Stephenson, Reactor Administrator

Merrill Engineering Building

Department of Mechanical Engineering

University of Utah

Salt Lake City, Utah 84112

W. Shepherd

Chief of Police

University of Utah

Salt Lake City, Utah 84112

bcc:

(see next page)

_. ..

. .

,

.-

-

. .

. - . . -

_.. . ,, - -

.

. . _ . _ -

. .

_ .. . . , ,

-

i.

r

.

. . , .

. ,.

- 2e

-

,l,

'

I

i

,

. c

-University of Utah

'

3-

bec:to DM8

.IE-01

bec:

R. Martin

Inspector (s)~-

  • C:RPSB-DRSS
  • DRP

Lisa Shea,'RM/ALF.~

RIV File

MIS Coordinator

p

  • 0RS

RSTS Operator

  • C:FRPS

R.' L. Bangart, DRSS

  • R.

Hall-DRSS

,

  • RPSB-0RSS

H. Scott

  • TSS.

.

A. Adams, NRR, Project Manager

.J.'

Lieberman

,

{ ,'

'

)

i

U

>

%

k

4

'

L

s

)

b

W

..ww.,-,trT-

~

~~'-'r

-*'-'n=-e

-***+t*

-'*'7

eeet'N'"*'v=*****+'**W-tr

'-*"Y

v'-*~*~N+- - *"~d'-+v-+Nww

e--'*ew'*"*---t*"

  • C---T'