l                                                                                                     i VINGINIA ELECTHIC AND POWER COMPANY                                         ,
l i
f                                    Hicnwown,VinorwrA causi                                           j December 3,1996 United States Nuclear Regulatory Commission                   Serial No.           96-612 Attention: Document Control Desk                             NAPS /JHL Washington, D. C. 20555                                       Docket Nos.         50-338
VINGINIA ELECTHIC AND POWER COMPANY f
,                                                                                        50-339 l                                                                   License Nos. NPF-4 l                                                                                         NPF-7 l
Hicnwown,VinorwrA causi j
December 3,1996 United States Nuclear Regulatory Commission Serial No.
96-612 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.
50-338 50-339 l
License Nos. NPF-4 l
NPF-7 l
l Gentlemen:
l Gentlemen:
(
(
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2                                                       l l      MONTHLY OPERATING REPORT                                                                         !
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 l
i Enclosed is the November 1996 Monthly Operating Report for North Anna Power                     I Station Unit 1 and 2.
MONTHLY OPERATING REPORT i
Very truly yours, l       4 i44/W             s W. R. Matthews Station Manager Enclosure cc:   U. S. Nuclear Regulatory Commission Regicn II ici Marietta Street, N. W.                                                           lI Suite 2900 Atlanta, Georgia 30323                                                             g7 Mr. R. D. McWhorter NRC Senior Resident Inspector North Anna Power Station i       9612110318 961130 l       PDR   ADOCK 05000338 l       R                   PDR 1
Enclosed is the November 1996 Monthly Operating Report for North Anna Power Station Unit 1 and 2.
Very truly yours, l
4 i44/W s
W. R. Matthews Station Manager Enclosure cc:
U. S. Nuclear Regulatory Commission Regicn II lI ici Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 g7 Mr. R. D. McWhorter NRC Senior Resident Inspector North Anna Power Station i
9612110318 961130 l
PDR ADOCK 05000338 l
R PDR 1
1
1


l t
l t
l, t
l t
J VIRGINIA POWER COMPANY NORTH ANNA POWER STATION                     j MONTHLY OPERATING REPORT                     ,
J VIRGINIA POWER COMPANY NORTH ANNA POWER STATION j
MONTH: November YEAR: 1996
MONTHLY OPERATING REPORT MONTH: November YEAR:
                                                            ?
1996
?
I s
I s
Approved:
Approved:
b station sanager p l
b station sanager p


