                                                                      'AUDITABLE LINK DOCUMENT 1
-m
FOR BYRON UNIT 1                     ,
*..E
COMPILED BY:       A. D. PETRONIS APPROVED BY:
'AUDITABLE LINK DOCUMENT FOR 1
BYRON UNIT 1 COMPILED BY:
A. D. PETRONIS APPROVED BY:
t-4 1LA/nd/ise Vd/J."JELOVICH,MANAdR CLASS lE SYSTEMS sg&
t-4 1LA/nd/ise Vd/J."JELOVICH,MANAdR CLASS lE SYSTEMS sg&
v G. L. HAUZE, MANAGER CLASS lE INSTRUMENTATION
vG. L. HAUZE, MANAGER CLASS lE INSTRUMENTATION
                                                                                                  /
/
_M PDR                                                                               1
_M PDR


  .        e.       .
e.
l
i i
* 1
INIBQQWGIlQN This document provides the auditable link information on all Class 1E-NSSS equipment, supplied by Westinghouse, applicable to Byron Unit 1, as listed in Table 1.
  ..                                                                                                                      i i
The intent of this document is to provide an equipment, component aging program and materials eging analysis link for this equipment.
INIBQQWGIlQN This         document provides the auditable link information on all Class       1E-NSSS equipment,         supplied by Westinghouse, applicable to                         .
Byron       Unit 1, as listed in Table 1. The intent of this document                               ,
is to       provide an equipment, component aging program and materials eging       analysis link for this equipment.
Each segment.of the link is highlighted as follows:
Each segment.of the link is highlighted as follows:
E9MLEstal blQh All the Class 1E-NSSS equipment provided Byron Unit 1 is covered by the Westinghouse qualification programs as documented in Table 2.
E9MLEstal blQh All the Class 1E-NSSS equipment provided Byron Unit 1 is covered by the Westinghouse qualification programs as documented in Table 2.
Gesannant Link The documents defined in Table 3 were reviewed against the aging parts list utilized in the selection process for components within the Westinghouse Component Aging Program.
Gesannant Link The documents defined in Table 3 were reviewed against the aging parts list utilized in the selection process for components within the Westinghouse Component Aging Program.
We have concluded that all applicable Class 1E Systems components cre contained in our Aging Parts List. Those components added to the Aging Parts List as a result of this effort were found to be represented by the 96 components selected for the Short Term Aging Program (WCAP-8587, Supplement 2, Appendix A1)..
We have concluded that all applicable Class 1E Systems components cre contained in our Aging Parts List.
The results give reasonable assurance that no aging mechanism exists that would result in comece code f ailures during a seismic event for five (5) years.                                             ,
Those components added to the Aging Parts List as a result of this effort were found to be represented by the 96 components selected for the Short Term Aging Program (WCAP-8587, Supplement 2, Appendix A1)..
l j2                                                             i
The results give reasonable assurance that no aging mechanism exists that would result in comece code f ailures during a seismic event for five (5) years.
j2 i


          .      . . - .              . . - . ~ - - . . - . ~ ~ . -     -      ..  .          - . - . . . .        .      .
.. -. ~ - -.. -. ~ ~. -
Meiecieln klah
Meiecieln klah The documents defined in Table 3 were reviewed for organic materials utilized on Byron Unit 1.
;                The documents defined in Table 3 were reviewed for organic materials utilized on Byron Unit 1.                               Materials that were covered via components in the Component Aging Program were excluded from 4               the list of materials as were materials that were determined to j               be non-critical.                               The remaining materials were reviewed against                               ,
Materials that were covered via components in the Component Aging Program were excluded from 4
the materials analyzed as part of*the materials aging analysis.                                                         ,
the list of materials as were materials that were determined to j
be non-critical.
The remaining materials were reviewed against the materials analyzed as part of*the materials aging analysis.
The materials aging analysis (WCAP-8587, SUPP 2, Appendix A2) covered all critical materials supplied to Byron Unit 1 with the following exceptions:
The materials aging analysis (WCAP-8587, SUPP 2, Appendix A2) covered all critical materials supplied to Byron Unit 1 with the following exceptions:
ESE-12           Testing not complete                                                                         '
ESE-12 Testing not complete ESE-13 Testing not complete ESE-23 Testing not complete ESE-40 Testing not complete ESE-47B Testing not complete ESE-47C Testing not complete 4
ESE-13           Testing not complete ESE-23           Testing not complete ESE-40           Testing not complete ESE-47B         Testing not complete ESE-47C         Testing not complete 4
1 3
1 3
_  _      _ ~ , . _     .
~,. _


g;;pj       -. ~hr     . ,
g;;pj
TABLE 1 DYBQN UNII 1 G68SS Ig NSSS ggy1EMENI (13I COMPONENT   MATERIAL
-. ~hr TABLE 1 DYBQN UNII 1 G68SS Ig NSSS ggy1EMENI (13I COMPONENT MATERIAL AGING AGING
                            .j AGING    AGING
.j
  ;9DE                           IIILE                         ENVIBQNdgNI EBQSS60   BN@Lygig nE-1         Medium Pump Motors                                     Mild       N/A       N/A 6E-2         Large Pump Motors                                     Mild       N/A       N/A
;9DE IIILE ENVIBQNdgNI EBQSS60 BN@Lygig nE-1 Medium Pump Motors Mild N/A N/A 6E-2 Large Pump Motors Mild N/A N/A
  )E-3         Champump Canned Pump Motor                             Mild       N/A       N/A
)E-3 Champump Canned Pump Motor Mild N/A N/A
  *SE-1       Pressure Transmitters - Group A (Barton)             Harsh     N/A       N/A E E-1       Pressure Transmitters - Group A (Veritrak)           Harsh     N/A       N/A
*SE-1 Pressure Transmitters - Group A (Barton)
:CE-2       Pressure Transmitters       - Group B (Barton)       Mild       Yes       Yes
Harsh N/A N/A E E-1 Pressure Transmitters - Group A (Veritrak)
  'SE-3 Differential Pressure Transmitters -                         Harsh     N/A       N/A Group A (Barton)
Harsh N/A N/A
:SE-4 Differential Pressure Transmitters -                         Mild       Yes       Yes Group B (Barton)
:CE-2 Pressure Transmitters - Group B (Barton)
:SE-5 Resistance Temperature Detectors RC-Bypass                   Harsh     N/A       N/A ISE Resistance Temperature Detectors RCS                         Harsh     N/A       N/A Well Mounted
Mild Yes Yes
:SE-8 2 Section Excore Neutron Detector                             Harsh     N/A       N/A
'SE-3 Differential Pressure Transmitters -
:SE-10 Nuclear Instrumentation System (NIS)                         Mild       Yes       Yes Console (Power Range Channel)                                     ,
Harsh N/A N/A Group A (Barton)
SE-12 Main Control Board Switch Modules                           Mild       Yes       Yes
:SE-4 Differential Pressure Transmitters -
:SE-13 Process Protection System                                   Mild       Yes       Yes ISE-14 Indicators: Post-Accident Monitoring                         Mild       Yes       Yes
Mild Yes Yes Group B (Barton)
:SE-15 Recorders:           Post-Accident Monitoring               Mild       Yes       Yes
:SE-5 Resistance Temperature Detectors RC-Bypass Harsh N/A N/A ISE Resistance Temperature Detectors RCS Harsh N/A N/A Well Mounted
:SE-16 Solid State Protection System (SSPS)                         Mild       Yes       Yes 2 Train & Auxiliary Safeguards Cabinet (Three and Four Bay)
:SE-8 2 Section Excore Neutron Detector Harsh N/A N/A
:SE-18 Instrument Bus Power Supply                                 Mild       Yes       Yes (Static Inverter)
:SE-10 Nuclear Instrumentation System (NIS)
:SE-19 Instrument Bus Distribution Panel                           Mild       Yes       Yes
Mild Yes Yes Console (Power Range Channel)
:SE-20 Reactor Trip Switchgear                                     Mild       Yes       Yes (DS 416 Circuit Breakers)
SE-12 Main Control Board Switch Modules Mild Yes Yes
:SE-21 Pressure Sensor                               .              Harsh     N/A       N/A
:SE-13 Process Protection System Mild Yes Yes ISE-14 Indicators:
:SE-23 Loop Stop Valve Cabinet                                     Mild       Yes       Yes
Post-Accident Monitoring Mild Yes Yes
:SE-40 Dif f erential Pressure' Indicating Switch                   Mild       Yes       Yes
:SE-15 Recorders:
:SE-47A Source / Intermediate Detectors -                           Harsh       N/A       N/A Boron Dilution
Post-Accident Monitoring Mild Yes Yes
:SE-47B Source / Intermediate Electronics & Preamp -               Mild       Yes       Yes Baron Dilution (Seismic)
:SE-16 Solid State Protection System (SSPS)
:SE-47C Source / Intermediate Electronics & Preamp -               Mild       Yes       Yes Baron Dilution (Environmental)           -
Mild Yes Yes 2 Train & Auxiliary Safeguards Cabinet (Three and Four Bay)
IE-1         Safety Related Valve Electric Motor Opers.             Harsh       N/A       N/A
:SE-18 Instrument Bus Power Supply Mild Yes Yes (Static Inverter)
,lE-2         Safety Related Solenoid Valves                         Harsh       N/A     N/A Saf ety Related E::ternally Mounted                   Harsh     .N/A       N/A llE-3 Limit Switches lie-4         Safety.Related Limitorque Valve                       Mild         N/A     N/A Electric Motor Operators 4
:SE-19 Instrument Bus Distribution Panel Mild Yes Yes
:SE-20 Reactor Trip Switchgear Mild Yes Yes (DS 416 Circuit Breakers)
:SE-21 Pressure Sensor Harsh N/A N/A
:SE-23 Loop Stop Valve Cabinet Mild Yes Yes
:SE-40 Dif f erential Pressure' Indicating Switch Mild Yes Yes
:SE-47A Source / Intermediate Detectors -
Harsh N/A N/A Boron Dilution
:SE-47B Source / Intermediate Electronics & Preamp -
Mild Yes Yes Baron Dilution (Seismic)
:SE-47C Source / Intermediate Electronics & Preamp -
Mild Yes Yes Baron Dilution (Environmental)
IE-1 Safety Related Valve Electric Motor Opers.
Harsh N/A N/A
,lE-2 Safety Related Solenoid Valves Harsh N/A N/A llE-3 Saf ety Related E::ternally Mounted Harsh
.N/A N/A Limit Switches
,lie-4 Safety.Related Limitorque Valve Mild N/A N/A Electric Motor Operators 4


