ML20138K189: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.. .-             _     -.                         -   _.         -             _   -.     . ..                     .
{{#Wiki_filter:.. .-
[                                                                                                                                         Oc9         ;
_
                                                                                                                                                        ,
-.
  P
-
                                                                      May 5, 1997
_.
                                                                                                                                                      :
-
        Mr. Lew W. Myers
_
        Vice President - Nuclear
-.
        Centerior Service Company
. ..
          P.O. Box 97, A200
.
          Perry, OH 44081
[
        SUBJECT:               NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION
Oc9
                                REPORT NO. 50-440/97003(DRS)
,
                                                                                                                                                      f
P
          Dear Mr. Myers:
May 5, 1997
          On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.
:
        The enclosed report presents the results of that inspection.
Mr. Lew W. Myers
                                                                                                                                                      !
Vice President - Nuclear
        Your radiological effluent controls were effective in maintaining off site exposure low,                                                     i
Centerior Service Company
          Several effective initiatives, such as the liquid discharge minimization plan, were
P.O. Box 97, A200
        implemented to minimize radioactive effluent discharges. However, a number of problems                                                         l
Perry, OH 44081
          were identified in your radiation monitor program. In particular, your staff was initially                                                   ;
SUBJECT:
        unaware of the proper actions to take when the off-gas ventilation monitor was                                                                 ,
NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION
        determined to be out of calibration. In addition, routine self-assessments failed to identify                                                 l
REPORT NO. 50-440/97003(DRS)
          some radiation monitor material condition problems.
f
                                                                                                                                                      '
Dear Mr. Myers:
          In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter
On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.
          and the enclosure will be placed in the NRC Public Document Room.                                                                           '
The enclosed report presents the results of that inspection.
        We will gladly discuss any questions you have concerning this inspection.
!
                                                                            Sincerely,
Your radiological effluent controls were effective in maintaining off site exposure low,
                                                                          /s/ Melvyn Leach (for)
i
                                                                            GeoHrey E. Grant, Director
Several effective initiatives, such as the liquid discharge minimization plan, were
        ^'()r)45
implemented to minimize radioactive effluent discharges. However, a number of problems
          10
l
                                                                            Division of Reactor Safety
were identified in your radiation monitor program. In particular, your staff was initially
l         Docket No. 50-440
;
                                                                                                                                                    l
unaware of the proper actions to take when the off-gas ventilation monitor was
,
determined to be out of calibration. In addition, routine self-assessments failed to identify
l
some radiation monitor material condition problems.
'
In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter
and the enclosure will be placed in the NRC Public Document Room.
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/s/ Melvyn Leach (for)
^'()r)45
GeoHrey E. Grant, Director
10
Division of Reactor Safety
l
Docket No. 50-440
l
License No. NPF-58
'
'
          License No. NPF-58
l        Enclosure:            Inspection Report 50-440/97003(DRS)
l
l
          See Attached Distribution                                                                                                 /h
Enclosure:
Inspection Report 50-440/97003(DRS)
See Attached Distribution
/h
l
(SEE PREVIOUS CONCURRENCE ['/
'
'
        ' DOCUMENT NAME: G:\DRS\PER97003.DRS                                           (SEE PREVIOUS CONCURRENCE ['/
' DOCUMENT NAME: G:\\DRS\\PER97003.DRS
          To receive a copy of thle document, Indicate in the bon: 'C" = Copy without attechment/ enclosure 'E" = Copy with attachment / enclosure
To receive a copy of thle document, Indicate in the bon: 'C" = Copy without attechment/ enclosure 'E" = Copy with attachment / enclosure
          "N" = No copy
"N" = No copy
          0FFICE           RIII                           RIII                       RIII                 l       RIII                   F
0FFICE
          NAME             KSelburg:jp                   TKozak                     JJacobson                   MLeach/GGran h
RIII
[         DATE             04/ /97                       04/ /97                   04/ /97                     05/ r/97
RIII
                                                              0FFICIAL RECORD COPY
RIII
                                                        ~
l
    9705120244 970505                                                   lE
RIII
l   PDR   ADOCK 05000440                                               ldilll
F
                                                                        ***
NAME
                                                                                lll l lll
KSelburg:jp
                                                                                        *,
TKozak
                                                                                            ll-    ll
JJacobson
                                                                                                    .
MLeach/GGran h
[
DATE
04/ /97
04/ /97
04/ /97
05/ r/97
0FFICIAL RECORD COPY
ldilll lll l lll ll-
ll
lE
~
9705120244 970505
l
PDR
ADOCK 05000440
***
*,
.
O
PDR
,
,
    O                            PDR


