ML20128C144: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:r
{{#Wiki_filter:r
  ,.
DO
      -
-
                                                                                      DO
,.
    '
'
                                                    MAY 201985
MAY 201985
        Docket No. 50-341
Docket No. 50-341
        The Detroit Edison Company
The Detroit Edison Company
        ATTN: Wayne H. Jens
ATTN: Wayne H. Jens
                  Vice President
Vice President
                  Nuclear Operations
Nuclear Operations
        6400 North Dixie Highway
6400 North Dixie Highway
        Newport, MI 48166
Newport, MI 48166
        Gentlemen:
Gentlemen:
        This refers to the routine safety inspection conducted by Messrs. P. M. Byron,
This refers to the routine safety inspection conducted by Messrs. P. M. Byron,
        M. E. Parker, and D. C. Jones of this office on April 7-30, 1985, of
M. E. Parker, and D. C. Jones of this office on April 7-30, 1985, of
        activities at~ Fermi 2 authorized by Facility Operating License No. NPF-33 and
activities at~ Fermi 2 authorized by Facility Operating License No. NPF-33 and
        to the discussion of our findings with R. S. Lenart at the conclusion of the
to the discussion of our findings with R. S. Lenart at the conclusion of the
        inspection.
inspection.
        The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
        'the inspection. Within these areas, the inspection consisted of a selective
'the inspection.
        examination of procedures and representative records, observations, and
Within these areas, the inspection consisted of a selective
        interviews with personnel.
examination of procedures and representative records, observations, and
        During the inspection, certain of your activities appeared to be in non-
interviews with personnel.
        compliance with NRC requirements, as specified in the enclosed Appendix.   A
During the inspection, certain of your activities appeared to be in non-
        written response is required.
compliance with NRC requirements, as specified in the enclosed Appendix.
        In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
A
        this letter and the enclosed inspection report will be placed in the NRC's
written response is required.
        Public Document Room.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
        The responses directed by this letter and the accompanying Notice are not
this letter and the enclosed inspection report will be placed in the NRC's
        subject to the clearance procedures of the Office of Management and Budget as
Public Document Room.
        required by the Paperwork Reduction Act of 1980, PL 96-511.
The responses directed by this letter and the accompanying Notice are not
                                                                                      9
subject to the clearance procedures of the Office of Management and Budget as
                      D
required by the Paperwork Reduction Act of 1980, PL 96-511.
                                                                                          t
9
D
t


  o
o
        *
*
    ,
,
          Detroit Edison Company                   2
Detroit Edison Company
                                                                    MAY 201985
2
          We will gladly discuss any questions you have concerning this inspection.
MAY 201985
                                                    Sincerely,
We will gladly discuss any questions you have concerning this inspection.
                                                    " Original signe by R. C. Knop"
Sincerely,
                                                    R. F. Warnick, Chief
" Original signe by R. C. Knop"
                                                    Projects Branch 1
R. F. Warnick, Chief
            Enclosures:
Projects Branch 1
          - 1.   Appendix, Notice.
Enclosures:
                  of Violation
- 1.
            2.   Inspection Report
Appendix, Notice.
                  No. 50-341/85021(DRP)
of Violation
            cc w/ enclosures:
2.
            L. P. Bregni, Licensing
Inspection Report
              Engineer
No. 50-341/85021(DRP)
cc w/ enclosures:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
'
'
            P. A. Marquardt, Corporate
Legal Department
              Legal Department
DMB/ Document Control Desk (RIDS)
            DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
            Resident Inspector, RIII
Ronald Callen, Michigan
            Ronald Callen, Michigan
.Public Service Commission
            .Public Service Commission
Harry H. Voigt, Esq.
          Harry H. Voigt, Esq.
Nuclear Facilities and
            Nuclear Facilities and
Environmental Monitoring
              Environmental Monitoring
Section
              Section
.
.
,
,
      ?
?
            RIII             RI:;         RIII
RIII
              ahk/kr       Cb sotimos   Warn k
RI:;
            05/17/85                         fluYSS
RIII
ahk/kr
Cb sotimos
Warn k
05/17/85
fluYSS
}}
}}

Latest revision as of 14:37, 12 December 2024

Forwards Insp Rept 50-341/85-21 on 850407-30 & Notice of Violation
ML20128C144
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/20/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20128C147 List:
References
NUDOCS 8505280202
Download: ML20128C144 (2)


See also: IR 05000341/1985021

Text

r

DO

-

,.

'

MAY 201985

Docket No. 50-341

The Detroit Edison Company

ATTN: Wayne H. Jens

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. M. Byron,

M. E. Parker, and D. C. Jones of this office on April 7-30, 1985, of

activities at~ Fermi 2 authorized by Facility Operating License No. NPF-33 and

to the discussion of our findings with R. S. Lenart at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

'the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During the inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A

written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

9

D

t

o

,

Detroit Edison Company

2

MAY 201985

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signe by R. C. Knop"

R. F. Warnick, Chief

Projects Branch 1

Enclosures:

- 1.

Appendix, Notice.

of Violation

2.

Inspection Report

No. 50-341/85021(DRP)

cc w/ enclosures:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

'

Legal Department

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

.Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

.

,

?

RIII

RI:;

RIII

ahk/kr

Cb sotimos

Warn k

05/17/85

fluYSS