                                                                                                                                    \
\\
TABLE 2 EL6NI SEEGlElG EDUlEdENI LLNG INEQBd8IlON MtrtMENLt DOCUMENT                                 EQUIPMENT LlNG B8Sl@                                                     ,
TABLE 2 EL6NI SEEGlElG EDUlEdENI LLNG INEQBd8IlON MtrtMENLt DOCUMENT EQUIPMENT LlNG B8Sl@
AE-1               Boric Acid Transfer Puma Mgtgt The pump motors supplied on Motor Shop Order No.
AE-1 Boric Acid Transfer Puma Mgtgt The pump motors supplied on Motor Shop Order No.
82D55567 are seismically qualified based                     upon seismic report No. 82D55567.                 The motors supplied on S.O.       82D55567 are environmentally qualified based upon Test Report A01A.
82D55567 are seismically qualified based upon seismic report No.
AE-2               ggm290EOi 999110g Eum2 Mgign The motors supplied on Motor Shop Order                 74F12588 are seismically qualified based upon Seismic Report No. 75F47535. The motors supplied on S.O. 74F12588 are environmentally qualified based on Test Report A02A.
82D55567.
AE-2             Eafety Inigctign Egma Mgtet The motors supplied on Motor Shop Order 74F18601 are seismically qualified based'upon Seismic Report No. 7532374. The motors supplied in S.O. 74F18601 are environmentally qualified based upon                   Test Report A02A.
The motors supplied on S.O.
AE-2             ghacgingfgaigty lufgeliga Egm2 Mgigt The   motors supplied on Motor Shop Order 75F32350 are seismically qualified based upon Seismic Report No. 75F32351. The motors supplied in S.O. 75F32350 are environmentally qualified               based upon     Test Report A02A.
82D55567 are environmentally qualified based upon Test Report A01A.
AE-2               8gsidual Hgat Rgmgval Euma Mgtgt The   motors supplied on Motor Shop Order 74F12182 are seismically qualified based upon Seismic Report No. 74F12681.         The motors supplied in S.O.
AE-2 ggm290EOi 999110g Eum2 Mgign The motors supplied on Motor Shop Order 74F12588 are seismically qualified based upon Seismic Report No. 75F47535.
74F12182 are environmentally qualified based               upon Test Report A02A.
The motors supplied on S.O.
74F12588 are environmentally qualified based on Test Report A02A.
AE-2 Eafety Inigctign Egma Mgtet The motors supplied on Motor Shop Order 74F18601 are seismically qualified based'upon Seismic Report No.
7532374.
The motors supplied in S.O.
74F18601 are environmentally qualified based upon Test Report A02A.
AE-2 ghacgingfgaigty lufgeliga Egm2 Mgigt The motors supplied on Motor Shop Order 75F32350 are seismically qualified based upon Seismic Report No. 75F32351.
The motors supplied in S.O.
75F32350 are environmentally qualified based upon Test Report A02A.
AE-2 8gsidual Hgat Rgmgval Euma Mgtgt The motors supplied on Motor Shop Order 74F12182 are seismically qualified based upon Seismic Report No.
74F12681.
The motors supplied in S.O.
74F12182 are environmentally qualified based upon Test Report A02A.
5
5


p__                                 ,                        - - . - - - - - --              .. .
p__
yae-i 10BLE 2 (cont'd. )                                                             l ELONI SEEGIEIG E991EMENI LINE INEQBd@IlQN
yae-i l
                                    +
10BLE 2 (cont'd. )
REFERENCE                                                                                                             .
ELONI SEEGIEIG E991EMENI LINE INEQBd@IlQN
QQGyMENT                                   ggy1EMENT LINE @@@l@                                                   ,
+
AE-2               Bgten Inigstign Recitquiatign Egen Ngtet The pump motors supplied as Pump Serial Numbers                                                   '
REFERENCE QQGyMENT ggy1EMENT LINE @@@l@
19853-92 and 19853-93 are seismically qualified based on seismic report number A-18187.                                   The pump motors   supplied as serial numbers 19853-92 and 19853-93 are environmentally qualified based upon Test Report A03A.
AE-2 Bgten Inigstign Recitquiatign Egen Ngtet motors supplied as Pump Serial Numbers The pump 19853-92 and 19853-93 are seismically qualified based on seismic report number A-18187.
ESE-1             This equipment was purchased via purchase orders (Barton)             414455 & 450729 for Byron Unit 1.                               Purchase Order 414455 references Lot 5 transmitters built in accordance               with           Baseline             Design         Document 0763.1126.5 Rev. 02. This Baseline Design Document is equivalent to that which was used to build                                     the qualification               units.                 Purchase   order         450729 references Lot 7 transmitters built in accordance with Baseline Design Document                               0763.11'26.5, Rev.
The pump motors supplied as serial numbers 19853-92 and 19853-93 are environmentally qualified based upon Test Report A03A.
: 03. This Baseline Design Document is equivalent to that which was used to build the qualification units (0763.1125.5 Rev. 02).
ESE-1 This equipment was purchased via purchase orders (Barton) 414455
;                    ESE-1             This equipment purchased via purchase order 427926 (Veritrak)           for Byron Unit 1 was built in accordance with Baseline Design Document 5518A80 Rev. 4.                                         This Baseline Design Document is identical to that which was used to build the qualificati'on units.
& 450729 for Byron Unit 1.
ESE-2             This equipment purchased via purchase order 457787 (Barton)             for Byron Unit 1 was built in accordance with Baseline Design Document 753.1050.5 Rev.- 2.                                     This Baseline Design Document is equivalent to that which. was used to build the qualification units
Purchase Order 414455 references Lot 5
;                                        (N753-OO9-A Rev. 3).
transmitters built in accordance with Baseline Design Document 0763.1126.5 Rev. 02.
This Baseline Design Document is equivalent to that which was used to build the qualification units.
Purchase order 450729 references Lot 7 transmitters built in accordance with Baseline Design Document 0763.11'26.5, Rev.
03.
This Baseline Design Document is equivalent to that which was used to build the qualification units (0763.1125.5 Rev. 02).
ESE-1 This equipment purchased via purchase order 427926 (Veritrak) for Byron Unit 1 was built in accordance with Baseline Design Document 5518A80 Rev.
4.
This Baseline Design Document is identical to that which was used to build the qualificati'on units.
ESE-2 This equipment purchased via purchase order 457787 (Barton) for Byron Unit 1 was built in accordance with Baseline Design Document 753.1050.5 Rev.-
2.
This Baseline Design Document is equivalent to that which. was used to build the qualification units (N753-OO9-A Rev. 3).
9
9
                                                                        -6
-6