      - - _ _         __         . - _ _ _   .                                     .__ _ _ __.                       _ __
- - _ _
    *
__
. - _ _ _
.
.__ _ _ __.
_
__
*
l
l
,
,
    *
*
                                                                                                                              '
'
1
1
!
!
      Mr. Lew W. Myers
Mr. Lew W. Myers
,     Vice President - Nuclear
,
l     Centerior Service Company
Vice President - Nuclear
      P.O. Box 97, A2OO
l
      Perry, OH 44081
Centerior Service Company
P.O. Box 97, A2OO
Perry, OH 44081
1
1
      SUBJECT:         NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION
SUBJECT:
                      REPORT NO. 50-440/97003(DRS)                                                                           ,
NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION
      Dear Mr. Myers:
REPORT NO. 50-440/97003(DRS)
      On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.
,
      The enclosed report presents the results of that inspection.
Dear Mr. Myers:
      Your radiological effluent controls were effective in maintaining off-site exposure low.
On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.
      Several effective initiatives, such as the liquid discharge minimization plan, were                                     1
The enclosed report presents the results of that inspection.
      implemented to minimize radioactive affluent discharges. However, a number of problems
Your radiological effluent controls were effective in maintaining off-site exposure low.
      were identified in your radiation monitor program. In particular, your staff was initially
Several effective initiatives, such as the liquid discharge minimization plan, were
,    unaware of the proper actions to take when the calibration of the off-gas ventilation                                   :
1
implemented to minimize radioactive affluent discharges. However, a number of problems
were identified in your radiation monitor program. In particular, your staff was initially
unaware of the proper actions to take when the calibration of the off-gas ventilation
,
:
monitor was determined to be void, in addition, routine self-assessments failed to identify
!
I
I
      monitor was determined to be void, in addition, routine self-assessments failed to identify                              !
some radiation monitor material condition problems.
i    some radiation monitor material condition problems.
i
!     In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter
!
i     and the enclosure will be placed in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter
      We will gladly discuss any questions you have conceming this inspection.
i
                                                          Sincerely,
and the enclosure will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have conceming this inspection.
Sincerely,
'
'
                                                                                                                                l
)
                                                                                                                              )
l
l
l                                                        Geoffrey E. Grant, Director
                                                          Division of Reactor Safety
      Docket No. 50-440
:    License No. NPF-58
l
l
l     Enclosure:       Inspection Eeport 50-440/97003(DRS)
Geoffrey E. Grant, Director
l     See Attached Distribution
Division of Reactor Safety
Docket No. 50-440
:
License No. NPF-58
l
l
Enclosure:
Inspection Eeport 50-440/97003(DRS)
l
See Attached Distribution
I
I
i     DOCUMENT NAME: G:\DRS\PER97003.DRS
i
      T.       . py ., ei. e w t. Sm t. > m. w : c - copy withoui .tt. chm.nU.ncio.w. 'U - Copy with .tt. chm.nt/.ncio.w.
DOCUMENT NAME: G:\\DRS\\PER97003.DRS
      r - w copy
T.
        0FFICE     RIII                     E RIII           M RIII                 ,l         RIII             l          l
. py ., ei. e w
  '
t. Sm t. > m. w : c - copy withoui .tt. chm.nU.ncio.w. 'U - Copy with .tt. chm.nt/.ncio.w.
        NAME       KSelburg:jp-Mj5 TKozak &                         JJacobson 4 % D MLeach/GGrant                             l
r - w copy
        DATE       04/4/97                   04/2(f97             04hS/97 / ) # 04/ /97                                     l
0FFICE
                                                  OFFICIAL RECORD COPY
RIII
                                                              "O                                                               i
E RIII
M RIII
,l
RIII
l
'
NAME
KSelburg:jp-Mj5 TKozak &
JJacobson 4 % D MLeach/GGrant
DATE
04/4/97
04/2(f97
04hS/97 /
) # 04/ /97
OFFICIAL RECORD COPY
"O
i


