ML20129G131: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:o | {{#Wiki_filter:o | ||
( | ( | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
: 1. REPORTING PERIOD: | 50-397 llNP-2 UNIT 4/3/85 DATE COMPLETED BY L.B. Hutchison (509) 377-2501 ext 2486 TELEPHONE OPER ATING STATUS | ||
: 2. CURRENTLY AUTHORIZED POWER LEVEL g: | : 1. REPORTING PERIOD: | ||
DESIGN ELECTRICAL RATING (MWe Net,): | GROSS HOURS IN REPORTING PERIOD: | ||
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth | 744 3 | ||
: 2. CURRENTLY AUTHORIZED POWER LEVEL g: | |||
max. DEPEND. CAPACITY (MWe Net): | |||
1095 DESIGN ELECTRICAL RATING (MWe Net,): | |||
MAX. DEPEND. CAPACITY (MWe-GROSS:1 1I40 | |||
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth NONE | |||
: 4. REASONS FOR RESTRICTION (IF ANYl: | : 4. REASONS FOR RESTRICTION (IF ANYl: | ||
THIS MONTH YR TO DATE CUMULATIVE | THIS MONTH YR TO DATE CUMULATIVE | ||
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 658.4 1796.2 2212.7 0 | |||
: 6. R EACTOR RESERVE SHUTCOWN HOURS . . . . . . . . . . . . . . . . . . . | 0 0 | ||
: 7. HOU RS GEN ER ATOR ON LIN E . . . . . . . . . . . . . . . . . | : 6. R EACTOR RESERVE SHUTCOWN HOURS................... | ||
641*1 1688.9 2087.4 | |||
: 8. UNIT RESERVE SHUTDOWN HOURS | : 7. HOU RS GEN ER ATOR ON LIN E..................... | ||
: 9. GROSS THERMAL ENERGY GENERATED (MWH) | 0 0 | ||
0 | |||
686,230 1.770,300 2,197,230 | : 8. UNIT RESERVE SHUTDOWN HOURS | ||
: | : 9. GROSS THERMAL ENERGY GENERATED (MWH) | ||
.... 2.078.640 5.330.140 6.543.768 686,230 1.770,300 2,197,230 | |||
: 10. GRCSS ELECTRICAL ENERGY GENERATED (MWH).. | |||
659,898 1,701,157 2,111,543 | 659,898 1,701,157 2,111,543 | ||
: 12. R EACTOR SE RVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . | : 11. NET ELECTRICAL ENERGY GENERATED (MWH) 88.5% | ||
83.2% | |||
: 13. R EACTOR AV AILA BILITY F ACTCR . . . . . . . . . . . . . . . . . . , . . . . | 85.1% | ||
1,4. UNIT SERVICE FACTOR | : 12. R EACTOR SE RVICE F ACTOR........................ | ||
86.2% | : 13. R EACTOR AV AILA BILITY F ACTCR..................,.... | ||
: 15. U NIT AV AILASILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . | 86.2% | ||
78.2% | |||
1s. UNIT CAPACITY FACTOR (Using MDC) | 80.3% | ||
1,4. UNIT SERVICE FACTOR 86.2% | |||
: 17. UNIT CAP ACITY FACTOR (Usmg Design MWel . . . . . . . . . . . . | 78.2% | ||
80.3% | |||
: 18. UNIT FCRCED CUTAGE RATE | : 15. U NIT AV AILASILITY F ACTOR.......................... | ||
81.0% | |||
71.9% | |||
74.2% | |||
1s. UNIT CAPACITY FACTOR (Using MDC) 80.6% | |||
71.6% | |||
73.8% | |||
: 17. UNIT CAP ACITY FACTOR (Usmg Design MWel............. | |||
13.8% | |||
21.8% | |||
19.7% | |||
: 18. UNIT FCRCED CUTAGE RATE | |||
: 19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl: | |||
Annual Maintenance Outage (M3) 5/1/85 for 60 days. | Annual Maintenance Outage (M3) 5/1/85 for 60 days. | ||
: 20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP: | : 20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP: | ||
: 21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI: | : 21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI: | ||
8506070165 850331 | FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F. | ||
h 8506070165 850331 g | |||
PDR ADOCK 05000397 R | |||
PDR | |||
LNIT HAME | LNIT HAME WNP-2 DATE 4/2/85 LNIT SHUFDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD MARCH 19 85 TELEPHONE (509) 377-2501' ext 2486 | ||
: month, year E M N NEX5DN N N. SYSTEM. 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07 3/22/85' F | |||
.102.9 A | |||
3 LATER HA INSTRU Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring mode. ' Trouble shooting revealed: | |||
i | |||
: 1) A faulty computer memory board | : 1) A faulty computer memory board | ||
: 2) A faulty EIS computer interface board i | : 2) A faulty EIS computer interface board i | ||
: 3) A faulty Prom . logic card in the governor valve circuit. | : 3) A faulty Prom. logic card in the governor valve circuit. | ||
Item 182 were replaced and item #3 was repaired. | Item 182 were replaced and item #3 was repaired. | ||
The DEH control system was then tested and the unit returned to service. | The DEH control system was then tested and the unit returned to service. | ||
(LER later) i s | |||
l 1 | |||
TYPE | I l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual-Scram Instructions for i | ||
C-Refueling H-Other 3-Auto Scram Preparation or D-Re0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8 | |||
& License Examination 9-Other (LER) File (NUREG-0161) | |||
O | O | ||
( | ( | ||
i | i | ||
0 AVERAGE DAILY UNTT POWER LEVEL DOCKET NO. | 0 AVERAGE DAILY UNTT POWER LEVEL 50-397 DOCKET NO. | ||
UNTT WNP-2 DATE 4/2/85 COMPLETED BY L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486 | |||
(MWe Net) | ?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
(MWe Net) 1072 1076 1 | |||
17 1012 1073 2 | |||