W;;:r-             ;&&w                   -              ,  , ,.- ~.n         .                . , . . ,      ,-
W;;:r- ;&&w
m ,             amm   .+o.so. m m g     -mma - n g   a-         =s ~                     ~>
. ~.n s
            . .                                                          I@BLE 2 (cont'd.)
m,
REFERENCE DQGudENI                                         EQQlPMENI LINK R@@lg ESE-3                   This equipment was purchased via purchase orders (Barton) , .;              414455 & 450729 for Byron Unit 1.                             Purchase Order 414455 references Lot 5 transmitters built in accordance                       with       Baseline       Design       Document     ,
amm
0764.1203.5 Rev. 02., This Baseline Design Document                               ,
.+o.so. m m g
is equivalent to that which was used to build the qualification                       units. Purchase       Order     450729 references Lot 7 transmitters built in accordance with Baseline Design Locument 0764.1203.5 Rev. 04.
-mma
- n g a-
=s
~
~>
I@BLE 2 (cont'd.)
REFERENCE DQGudENI EQQlPMENI LINK R@@lg ESE-3 (Barton),
This equipment was purchased via purchase orders 414455 & 450729 for Byron Unit 1.
Purchase Order 414455 references Lot 5
transmitters built in accordance with Baseline Design Document 0764.1203.5 Rev.
02.,
This Baseline Design Document is equivalent to that which was used to build the qualification units.
Purchase Order 450729 references Lot 7 transmitters built in accordance with Baseline Design Locument 0764.1203.5 Rev.
04.
This Baseline Design Document is equivalent to that which was used to build the qualification units (0764.1195.5 Rev. 03).
This Baseline Design Document is equivalent to that which was used to build the qualification units (0764.1195.5 Rev. 03).
ESE-4                   This equipment purchased via purchase order 457787 (Barton)                   for Byron Unit                         1 was built in accordance with Baseline Design Document 752.1180.5, Rev. 2. This Baseline Design Document is equivalent                                 to that which was used to build the qualification units (N752-OO13-A Rev. 3).
ESE-4 This equipment purchased via purchase order 457787 (Barton) for Byron Unit 1 was built in accordance with Baseline Design Document 752.1180.5, Rev.
ESE-5                   This           equipment purchased via purchase order 265732 for           Byron Unit I was built in accordance with Baseline Design Document T-10365 Rev.                               10. This Baseline Design Document is equivalent                                 to that j
2.
This Baseline Design Document is equivalent to that which was used to build the qualification units (N752-OO13-A Rev. 3).
ESE-5 This equipment purchased via purchase order 265732 for Byron Unit I was built in accordance with Baseline Design Document T-10365 Rev.
10.
This Baseline Design Document is equivalent to that j
which was used to build the qualification units (T-10365 Rev. 7).
which was used to build the qualification units (T-10365 Rev. 7).
ESE-6                   This equipment purchased via purchase order 265732 for Byron Unit                         1 was built .in accordance           with Baseline Design Document T-10365 Rev.                               10. This Baseline Design Document is equivalent to that which was used to build the qualification units (T-10365 Rev. 7).
ESE-6 This equipment purchased via purchase order 265732 for Byron Unit 1 was built
ESE-8                   The           Power Ranr7 Neutron Detectors                         (WL-23753, .
.in accordance with Baseline Design Document T-10365 Rev.
Drawing E-2231 Rc..                       12) purchased by P.O. 546-GLE-177184-BN,               serial numbers 771701,             771702, 771703, 772103 have been structurally and f uncti onal l y analyzed,               and were found to be equivalent                   (with
10.
;                                              regards to Qualification) to WL-24156 (Drawing E-l                                               3172,             BDD No.24156).             WL-24156 was qualified via P.O. 402003.
This Baseline Design Document is equivalent to that which was used to build the qualification units (T-10365 Rev. 7).
ESE-10                 A     comparison between Byron's as-built drawing list and           that of the Qualification Unit was performed.
ESE-8 The Power Ranr7 Neutron Detectors (WL-23753, Drawing E-2231 Rc..
The           comparison verified the applicability                         of qualification results with regard to the equipment l                                               (specified. on P.O. 546-GID-164438-BN) supplied to l                                               Byron Unit 1.
: 12) purchased by P.O.
546-GLE-177184-BN, serial numbers 771701, 771702, 771703, 772103 have been structurally and f uncti onal l y
: analyzed, and were found to be equivalent (with regards to Qualification) to WL-24156 (Drawing E-l
: 3172, BDD No.24156).
WL-24156 was qualified via P.O.
402003.
ESE-10 A
comparison between Byron's as-built drawing list and that of the Qualification Unit was performed.
The comparison verified the applicability of qualification results with regard to the equipment l
(specified. on P.O.
546-GID-164438-BN) supplied to l
Byron Unit 1.
E 7
E 7
L
L


