05 0EC18 P 2; 68 Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 November 18, 1985 FILE: B09-13510C SERIAL: BSEP/85-1953 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission ' | |||
Suite 2900 101 Marietta Street NW - | |||
Atlanta, GA 30323 BPWSWICK STEAM ELECTRIC PLAhT UNITS 1 AND 2 DOCKET NOS. 50-325 AND $0-324 LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO INFRACTIONS OF NRC REQUIREMENTS | |||
==Dear Dr. Grace:== | |||
The Brunswick Steam Electric Plant (BSEP) has received I&E Inspection Report 50-325/33 and 50-324/33 and finds that it does not ' contain information of a proprietary naturc. , | |||
This report identified one item that appeared to be in noncompliance with NRC . | |||
requirements. Enclosed please find Carolina Power & Light Company's response d to the subject violation. | |||
, Very truly yours, ORIGINAL SIGNED BY: | |||
8512270476 851118 C. It DIETZ PDR ADOCK 05000324 G PDR C. R. Dietz, General Manager Brunswick Steam Electric Plant . | |||
MJP/mbh DESIGNATED ORIGINAI! | |||
Enclosure | |||
* Certilfiod BE bM ' | |||
cc: NRC Document Control Desk | |||
* bcc: Mr. D. L. Pensinger Mr.h.D. Hill Mr. B. L. Parks , Jr. | |||
~ | |||
Mr. R. H. Coats Mr. P. W. Howe Mr. L. V. Wagoner CP&L Corporate Dr. J. D. E. Jeffries Mr. J. L. Willis Nuclear Licensing / Mr. I. A. Johnson BSEP NRC Resident Office File: B-X-545 Mr. L. E. Jones INPO Mr. A. B. Cutter Mr. L. H. Martin On-Sita Licensing Dr. T. S. E11eman, Mr. R. E. Morgan Fila: BC/A-4 Mr. W. P. Guarino Mr. C. H. Moseley SHEEC Training gI g . | |||
Mr. R.'E. Helme ;Mr. J. W. Moyer Reference Library l Mr. L. P. Hewlett g gj | |||
6 , | |||
6 s- - | |||
VIOLATION ' | |||
Technical Specification 6.8.1.a requires that written procedures listed in Appendix A of Regulatory Guide 1.33, November 1972, be implemented. Item A.3 of Appendix A requires procedures for equipment control. Equipment control procedure 01-13, Step 4.5, requires all valves be maintained in position required for the OP valve lineup. OP-46 requires valves 2-RNA-V202 and V203 to be in the open position. x Contrary to the above, Technical Specification 6.8.1.a was not implemented in that valves 2-RNA-V202 and V203 were not maintained open on September 4, 1985. | |||
The valves were inadvertently closed by an auxiliary operator while hanging clearance No. 2-1107. | |||
This is a Severity Level V Violation (Supplement I). | |||
===RESPONSE=== | |||
I. Admission or Denial of the Alleged Violation CP&L .scknowledges the violation occurred as stated. | |||
II. Reason For Violation Clearance No. 2-1107 necessitated closure and red tagging of Unit 2 Reactor Building Service Air (SA) System valves 2-SA-V301 and V302. 'IVo auxiliary operators (Aos) were dispatched to accomplish this task. The clearance tag sheet specified the location of V301 and V302 as in the overhead vicinity of the electrical motor control center 2XM. One of the A0s climbed to the described location and closed what he believed were the desired SA System valves. However, actually he closed isolation valves V202 e ar.d V203 of the Reactor Building Noninterruptible Instrument Air (RNA) to the control rod scram air header. | |||
An assessment of the circumstances leading to the closing of the RNA isolation valves revealed an error existed in the SA System operating procedure (OP) valve lineup sheet. The OP valve lineup sheet incorrectly referenced the location of the SA valves. The involved equipment clearance was written utilizing the subject valve lineup sheet along with appropriate plant drawings to describe on the clearance tag sheet the . | |||
location of components to be tagged. The RNA valves were correctly tagged; however, due to the confines of the location and the similarity of the valve numbers, the RNA valves were closed. | |||
III. Corrective Steps Which Have Been Taken The involved A0 was appropriately disciplined concerning his actions ' | |||
relative to the closing of RNA t"202 and V203. In addition shift Operations personnel were instructed during scheduled real time training sessions on the use of applicable plant procedures for identificatien and verification of plant valves and for plant equipment clearances. | |||
During these sessions presentations t ere given by the plant Operations Manager to reinforce the importance of correct valve manipulations and ' | |||
the significance of errors made during valve manipulations which icpact upon operation of the station. | |||
r | |||
s y, , | |||
cv , | |||
IV. Corrective Sten Which Will Be Taken | |||
* The subject OP valve lineup sheet will be revised to reflect the actual location of SA valves 2-SA-V301 and V302. | |||
V. Date When Full Compliance Vill Be Achieved Corrective actions will be completed by December 18, 1985. O f' \ | |||
s\ | |||
O M | |||
e 0 | |||
0 O | |||
D k | |||
ei 4 | |||
l - | |||
1 b | |||
__}} | |||
Revision as of 05:57, 22 July 2020
| ML20138Q759 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/18/1985 |
| From: | Dietz C CAROLINA POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| BSEP-85-1953, NUDOCS 8512270476 | |
| Download: ML20138Q759 (3) | |
Text
-
r J om(3
+ r=u n .
