ML20132C579: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ _ _ - _ | {{#Wiki_filter:_ _ _ _ _ _ - _ | ||
._ _ | |||
. | |||
. | |||
k | k | ||
SEP 2 01985 | |||
1 | 1 | ||
Docket No. 50-295 | |||
Docket No. 50-304 | |||
Commonwealth Edison Company | |||
ATTN: Mr. Cordell Reed | |||
Vice President | |||
Post Office Box 767 | |||
Chicago, IL 60690 | |||
Gentlemen: | |||
This refers to the routine safety inspection conducted by | |||
l | l | ||
! | Ms. M. L. McCormick-Barger of this office on July 22 through August 30, | ||
! | |||
1985, of activities at Zion Nuclear Generating Station authorized by NRC | |||
Operating Lice ~ ses No. DPR-39 and No. DPR-48 and to the discussion of | |||
n | |||
our findings with Mr. K. Graesser and other members of your staff at the | |||
conclusion of the inspection. | |||
The enclosed copy of our inspection report identifies areas examined during | |||
the inspection. Within these areas, the inspection consisted of a selective | |||
examination of procedures and representative records, observations, and | |||
interviews with personnel. | |||
No violations of NRC requirements were identified during the course of this | |||
inspection. | |||
, | , | ||
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of | |||
this letter and the enclosures will be placed in the NRC's Public Document | |||
Room. | |||
We will gladly discuss any questions you have concerning this inspection. | |||
l | |||
l | Sincerely, | ||
C.'iciral Sigt.:d by CChrr%:r. | |||
~ | |||
J. J. Harrison, Chief | |||
Engineering Branch | |||
Enclosure: | |||
Inspec. tion Report | |||
No. 50-295/85027(DRS); | |||
No. 50-304/85028(DRS) | |||
See Attached List For Distribution | |||
8509270092 850920 | |||
gDR | |||
ADOCM 05000295 | |||
l | |||
PDR | |||
l | |||
I | |||
M | |||
. | |||
.. | |||
. | |||
' | |||
l | |||
1 | |||
. | . | ||
t | t | ||
Commonwealth Edison Company | |||
2 | |||
SEP 2 01985 | |||
Distribution | |||
cc w/ enclosure: | |||
D. L. Farrar, Director | |||
of Nuclear Licensing | |||
K. L. Graesser, Plant Manager | |||
Jan Norris, Project Manager, NRR | |||
DCS/RSB (RIDS) | |||
Licensing Fee Management Branch | |||
Resident Inspector, RIII | |||
Phyllis Dunton, Attorney | |||
General's Office, Environmental | |||
. Control C' vision | |||
Mayor, Cif: of Zion | |||
l | l | ||
l | l | ||
l | l | ||
I | I | ||
! | ! | ||
RIII | |||
RIII | |||
RI | |||
. | |||
RIIIh | |||
MLMcCormickl-Barger/kja%.~1ht#'-B(WR) | |||
yd s | |||
hs. pr | |||
Suerma n | |||
R1 g | |||
Harrison | |||
09/19/85 | |||
g{g | |||
! | ! | ||
u __ | u __ | ||
}} | }} | ||
Latest revision as of 10:11, 12 December 2024
| ML20132C579 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 09/20/1985 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20132C583 | List: |
| References | |
| NUDOCS 8509270092 | |
| Download: ML20132C579 (2) | |
See also: IR 05000295/1985027
Text
_ _ _ _ _ _ - _
._ _
.
.
k
SEP 2 01985
1
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by
l
Ms. M. L. McCormick-Barger of this office on July 22 through August 30,
!
1985, of activities at Zion Nuclear Generating Station authorized by NRC
Operating Lice ~ ses No. DPR-39 and No. DPR-48 and to the discussion of
n
our findings with Mr. K. Graesser and other members of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
C.'iciral Sigt.:d by CChrr%:r.
~
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspec. tion Report
No. 50-295/85027(DRS);
No. 50-304/85028(DRS)
See Attached List For Distribution
8509270092 850920
gDR
ADOCM 05000295
l
l
I
M
.
..
.
'
l
1
.
t
Commonwealth Edison Company
2
SEP 2 01985
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
K. L. Graesser, Plant Manager
Jan Norris, Project Manager, NRR
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
. Control C' vision
Mayor, Cif: of Zion
l
l
l
I
!
RIII
RIII
RI
.
RIIIh
MLMcCormickl-Barger/kja%.~1ht#'-B(WR)
yd s
hs. pr
Suerma n
R1 g
Harrison
09/19/85
g{g
!
u __