OPERATING DATA REPORT DOCKET NO.       50-397 UNIT  llNP-2 DATE    4/3/85 COMPLETED BY         L.B. Hutchison TELEPHONE      (509) 377-2501 ext 2486 OPER ATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. REPORTING PERIOD:                                                   GROSS HOURS IN REPORTING PERIOD:                         744 3                                                     1095
50-397 llNP-2 UNIT 4/3/85 DATE COMPLETED BY L.B. Hutchison (509) 377-2501 ext 2486 TELEPHONE OPER ATING STATUS
: 2. CURRENTLY AUTHORIZED POWER LEVEL g:                                                   max. DEPEND. CAPACITY (MWe Net):
: 1. REPORTING PERIOD:
DESIGN ELECTRICAL RATING (MWe Net,):                                                 MAX. DEPEND. CAPACITY (MWe-GROSS:1     1I40
GROSS HOURS IN REPORTING PERIOD:
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth                                     NONE
744 3
: 2. CURRENTLY AUTHORIZED POWER LEVEL g:
max. DEPEND. CAPACITY (MWe Net):
1095 DESIGN ELECTRICAL RATING (MWe Net,):
MAX. DEPEND. CAPACITY (MWe-GROSS:1 1I40
: 3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth NONE
: 4. REASONS FOR RESTRICTION (IF ANYl:
: 4. REASONS FOR RESTRICTION (IF ANYl:
THIS MONTH YR TO DATE CUMULATIVE
THIS MONTH YR TO DATE CUMULATIVE
;                5. NUMBER OF HOURS REACTOR WAS CRITICAL .............. 658.4                                                       1796.2       2212.7
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 658.4 1796.2 2212.7 0
: 6. R EACTOR RESERVE SHUTCOWN HOURS . . . . . . . . . . . . . . . . . . .                               0              0            0
0 0
: 7. HOU RS GEN ER ATOR ON LIN E . . . . . . . . . . . . . . . . . . . . .                    ....
: 6. R EACTOR RESERVE SHUTCOWN HOURS...................
641*1        1688.9        2087.4 0               0             0
641*1 1688.9 2087.4
: 8. UNIT RESERVE SHUTDOWN HOURS                   ...... ...............
: 7. HOU RS GEN ER ATOR ON LIN E.....................
: 9. GROSS THERMAL ENERGY GENERATED (MWH)                             ........            .... 2.078.640 5.330.140 6.543.768
0 0
: 10. GRCSS ELECTRICAL ENERGY GENERATED (MWH) . .                                ..........
0
686,230 1.770,300 2,197,230
: 8. UNIT RESERVE SHUTDOWN HOURS
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                             ............ .
: 9. GROSS THERMAL ENERGY GENERATED (MWH)
.... 2.078.640 5.330.140 6.543.768 686,230 1.770,300 2,197,230
: 10. GRCSS ELECTRICAL ENERGY GENERATED (MWH)..
659,898 1,701,157 2,111,543
659,898 1,701,157 2,111,543
: 12. R EACTOR SE RVICE F ACTOR . . . . . . . . . . . . . . . . . . . . . . . .                     ..
: 11. NET ELECTRICAL ENERGY GENERATED (MWH) 88.5%
88.5%        83.2%        85.1%
83.2%
: 13. R EACTOR AV AILA BILITY F ACTCR . . . . . . . . . . . . . . . . . . , . . . .
85.1%
1,4. UNIT SERVICE FACTOR       .............................
: 12. R EACTOR SE RVICE F ACTOR........................
86.2%         78.2%         80.3%
: 13. R EACTOR AV AILA BILITY F ACTCR..................,....
: 15. U NIT AV AILASILITY F ACTOR . . . . . . . . . . . . . . . . . . . . . . . . . .
86.2%
86.2%         78.2%         80.3%
78.2%
1s. UNIT CAPACITY FACTOR (Using MDC)                     ............. .....
80.3%
81.0%          71.9%         74.2%
1,4. UNIT SERVICE FACTOR 86.2%
: 17. UNIT CAP ACITY FACTOR (Usmg Design MWel . . . . . . . . . . . . .                            .
78.2%
80.6%         71.6%         73.8%
80.3%
: 18. UNIT FCRCED CUTAGE RATE               ,... ........ . . ...                                  ..
: 15. U NIT AV AILASILITY F ACTOR..........................
13.8%        21.8%        19.7%
81.0%
  .            19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl:
71.9%
74.2%
1s. UNIT CAPACITY FACTOR (Using MDC) 80.6%
71.6%
73.8%
: 17. UNIT CAP ACITY FACTOR (Usmg Design MWel.............
13.8%
21.8%
19.7%
: 18. UNIT FCRCED CUTAGE RATE
: 19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl:
Annual Maintenance Outage (M3) 5/1/85 for 60 days.
Annual Maintenance Outage (M3) 5/1/85 for 60 days.
: 20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP:
: 20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP:
: 21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI:                                         FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F.
: 21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI:
8506070165 850331                                                                         h    g PDR ADOCK 05000397 R                                         PDR
FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F.
h 8506070165 850331 g
PDR ADOCK 05000397 R
PDR