p op
~.
gpgg Carolina Power a Light Company - -
05 0EC18 P 2; 68 Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 November 18, 1985 FILE: B09-13510C SERIAL: BSEP/85-1953 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission '
Suite 2900 101 Marietta Street NW -
Atlanta, GA 30323 BPWSWICK STEAM ELECTRIC PLAhT UNITS 1 AND 2 DOCKET NOS. 50-325 AND $0-324 LICENSE NOS. DPR-71 AND DPR-62 RESPONSE TO INFRACTIONS OF NRC REQUIREMENTS
Dear Dr. Grace:
The Brunswick Steam Electric Plant (BSEP) has received I&E Inspection Report 50-325/33 and 50-324/33 and finds that it does not ' contain information of a proprietary naturc. ,
This report identified one item that appeared to be in noncompliance with NRC .
requirements. Enclosed please find Carolina Power & Light Company's response d to the subject violation.
, Very truly yours, ORIGINAL SIGNED BY:
8512270476 851118 C. It DIETZ PDR ADOCK 05000324 G PDR C. R. Dietz, General Manager Brunswick Steam Electric Plant .
MJP/mbh DESIGNATED ORIGINAI!
Enclosure
- Certilfiod BE bM '
cc: NRC Document Control Desk
- bcc: Mr. D. L. Pensinger Mr.h.D. Hill Mr. B. L. Parks , Jr.
~
Mr. R. H. Coats Mr. P. W. Howe Mr. L. V. Wagoner CP&L Corporate Dr. J. D. E. Jeffries Mr. J. L. Willis Nuclear Licensing / Mr. I. A. Johnson BSEP NRC Resident Office File: B-X-545 Mr. L. E. Jones INPO Mr. A. B. Cutter Mr. L. H. Martin On-Sita Licensing Dr. T. S. E11eman, Mr. R. E. Morgan Fila: BC/A-4 Mr. W. P. Guarino Mr. C. H. Moseley SHEEC Training gI g .
Mr. R.'E. Helme ;Mr. J. W. Moyer Reference Library l Mr. L. P. Hewlett g gj
6 ,
6 s- -
VIOLATION '
Technical Specification 6.8.1.a requires that written procedures listed in Appendix A of Regulatory Guide 1.33, November 1972, be implemented. Item A.3 of Appendix A requires procedures for equipment control. Equipment control procedure 01-13, Step 4.5, requires all valves be maintained in position required for the OP valve lineup. OP-46 requires valves 2-RNA-V202 and V203 to be in the open position. x Contrary to the above, Technical Specification 6.8.1.a was not implemented in that valves 2-RNA-V202 and V203 were not maintained open on September 4, 1985.
The valves were inadvertently closed by an auxiliary operator while hanging clearance No. 2-1107.
This is a Severity Level V Violation (Supplement I).
RESPONSE
I. Admission or Denial of the Alleged Violation CP&L .scknowledges the violation occurred as stated.
II. Reason For Violation Clearance No. 2-1107 necessitated closure and red tagging of Unit 2 Reactor Building Service Air (SA) System valves 2-SA-V301 and V302. 'IVo auxiliary operators (Aos) were dispatched to accomplish this task. The clearance tag sheet specified the location of V301 and V302 as in the overhead vicinity of the electrical motor control center 2XM. One of the A0s climbed to the described location and closed what he believed were the desired SA System valves. However, actually he closed isolation valves V202 e ar.d V203 of the Reactor Building Noninterruptible Instrument Air (RNA) to the control rod scram air header.
An assessment of the circumstances leading to the closing of the RNA isolation valves revealed an error existed in the SA System operating procedure (OP) valve lineup sheet. The OP valve lineup sheet incorrectly referenced the location of the SA valves. The involved equipment clearance was written utilizing the subject valve lineup sheet along with appropriate plant drawings to describe on the clearance tag sheet the .
location of components to be tagged. The RNA valves were correctly tagged; however, due to the confines of the location and the similarity of the valve numbers, the RNA valves were closed.
III. Corrective Steps Which Have Been Taken The involved A0 was appropriately disciplined concerning his actions '
relative to the closing of RNA t"202 and V203. In addition shift Operations personnel were instructed during scheduled real time training sessions on the use of applicable plant procedures for identificatien and verification of plant valves and for plant equipment clearances.
During these sessions presentations t ere given by the plant Operations Manager to reinforce the importance of correct valve manipulations and '
the significance of errors made during valve manipulations which icpact upon operation of the station.
r
s y, ,
cv ,
IV. Corrective Sten Which Will Be Taken
- The subject OP valve lineup sheet will be revised to reflect the actual location of SA valves 2-SA-V301 and V302.
V. Date When Full Compliance Vill Be Achieved Corrective actions will be completed by December 18, 1985. O f' \
s\
O M
e 0
0 O
D k
ei 4
l -
1 b