                                    -- - -3 ;- - _-                   -_;..--~..                  ..
-- - -3 ;- - _-
-_;..--~..
TABLE 2 (cont'd.)
TABLE 2 (cont'd.)
              .ESE-12         Testing not complete
.ESE-12 Testing not complete
                          .c ESE-13         Inadequacies in previous qualification testing are being addressed by an ongoing test program.             All             ,
.c ESE-13 Inadequacies in previous qualification testing are being addressed by an ongoing test program.
requirements of CAE equipment will be satisfied                         ,
All requirements of CAE equipment will be satisfied upon completion of these tests.
upon completion of these tests.
ESE-14 Qualification is based on similarity of design to the Qualification Test Units (QA8722) BDD for PAM indicators specified in Purchase Order 546-CML-425579-BN.
ESE-14   . Qualification is based on similarity of design to the Qualification Test Units (QA8722) BDD for PAM indicators specified in Purchase Order 546-CML-425579-BN.
ESE-15 Purchase Order 546-CLG-271480-BN references the units shipped to Byron Unit 1 as being Lot 1
ESE-15         Purchase Order 546-CLG-271480-BN references the units shipped to Byron Unit 1 as being Lot 1 Qualified.
Qualified.
ESE-16'       A   comparison between Byron's as-built drawing list and that of the 2 and 3 Train SSPS qualification units was performed.       The conparison verified the applicability of qualification results with regard to the equipment (specified in P.O. 546-GLS-209038-BNE) supplied to Byron Unit 1.
ESE-16' A
ESE-18         The units ordered for Byron Unit 1 on NES/PWR Purchase Order 546-GLP-248606-BN are identical to the   unit     used for qualification testing             as identified within the Baseline Design Document (3017D68 Rev. 8).
comparison between Byron's as-built drawing list and that of the 2 and 3 Train SSPS qualification units was performed.
ESE-19         The equipment shipped to Byron Unit 1 was built           to the same drawing as that of the qualification unit (1143E61 Rev. 2).
The conparison verified the applicability of qualification results with regard to the equipment (specified in P.O. 546-GLS-209038-BNE) supplied to Byron Unit 1.
ESE-18 The units ordered for Byron Unit 1
on NES/PWR Purchase Order 546-GLP-248606-BN are identical to the unit used for qualification testing as identified within the Baseline Design Document (3017D68 Rev. 8).
ESE-19 The equipment shipped to Byron Unit 1 was built to the same drawing as that of the qualification unit (1143E61 Rev. 2).
The breakers (as specified in Westinghouse NES P.O.
The breakers (as specified in Westinghouse NES P.O.
                              #546-GLP-235075-BN)     installed within the         panel shipped to Byron Unit 1 are identical in both type and style to those employed in the Qualification Program.
#546-GLP-235075-BN) installed within the panel shipped to Byron Unit 1 are identical in both type and style to those employed in the Qualification Program.
ESE-20         Via   completion of FCN #10537         (installation of I
ESE-20 Via completion of FCN
seismic reinforcements) the reactor trip switchgear for Byron Unit       1 has been updated to meet the r equi rements   of IEEE-323-1974. This equipment is now similar to the equipment built at the . factory and by comparison was shown to be traceable through the Baseline Design Documentation to the tested i                             unit.
#10537 (installation of I
seismic reinforcements) the reactor trip switchgear for Byron Unit 1 has been updated to meet the r equi rements of IEEE-323-1974.
This equipment is now similar to the equipment built at the. factory and by comparison was shown to be traceable through the Baseline Design Documentation to the tested i
unit.
8 l
8 l


_...... 7 7 ..7- _ _ _ .7 ----
_...... 7 7..7-
  .-l*           ...
_ _ _.7 ----
.-l*
TABLE 2 (cont'd.)
TABLE 2 (cont'd.)
REFERENCE RgCydENI . ,e                   EgylPdENI (IMM B@Sl@
REFERENCE RgCydENI.,e EgylPdENI (IMM B@Sl@
ESE-21             This equipment purchased via Purchase Order 546-                               ,
ESE-21 This equipment purchased via Purchase Order 546-457707-BN f or Byron Unit 1 are ITT Barton Model 351 sensors purchased as part of Westinghouse Part No.
457707-BN f or Byron Unit 1 are ITT Barton Model 351 sensors purchased as part of Westinghouse Part No.
8765D64GO5.
  .                              8765D64GO5.     This ITT Barton Model 351 sensor is the     same in design and manufacture                             as   the qualification units.
This ITT Barton Model 351 sensor is the same in design and manufacture as the qualification units.
ESE-23             Testing not complete.
ESE-23 Testing not complete.
ESE-40             Testing not complete.
ESE-40 Testing not complete.
ESE-47A           This equipment was purchased                           via P.O. 546-CAC-453995-BN and was built in accordance with Baseline Design Document No.           24159,       Drawing E-3171 Rev. A.
ESE-47A This equipment was purchased via P.O.
546-CAC-453995-BN and was built in accordance with Baseline Design Document No.
: 24159, Drawing E-3171 Rev.
A.
This Baseline Design Document is identical to that which was used to build the qualification units.
This Baseline Design Document is identical to that which was used to build the qualification units.
HE-1               Testing by W and Limitorque is currently underway to qualify the existing operators with a new design electric motor.         This testin'g is scheduled to finish in mid-February 1983.                       Based on successful completion of this testing, the replacement motors will be delivered in September 1963.
HE-1 Testing by W and Limitorque is currently underway to qualify the existing operators with a new design electric motor.
W   has already provided an                     Interim Position to Sargent and Lundy justifying the operation of the existing motors at Byron on an interim. basis.
This testin'g is scheduled to finish in mid-February 1983.
HE-2/5             ASCO solenoid valves,           qualified to IEEE-323-1974                   .
Based on successful completion of this testing, the replacement motors will be delivered in September 1963.
requirements and the W generic program,                         WCAP-8587, have been provided,           under W     purchase         orders   454818 and 454819,     to Byron for all NSSS active Class 1E valves as listed on Rev.             2 to the Byron /Braidwood Class 1E list.         Field Change Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-10584, CBEM-10585, and CBEM-10586 have been issued by W to                                 provide guidance on the backfit of the qualified switches.
W has already provided an Interim Position to Sargent and Lundy justifying the operation of the existing motors at Byron on an interim. basis.
1
HE-2/5 ASCO solenoid valves, qualified to IEEE-323-1974 requirements and the W generic program, WCAP-8587, have been provided, under W purchase orders 454818 and 454819, to Byron for all NSSS active Class 1E valves as listed on Rev.
                                                                                                                      )
2 to the Byron /Braidwood Class 1E list.
l 9
Field Change Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-10584, CBEM-10585, and CBEM-10586 have been issued by W
l
to provide guidance on the backfit of the qualified switches.
)
9


    ;. . . . . .m         .                                                          --        _ .
;......m 7.,.
7., . 77 _
77 _
o                                     .                                                              .
o 9
9 TABLE 2 (cont'd. )
TABLE 2 (cont'd. )
l l
l l
l HE-3/6       ..
l HE-3/6 NAMCO limit switches, qualified to IEEE-323-1974
NAMCO limit switches,                     qualified to IEEE-323-1974
..e requirements and the W generic program, WCAP-8587, have been provided to Byron for all NSSS active Class 1E valves as listed on Rev.
                                . .e     requirements and the W generic program,                       WCAP-8587, have been provided to Byron for all                         NSSS   active Class 1E valves as listed on Rev. 2 to the                                   ,
2 to the Byron /Braidwood Class 1E list.
Byron /Braidwood                     Class 1E list.         Field Change   ,
Field Change I
I                                        Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-10504,   CBEM-10585, and CBEM-10586 have been issued by W to provide guidance on the backfit of the qualified switches. The switches were purchased by W under purchase orders 457113 and 457114.
Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-
HE-4                     The motor operators originally shipped to Byron with the perent valves were                       qualified by the testing done by W/Limitorque and                         documented by EODP-HE-4 and W Test Report                     2-HO4A.     Westinghouse is   currently                   finalizing with Limitorque         the traceability evaluation to insure motor operators actually on-site at Byron are traceable to that motor operator tested above by W/Limitorque.
: 10504, CBEM-10585, and CBEM-10586 have been issued by W
to provide guidance on the backfit of the qualified switches.
The switches were purchased by W under purchase orders 457113 and 457114.
HE-4 The motor operators originally shipped to Byron with the perent valves were qualified by the testing done by W/Limitorque and documented by EODP-HE-4 and W Test Report 2-HO4A.
Westinghouse is currently finalizing with Limitorque the traceability evaluation to insure motor operators actually on-site at Byron are traceable to that motor operator tested above by W/Limitorque.
4 4
4 4
o G
o G
10
10