l.
l.
t                                                                                                                                                                     i i
t i
l -
i l
1
1 CPERATIN3 DATA REPORT i
                          .                                        CPERATIN3 DATA REPORT                                                                             i DOCKET NO.s         50-338 DATE: Decent >er 5, 1996 CONTACTS W. R. Matthews PHONES     (540) 894-2101 OPERATING STATUS
DOCKET NO.s 50-338 DATE: Decent >er 5, 1996 CONTACTS W. R. Matthews PHONES (540) 894-2101 OPERATING STATUS 1.
: 1. Unit Names., . .......   . . . ..          . ...                North Anna 1 i        2. Reporting Periods................       .. . .                  Noventier 1996 I       3. Licensed Thermal Power (MWt)s.. .....             .                        2,893
Unit Names.,........
: 4. Nameplate Rating (Gross Pedel s . . . .   .. . ..                            994
North Anna 1 2.
        !. Design Electrical Rating (Net MWe) .                     .                    907
Reporting Periods................
: 6. Maximum Dependable Capacity (Gross MWe)s. .            .                      940 l       7. Maximum Dependable Capacity (Net MWe) . ..                                    893                                                                      I
Noventier 1996 i
: 8. If changes occur to Capacity Ratings (!tems 3 thru 7) since last report, give reasons:                                             N/A l                                                                                                                                                                   -
I 3.
l
Licensed Thermal Power (MWt)s.......
: 9. Power level to which restricted, if any (Net MWe):                                         N/A
2,893 4.
: 10. Reasons for restrictions, if anya                                                         N/A i
Nameplate Rating (Gross Pedel s....
This Month                 Y-t-D           Cumulative
994 Design Electrical Rating (Net MWe).
: 11. Hours in Reporting Period..     . ...                . .. .              . ..                      720.0               0,040.0           161,676.0
907 6.
: 12. Number of Hours Reactor was Critical..           . ..          .                ..                120.0               7,286.0           124,413.2
Maximum Dependable Capacity (Gross MWe)s.
: 13. Reactor Reserve Shutdown Hours. ......           . ... .              . . .                          0.0                   94.6             7,046.0
940 893 I
: 14. Hours Generator On-Line.......           . ...                  . . . . .                          720.0               7,242.3           121,429.0
l 7.
: 15. Unit Reserve shutdown Hours......       ... .. .. ...                  .                              0.0                     0.0                 0.0
Maximum Dependable Capacity (Net MWe).
: 16. Gross Thermal Energy Generated ( M O.,         ... ... .. .. . .                        . 2,082,606.9         20,114,975.0       325,426,712.1 l       17. Gross Electrical Energy Generated (MO .             . ... . ...... . .                        685,146.0           6,604,948.0       143,935,561.0 l       18. Net Electrical Energy Generated (MWH)..               .. . . .                ..... .          651,706.0           6,272,314.0       101,313,460.0
8.
: 19. Unit Service Factor.   .. ........ ... .            . ., ...... .. ....                          100.0%                 90.1%               15.1%   J
If changes occur to Capacity Ratings (!tems 3 thru 7) since last report, give reasons:
: 20. Unit Availability Factor..... . . . ...                    .. .                  ..                100.04                 90.16               75.11   l
N/A l
: 21. Unit Capacity Factor (using MD2 Net) .       ..                  .        .        ..          101.4%                 87.4%               70.14
l 9.
: 22. Unit Capacity Factor (using DER Net).                           . ....                              99.04                 B6.06               69.1%
Power level to which restricted, if any (Net MWe):
: 23. Forced Outage Rate.........       ..      .... ..            .. . .              . ..                0.04                   0.96               8.84
N/A 10.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Lach):                                     N/A
Reasons for restrictions, if anya N/A i
: 25. If shutdown at end of Report Period, estimated time of Startupt                           N/A l
This Month Y-t-D Cumulative 11.
I I
Hours in Reporting Period..
: 26. Units in Test Status (Prior to Conmercial Operation!:
720.0 0,040.0 161,676.0 12.
Forecast                   Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COP 91ERCI AL OPERATION l
Number of Hours Reactor was Critical..
120.0 7,286.0 124,413.2 13.
Reactor Reserve Shutdown Hours.......
0.0 94.6 7,046.0 14.
Hours Generator On-Line.......
720.0 7,242.3 121,429.0 15.
Unit Reserve shutdown Hours......
0.0 0.0 0.0 16.
Gross Thermal Energy Generated ( M O.,
2,082,606.9 20,114,975.0 325,426,712.1 l
17.
Gross Electrical Energy Generated (MO.
685,146.0 6,604,948.0 143,935,561.0 l
18.
Net Electrical Energy Generated (MWH)..
651,706.0 6,272,314.0 101,313,460.0 19.
Unit Service Factor.
100.0%
90.1%
15.1%
J 20.
Unit Availability Factor.....
100.04 90.16 75.11 l
21.
Unit Capacity Factor (using MD2 Net).
101.4%
87.4%
70.14 22.
Unit Capacity Factor (using DER Net).
99.04 B6.06 69.1%
23.
Forced Outage Rate.........
0.04 0.96 8.84 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Lach):
N/A 25.
If shutdown at end of Report Period, estimated time of Startupt N/A I
26.
Units in Test Status (Prior to Conmercial Operation!:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COP 91ERCI AL OPERATION l
l I
l I


a r
a r
l I
l 1
1                                                                                                                              \
\\
AVERAGE DAILY UNIT PCMER LEVEL i
AVERAGE DAILY UNIT PCMER LEVEL i
Docket No.:                         50-338 Unit:                               NA-1                   :
Docket No.:
Date:                        December 5, 1996             :
50-338 Unit:
NA-1 Date:
December 5, 1996


==Contact:==
==Contact:==
W. R. Matthews               ,
W. R. Matthews Phone:
Phone:                         (540) 894-2101             ;
(540) 894-2101 i
i l
l i
i MONTH: November 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER' LEVEL (MWe-Net)
LEVEL (MWe-Net) i 1
907 17 905 i'
2 906 18 905 l
3 906 19 906
{
4 906 20 906 l
5 906 21 906 j
6 906 22 903 l
l 7
905 23 906
~
8 905 24 906 l
9 905 25 905 i
10 905 26 905 11 905 27 905 12 904 28 905 13 903 29 904 14 904 30 905 15 905 i
16 905 1
i i
i i
MONTH: November 1996
Instructions:
;              DAY        AVERAGE DAILY POWER                            DAY            AVERAGE DAILY POWER'                !
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
LEVEL (MWe-Net)                                                  LEVEL (MWe-Net)                !
Compute to the nearest whole megawatt.
i              1                        907                              17                        905                      i' 2                        906                              18                        905 l              3                        906                              19                        906                      {
4                        906                              20                        906                      l 5                        906                              21                        906                        j
!              6                        906  ~
22                        903                        l l              7                        905                              23                        906 905 8                                                        24                        906                        l 9                        905                              25                        905                        i 10                        905                              26                        905 11                        905                              27                        905                        l 12                        904                              28                        905                        '
13                        903                            29                        904 14                        904                              30                        905 15                        905                                                                                  i 16                        905                                                                                  1 i
l i
Instructions:                                                                                                      l On this format, list the average daily unit power level in MWe-                                               l Net for each day in the reporting month.                           Compute to the nearest                         I whole megawatt.
l l
l l
l
l