LNIT HAME   WNP-2 DATE   4/2/85 LNIT SHUFDOWNS / REDUCTIONS                       COMPLETED BY   L.B. Hutchison REPORT PERIOD MARCH                             19 85                                                                             TELEPHONE (509) 377-2501' ext 2486 month,     year E M N NEX5DN N N . SYSTEM . 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07                       3/22/85' F         .102.9         A         3     LATER           HA         INSTRU     Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring i
LNIT HAME WNP-2 DATE 4/2/85 LNIT SHUFDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD MARCH 19 85 TELEPHONE (509) 377-2501' ext 2486
* mode. ' Trouble shooting revealed:
: month, year E M N NEX5DN N N. SYSTEM. 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07 3/22/85' F
.102.9 A
3 LATER HA INSTRU Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring mode. ' Trouble shooting revealed:
i
: 1) A faulty computer memory board
: 1) A faulty computer memory board
: 2) A faulty EIS computer interface board i
: 2) A faulty EIS computer interface board i
: 3) A faulty Prom . logic card in the governor valve circuit.
: 3) A faulty Prom. logic card in the governor valve circuit.
Item 182 were replaced and item #3 was repaired.
Item 182 were replaced and item #3 was repaired.
The DEH control system was then tested and the unit returned to service.
The DEH control system was then tested and the unit returned to service.
i                                                                                                                          (LER later) s l                                                               .-
(LER later) i s
1                                  I l SLM4ARY l                                                                                                                         .-
l 1
TYPE                               REASON                                                 METHOD           SYSTEM & COMP 0 TENT F-Forced                             A-Equip Failure                 F-Admin             1-Manual             Exhibit F & H S-Sched                               8-Maint or Test                 G-Oper Error         2-Manual-Scram       Instructions for i                                         C-Refueling                     H-Other             3-Auto Scram         Preparation or
I l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual-Scram Instructions for i
              ,                          D-Re0ulatory Restriction                             4-Continued           Data Entry Sheet
C-Refueling H-Other 3-Auto Scram Preparation or D-Re0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8
      .-*                                  E-Operator Training                                   5-Reduced Load       Licensee Event Report                                 8
& License Examination 9-Other (LER) File (NUREG-0161)
                                              & License Examination                             9-Other               (LER) File (NUREG-0161)
O
O
(                                                                                   .
(
i                                                                                                                                                 .
i


0 AVERAGE DAILY UNTT POWER LEVEL DOCKET NO.         50-397 UNTT     WNP-2 DATE       4/2/85 COMPLETED BY           L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486
0 AVERAGE DAILY UNTT POWER LEVEL 50-397 DOCKET NO.
                            ?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL                                   DAY AVERAGE DAILY POWER LEVEL (MWe-Net)               .
UNTT WNP-2 DATE 4/2/85 COMPLETED BY L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486
(MWe Net) 1      1072                                                         1076 17 2      1012                                                         1073 18 3       1079                      ,
?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
1072 3,
(MWe Net) 1072 1076 1
4      1081                                                         1069 20 s      1081                                                         1072 21 8
17 1012 1073 2
1081                                                            664 22 1084                                                             0 7                                                           23 1082 a                                                           24           0 g
18 1079 1072 3
1025 2s           0 1082                                                             8 to                                                           2s 11      1077                                                           678 27 1078                                                           997 12 ,                                                         2e 1078 13                                                           29-         874                           -
3, 1081 1069 4
!                          1077               ,
20 1081 1072 s
924 34                                                           m 984 15                                                           37         941 16       1074 INSTRUCHONS On this form, list the avera dail             **# I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
21 1081 664 8
22 1084 0
7 23 1082 a
24 0
1025 0
g 2s 1082 8
to 2s 1077 678 11 27 1078 997 12,
2e 1078 13 29-874 1077 924 34 m
984 15 37 941 1074 16 INSTRUCHONS On this form, list the avera dail
**# I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly.
Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly.
l 1
l 1
Line 86: Line 117:


==Dear Sir:==
==Dear Sir:==
==Subject:==
==Subject:==
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March .1985 as required by our Technical Specifications 6.9.1.6.
NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March.1985 as required by our Technical Specifications 6.9.1.6.
Very truly yours, hklkWtAh(M/D927M)
Very truly yours, hklkWtAh(M/D927M)
J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth     - WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I}}
J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth
- WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I
'}}

Latest revision as of 11:16, 12 December 2024

Monthly Operating Rept for Mar 1985
ML20129G131
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1985
From: Hutchison L, Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8506070165
Download: ML20129G131 (4)


Text

o

(

OPERATING DATA REPORT DOCKET NO.

