ML20070T972: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
P.O. Boa 178, it Pierce, il 34 % 4 0178
\\
                                                                                                      \
P.O. Boa 178, it Pierce, il 34 % 4 0178 April le 1991 FPL i
April le 1991 FPL i
L-91-81 10 CFR 50.54 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, D.
L-91-81 10 CFR 50.54 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, D. C. 20555 Gentlement Ret   St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389
C.
              ~ Guard Training and Qualification Plan - Revision 10 Florida Power and Light Company has revised the St. Lucie Plant Guard Training and Qualification Plan and has determined that the revision does not decrease the offectiveness of the plan. Pursuant t         to 2 0 CFR 50. 54 (p) , a report dt. scribing the revision and copies SSLTQP-R10-03 through PSLTQP-R10-06 are enclosed.
20555 Gentlement Ret St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389
Enclosure it     Sumr. dry of the changes and a marked up copy of the revised pages.
~ Guard Training and Qualification Plan - Revision 10 Florida Power and Light Company has revised the St. Lucie Plant Guard Training and Qualification Plan and has determined that the revision does not decrease the offectiveness of the plan. Pursuant t
* Enclosure 2      Directions for incorporating this revision inte the plan'and copies of the replacement pages.
to 2 0 CFR 50. 54 (p), a report dt. scribing the revision and copies SSLTQP-R10-03 through PSLTQP-R10-06 are enclosed.
Enclosure it Sumr. dry of the changes and a marked up copy of the revised pages.
Directions for incorporating this revision inte the plan'and copies of the replacement pages.
The enclosed material'does not contain safeguards information as defined by 10 CFR 73.21.
The enclosed material'does not contain safeguards information as defined by 10 CFR 73.21.
By copy of this letter, we are forwarding copies PSLTQP-R10-01 and PSLTQP-R10-02 to the Nuclear Regulatory Commission, Region II.
By copy of this letter, we are forwarding copies PSLTQP-R10-01 and PSLTQP-R10-02 to the Nuclear Regulatory Commission, Region II.
I         Very truly yours, l,
I Very truly yours, l,
L         D. A. ager Vico   resident St. Lu le Plant DAS/GRM/kw Enclosures cc   Stewart D. Ebneter, Regional Administrator, USNRC Region II                             -
L D. A.
Senior. Resident Inspector, USNRC, St. Lucio Plant I
ager Vico resident St. Lu le Plant DAS/GRM/kw Enclosures cc Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior. Resident Inspector, USNRC, St. Lucio Plant I
DAS/PSL #384                                                                               /
DAS/PSL #384
9104080015 9104o1 hM     ADOCK 0500o335 PDR 0 5 L10 5 " ""'"' """"                                                                 5C)D3 l
/
9104080015 9104o1 hM ADOCK 0500o335 PDR 0 5 L10 5 " ""'"' """"
5C)D3 l


Het St. Lucie Units 1 and 2 Docket Nos. 50-335 And 50-389 Guard Training and Qualification Plan - Revision 10 ENCLOSURE 1 l
Het St. Lucie Units 1 and 2 Docket Nos. 50-335 And 50-389 Guard Training and Qualification Plan - Revision 10 ENCLOSURE 1 l
l
l


I
I ST. LUCIE TRAINING & QUALIFICATION PLAN REASONS FOR REVISIONS REVISION 10 PAGE PARA DESCRIPTION REASON FOR REVISION Cover N,'A Denoting Revision #10 Submission of Revision #10 SR-1 N/A Note date of approval.
  ,                                        ST. LUCIE TRAINING & QUALIFICATION PLAN REASONS FOR REVISIONS REVISION 10 PAGE       PARA                                   DESCRIPTION                 REASON FOR REVISION Cover       N,'A                 Denoting Revision #10                     Submission of Revision #10 SR-1       N/A                   Note date of approval.                     Submission of Revision #10 A-5         N/A                   Include the Task of re-                   New system not previously sponding to Safe-Not                       identified in the TQP.
Submission of Revision #10 A-5 N/A Include the Task of re-New system not previously sponding to Safe-Not identified in the TQP.
alarms in the Task assign-ment Matrix.
alarms in the Task assign-ment Matrix.
C-6         N/A                   Include standards of per-                 New system not previously formance for operabil!.ty                 identified in the TQP.
C-6 N/A Include standards of per-New system not previously formance for operabil!.ty identified in the TQP.
testing of the Safo-Net.
testing of the Safo-Net.
C-57a       N/A                   Provido standards of 1er-                 New system not previously formance for responding                   identified in the TQP.
C-57a N/A Provido standards of 1er-New system not previously formance for responding identified in the TQP.
to alarms generated on the Safe-Not.
to alarms generated on the Safe-Not.
l ws}}
l ws}}

Latest revision as of 09:04, 16 December 2024

Forwards Rev 10 to Training & Qualification Plan
ML20070T972
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/01/1991
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070T974 List:
References
L-91-81, NUDOCS 9104080015
Download: ML20070T972 (3)


Text

'

\\

P.O. Boa 178, it Pierce, il 34 % 4 0178 April le 1991 FPL i

L-91-81 10 CFR 50.54 U.S. Nuclear Regulatory Commission Attnt Document Control Desk Washington, D.

C.

20555 Gentlement Ret St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389

~ Guard Training and Qualification Plan - Revision 10 Florida Power and Light Company has revised the St. Lucie Plant Guard Training and Qualification Plan and has determined that the revision does not decrease the offectiveness of the plan. Pursuant t

to 2 0 CFR 50. 54 (p), a report dt. scribing the revision and copies SSLTQP-R10-03 through PSLTQP-R10-06 are enclosed.

Enclosure it Sumr. dry of the changes and a marked up copy of the revised pages.

Directions for incorporating this revision inte the plan'and copies of the replacement pages.

The enclosed material'does not contain safeguards information as defined by 10 CFR 73.21.

By copy of this letter, we are forwarding copies PSLTQP-R10-01 and PSLTQP-R10-02 to the Nuclear Regulatory Commission, Region II.

I Very truly yours, l,

L D. A.

ager Vico resident St. Lu le Plant DAS/GRM/kw Enclosures cc Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior. Resident Inspector, USNRC, St. Lucio Plant I

DAS/PSL #384

/

9104080015 9104o1 hM ADOCK 0500o335 PDR 0 5 L10 5 " ""'"' """"

5C)D3 l

Het St. Lucie Units 1 and 2 Docket Nos. 50-335 And 50-389 Guard Training and Qualification Plan - Revision 10 ENCLOSURE 1 l

l

I ST. LUCIE TRAINING & QUALIFICATION PLAN REASONS FOR REVISIONS REVISION 10 PAGE PARA DESCRIPTION REASON FOR REVISION Cover N,'A Denoting Revision #10 Submission of Revision #10 SR-1 N/A Note date of approval.

Submission of Revision #10 A-5 N/A Include the Task of re-New system not previously sponding to Safe-Not identified in the TQP.

alarms in the Task assign-ment Matrix.

C-6 N/A Include standards of per-New system not previously formance for operabil!.ty identified in the TQP.

testing of the Safo-Net.

C-57a N/A Provido standards of 1er-New system not previously formance for responding identified in the TQP.

to alarms generated on the Safe-Not.

l ws