            ,                                                    NORTH ANNA POWER STATION UNIT NO.: J MONTH: November 1
NORTH ANNA POWER STATION UNIT NO.: J MONTH: November 1
SUte4ARY OF OPERATING EXPERIENCE                                                                 )
SUte4ARY OF OPERATING EXPERIENCE
i Page 1 of 1                                                           j j
)
                          . Listed below in chronological sequence is a . summary of operating                                                             i experiences for this month which required load reductions or resulted in                                                                   '
i Page 1 of 1 j
significant non-load related incidents.                                                                                                   I 1
j
l i
. Listed below in chronological sequence is a. summary of operating i
                                                                                                                                                          )
experiences for this month which required load reductions or resulted in significant non-load related incidents.
i                       Date                   Time                                         Data                                                           !
l 1
i                                                                                                                                                          t
i
(               November 01, 1996               0000                       Began month with unit at 100% power, 952 Mwe.                                 '
)
I November 22, 1996               1434                         Commenced rampdown for Turbine Valve Freedom                                 l Test (TVFT).                                                                 !
i Date Time Data i
1510                       Unit stable at 93% power, 890 MWe.                                           ;
t
I 1545                         TVFT completed satisfactorily.                     Commenced ramp to 100% power.                                                               ;
(
1630                         Unit stable at 100% power, 950 MWe.                                         ,
November 01, 1996 0000 Began month with unit at 100% power, 952 Mwe.
November 30, 1996               2400                         Ended month with unit stable at 100% power, 954 MWe.
I November 22, 1996 1434 Commenced rampdown for Turbine Valve Freedom Test (TVFT).
1510 Unit stable at 93% power, 890 MWe.
I 1545 TVFT completed satisfactorily.
Commenced ramp to 100% power.
1630 Unit stable at 100% power, 950 MWe.
November 30, 1996 2400 Ended month with unit stable at 100% power, 954 MWe.
t I
t I
i i
i i
I l
I 4
4 i
i l
l I
I
)
)
i
i
Line 118: Line 186:
i e
i e


Page         1 of     1 i
Page 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:         50-338                                                             ;
of 1
r 1
i UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
l                                                            Report Month November Unit Name:                         NA-1                                     l.
50-338 1
Year:   1996         Date: December 5, 1996 f
r l
Report Month November Unit Name:
NA-1 Year:
1996 Date: December 5, 1996 f


==Contact:==
==Contact:==
W. R. Matthews                                                             t
W. R. Matthews t
* No entries this month.                                                                                                         l L
* No entries this month.
l L
l l,
l l,
I p
I p
Line 138: Line 210:
i I
i I
d 4
d 4
l


UNIT SHUTDOWS AND POWER REDUCTIONS 9
UNIT SHUTDOWS AND POWER REDUCTIONS 9
DOCKET NO.: 50-338 UNIT NAME: NA-1 DATE: December 5, 1996 REPORT MONTH: November 1996                                       CONTACT: W. R. Matthews PHONE: (540) 894-2101 1                   2             3                         4           5 No.                                                                             Date           Type   Duration Reason       Metned of       Licensee     System   Component       Cause & Corrective (hrs)               Shutting         Event       Code       Code               Action to Down Reactor     Report #                                 Prevent Recurrence
DOCKET NO.:
* No entries                                                                                   this   month.
50-338 UNIT NAME:
1: Type                                                                                     2: Reason                                               3: Method                 4:
NA-1 DATE: December 5,
F= Forced                                                                           A= Equipment Failure (explain)                             l= Manual               Exhibit F - Instructions S= Scheduled                                                                         B= Maintenance or Test                                     2= Manual Scram         for preparation of Data C= Refueling                                               3= Automatic Scram     Entry Sheets for Licensee D= Regulatory Restriction                                 4= Continuations       Event Report (LER) File E= Operator Training & License Examination                 5= Load Reduction       (NUREG-0161)
1996 REPORT MONTH: November 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1
F= Administrative                                         9-Other G= Operational Error                                                             5:
2 3
H=Other (explain)                                                                 Exhibit H - Same Source
4 5
No.
Date Type Duration Reason Metned of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence
* No entries this month.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9-Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source