    .   .       . . - .         . . . -   . - - - _ _ -           . . -         _       _     -
.
      .
.
  s
. . - .
    .
. . . -
      .
. - - - _ _ -
          L. W. Myers                                           -2-             May 5, 1997
.
          cc w/sncl:     H. L. Hegrat, Manager, Regulatory Affairs
. -
                        W. R. Kanda, Director, Quality and
_
                          Personnel Development                                                     I
_
                        J. J. Powers, Director, Perry
-
                          Nuclear Engineering Department
.
                        R. D. Brandt, General Manager,
s .
                          Nuclear Power Plant Department
.
                        Terry L. Lodge, Esq.
L. W. Myers
                        State Liaison Officer, State of Ohio
-2-
                        Robert E. Owen, Ohio Department of Health           ,
May 5, 1997
                        C. A. Glazer, State of Ohio
cc w/sncl:
                          Public Utilities Commission
H. L. Hegrat, Manager, Regulatory Affairs
          Distr!bution:
W. R. Kanda, Director, Quality and
          Docket File w/enci             Rlli PRR w/ encl           Rlli Enf. Coordinator w/enci
Personnel Development
          PUBLIC IE-01 w/ encl           SRI, Perry w/enci           TSS w/enci
I
          OC/LFDCB w/enct               LPM, NRR w/enci             CAA1 w/ encl
J. J. Powers, Director, Perry
          DRP w/ encl                   A. B. Beach, Rlil w/ encl
Nuclear Engineering Department
          DRS w/enci                     C. D. Pederson, Rill w/enci
R. D. Brandt, General Manager,
                                                          i
Nuclear Power Plant Department
Terry L. Lodge, Esq.
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
,
C. A. Glazer, State of Ohio
Public Utilities Commission
Distr!bution:
Docket File w/enci
Rlli PRR w/ encl
Rlli Enf. Coordinator w/enci
PUBLIC IE-01 w/ encl
SRI, Perry w/enci
TSS w/enci
OC/LFDCB w/enct
LPM, NRR w/enci
CAA1 w/ encl
DRP w/ encl
A. B. Beach, Rlil w/ encl
DRS w/enci
C. D. Pederson, Rill w/enci
i
i
i
                                                                                                      !
.
.
                                                                                                      i
i
.
.
                                                                                                      ,
,
}}
}}

Latest revision as of 18:58, 11 December 2024

Forwards Insp Rept 50-440/97-03 on 970303-0410.No Violations Noted
ML20138K189
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/05/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20138K192 List:
References
50-440-97-03, 50-440-97-3, NUDOCS 9705120244
Download: ML20138K189 (3)


See also: IR 05000440/1997003

Text

.. .-

_

-.

-

_.

-

_

-.

. ..

.

[

Oc9

,

P

May 5, 1997

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION

REPORT NO. 50-440/97003(DRS)

f

Dear Mr. Myers:

On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.

The enclosed report presents the results of that inspection.

!

Your radiological effluent controls were effective in maintaining off site exposure low,

i

Several effective initiatives, such as the liquid discharge minimization plan, were

implemented to minimize radioactive effluent discharges. However, a number of problems

l

were identified in your radiation monitor program. In particular, your staff was initially

unaware of the proper actions to take when the off-gas ventilation monitor was

,

determined to be out of calibration. In addition, routine self-assessments failed to identify

l

some radiation monitor material condition problems.