,a         * '
,a c,.,,.,
                , c,.,,.,       ,        ,.
m-L_
m-L_                   .
18BbE I ELONI EEEQlElQ DQQQUENI@IlQN BEMIENED 4
18BbE I ELONI EEEQlElQ DQQQUENI@IlQN BEMIENED 4
GROUP B PRESSURE TRANSMITTERS                             ,
GROUP B PRESSURE TRANSMITTERS (ESE-2)
(ESE-2)
(BARTON)
(BARTON)
Baseline Design Document N753-OOO9A Rev. 1 was reviewed.
Baseline Design Document N753-OOO9A Rev. 1 was reviewed.
NOTE:       In reference to changes from BDD N753-OO9A Rev.               1 to   DDD N753.1050.5 Rev. 2, the only changes made were:
NOTE:
A)     Correction of misspelled words.
In reference to changes from BDD N753-OO9A Rev.
B)   Correction of Spec. level revisions.               -
1 to DDD N753.1050.5 Rev.
C)     Added level of control to each item.
2, the only changes made were:
}                                                                                     .
A)
As     these changes were all a result of changing                     the   baseline format, there was no impact on the product.
Correction of misspelled words.
B)
Correction of Spec. level revisions.
C)
Added level of control to each item.
}
As these changes were all a result of changing the baseline format, there was no impact on the product.
I GEOWE E DIEEEBENIl@6 E8ESSyBE IB8NEdlIIE8@
I GEOWE E DIEEEBENIl@6 E8ESSyBE IB8NEdlIIE8@
(ESE- 4)
(ESE-4)
(BARTON)
(BARTON)
Baseline Design Document N752-0113A Rev. 1 was reviewed.
Baseline Design Document N752-0113A Rev. 1 was reviewed.
1 NOTE:       In reference to changes from BDD N752-OO13A Rev.                 1 to BDD     l N752.1180.5 Rev. 2, the only changes made were:
1 NOTE:
A)     Correction of misspelled words.
In reference to changes from BDD N752-OO13A Rev.
B)   Correction of Spec. level revisions.
1 to BDD l
C)     Added level of control to each item.
N752.1180.5 Rev.
As     these changes             were all a result of changing         the   baseline format, there was no impact on the product.
2, the only changes made were:
A)
Correction of misspelled words.
B)
Correction of Spec. level revisions.
C)
Added level of control to each item.
As these changes were all a result of changing the baseline format, there was no impact on the product.
11
11
: p.               .    . . _ _ _ _
 
un=v.          .
p.
                                            =~                ~~
~~
      .e                                                  IARLE ;E (cont'd. )
un=v.
NUCLEAR INSTRUMENTATION SYSTEM (ESE-10) i l
=~
IARLE ;E (cont'd. )
.e NUCLEAR INSTRUMENTATION SYSTEM (ESE-10) i l
The following as-built drawings applicable to CAE were reviewed:
The following as-built drawings applicable to CAE were reviewed:
1054E26           REV. D 1469F61           REV. A                                     ,
1054E26 REV. D 1469F61 REV. A 3359C37 REV. G 3359C39 REV. N 3359C41 REV. J 6051D51 REV. P 6051D53 REV. S NOTE:
3359C37           REV. G 3359C39           REV. N
Efforts are underway to review the Power Designs power supply utilized in this system.
  -                                                    3359C41           REV. J 6051D51           REV. P 6051D53           REV. S NOTE:             Efforts are underway to review the Power Designs power supply utilized in this system.           Publication of the results anticipated in the next revision of this document.
Publication of the results anticipated in the next revision of this document.
e e
e e
e i
e i
l
l 12
!                                                                      12


                                                                                                                                                          ~
p ce m -
                                                                                                  .*                    'm'                        P.~ 2 a' :' -- ~ ,_ .:,9ff*g to,- .- sry
a' :' -- ~,_.:,9ff*g to,-.- sry
* n ' rt ? ' ; " es .,_ ~ 3 ~v-' ~_ _ ts,~97y
* n ' rt ? ' ; " es.,_ ~ 3 ~v-' ~_ _ ts,~97y
                                                                                                        ~-
~-
1 p ce m -                                                                                                                                    _,
'm' P.~ 2
i
~
  ~
1 i
~
TA%E } (cont'd.)
TA%E } (cont'd.)
7300 PROCESS SYSTEM (ESE-13)
7300 PROCESS SYSTEM (ESE-13)
                                                  .+
.+
ine         silis of Materials of the f ollowing card styles (as outlined in the instruction manual) were reviewed:                                                                                                           .
ine silis of Materials of the f ollowing card styles (as outlined in the instruction manual) were reviewed:
NAI                     2837A88
NAI 2837A88 NAL 2837A13 NAS 283BA89 NCH 2837A11 NCI 2837A86 NCT 2837A91 NLL 2837A18 NLP 2837A12 NMT 2840A01 NPC 2837A93 NQP 2822A97 NRA 2837A15 NRC 2837A87 NSA 2837A14 N50 2837A10 N?C 2837A94 N~. P 2837A90 1
    .                                                                                NAL                     2837A13 NAS                     283BA89 NCH                     2837A11 NCI                     2837A86 NCT                     2837A91 NLL                     2837A18 NLP                     2837A12 NMT                     2840A01 NPC                     2837A93 NQP                     2822A97 NRA                     2837A15 NRC                     2837A87 NSA                     2837A14 N50                     2837A10 N?C                     2837A94 N~. P                   2837A90 1
(
(
l l
l l
13
13


                                            *'                              ~'~
; i - m.,,~ ' ' ',- ;-me,
; i - m ., ,~ ' ' ' ,- ;-me , m. m           m-.,-     . - . 7 f-..--  -
~'~
9 TABLE I (cont'd.)
f-..--
_ ,c PAM INDICATORS                                                   ,
: m. m m-.,-
(ESE-14)
7 9
TABLE I (cont'd.)
_,c PAM INDICATORS (ESE-14)
Applicable Baseline Design Documentation (OA8722) was reviewed.
Applicable Baseline Design Documentation (OA8722) was reviewed.
PAM RECORDERS (ESE-15)
PAM RECORDERS (ESE-15)
P.O.       No.       271480 references the units shipped as being Lot 1 qualified and are therefore encompased in the Baseline Design Documentation.                   It is this Baseline Documentation (6294A78 Rev.
P.O.
No.
271480 references the units shipped as being Lot 1
qualified and are therefore encompased in the Baseline Design Documentation.
It is this Baseline Documentation (6294A78 Rev.
: 8) that was reviewed.
: 8) that was reviewed.
1 l
1 l
Line 249: Line 350:
14
14


m---    - - - - - - . . -            - - - - - -                                            - ~.
- ~.
:m ,         e   u s e en.w -                 ,
:m,
r*c-.,-              -                                - - -
e u s e en.w -
p + gy.=       * -w ; f. y y   M., '.pra??? ? -+ -   4-*. .
m---
p + gy.=
* -w ; f. y y
M.,
'.pra??? ? -+ -
4-*.
V",.-
V",.-
l
r*c-.,-
      . .                                                        Ishg g (cont'd. )
l Ishg g (cont'd. )
SOLID STATE PRdTECTION SYSTEM (ESE-16)
SOLID STATE PRdTECTION SYSTEM (ESE-16)
                                        . .e e'
..e e'
The following as-manufactured drawings were reviewed:
The following as-manufactured drawings were reviewed:
1046F36                     REV. F 1046F40                     REV. N 1046F95                     REV. D 1049F37                     REV. C 1053E96                   REV. R 1058E49                     REV. G 6056D21                     REV. D 6056D25                     REV. E 6056D27                     REV. F                                           -
1046F36 REV. F 1046F40 REV. N 1046F95 REV. D 1049F37 REV. C 1053E96 REV. R 1058E49 REV. G 6056D21 REV. D 6056D25 REV. E 6056D27 REV. F 6056D30 REV. D 6056D32 REV. E 6056D33 REV.. F 6056D89 REV. H 605BD45 REV. G 6060D55 REV. C l
6056D30                     REV. D 6056D32                     REV. E 6056D33                     REV.. F 6056D89                     REV. H 605BD45                     REV. G 6060D55                     REV. C l
t 15 p
t 15 p