l                 ,
l OPERATING DATA REPORT i
                          ,                                                      OPERATING DATA REPORT i
i t
i t
l                                                                                                                                   DOCKET NO.s           50-339                 ;
l DOCKET NO.s 50-339 1
1 EATE Decent >er     5, 1996                   ;
EATE Decent >er 5, 1996 i
R. Matthews i
CONTACT 1 W. R. Matthews i
i                                                                                                                                  CONTACT 1   W.
l PHONE:
l l
(540) 894 2101 l
PHONE:       (540) 894 2101
OPERATING STATUS l
!                              OPERATING STATUS l
l 1.
l
Uni t Name s............
: 1. Uni t Name s . . . . . . . . . . . .   .. . ... .. ...                        North Anna 2 l       2. Reporting Periods... .               . . . .            . . .                November 1996                                                                           ,
North Anna 2 l
j        3. Licensed Thermal Power (MWt)t.... ... ..                                                  2,093                                                                     1
2.
: 4. Nameplate Rating (Gross MWels.. . . . ...                                                    97 9                                                                   I
Reporting Periods....
: 5. Design Electrical Rating (Net MWe): .                             .                          907
November 1996 j
: 6. Maximum Dependable Capacity (Gross Vin)t.                                                     944                                                                     i
3.
: 7. Maximum Dependable Capacity (Not MWa)2.,                         , ,                          897                                                                     !
Licensed Thermal Power (MWt)t....
1 i
2,093 4.
i
Nameplate Rating (Gross MWels..
: 8. If changee occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:                                                           N/A l
97 9 I
l l
5.
: 9. Power level to which restricted, if any (Net MWe):                                                     N/A                                                           j
Design Electrical Rating (Net MWe):.
: 10. Reasons for restrictions, if any:                                                                     N/A                                                           1 1
907 6.
This Month                   Y-t-D             Cumulative   j
Maximum Dependable Capacity (Gross Vin)t.
: 11. Hours in Reporting Period.                 . .              .              .. .                              120.0                 0,040.0           139,944.0
944 7.
: 12. Nunteer of Hours Reactor was critical.                                                                         212.9                 6,673.9           116,731.5
Maximum Dependable Capacity (Not MWa)2.,
: 13. Reactor Reserve Shutdown Hours.                         ..            .. .            . .                    411.6                   541.0             7,082.0
897 i
: 14. Hours Generator on-Line. . .                      .      . .  .                              ..              272.9                 6,643.4           115,566.5
i 8.
: 15. Unit Reserve Shutdown Hours.                       .            .            ,                                  0.0                       0.0                 0.0 16 Gross Thermal Energy Generated (MWlO....                                         .                          789,979.0           18,950,950.9         314,926,189.4
If changee occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:
: 17. Gross Electrical Energy Generated (MWH).                                 . . . ... . .....                  259,656.0             6.223,865.0         103,055,263.0
N/A l
: 18. Net Electrical Energy Generated (MWH) .                           . . .                                    246,913.0             5,910,217.0         99,409,056.0
j 9.
: 19. Unit Service Factor. . .           ,. . .            . .            .          . . .                        37.96                   82.6%               B2.6%
Power level to which restricted, if any (Net MWe):
: 20. Unit Availability Factor.                 . ... ... ... .                  .      ... . .. . ..                37.94                   82.6%               02.6%
N/A 10.
: 21. Unit Capacity Factor (using MDC Net) .                                       .                    . .          38.2%                   82.16               78.2%
Reasons for restrictions, if any:
: 22. Unit Capacity Factor (using DER Net).                       .            .          ..                          37.04                   81.24               77.6%
N/A j
: 23. Forced Outage Rate ..                 ..        . . .                                .                        62.14                     1.6%                 4.6%
This Month Y-t-D Cumulative 11.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each):                                                 N/A
Hours in Reporting Period.
: 25. If Shutdown at end of Report feriod, estimated time of Startups                                       Estimated startup of December 14, 1996 followinQ repairs to the Main Generator.
120.0 0,040.0 139,944.0 12.
Nunteer of Hours Reactor was critical.
212.9 6,673.9 116,731.5 13.
Reactor Reserve Shutdown Hours.
411.6 541.0 7,082.0 14.
Hours Generator on-Line.
272.9 6,643.4 115,566.5 15.
Unit Reserve Shutdown Hours.
0.0 0.0 0.0 16 Gross Thermal Energy Generated (MWlO....
789,979.0 18,950,950.9 314,926,189.4 17.
Gross Electrical Energy Generated (MWH).
259,656.0 6.223,865.0 103,055,263.0 18.
Net Electrical Energy Generated (MWH).
246,913.0 5,910,217.0 99,409,056.0 19.
Unit Service Factor...
37.96 82.6%
B2.6%
20.
Unit Availability Factor.
37.94 82.6%
02.6%
21.
Unit Capacity Factor (using MDC Net).
38.2%
82.16 78.2%
22.
Unit Capacity Factor (using DER Net).
37.04 81.24 77.6%
23.
Forced Outage Rate..
62.14 1.6%
4.6%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each):
N/A 25.
If Shutdown at end of Report feriod, estimated time of Startups Estimated startup of December 14, 1996 followinQ repairs to the Main Generator.
26, Units in Test Status (Prior to Consnercial Operation):
26, Units in Test Status (Prior to Consnercial Operation):
Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMRCI AL OPERATION l
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMRCI AL OPERATION l
l l
l l
l i
l i
Line 194: Line 309:
i
i


      .-._ -        - . - - - . . ~ . . .           . . -. . . . . -    .-.  -.-      -    .  .  .-  . - ~ ..
-. - - -.. ~...
                        .                                                                                        l AVERAGE DAILY UNIT POWER LEVEL'                                     ,
. - ~
1 Docket No.:               50-339 Unit:                     NA-2               !
AVERAGE DAILY UNIT POWER LEVEL' Docket No.:
Date:           December 5, 1996
50-339 Unit:
NA-2 Date:
December 5, 1996


