ML20133D688: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:L, :
{{#Wiki_filter:L,
:
:
:
1
1
                                          AUG1     1985
AUG1
    Docket No. 50-440
1985
    The Cleveland Electric Illuminating
Docket No. 50-440
      Company
The Cleveland Electric Illuminating
    ATTN: Mr. Murray R. Edelman
Company
            Vice President
ATTN: Mr. Murray R. Edelman
            Nuclear Group
Vice President
    Post Office Box 5000
Nuclear Group
    Cleveland, OH 44101
Post Office Box 5000
Cleveland, OH 44101
,
,
Gentlemen:
,
,
    Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. H. Neisler of
    This refers to the routine safety inspection conducted by Mr. J. H. Neisler of
this office on June 26-28 and July 10-12, 1985, of activities at Perry Nuclear
    this office on June 26-28 and July 10-12, 1985, of activities at Perry Nuclear
Power Plant Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to
    Power Plant Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to
the discussion of our findings with Mr. C. M. Shuster and other members of your
    the discussion of our findings with Mr. C. M. Shuster and other members of your
staff at the conclusion of the inspection.
    staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
    The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
    the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
    examination of procedures and representative records, observations, and
interviews with personnel.
    interviews with personnel.
No violations of NRC requirements were identified during the course of this
    No violations of NRC requirements were identified during the course of this
inspection.
    inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
    this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
    Public Document Room.
'
'
,
,
    We will gladly discuss any questions you have concerning this inspection.
We will gladly discuss any questions you have concerning this inspection.
                                              Sincerely,
Sincerely,
,                                                              .
.
                                                                  e
,
                                              C.[.
C.[. Pa
                                              C.     Pa  riello, Director
e
                                              Division of Reactor Safety
C.
    Enclosure:   Inspection Report
riello, Director
        No. 50-440/85041(DRS)
Division of Reactor Safety
    See Attached List For Distribution
Enclosure:
          8500070415 B20801                                                         g
Inspection Report
          PDR   ADOCK 05000440                                                       l
No. 50-440/85041(DRS)
          G                 PDR     ..
See Attached List For Distribution
                                                                                d60 /
8500070415 B20801
PDR
ADOCK 05000440
g l
G
PDR
..
d60 /


    ,
,
  ,
,
                                                AUG1   1985
AUG1
      Commonwealth Edison Company         2
1985
      Distribution:
Commonwealth Edison Company
      cc w/ enclosure:
2
      J. J. Waldron, Manager, Perry
Distribution:
        Plant Technical Department
cc w/ enclosure:
      M. D. Lyster, Manager, Perry Plant
J. J. Waldron, Manager, Perry
        Operations Department
Plant Technical Department
      L. O. Beck, General Supervising
M. D. Lyster, Manager, Perry Plant
        Engineer, Nuclear Licensing and
Operations Department
        Fuel Management Section
L. O. Beck, General Supervising
      DMB/ Document Control Desk (RIDS)
Engineer, Nuclear Licensing and
      Resident Inspector, RIII
Fuel Management Section
      Harold W. Kohn, Ohio EPA
DMB/ Document Control Desk (RIDS)
      Terry J. Lodge, Esq.
Resident Inspector, RIII
      James W. Harris, State of Ohio
Harold W. Kohn, Ohio EPA
      Robert H. Quillin, Ohio
Terry J. Lodge, Esq.
        Department of Health
James W. Harris, State of Ohio
              .
Robert H. Quillin, Ohio
      RII-             RIII           RII   RI     RIII
Department of Health
      N.i dd           Wi   ms       Kno   Ha     P         .
.
      07/ /85                               1(M   y g py
RII-
RIII
RII
RI
RIII
N.i dd
Wi
ms
Kno
Ha
P
.
07/ /85
1(M
y g py
_
_
}}
}}

Latest revision as of 08:46, 12 December 2024

Forwards Safety Insp Rept 50-440/85-41 on 850626-28 & 0710-12.No Violations Identified
ML20133D688
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/01/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20133D694 List:
References
NUDOCS 8508070415
Download: ML20133D688 (2)


See also: IR 05000440/1985041

Text

L,

1

AUG1

1985

Docket No. 50-440

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

,

Gentlemen:

,

This refers to the routine safety inspection conducted by Mr. J. H. Neisler of

this office on June 26-28 and July 10-12, 1985, of activities at Perry Nuclear

Power Plant Unit 1 authorized by NRC Construction Permit No. CPPR-148 and to

the discussion of our findings with Mr. C. M. Shuster and other members of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

'

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

,

C.[. Pa

e

C.

riello, Director

Division of Reactor Safety

Enclosure:

Inspection Report

No. 50-440/85041(DRS)

See Attached List For Distribution

8500070415 B20801

PDR

ADOCK 05000440

g l

G

PDR

..

d60 /

,

,

AUG1

1985

Commonwealth Edison Company

2

Distribution:

cc w/ enclosure:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

.

RII-

RIII

RII

RI

RIII

N.i dd

Wi

ms

Kno

Ha

P

.

07/ /85

1(M

y g py

_