| number = | | number = ML18038B584 | ||
| issue date = | | issue date = 02/07/2018 | ||
| title = Grand Gulf, Unit 1, | | title = Grand Gulf Nuclear Station, Unit 1, Response To Clarification Of Initial Response To a Notice Of Violation And Nuclear Regulatory Commission Inspection Report 05000416/2017012 | ||
| author name = | | author name = Gepford H J | ||
| author affiliation = | | author affiliation = NRC/RGN-IV/DRS/PSB-2 | ||
| addressee name = | | addressee name = Larson E | ||
| addressee affiliation = | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000416 | | docket = 05000416 | ||
| license number = NPF-029 | | license number = NPF-029 | ||
| contact person = | | contact person = | ||
| document report number = IR 2017012 | | document report number = IR 2017012 | ||
| document type = Letter | | document type = Letter | ||
| page count = | | page count = 3 | ||
}} | }} | ||
| Line 19: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: | ||
[[Issue date::February 7, 2018]] | |||
Mr. Eric Larson, Site Vice President Entergy Operations, Inc. | |||
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 | |||
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION OF INITIAL RESPONSE TO A NOTICE OF VIOLATION AND NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012 | |||
== | ==Dear Mr. Larson:== | ||
Thank you for your letter of December 21, 2017, (ML17362A041) which provided clarifying information to supplement your September 21, 2017, reply (ML17269A031) to the Notice of Violation concerning calibration of the main steam line and containment/drywell high range radiation monitors. The Notice of Violation was issued on August 22, 2017, in NRC Inspection Report 05000416/2017012 (ML17235B265). | |||
The NRC identified several discrepancies in your initial response that required clarification. We have reviewed these clarifications in conjunction with your initial response to the Notice of Violation and find that they address the violation and the corrective actions taken. Following review of your responses to the Notice of Violation, we concluded that the surveillances performed on the main steam line and containment/drywell high range radiation monitors in response to the Notice of Violation demonstrate reasonably accurate instrument responses. However, the changes to the calibration procedures themselves warrant additional review. In particular, we noted that the procedures continue to allow tolerances significantly wider than industry norm. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC's Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC also includes significant enforcement actions on its Web site at https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/. | |||
Sincerely,/RA/ | |||
Heather J. Gepford, Ph.D., CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 | |||
cc: Electronic Distribution GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION OF INITIAL RESPONSE TO NOTICE OF VIOLATION AND NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012 - February 7, 2017 DISTRIBUTION: KKennedy, RA SMorris, DRA TPruett, DRP AVegel, DRS RLantz, DRP JClark, DRS SKirkwood, RC JKozal, DRP CYoung, DRP MYoung, DRP TSteadham, DRP NDay, DRP AAthar, DRP AElam, DRP JBowen, RIV/OEDO VDricks, ORA JWeil, OCA SLingam, NRR AMoreno, RIV/CAO BMaier, RSLO THipschman, IPAT EUribe, IPAT TDeBey, DRP MHerrera, DRMA R4Enforcement | |||
DOCUMENT NAME: R:\_REACTORS\_GG\2017\GG2017012 Ack Ltr to GG Clarification of NOV Response.docx ADAMS ACCESSION NUMBER: ML18038B584 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JJO Yes No Publicly Available Sensitive NRC-002 OFFICE HP:DRS/PSB2 C:DRS/PSB2 C:DRP/PBC C:DRS/PSB2 NAME JO'Donnell HGepford JKozal HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 2/6/18 2/618 2/7/18 2/7/18 OFFICIAL RECORD COPY | |||
}} | }} | ||
Revision as of 16:44, 18 February 2018
| ML18038B584 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 02/07/2018 |
| From: | Gepford H J NRC/RGN-IV/DRS/PSB-2 |
| To: | Emily Larson Entergy Operations |
| References | |
| IR 2017012 | |
| Preceding documents: |
|
| Download: ML18038B584 (3) | |
Text
February 7, 2018
Mr. Eric Larson, Site Vice President Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION OF INITIAL RESPONSE TO A NOTICE OF VIOLATION AND NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012
Dear Mr. Larson:
Thank you for your letter of December 21, 2017, (ML17362A041) which provided clarifying information to supplement your September 21, 2017, reply (ML17269A031) to the Notice of Violation concerning calibration of the main steam line and containment/drywell high range radiation monitors. The Notice of Violation was issued on August 22, 2017, in NRC Inspection Report 05000416/2017012 (ML17235B265).
The NRC identified several discrepancies in your initial response that required clarification. We have reviewed these clarifications in conjunction with your initial response to the Notice of Violation and find that they address the violation and the corrective actions taken. Following review of your responses to the Notice of Violation, we concluded that the surveillances performed on the main steam line and containment/drywell high range radiation monitors in response to the Notice of Violation demonstrate reasonably accurate instrument responses. However, the changes to the calibration procedures themselves warrant additional review. In particular, we noted that the procedures continue to allow tolerances significantly wider than industry norm. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC's Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC also includes significant enforcement actions on its Web site at https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/.
Sincerely,/RA/
Heather J. Gepford, Ph.D., CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket No. 50-416 License No. NPF-29
cc: Electronic Distribution GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION OF INITIAL RESPONSE TO NOTICE OF VIOLATION AND NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012 - February 7, 2017 DISTRIBUTION: KKennedy, RA SMorris, DRA TPruett, DRP AVegel, DRS RLantz, DRP JClark, DRS SKirkwood, RC JKozal, DRP CYoung, DRP MYoung, DRP TSteadham, DRP NDay, DRP AAthar, DRP AElam, DRP JBowen, RIV/OEDO VDricks, ORA JWeil, OCA SLingam, NRR AMoreno, RIV/CAO BMaier, RSLO THipschman, IPAT EUribe, IPAT TDeBey, DRP MHerrera, DRMA R4Enforcement
DOCUMENT NAME: R:\_REACTORS\_GG\2017\GG2017012 Ack Ltr to GG Clarification of NOV Response.docx ADAMS ACCESSION NUMBER: ML18038B584 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JJO Yes No Publicly Available Sensitive NRC-002 OFFICE HP:DRS/PSB2 C:DRS/PSB2 C:DRP/PBC C:DRS/PSB2 NAME JO'Donnell HGepford JKozal HGepford SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 2/6/18 2/618 2/7/18 2/7/18 OFFICIAL RECORD COPY