W . ... --
W.. --
                                                                                          ~ . ..              .
~...
        ,-                                                IABLE 3 (cont.d.)
IABLE 3 (cont.d.)
SAFEGUARDS TEST CABINET (ESE-16)
SAFEGUARDS TEST CABINET (ESE-16)
The following as-manufactured drawings were reviewed:
The following as-manufactured drawings were reviewed:
1060E42       REV. A 1060E43       REV. B 1468F61       REV. -
1060E42 REV. A 1060E43 REV. B 1468F61 REV. -
1468F62       REV. -
1468F62 REV. -
6077D42       REV. -
6077D42 REV. -
AUXILIARY SAFEGUARDS CABINET (ESE-16)
AUXILIARY SAFEGUARDS CABINET (ESE-16)
The f ollowing as-manuf actured drawing was reviewed:
The f ollowing as-manuf actured drawing was reviewed:
1059E77       REV. -
1059E77 REV. -
I I
I l
l l                                                                  16 1                                                                                                                   j 1
16 1
j


pg ^ ' ~             , ~ , = . _ _ ,   ,-.. -
pg ^ ' ~
                                                      -m                     -    ~
, ~, =. _ _,
-m
~
ISBLE 3 (cont'd.)
ISBLE 3 (cont'd.)
STATIC INVERTER (ESE-18)
STATIC INVERTER (ESE-18)
P.O. No. 546-GLP-248606                                     S.N.'s     3OK22OO-1 3OK22OO-2 3OK22OO-3       ,
P.O.
                                                                    .                    3OK22OO-4     ,
No. 546-GLP-248606 S.N.'s 3OK22OO-1 3OK22OO-2 3OK22OO-3 3OK22OO-4 Baseline Design Decument 3017D6B Rev. B was reviewed.
Baseline Design Decument 3017D6B Rev. B was reviewed.
INSTRUMENT BUS DISTRIBUTION PANEL (ESE-19)
i INSTRUMENT BUS DISTRIBUTION PANEL (ESE-19)
Westinghouse NES Purchase Order #546-GLP-235075-BN and Drawing No. 1143E61 Rev. 2 were reviewed.
Westinghouse NES Purchase Order #546-GLP-235075-BN and                     Drawing No. 1143E61 Rev. 2 were reviewed.                      .
REACTOR TRIP SWITCHGEAR (ESE-20)
REACTOR TRIP SWITCHGEAR (ESE-20)
P.O. No. 546-GLP-254825                                     S.N.'s     02-Y-N052 Baseline Design Document NQD-326-OO was reviewed.                     A comparison -
P.O.
was performed substantiating traceability from the plant specific bill of materials (9141DO7 Sub. 4) to the BDD referenced above.
No. 546-GLP-254825 S.N.'s 02-Y-N052 Baseline Design Document NQD-326-OO was reviewed.
A comparison was performed substantiating traceability from the plant specific bill of materials (9141DO7 Sub. 4) to the BDD referenced above.
l 5
l 5
17
17
                                                          . .  .}}
.}}

Latest revision as of 04:54, 15 December 2024

Rev 0 to Auditable Link Document for Byron Unit 1
ML20072L341
Person / Time
Site: Byron, 05000000
Issue date: 07/07/1983
From: Hauze G, Jelovich J, Petronis A
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20072L320 List:
References
EQAL-CAE, EQAL-CAE-R, EQAL-CAE-R00, NUDOCS 8307130317
Download: ML20072L341 (17)


Text

- '

c-L ;, ^

~

--~

y e,-

f

' EQAL-CAE REY. d

-m

  • ..E

'AUDITABLE LINK DOCUMENT FOR 1

BYRON UNIT 1 COMPILED BY:

A. D. PETRONIS APPROVED BY:

t-4 1LA/nd/ise Vd/J."JELOVICH,MANAdR CLASS lE SYSTEMS sg&

vG. L. HAUZE, MANAGER CLASS lE INSTRUMENTATION

/

_M PDR

e.

i i

INIBQQWGIlQN This document provides the auditable link information on all Class 1E-NSSS equipment, supplied by Westinghouse, applicable to Byron Unit 1, as listed in Table 1.

The intent of this document is to provide an equipment, component aging program and materials eging analysis link for this equipment.

Each segment.of the link is highlighted as follows:

E9MLEstal blQh All the Class 1E-NSSS equipment provided Byron Unit 1 is covered by the Westinghouse qualification programs as documented in Table 2.

Gesannant Link The documents defined in Table 3 were reviewed against the aging parts list utilized in the selection process for components within the Westinghouse Component Aging Program.

We have concluded that all applicable Class 1E Systems components cre contained in our Aging Parts List.

Those components added to the Aging Parts List as a result of this effort were found to be represented by the 96 components selected for the Short Term Aging Program (WCAP-8587, Supplement 2, Appendix A1)..

The results give reasonable assurance that no aging mechanism exists that would result in comece code f ailures during a seismic event for five (5) years.

j2 i

.. -. ~ - -.. -. ~ ~. -

Meiecieln klah The documents defined in Table 3 were reviewed for organic materials utilized on Byron Unit 1.

Materials that were covered via components in the Component Aging Program were excluded from 4

the list of materials as were materials that were determined to j

be non-critical.

The remaining materials were reviewed against the materials analyzed as part of*the materials aging analysis.

The materials aging analysis (WCAP-8587, SUPP 2, Appendix A2) covered all critical materials supplied to Byron Unit 1 with the following exceptions:

ESE-12 Testing not complete ESE-13 Testing not complete ESE-23 Testing not complete ESE-40 Testing not complete ESE-47B Testing not complete ESE-47C Testing not complete 4

1 3

~,. _

g;;pj

-. ~hr TABLE 1 DYBQN UNII 1 G68SS Ig NSSS ggy1EMENI (13I COMPONENT MATERIAL AGING AGING

.j

9DE IIILE ENVIBQNdgNI EBQSS60 BN@Lygig nE-1 Medium Pump Motors Mild N/A N/A 6E-2 Large Pump Motors Mild N/A N/A

)E-3 Champump Canned Pump Motor Mild N/A N/A

  • SE-1 Pressure Transmitters - Group A (Barton)

Harsh N/A N/A E E-1 Pressure Transmitters - Group A (Veritrak)

Harsh N/A N/A

CE-2 Pressure Transmitters - Group B (Barton)

Mild Yes Yes

'SE-3 Differential Pressure Transmitters -

Harsh N/A N/A Group A (Barton)

SE-4 Differential Pressure Transmitters -

Mild Yes Yes Group B (Barton)

SE-5 Resistance Temperature Detectors RC-Bypass Harsh N/A N/A ISE Resistance Temperature Detectors RCS Harsh N/A N/A Well Mounted
SE-8 2 Section Excore Neutron Detector Harsh N/A N/A
SE-10 Nuclear Instrumentation System (NIS)

Mild Yes Yes Console (Power Range Channel)

SE-12 Main Control Board Switch Modules Mild Yes Yes

SE-13 Process Protection System Mild Yes Yes ISE-14 Indicators:

Post-Accident Monitoring Mild Yes Yes

SE-15 Recorders:

Post-Accident Monitoring Mild Yes Yes

SE-16 Solid State Protection System (SSPS)

Mild Yes Yes 2 Train & Auxiliary Safeguards Cabinet (Three and Four Bay)

SE-18 Instrument Bus Power Supply Mild Yes Yes (Static Inverter)
SE-19 Instrument Bus Distribution Panel Mild Yes Yes
SE-20 Reactor Trip Switchgear Mild Yes Yes (DS 416 Circuit Breakers)
SE-21 Pressure Sensor Harsh N/A N/A
SE-23 Loop Stop Valve Cabinet Mild Yes Yes
SE-40 Dif f erential Pressure' Indicating Switch Mild Yes Yes
SE-47A Source / Intermediate Detectors -

Harsh N/A N/A Boron Dilution

SE-47B Source / Intermediate Electronics & Preamp -

Mild Yes Yes Baron Dilution (Seismic)

SE-47C Source / Intermediate Electronics & Preamp -

Mild Yes Yes Baron Dilution (Environmental)

IE-1 Safety Related Valve Electric Motor Opers.