==Contact:==
==Contact:==
W. R. Matthews l
W. R. Matthews l
Phone:             (540) 894-2101         l MONTH: November 1996                                                                                 1 l
Phone:
DAY           AVERAGE DAILY POWER                       DAY       AVERAGE DAILY POWER LEVEL (MWe-Net)                                 LEVEL (MWe-Net) t               1                         907                           17                   0' l               2                         906                           18                   0                   ;
(540) 894-2101 MONTH: November 1996 1
l               3                         906                           19                   0                   i L               4                         905                           20                   0                   ,
l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
5                         S!05                         21                   0                   ;
LEVEL (MWe-Net) t 1
6                         906                           22                   0
907 17 0'
: j.             7                         897                           23                   0 l               8                         906                           24                   0
l 2
!              9                         906                           25                   0 l-             10                         905                           26                   0 11                         905                           27                   0 12                         336                           28                   0
906 18 0
;              13                             0                         29                   0 l             14                             0                         30                   0                   1 15                             0                                                                   :
l 3
16                             0                                                                   l Instructions:
906 19 0
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.                         Compute to the nearest whole megawatt.
i L
4 905 20 0
5 S!05 21 0
6 906 22 0
j.
7 897 23 0
l 8
906 24 0
9 906 25 0
l-10 905 26 0
11 905 27 0
12 336 28 0
13 0
29 0
l 14 0
30 0
15 0
16 0
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
4 I
4 I
l l
l l
i
i


l l                       .
l l
i                                                             NORTH ANNA POWER STATION i                                                                                                                                   i UNIT NO.:           2                                         I MONTH: November                                               '
i NORTH ANNA POWER STATION i
SUl44ARY OF OPERATING EXPERIENCE Page 1 of 1                                                 ;
i UNIT NO.:
i
2 I
                    . Listed below in chronological sequence is a summary of operating                                           !
MONTH: November SUl44ARY OF OPERATING EXPERIENCE Page 1 of 1 i
cxperiences for this month which required load reductions . or resulted in                                               '
Listed below in chronological sequence is a summary of operating cxperiences for this month which required load reductions. or resulted in significant non-load related incidents.
significant non-load related incidents.                                                                                 !
Date Time Data j
Date                     Time                                   Data                                         j November 01, 1996                       0000             Began month at 100% power, 951 MWe.                             l November 07, 1996                       0415             Commenced ramping unit from 100% power, 952                   l MWe for removal of "B" Moisture       Separator               i Reheater (MSR) Drain Tank due to an unisolable                 {
November 01, 1996 0000 Began month at 100% power, 951 MWe.
leak on weld for level column.                                 !
November 07, 1996 0415 Commenced ramping unit from 100% power, 952 l
0549             Unit stable at 97.5% power, 930 MWe.
MWe for removal of "B" Moisture Separator i
0812             Commenced ramp to 100% power after "B" MSR                     j steam leak.                                                   1 l
Reheater (MSR) Drain Tank due to an unisolable
0846             Unit stable at 100% power, 944 MWe.
{
November 12, 1996                       0853             Automatic Reactor trip due to Main Generator Differential Lock Out Relay actuation.
leak on weld for level column.
November 13, 1996                       1103             Commence cooldown to 325 F for extended repairs to Main Generator.
0549 Unit stable at 97.5% power, 930 MWe.
1612             Enter Mode 4.
0812 Commenced ramp to 100% power after "B" MSR j
1942             Unit stable at 400 psig and 325'F with RHR established.
steam leak.
November 29, 1996                       0944             Began cooldown to Mode 5 for RCS repairs.                     ;
1 0846 Unit stable at 100% power, 944 MWe.
1230             Entered Mode 5.                                               I 1240             Broke Containment vacuum.
November 12, 1996 0853 Automatic Reactor trip due to Main Generator Differential Lock Out Relay actuation.
l l                                                   1330             Unit stable at 185 F,   325 psi.
November 13, 1996 1103 Commence cooldown to 325 F for extended repairs to Main Generator.
I l         November 30, 1996                       2400             Ended month in Mode 5 for Main Generator i                                                                   repairs.                                                       ;
1612 Enter Mode 4.
i e ,, , ,,,               ~.                                     -
1942 Unit stable at 400 psig and 325'F with RHR established.
November 29, 1996 0944 Began cooldown to Mode 5 for RCS repairs.
1230 Entered Mode 5.
1240 Broke Containment vacuum.
l l
1330 Unit stable at 185 F, 325 psi.
I l
November 30, 1996 2400 Ended month in Mode 5 for Main Generator i
repairs.
i e,,,,,,
~.
,-.x


