ML20076C964: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:\
{{#Wiki_filter:\\
b Dunn POWER Gonmxy I'.O. Ilox 331fl0 CIIAHLOTTE, N.C. 28242 IIAL II. TUCKER                                                                 TE!_E PH ON E vu e enterorst                                                             (704) 373-SN31 mm .     -,orem,-                       July 29, 1983 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission                                       co         y Region II                                                                 W            4C 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 g
b Dunn POWER Gonmxy I'.O. Ilox 331fl0 CIIAHLOTTE, N.C. 28242 IIAL II. TUCKER TE!_E PH ON E vu e enterorst (704) 373-SN31 July 29, 1983 mm.
c>
-,orem,-
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission co y
W 4C Region II 101 Marietta Street, NW, Suite 2900 g
{$
{$
                                                                                          .- 3
Atlanta, Georgia 30303 c>
                                                                            .c-aa Re: R11:JP0                                                                             -3 Catawba Nuclear Station                                             23         t Docket Nos. 50-413 and 50-414                                       25 3
.- 3 aa
.c-Re: R11:JP0
-3 Catawba Nuclear Station 23 t
Docket Nos. 50-413 and 50-414 25 3
[ ', h, 22:
[ ', h, 22:
C3 9;


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
C3          9; O           T-In response to Mr. Richard C. DeYoung's letter of May 13, 1983, which transmitted IE Bulletin 83-05, please be advised that a review for the Catawba Nuclear Station has been conducted. There are no Hayward Tyler Pump Company pumps or spare parts at Catawba.
O T-In response to Mr. Richard C. DeYoung's letter of May 13, 1983, which transmitted IE Bulletin 83-05, please be advised that a review for the Catawba Nuclear Station has been conducted. There are no Hayward Tyler Pump Company pumps or spare parts at Catawba.
This review required approximately 10 man-hours to complete and report.
This review required approximately 10 man-hours to complete and report.
I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge.
I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge.
Very truly yours,
Very truly yours, k t, <c
    ' <d          k t , <c Hal B. Tucker RWO/php cc: Document Control Desk U. S. Nuclear Regulatory Ccmmission Washington, D. C. 20555 Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
' <d Hal B. Tucker RWO/php cc: Document Control Desk U. S. Nuclear Regulatory Ccmmission Washington, D. C. 20555 Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 8308230g39 9397gg gDRADOCK 05000413 PDR 11 0 I         rEH               3}}
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 8308230g39 9397gg gDRADOCK 05000413 PDR 11 0 I
rEH 3}}

Latest revision as of 02:57, 15 December 2024

Responds to IE Bulletin 83-05 Re Use of Hayward Tyler Pump Co Pumps or Spare Parts.No Hayward Tyler Co Pumps or Spare Parts in Use at Plant Site
ML20076C964
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/29/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-83-05, IEB-83-5, NUDOCS 8308230238
Download: ML20076C964 (1)


Text

\\

b Dunn POWER Gonmxy I'.O. Ilox 331fl0 CIIAHLOTTE, N.C. 28242 IIAL II. TUCKER TE!_E PH ON E vu e enterorst (704) 373-SN31 July 29, 1983 mm.

-,orem,-

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission co y

W 4C Region II 101 Marietta Street, NW, Suite 2900 g

{$

Atlanta, Georgia 30303 c>

.- 3 aa

.c-Re: R11:JP0

-3 Catawba Nuclear Station 23 t

Docket Nos. 50-413 and 50-414 25 3

[ ', h, 22:

C3 9;

Dear Mr. O'Reilly:

O T-In response to Mr. Richard C. DeYoung's letter of May 13, 1983, which transmitted IE Bulletin 83-05, please be advised that a review for the Catawba Nuclear Station has been conducted. There are no Hayward Tyler Pump Company pumps or spare parts at Catawba.

This review required approximately 10 man-hours to complete and report.

I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge.

Very truly yours, k t, <c

' <d Hal B. Tucker RWO/php cc: Document Control Desk U. S. Nuclear Regulatory Ccmmission Washington, D. C. 20555 Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 8308230g39 9397gg gDRADOCK 05000413 PDR 11 0 I

rEH 3