50-397 llNP-2 UNIT 4/3/85 DATE COMPLETED BY L.B. Hutchison (509) 377-2501 ext 2486 TELEPHONE OPER ATING STATUS

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD:

744 3

2. CURRENTLY AUTHORIZED POWER LEVEL g:

max. DEPEND. CAPACITY (MWe Net):

1095 DESIGN ELECTRICAL RATING (MWe Net,):

MAX. DEPEND. CAPACITY (MWe-GROSS:1 1I40

3. POWER LEVELTO WHICH RESTRICTED (IF ANY) (MWe Neth NONE
4. REASONS FOR RESTRICTION (IF ANYl:

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL.............. 658.4 1796.2 2212.7 0

0 0

6. R EACTOR RESERVE SHUTCOWN HOURS...................

641*1 1688.9 2087.4

7. HOU RS GEN ER ATOR ON LIN E.....................

0 0

0

8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)

.... 2.078.640 5.330.140 6.543.768 686,230 1.770,300 2,197,230

10. GRCSS ELECTRICAL ENERGY GENERATED (MWH)..

659,898 1,701,157 2,111,543

11. NET ELECTRICAL ENERGY GENERATED (MWH) 88.5%

83.2%

85.1%

12. R EACTOR SE RVICE F ACTOR........................
13. R EACTOR AV AILA BILITY F ACTCR..................,....

86.2%

78.2%

80.3%

1,4. UNIT SERVICE FACTOR 86.2%

78.2%

80.3%

15. U NIT AV AILASILITY F ACTOR..........................

81.0%

71.9%

74.2%

1s. UNIT CAPACITY FACTOR (Using MDC) 80.6%

71.6%

73.8%

17. UNIT CAP ACITY FACTOR (Usmg Design MWel.............

13.8%

21.8%

19.7%

18. UNIT FCRCED CUTAGE RATE
19. SHUTDCWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND CURATICN CF EACHl:

Annual Maintenance Outage (M3) 5/1/85 for 60 days.

20. IF SHUT OCWN AT END OF REPORT PERIOD. ESTIMATED DATE CF STARTUP:
21. UNITS IN TEST STATUS (PRICR TO CCM*.tERCIAL CPERATlCNI:

FCRECAST ACHIEVED INI*1 AL CRITICALITY INITI AL ELECTRICITY COMMERCIAL CPERATION Generator Name Plate 1,231,700 KVA 0 0.975 P.F.

h 8506070165 850331 g

PDR ADOCK 05000397 R

PDR

LNIT HAME WNP-2 DATE 4/2/85 LNIT SHUFDOWNS / REDUCTIONS COMPLETED BY L.B. Hutchison REPORT PERIOD MARCH 19 85 TELEPHONE (509) 377-2501' ext 2486

month, year E M N NEX5DN N N. SYSTEM. 05FDMDif CAuSE & CuettCTIVE ACTION TO PREVENT RECURRENCE 85-07 3/22/85' F

.102.9 A

3 LATER HA INSTRU Reactor SCRAMMED at 100% power when placing the turbine DEH control system in the monitoring mode. ' Trouble shooting revealed:

i

1) A faulty computer memory board
2) A faulty EIS computer interface board i
3) A faulty Prom. logic card in the governor valve circuit.

Item 182 were replaced and item #3 was repaired.

The DEH control system was then tested and the unit returned to service.

(LER later) i s

l 1

I l SLM4ARY l TYPE REASON METHOD SYSTEM & COMP 0 TENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched 8-Maint or Test G-Oper Error 2-Manual-Scram Instructions for i

C-Refueling H-Other 3-Auto Scram Preparation or D-Re0ulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report 8

& License Examination 9-Other (LER) File (NUREG-0161)

O

(

i

0 AVERAGE DAILY UNTT POWER LEVEL 50-397 DOCKET NO.

UNTT WNP-2 DATE 4/2/85 COMPLETED BY L. 8. Hutchison TELEPHONE (509)377-2501 ext 2486

?! ARCH 1985 MONTri DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 1072 1076 1

17 1012 1073 2

18 1079 1072 3

3, 1081 1069 4

20 1081 1072 s

21 1081 664 8

22 1084 0

7 23 1082 a

24 0

1025 0

g 2s 1082 8

to 2s 1077 678 11 27 1078 997 12,

2e 1078 13 29-874 1077 924 34 m

984 15 37 941 1074 16 INSTRUCHONS On this form, list the avera dail

      1. I'"I In MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Taese figure:, wi!!.be ::ed to plot a graph for ec:h reporting month. Note that when maximum dependable capscity is t: sed for the net electncal ratmg of thc-unit.taere may be oc::r.sions when the daily average power !cvel exceeds the IGG % line (or the restricted power !cvel line). In such esses, the average daily unit power output sheet should be footnoted to explain the apparent anorr.aly.

l 1

0 Washington Public Power Supply System 3000GeorgeWashingtonWay P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 April 8,1985 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for March.1985 as required by our Technical Specifications 6.9.1.6.

Very truly yours, hklkWtAh(M/D927M)

J. D. Martin WNP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A. D. Toth

- WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT I

'