  . . . . .              _ . . - .      . - - .        . - - . _ . . - - . _ - . - ~ - _ - - - -                        . - _ - .    . - - . .  . . . . -
. - -. _.. - -. _ -. - ~ - _ - - - -
l
l l.
: l.                 ,
i I
i                         .
l Page 1
I l                                                                                                                                                           ,
of 1
Page     1       of     1               !
UNIT SHUTDOWN AND POWER REDUCTIONS l
UNIT SHUTDOWN AND POWER REDUCTIONS l                                                                     Explanation Sheet                                                                     ,
Explanation Sheet l
l Docket No.:                           50-339                                               l l                                                                                                                                                           ;
Docket No.:
Report Month November Unit Name:                                     NA-2                                   ;
50-339 l
Year:           1996               Date: December 5, 1996                                             l
l Report Month November Unit Name:
                                                                                                                                                            )
NA-2 Year:
1996 Date: December 5, 1996 l
)


==Contact:==
==Contact:==
W. R. Matthews                                                             j l                                                                                                                                                             I 96-03                 November 12, 1996                                   0853 hours                                               !
W. R. Matthews j
Automatic reactor trip due to. Main Generator                                                                 i Differential Lock Out Relay actuation.                                                                       j i
l 96-03 November 12, 1996 0853 hours Automatic reactor trip due to. Main Generator i
November 13, 1996                                   1103 hours                                               !
Differential Lock Out Relay actuation.
Commenced cooldown to 325 F for extended repairs to Main Generator.                                                                                                     1 1
j i
1 November 29, 1996                                   0944                                                     {
November 13, 1996 1103 hours Commenced cooldown to 325 F for extended repairs to Main Generator.
Began cooldown to Mode 5 for RCS repairs.                                                                     i Entered Mode 5 at 1230 hours.                                                                                 I I
1 1
1 November 29, 1996 0944
{
Began cooldown to Mode 5 for RCS repairs.
i Entered Mode 5 at 1230 hours.
I t
I t


UNIT SHUTDOWS AND POWER REDUCTIONS                                                                                                               ',
UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:
DOCKET NO.: 50-339 UNIT NAME: NA-2 DATE: December 5, 1996 REPORT MONTH: November 1996                                                                   CONTACT: W. R. Matthews                                                             ,
50-339 UNIT NAME:
PHONE: (540) 894-2101 1                                                             2             3                       4           5 No.           Date     Type   Duration Reason                                                 Method of       Licensee   System   Component                 Cause & Corrective (hrs)                                                         Shutting         Event     Code         Code                                                 Action to Down Reactor     Report #                                         Prevent Recurrence 96- 3         961112   F         447.1                                               A                 3     2-96-003   TB       TG         Main Generator "A" Phase Fault Caused by Foreign Material Blocking Cooling Flow 1: Type             2: Reason                                                                                           3: Method                 4:
NA-2 DATE: December 5, 1996 REPORT MONTH: November 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1
F= Forced           A= Equipment Failure (explain)                                                                     l= Manual                         Exhibit F - Instructions S= Scheduled         B= Maintenance or Test                                                                             2= Manual Scram                   for preparation of Data C= Refueling                                                                                       3= Automatic Scram                 Entry Sheets for Licensee D= Regulatory Restriction                                                                           4= Continuations                   Event Report (LER) File E= Operator Training & License Examination                                                         5= Load Reduction                 (NUREG-0161)
2 3
F= Administrative                                                                                   9-Other G= Operational Error                                                                                                         5:
4 5
H=Other (explain)                                                                                                                     Exhibit H - Same Source
No.
                                  .-- _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ -                      _ _                  -    ._                - _                                                          ,}}
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 96-3 961112 F
447.1 A
3 2-96-003 TB TG Main Generator "A" Phase Fault Caused by Foreign Material Blocking Cooling Flow 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9-Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
,}}

Latest revision as of 02:10, 12 December 2024

Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2
ML20135E496
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/30/1996
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
96-612, NUDOCS 9612110318
Download: ML20135E496 (12)


Text

_-

l i

VINGINIA ELECTHIC AND POWER COMPANY f

Hicnwown,VinorwrA causi j

December 3,1996 United States Nuclear Regulatory Commission Serial No.96-612 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos.

50-338 50-339 l

License Nos. NPF-4 l

NPF-7 l

l Gentlemen:

(

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 l

MONTHLY OPERATING REPORT i

Enclosed is the November 1996 Monthly Operating Report for North Anna Power Station Unit 1 and 2.

Very truly yours, l

4 i44/W s

W. R. Matthews Station Manager Enclosure cc:

U. S. Nuclear Regulatory Commission Regicn II lI ici Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 g7 Mr. R. D. McWhorter NRC Senior Resident Inspector North Anna Power Station i

9612110318 961130 l

PDR ADOCK 05000338 l

R PDR 1

1

l t

l t

J VIRGINIA POWER COMPANY NORTH ANNA POWER STATION j

MONTHLY OPERATING REPORT MONTH: November YEAR:

1996

?

I s

Approved:

b station sanager p

l.

t i

i l

1 CPERATIN3 DATA REPORT i

DOCKET NO.s 50-338 DATE: Decent >er 5, 1996 CONTACTS W. R. Matthews PHONES (540) 894-2101 OPERATING STATUS 1.

Unit Names.,........

North Anna 1 2.

Reporting Periods................