Harsh N/A N/A

,lE-2 Safety Related Solenoid Valves Harsh N/A N/A llE-3 Saf ety Related E::ternally Mounted Harsh

.N/A N/A Limit Switches

,lie-4 Safety.Related Limitorque Valve Mild N/A N/A Electric Motor Operators 4

\\

TABLE 2 EL6NI SEEGlElG EDUlEdENI LLNG INEQBd8IlON MtrtMENLt DOCUMENT EQUIPMENT LlNG B8Sl@

AE-1 Boric Acid Transfer Puma Mgtgt The pump motors supplied on Motor Shop Order No.

82D55567 are seismically qualified based upon seismic report No.

82D55567.

The motors supplied on S.O.

82D55567 are environmentally qualified based upon Test Report A01A.

AE-2 ggm290EOi 999110g Eum2 Mgign The motors supplied on Motor Shop Order 74F12588 are seismically qualified based upon Seismic Report No. 75F47535.

The motors supplied on S.O.

74F12588 are environmentally qualified based on Test Report A02A.

AE-2 Eafety Inigctign Egma Mgtet The motors supplied on Motor Shop Order 74F18601 are seismically qualified based'upon Seismic Report No.

7532374.

The motors supplied in S.O.

74F18601 are environmentally qualified based upon Test Report A02A.

AE-2 ghacgingfgaigty lufgeliga Egm2 Mgigt The motors supplied on Motor Shop Order 75F32350 are seismically qualified based upon Seismic Report No. 75F32351.

The motors supplied in S.O.

75F32350 are environmentally qualified based upon Test Report A02A.

AE-2 8gsidual Hgat Rgmgval Euma Mgtgt The motors supplied on Motor Shop Order 74F12182 are seismically qualified based upon Seismic Report No.

74F12681.

The motors supplied in S.O.

74F12182 are environmentally qualified based upon Test Report A02A.

5

p__

yae-i l

10BLE 2 (cont'd. )

ELONI SEEGIEIG E991EMENI LINE INEQBd@IlQN

+

REFERENCE QQGyMENT ggy1EMENT LINE @@@l@

AE-2 Bgten Inigstign Recitquiatign Egen Ngtet motors supplied as Pump Serial Numbers The pump 19853-92 and 19853-93 are seismically qualified based on seismic report number A-18187.

The pump motors supplied as serial numbers 19853-92 and 19853-93 are environmentally qualified based upon Test Report A03A.

ESE-1 This equipment was purchased via purchase orders (Barton) 414455

& 450729 for Byron Unit 1.

Purchase Order 414455 references Lot 5

transmitters built in accordance with Baseline Design Document 0763.1126.5 Rev. 02.

This Baseline Design Document is equivalent to that which was used to build the qualification units.

Purchase order 450729 references Lot 7 transmitters built in accordance with Baseline Design Document 0763.11'26.5, Rev.

03.

This Baseline Design Document is equivalent to that which was used to build the qualification units (0763.1125.5 Rev. 02).

ESE-1 This equipment purchased via purchase order 427926 (Veritrak) for Byron Unit 1 was built in accordance with Baseline Design Document 5518A80 Rev.

4.

This Baseline Design Document is identical to that which was used to build the qualificati'on units.

ESE-2 This equipment purchased via purchase order 457787 (Barton) for Byron Unit 1 was built in accordance with Baseline Design Document 753.1050.5 Rev.-

2.

This Baseline Design Document is equivalent to that which. was used to build the qualification units (N753-OO9-A Rev. 3).

9

-6

W;;:r- ;&&w

. ~.n s

m,

amm

.+o.so. m m g

-mma

- n g a-

=s

~

~>

I@BLE 2 (cont'd.)

REFERENCE DQGudENI EQQlPMENI LINK R@@lg ESE-3 (Barton),

This equipment was purchased via purchase orders 414455 & 450729 for Byron Unit 1.

Purchase Order 414455 references Lot 5

transmitters built in accordance with Baseline Design Document 0764.1203.5 Rev.

02.,

This Baseline Design Document is equivalent to that which was used to build the qualification units.

Purchase Order 450729 references Lot 7 transmitters built in accordance with Baseline Design Locument 0764.1203.5 Rev.

04.

This Baseline Design Document is equivalent to that which was used to build the qualification units (0764.1195.5 Rev. 03).

ESE-4 This equipment purchased via purchase order 457787 (Barton) for Byron Unit 1 was built in accordance with Baseline Design Document 752.1180.5, Rev.

2.

This Baseline Design Document is equivalent to that which was used to build the qualification units (N752-OO13-A Rev. 3).

ESE-5 This equipment purchased via purchase order 265732 for Byron Unit I was built in accordance with Baseline Design Document T-10365 Rev.

10.

This Baseline Design Document is equivalent to that j

which was used to build the qualification units (T-10365 Rev. 7).

ESE-6 This equipment purchased via purchase order 265732 for Byron Unit 1 was built

.in accordance with Baseline Design Document T-10365 Rev.

10.

This Baseline Design Document is equivalent to that which was used to build the qualification units (T-10365 Rev. 7).

ESE-8 The Power Ranr7 Neutron Detectors (WL-23753, Drawing E-2231 Rc..

12) purchased by P.O.

546-GLE-177184-BN, serial numbers 771701, 771702, 771703, 772103 have been structurally and f uncti onal l y

analyzed, and were found to be equivalent (with regards to Qualification) to WL-24156 (Drawing E-l
3172, BDD No.24156).

WL-24156 was qualified via P.O.

402003.

ESE-10 A

comparison between Byron's as-built drawing list and that of the Qualification Unit was performed.

The comparison verified the applicability of qualification results with regard to the equipment l

(specified. on P.O.

546-GID-164438-BN) supplied to l

Byron Unit 1.

E 7

L

-- - -3 ;- - _-

-_;..--~..

TABLE 2 (cont'd.)

.ESE-12 Testing not complete

.c ESE-13 Inadequacies in previous qualification testing are being addressed by an ongoing test program.

All requirements of CAE equipment will be satisfied upon completion of these tests.

ESE-14 Qualification is based on similarity of design to the Qualification Test Units (QA8722) BDD for PAM indicators specified in Purchase Order 546-CML-425579-BN.

ESE-15 Purchase Order 546-CLG-271480-BN references the units shipped to Byron Unit 1 as being Lot 1

Qualified.

ESE-16' A

comparison between Byron's as-built drawing list and that of the 2 and 3 Train SSPS qualification units was performed.

The conparison verified the applicability of qualification results with regard to the equipment (specified in P.O. 546-GLS-209038-BNE) supplied to Byron Unit 1.

ESE-18 The units ordered for Byron Unit 1

on NES/PWR Purchase Order 546-GLP-248606-BN are identical to the unit used for qualification testing as identified within the Baseline Design Document (3017D68 Rev. 8).

ESE-19 The equipment shipped to Byron Unit 1 was built to the same drawing as that of the qualification unit (1143E61 Rev. 2).

The breakers (as specified in Westinghouse NES P.O.

  1. 546-GLP-235075-BN) installed within the panel shipped to Byron Unit 1 are identical in both type and style to those employed in the Qualification Program.

ESE-20 Via completion of FCN

  1. 10537 (installation of I

seismic reinforcements) the reactor trip switchgear for Byron Unit 1 has been updated to meet the r equi rements of IEEE-323-1974.