'

In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter

and the enclosure will be placed in the NRC Public Document Room.

'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ Melvyn Leach (for)

^'()r)45

GeoHrey E. Grant, Director

10

Division of Reactor Safety

l

Docket No. 50-440

l

License No. NPF-58

'

l

Enclosure:

Inspection Report 50-440/97003(DRS)

See Attached Distribution

/h

l

(SEE PREVIOUS CONCURRENCE ['/

'

' DOCUMENT NAME: G:\\DRS\\PER97003.DRS

To receive a copy of thle document, Indicate in the bon: 'C" = Copy without attechment/ enclosure 'E" = Copy with attachment / enclosure

"N" = No copy

0FFICE

RIII

RIII

RIII

l

RIII

F

NAME

KSelburg:jp

TKozak

JJacobson

MLeach/GGran h

[

DATE

04/ /97

04/ /97

04/ /97

05/ r/97

0FFICIAL RECORD COPY

ldilll lll l lll ll-

ll

lE

~

9705120244 970505

l

PDR

ADOCK 05000440

  • ,

.

O

PDR

,

- - _ _

__

. - _ _ _

.

.__ _ _ __.

_

__

l

,

'

1

!

Mr. Lew W. Myers

,

Vice President - Nuclear

l

Centerior Service Company

P.O. Box 97, A2OO

Perry, OH 44081

1

SUBJECT:

NRC ROUTINE RADIATION PROTECTION AND CHEMISTRY INSPECTION

REPORT NO. 50-440/97003(DRS)

,

Dear Mr. Myers:

On April 10,1997, the NRC completed an inspection of your Perry Nuclear Power Plant.

The enclosed report presents the results of that inspection.

Your radiological effluent controls were effective in maintaining off-site exposure low.

Several effective initiatives, such as the liquid discharge minimization plan, were

1

implemented to minimize radioactive affluent discharges. However, a number of problems

were identified in your radiation monitor program. In particular, your staff was initially

unaware of the proper actions to take when the calibration of the off-gas ventilation

,

monitor was determined to be void, in addition, routine self-assessments failed to identify

!

I

some radiation monitor material condition problems.

i

!

In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter

i

and the enclosure will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have conceming this inspection.

Sincerely,

'

)

l

l

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

l

l

Enclosure:

Inspection Eeport 50-440/97003(DRS)

l

See Attached Distribution

I

i

DOCUMENT NAME: G:\\DRS\\PER97003.DRS

T.

. py ., ei. e w

t. Sm t. > m. w : c - copy withoui .tt. chm.nU.ncio.w. 'U - Copy with .tt. chm.nt/.ncio.w.

r - w copy

0FFICE

RIII

E RIII

M RIII

,l

RIII

l

'

NAME

KSelburg:jp-Mj5 TKozak &

JJacobson 4 % D MLeach/GGrant

DATE

04/4/97

04/2(f97

04hS/97 /

) # 04/ /97

OFFICIAL RECORD COPY

"O

i

.

.

. . - .

. . . -

. - - - _ _ -

.

. -

_

_

-

.

s .

.

L. W. Myers

-2-

May 5, 1997

cc w/sncl:

H. L. Hegrat, Manager, Regulatory Affairs

W. R. Kanda, Director, Quality and

Personnel Development

I

J. J. Powers, Director, Perry

Nuclear Engineering Department

R. D. Brandt, General Manager,

Nuclear Power Plant Department

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

,

C. A. Glazer, State of Ohio

Public Utilities Commission

Distr!bution:

Docket File w/enci

Rlli PRR w/ encl

Rlli Enf. Coordinator w/enci

PUBLIC IE-01 w/ encl

SRI, Perry w/enci

TSS w/enci

OC/LFDCB w/enct

LPM, NRR w/enci

CAA1 w/ encl

DRP w/ encl

A. B. Beach, Rlil w/ encl

DRS w/enci

C. D. Pederson, Rill w/enci

i

i

.

i

.

,