Noventier 1996 i

I 3.

Licensed Thermal Power (MWt)s.......

2,893 4.

Nameplate Rating (Gross Pedel s....

994 Design Electrical Rating (Net MWe).

907 6.

Maximum Dependable Capacity (Gross MWe)s.

940 893 I

l 7.

Maximum Dependable Capacity (Net MWe).

8.

If changes occur to Capacity Ratings (!tems 3 thru 7) since last report, give reasons:

N/A l

l 9.

Power level to which restricted, if any (Net MWe):

N/A 10.

Reasons for restrictions, if anya N/A i

This Month Y-t-D Cumulative 11.

Hours in Reporting Period..

720.0 0,040.0 161,676.0 12.

Number of Hours Reactor was Critical..

120.0 7,286.0 124,413.2 13.

Reactor Reserve Shutdown Hours.......

0.0 94.6 7,046.0 14.

Hours Generator On-Line.......

720.0 7,242.3 121,429.0 15.

Unit Reserve shutdown Hours......

0.0 0.0 0.0 16.

Gross Thermal Energy Generated ( M O.,

2,082,606.9 20,114,975.0 325,426,712.1 l

17.

Gross Electrical Energy Generated (MO.

685,146.0 6,604,948.0 143,935,561.0 l

18.

Net Electrical Energy Generated (MWH)..

651,706.0 6,272,314.0 101,313,460.0 19.

Unit Service Factor.

100.0%

90.1%

15.1%

J 20.

Unit Availability Factor.....

100.04 90.16 75.11 l

21.

Unit Capacity Factor (using MD2 Net).

101.4%

87.4%

70.14 22.

Unit Capacity Factor (using DER Net).

99.04 B6.06 69.1%

23.

Forced Outage Rate.........

0.04 0.96 8.84 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Lach):

N/A 25.

If shutdown at end of Report Period, estimated time of Startupt N/A I

26.

Units in Test Status (Prior to Conmercial Operation!:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COP 91ERCI AL OPERATION l

l I

a r

l 1

\\

AVERAGE DAILY UNIT PCMER LEVEL i

Docket No.:

50-338 Unit:

NA-1 Date:

December 5, 1996

Contact:

W. R. Matthews Phone:

(540) 894-2101 i

l i

i MONTH: November 1996 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER' LEVEL (MWe-Net)

LEVEL (MWe-Net) i 1

907 17 905 i'

2 906 18 905 l

3 906 19 906

{

4 906 20 906 l

5 906 21 906 j

6 906 22 903 l

l 7

905 23 906

~

8 905 24 906 l

9 905 25 905 i

10 905 26 905 11 905 27 905 12 904 28 905 13 903 29 904 14 904 30 905 15 905 i

16 905 1

i i

Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l l

l

NORTH ANNA POWER STATION UNIT NO.: J MONTH: November 1

SUte4ARY OF OPERATING EXPERIENCE

)

i Page 1 of 1 j

j

. Listed below in chronological sequence is a. summary of operating i

experiences for this month which required load reductions or resulted in significant non-load related incidents.

l 1

i

)

i Date Time Data i

t

(

November 01, 1996 0000 Began month with unit at 100% power, 952 Mwe.

I November 22, 1996 1434 Commenced rampdown for Turbine Valve Freedom Test (TVFT).

1510 Unit stable at 93% power, 890 MWe.

I 1545 TVFT completed satisfactorily.

Commenced ramp to 100% power.

1630 Unit stable at 100% power, 950 MWe.

November 30, 1996 2400 Ended month with unit stable at 100% power, 954 MWe.

t I

i i

I 4

i l

I

)

i

}

i e

Page 1

of 1

i UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 1

r l

Report Month November Unit Name:

NA-1 Year:

1996 Date: December 5, 1996 f

Contact:

W. R. Matthews t

  • No entries this month.

l L

l l,

I p

I i

t 5

i i

t l

r 1

I h

i t

i I

d 4

UNIT SHUTDOWS AND POWER REDUCTIONS 9

DOCKET NO.:

50-338 UNIT NAME:

NA-1 DATE: December 5,

1996 REPORT MONTH: November 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Metned of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence

  • No entries this month.

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9-Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

l OPERATING DATA REPORT i

i t

l DOCKET NO.s 50-339 1

EATE Decent >er 5, 1996 i

CONTACT 1 W. R. Matthews i

l PHONE:

(540) 894 2101 l

OPERATING STATUS l

l 1.

Uni t Name s............

North Anna 2 l

2.

Reporting Periods....

November 1996 j

3.

Licensed Thermal Power (MWt)t....

2,093 4.

Nameplate Rating (Gross MWels..

97 9 I

5.

Design Electrical Rating (Net MWe):.

907 6.

Maximum Dependable Capacity (Gross Vin)t.

944 7.

Maximum Dependable Capacity (Not MWa)2.,

897 i

i 8.

If changee occur to Capacity Ratings (Items 3 thru 7) since last report, give reasons:

N/A l

j 9.

