ML20132C579: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ - _
{{#Wiki_filter:_ _ _ _ _ _ - _
                                                                                      ._ _
._ _
    .
.
  .
.
k
k
                                          SEP 2 01985
SEP 2 01985
1
1
      Docket No. 50-295
Docket No. 50-295
      Docket No. 50-304
Docket No. 50-304
      Commonwealth Edison Company
Commonwealth Edison Company
      ATTN: Mr. Cordell Reed
ATTN: Mr. Cordell Reed
              Vice President
Vice President
      Post Office Box 767
Post Office Box 767
      Chicago, IL 60690
Chicago, IL 60690
      Gentlemen:
Gentlemen:
      This refers to the routine safety inspection conducted by
This refers to the routine safety inspection conducted by
l     Ms. M. L. McCormick-Barger of this office on July 22 through August 30,
l
!     1985, of activities at Zion Nuclear Generating Station authorized by NRC
Ms. M. L. McCormick-Barger of this office on July 22 through August 30,
      Operating Lice n~ ses No. DPR-39 and No. DPR-48 and to the discussion of
!
      our findings with Mr. K. Graesser and other members of your staff at the
1985, of activities at Zion Nuclear Generating Station authorized by NRC
      conclusion of the inspection.
Operating Lice ~ ses No. DPR-39 and No. DPR-48 and to the discussion of
      The enclosed copy of our inspection report identifies areas examined during
n
      the inspection. Within these areas, the inspection consisted of a selective
our findings with Mr. K. Graesser and other members of your staff at the
      examination of procedures and representative records, observations, and
conclusion of the inspection.
      interviews with personnel.
The enclosed copy of our inspection report identifies areas examined during
      No violations of NRC requirements were identified during the course of this
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
,
,
      inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
      this letter and the enclosures will be placed in the NRC's Public Document
Room.
      Room.
We will gladly discuss any questions you have concerning this inspection.
      We will gladly discuss any questions you have concerning this inspection.
l
l                                               Sincerely,
Sincerely,
                                                                              ~
C.'iciral Sigt.:d by CChrr%:r.
                                                C.'iciral Sigt.:d by CChrr%:r.
~
                                                J. J. Harrison, Chief
J. J. Harrison, Chief
                                                Engineering Branch
Engineering Branch
      Enclosure: Inspec. tion Report
Enclosure:
        No. 50-295/85027(DRS);
Inspec. tion Report
        No. 50-304/85028(DRS)
No. 50-295/85027(DRS);
      See Attached List For Distribution
No. 50-304/85028(DRS)
        8509270092 850920
See Attached List For Distribution
        gDR     ADOCM 05000295                                                               l
8509270092 850920
                            PDR
gDR
                                                                                    I     l
ADOCM 05000295
                                                                                  M
l
PDR
l
I
M


        .                                                               ..
.
      .
..
    '
.
                                                                          l
'
                                                                          1
l
1
.
.
t
t
          Commonwealth Edison Company             2         SEP 2 01985
Commonwealth Edison Company
          Distribution
2
          cc w/ enclosure:
SEP 2 01985
          D. L. Farrar, Director
Distribution
            of Nuclear Licensing
cc w/ enclosure:
          K. L. Graesser, Plant Manager
D. L. Farrar, Director
          Jan Norris, Project Manager, NRR
of Nuclear Licensing
          DCS/RSB (RIDS)
K. L. Graesser, Plant Manager
          Licensing Fee Management Branch
Jan Norris, Project Manager, NRR
          Resident Inspector, RIII
DCS/RSB (RIDS)
          Phyllis Dunton, Attorney
Licensing Fee Management Branch
            General's Office, Environmental
Resident Inspector, RIII
          . Control C' vision
Phyllis Dunton, Attorney
          Mayor, Cif: of Zion
General's Office, Environmental
. Control C' vision
Mayor, Cif: of Zion
l
l
l
l
l
l
I
I
!         RIII                           RIII       RI   .
!
                                                            RIII
RIII
                                          yd s
RIII
          MLMcCormickl-Barger/kja%.~1ht#'-B(WR)
RI
                                        Suerma n
.
                                                    hs. pr
RIIIh
                                                    R1 g
MLMcCormickl-Barger/kja%.~1ht#'-B(WR)
                                                              h
yd s
                                                            Harrison
hs. pr
          09/19/85                                           g{g
Suerma n
R1 g
Harrison
09/19/85
g{g
!
!
u __
u __
}}
}}

Latest revision as of 10:11, 12 December 2024

Forwards Safety Insp Repts 50-295/85-27 & 50-304/85-28 on 850722-0830.No Violation Noted
ML20132C579
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/20/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20132C583 List:
References
NUDOCS 8509270092
Download: ML20132C579 (2)


See also: IR 05000295/1985027

Text

_ _ _ _ _ _ - _

._ _

.

.

k

SEP 2 01985

1

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by

l

Ms. M. L. McCormick-Barger of this office on July 22 through August 30,

!

1985, of activities at Zion Nuclear Generating Station authorized by NRC

Operating Lice ~ ses No. DPR-39 and No. DPR-48 and to the discussion of

n

our findings with Mr. K. Graesser and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

,

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

l

Sincerely,

C.'iciral Sigt.:d by CChrr%:r.

~

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspec. tion Report

No. 50-295/85027(DRS);

No. 50-304/85028(DRS)

See Attached List For Distribution

8509270092 850920

gDR

ADOCM 05000295

l

PDR

l

I

M

.

..

.

'

l

1

.

t

Commonwealth Edison Company

2

SEP 2 01985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

K. L. Graesser, Plant Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

. Control C' vision

Mayor, Cif: of Zion

l

l

l

I

!

RIII

RIII

RI

.

RIIIh

MLMcCormickl-Barger/kja%.~1ht#'-B(WR)

yd s

hs. pr

Suerma n

R1 g

Harrison

09/19/85

g{g

!

u __