This equipment is now similar to the equipment built at the. factory and by comparison was shown to be traceable through the Baseline Design Documentation to the tested i

unit.

8 l

_...... 7 7..7-

_ _ _.7 ----

.-l*

TABLE 2 (cont'd.)

REFERENCE RgCydENI.,e EgylPdENI (IMM B@Sl@

ESE-21 This equipment purchased via Purchase Order 546-457707-BN f or Byron Unit 1 are ITT Barton Model 351 sensors purchased as part of Westinghouse Part No.

8765D64GO5.

This ITT Barton Model 351 sensor is the same in design and manufacture as the qualification units.

ESE-23 Testing not complete.

ESE-40 Testing not complete.

ESE-47A This equipment was purchased via P.O.

546-CAC-453995-BN and was built in accordance with Baseline Design Document No.

24159, Drawing E-3171 Rev.

A.

This Baseline Design Document is identical to that which was used to build the qualification units.

HE-1 Testing by W and Limitorque is currently underway to qualify the existing operators with a new design electric motor.

This testin'g is scheduled to finish in mid-February 1983.

Based on successful completion of this testing, the replacement motors will be delivered in September 1963.

W has already provided an Interim Position to Sargent and Lundy justifying the operation of the existing motors at Byron on an interim. basis.

HE-2/5 ASCO solenoid valves, qualified to IEEE-323-1974 requirements and the W generic program, WCAP-8587, have been provided, under W purchase orders 454818 and 454819, to Byron for all NSSS active Class 1E valves as listed on Rev.

2 to the Byron /Braidwood Class 1E list.

Field Change Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-10584, CBEM-10585, and CBEM-10586 have been issued by W

to provide guidance on the backfit of the qualified switches.

)

9

......m 7.,.

77 _

o 9

TABLE 2 (cont'd. )

l l

l HE-3/6 NAMCO limit switches, qualified to IEEE-323-1974

..e requirements and the W generic program, WCAP-8587, have been provided to Byron for all NSSS active Class 1E valves as listed on Rev.

2 to the Byron /Braidwood Class 1E list.

Field Change I

Notices CAEM-10625, CAEM-10626, CAEM-10627, CBEM-

10504, CBEM-10585, and CBEM-10586 have been issued by W

to provide guidance on the backfit of the qualified switches.

The switches were purchased by W under purchase orders 457113 and 457114.

HE-4 The motor operators originally shipped to Byron with the perent valves were qualified by the testing done by W/Limitorque and documented by EODP-HE-4 and W Test Report 2-HO4A.

Westinghouse is currently finalizing with Limitorque the traceability evaluation to insure motor operators actually on-site at Byron are traceable to that motor operator tested above by W/Limitorque.

4 4

o G

10

,a c,.,,.,

m-L_

18BbE I ELONI EEEQlElQ DQQQUENI@IlQN BEMIENED 4

GROUP B PRESSURE TRANSMITTERS (ESE-2)

(BARTON)

Baseline Design Document N753-OOO9A Rev. 1 was reviewed.

NOTE:

In reference to changes from BDD N753-OO9A Rev.

1 to DDD N753.1050.5 Rev.

2, the only changes made were:

A)

Correction of misspelled words.

B)

Correction of Spec. level revisions.

C)

Added level of control to each item.

}

As these changes were all a result of changing the baseline format, there was no impact on the product.

I GEOWE E DIEEEBENIl@6 E8ESSyBE IB8NEdlIIE8@

(ESE-4)

(BARTON)

Baseline Design Document N752-0113A Rev. 1 was reviewed.

1 NOTE:

In reference to changes from BDD N752-OO13A Rev.

1 to BDD l

N752.1180.5 Rev.

2, the only changes made were:

A)

Correction of misspelled words.

B)

Correction of Spec. level revisions.

C)

Added level of control to each item.

As these changes were all a result of changing the baseline format, there was no impact on the product.

11

p.

~~

un=v.

=~

IARLE ;E (cont'd. )

.e NUCLEAR INSTRUMENTATION SYSTEM (ESE-10) i l

The following as-built drawings applicable to CAE were reviewed:

1054E26 REV. D 1469F61 REV. A 3359C37 REV. G 3359C39 REV. N 3359C41 REV. J 6051D51 REV. P 6051D53 REV. S NOTE:

Efforts are underway to review the Power Designs power supply utilized in this system.

Publication of the results anticipated in the next revision of this document.

e e

e i

l 12

p ce m -

a' :' -- ~,_.:,9ff*g to,-.- sry

  • n ' rt ? ' ; " es.,_ ~ 3 ~v-' ~_ _ ts,~97y

~-

'm' P.~ 2

~

1 i

~

TA%E } (cont'd.)

7300 PROCESS SYSTEM (ESE-13)

.+

ine silis of Materials of the f ollowing card styles (as outlined in the instruction manual) were reviewed:

NAI 2837A88 NAL 2837A13 NAS 283BA89 NCH 2837A11 NCI 2837A86 NCT 2837A91 NLL 2837A18 NLP 2837A12 NMT 2840A01 NPC 2837A93 NQP 2822A97 NRA 2837A15 NRC 2837A87 NSA 2837A14 N50 2837A10 N?C 2837A94 N~. P 2837A90 1

(

l l

13

i - m.,,~ ' ' ',- ;-me,

~'~

f-..--

m. m m-.,-

7 9

TABLE I (cont'd.)

_,c PAM INDICATORS (ESE-14)

Applicable Baseline Design Documentation (OA8722) was reviewed.

PAM RECORDERS (ESE-15)

P.O.

No.

271480 references the units shipped as being Lot 1

qualified and are therefore encompased in the Baseline Design Documentation.

It is this Baseline Documentation (6294A78 Rev.

8) that was reviewed.

1 l

b e

14

- ~.

m,

e u s e en.w -

m---

p + gy.=

  • -w ; f. y y

M.,

'.pra??? ? -+ -

4-*.

V",.-

r*c-.,-

l Ishg g (cont'd. )

SOLID STATE PRdTECTION SYSTEM (ESE-16)

..e e'

The following as-manufactured drawings were reviewed:

1046F36 REV. F 1046F40 REV. N 1046F95 REV. D 1049F37 REV. C 1053E96 REV. R 1058E49 REV. G 6056D21 REV. D 6056D25 REV. E 6056D27 REV. F 6056D30 REV. D 6056D32 REV. E 6056D33 REV.. F 6056D89 REV. H 605BD45 REV. G 6060D55 REV. C l

t 15 p

W.. --

~...

IABLE 3 (cont.d.)

SAFEGUARDS TEST CABINET (ESE-16)

The following as-manufactured drawings were reviewed:

1060E42 REV. A 1060E43 REV. B 1468F61 REV. -

1468F62 REV. -

6077D42 REV. -

AUXILIARY SAFEGUARDS CABINET (ESE-16)

The f ollowing as-manuf actured drawing was reviewed:

1059E77 REV. -

I l

16 1

j

pg ^ ' ~

, ~, =. _ _,

-m

~

ISBLE 3 (cont'd.)

STATIC INVERTER (ESE-18)

P.O.

No. 546-GLP-248606 S.N.'s 3OK22OO-1 3OK22OO-2 3OK22OO-3 3OK22OO-4 Baseline Design Decument 3017D6B Rev. B was reviewed.

INSTRUMENT BUS DISTRIBUTION PANEL (ESE-19)

Westinghouse NES Purchase Order #546-GLP-235075-BN and Drawing No. 1143E61 Rev. 2 were reviewed.

REACTOR TRIP SWITCHGEAR (ESE-20)

P.O.

No. 546-GLP-254825 S.N.'s 02-Y-N052 Baseline Design Document NQD-326-OO was reviewed.

A comparison was performed substantiating traceability from the plant specific bill of materials (9141DO7 Sub. 4) to the BDD referenced above.

l 5

17

.