Power level to which restricted, if any (Net MWe):

N/A 10.

Reasons for restrictions, if any:

N/A j

This Month Y-t-D Cumulative 11.

Hours in Reporting Period.

120.0 0,040.0 139,944.0 12.

Nunteer of Hours Reactor was critical.

212.9 6,673.9 116,731.5 13.

Reactor Reserve Shutdown Hours.

411.6 541.0 7,082.0 14.

Hours Generator on-Line.

272.9 6,643.4 115,566.5 15.

Unit Reserve Shutdown Hours.

0.0 0.0 0.0 16 Gross Thermal Energy Generated (MWlO....

789,979.0 18,950,950.9 314,926,189.4 17.

Gross Electrical Energy Generated (MWH).

259,656.0 6.223,865.0 103,055,263.0 18.

Net Electrical Energy Generated (MWH).

246,913.0 5,910,217.0 99,409,056.0 19.

Unit Service Factor...

37.96 82.6%

B2.6%

20.

Unit Availability Factor.

37.94 82.6%

02.6%

21.

Unit Capacity Factor (using MDC Net).

38.2%

82.16 78.2%

22.

Unit Capacity Factor (using DER Net).

37.04 81.24 77.6%

23.

Forced Outage Rate..

62.14 1.6%

4.6%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, Duration of Each):

N/A 25.

If Shutdown at end of Report feriod, estimated time of Startups Estimated startup of December 14, 1996 followinQ repairs to the Main Generator.

26, Units in Test Status (Prior to Consnercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMRCI AL OPERATION l

l l

l i

i i

{

i

-. - - -.. ~...

. - ~

AVERAGE DAILY UNIT POWER LEVEL' Docket No.:

50-339 Unit:

NA-2 Date:

December 5, 1996

Contact:

W. R. Matthews l

Phone:

(540) 894-2101 MONTH: November 1996 1

l DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) t 1

907 17 0'

l 2

906 18 0

l 3

906 19 0

i L

4 905 20 0

5 S!05 21 0

6 906 22 0

j.

7 897 23 0

l 8

906 24 0

9 906 25 0

l-10 905 26 0

11 905 27 0

12 336 28 0

13 0

29 0

l 14 0

30 0

15 0

16 0

Instructions:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

4 I

l l

i

l l

i NORTH ANNA POWER STATION i

i UNIT NO.:

2 I

MONTH: November SUl44ARY OF OPERATING EXPERIENCE Page 1 of 1 i

Listed below in chronological sequence is a summary of operating cxperiences for this month which required load reductions. or resulted in significant non-load related incidents.

Date Time Data j

November 01, 1996 0000 Began month at 100% power, 951 MWe.

November 07, 1996 0415 Commenced ramping unit from 100% power, 952 l

MWe for removal of "B" Moisture Separator i

Reheater (MSR) Drain Tank due to an unisolable

{

leak on weld for level column.

0549 Unit stable at 97.5% power, 930 MWe.

0812 Commenced ramp to 100% power after "B" MSR j

steam leak.

1 0846 Unit stable at 100% power, 944 MWe.

November 12, 1996 0853 Automatic Reactor trip due to Main Generator Differential Lock Out Relay actuation.

November 13, 1996 1103 Commence cooldown to 325 F for extended repairs to Main Generator.

1612 Enter Mode 4.

1942 Unit stable at 400 psig and 325'F with RHR established.

November 29, 1996 0944 Began cooldown to Mode 5 for RCS repairs.

1230 Entered Mode 5.

1240 Broke Containment vacuum.

l l

1330 Unit stable at 185 F, 325 psi.

I l

November 30, 1996 2400 Ended month in Mode 5 for Main Generator i

repairs.

i e,,,,,,

~.

,-.x

. - -. _.. - -. _ -. - ~ - _ - - - -

l l.

i I

l Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS l

Explanation Sheet l

Docket No.:

50-339 l

l Report Month November Unit Name:

NA-2 Year:

1996 Date: December 5, 1996 l

)

Contact:

W. R. Matthews j

l 96-03 November 12, 1996 0853 hours0.00987 days <br />0.237 hours <br />0.00141 weeks <br />3.245665e-4 months <br /> Automatic reactor trip due to. Main Generator i

Differential Lock Out Relay actuation.

j i

November 13, 1996 1103 hours0.0128 days <br />0.306 hours <br />0.00182 weeks <br />4.196915e-4 months <br /> Commenced cooldown to 325 F for extended repairs to Main Generator.

1 1

1 November 29, 1996 0944

{

Began cooldown to Mode 5 for RCS repairs.

i Entered Mode 5 at 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />.

I t

UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO.:

50-339 UNIT NAME:

NA-2 DATE: December 5, 1996 REPORT MONTH: November 1996 CONTACT: W. R. Matthews PHONE: (540) 894-2101 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence 96-3 961112 F

447.1 A

3 2-96-003 TB TG Main Generator "A" Phase Fault Caused by Foreign Material Blocking Cooling Flow 1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) l= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9-Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source

,