18 1079 1072 3 | |||
1025 2s | 3, 1081 1069 4 | ||
20 1081 1072 s | |||
924 34 | 21 1081 664 8 | ||
22 1084 0 | |||
7 23 1082 a | |||
24 0 | |||
1025 0 | |||
g 2s 1082 8 | |||
to 2s 1077 678 11 27 1078 997 12, | |||
2e 1078 13 29-874 1077 924 34 m | |||
984 15 37 941 1074 16 INSTRUCHONS On this form, list the avera dail | |||
**# I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly. | Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly. | ||
l 1 | l 1 | ||
| Line 86: | Line 117: | ||
==Dear Sir:== | ==Dear Sir:== | ||
==Subject:== | ==Subject:== | ||
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March .1985 as required by our Technical Specifications 6.9.1.6. | NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March.1985 as required by our Technical Specifications 6.9.1.6. | ||
Very truly yours, hklkWtAh(M/D927M) | Very truly yours, hklkWtAh(M/D927M) | ||
J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth | J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth | ||
- WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I | |||
'}} | |||
Latest revision as of 11:16, 12 December 2024
| ML20129G131 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/31/1985 |
| From: | Hutchison L, Martin J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8506070165 | |
| Download: ML20129G131 (4) | |
Text
o
(
OPERATING DATA REPORT DOCKET NO.
50-397 llNP-2 UNIT 4/3/85 DATE COMPLETED BY L.B. Hutchison (509) 377-2501 ext 2486 TELEPHONE OPER ATING STATUS
- 1. REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
744 3
- 2. CURRENTLY AUTHORIZED POWER LEVEL g:
max. DEPEND. CAPACITY (MWe Net):
1095 DESIGN ELECTRICAL RATING (MWe Net,):
MAX. DEPEND. CAPACITY (MWe-GROSS:1 1I40
- 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth NONE
- 4. REASONS FOR RESTRICTION (IF ANYl:
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 658.4 1796.2 2212.7 0
0 0
- 6. R EACTOR RESERVE SHUTCOWN HOURS...................
641*1 1688.9 2087.4
- 7. HOU RS GEN ER ATOR ON LIN E.....................
0 0
0
- 8. UNIT RESERVE SHUTDOWN HOURS
- 9. GROSS THERMAL ENERGY GENERATED (MWH)
.... 2.078.640 5.330.140 6.543.768 686,230 1.770,300 2,197,230
- 10. GRCSS ELECTRICAL ENERGY GENERATED (MWH)..
659,898 1,701,157 2,111,543
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 88.5%
83.2%
85.1%
- 12. R EACTOR SE RVICE F ACTOR........................
- 13. R EACTOR AV AILA BILITY F ACTCR..................,....
86.2%
78.2%
80.3%
1,4. UNIT SERVICE FACTOR 86.2%
78.2%
80.3%
81.0%
71.9%
74.2%
1s. UNIT CAPACITY FACTOR (Using MDC) 80.6%
71.6%
73.8%
- 17. UNIT CAP ACITY FACTOR (Usmg Design MWel.............
13.8%
21.8%
19.7%
- 18. UNIT FCRCED CUTAGE RATE
- 19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl:
Annual Maintenance Outage (M3) 5/1/85 for 60 days.
- 20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP:
- 21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI:
FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F.
h 8506070165 850331 g
PDR ADOCK 05000397 R
LNIT HAME WNP-2 DATE 4/2/85 LNIT SHUFDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD MARCH 19 85 TELEPHONE (509) 377-2501' ext 2486
- month, year E M N NEX5DN N N. SYSTEM. 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07 3/22/85' F
.102.9 A
3 LATER HA INSTRU Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring mode. ' Trouble shooting revealed:
i
- 1) A faulty computer memory board
- 2) A faulty EIS computer interface board i
- 3) A faulty Prom. logic card in the governor valve circuit.
Item 182 were replaced and item #3 was repaired.
The DEH control system was then tested and the unit returned to service.
(LER later) i s
l 1
I l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual-Scram Instructions for i
C-Refueling H-Other 3-Auto Scram Preparation or D-Re0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8
& License Examination 9-Other (LER) File (NUREG-0161)
O
(
i
0 AVERAGE DAILY UNTT POWER LEVEL 50-397 DOCKET NO.
UNTT WNP-2 DATE 4/2/85 COMPLETED BY L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486
?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1072 1076 1
17 1012 1073 2
18 1079 1072 3
3, 1081 1069 4
20 1081 1072 s
21 1081 664 8
22 1084 0
7 23 1082 a
24 0
1025 0
g 2s 1082 8
to 2s 1077 678 11 27 1078 997 12,
2e 1078 13 29-874 1077 924 34 m
984 15 37 941 1074 16 INSTRUCHONS On this form, list the avera dail
- I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly.
l 1
0 Washington Public Power Supply System 3000GeorgeWashingtonWay P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 April 8,1985 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C. 20555
Dear Sir:
Subject:
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March.1985 as required by our Technical Specifications 6.9.1.6.
Very truly yours, hklkWtAh(M/D927M)
J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth
- WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I
'