ML20100R436: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
V g | |||
GENERAL OFFICE P.O. BOX 499 COLUMBUS. NE0RASKA 68602 0499 Nebraska Public Power District | |||
Nebraska Public Power District | *i"AxW'E'is'n'"' | ||
m.. | |||
G. R. HORN Vice-President, Nuclear (402) 563 5518 NLS960038 March 5,1996 | G. R. HORN Vice-President, Nuclear (402) 563 5518 NLS960038 March 5,1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen: | ||
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen: | |||
==Subject:== | ==Subject:== | ||
| Line 32: | Line 31: | ||
==References:== | ==References:== | ||
: 1. Letter from G. R. Horn to NRC dated May 5,1995, " Proposed Change No.142 to the CNS Technical Specifications, Diesel Generator Enhancements" | : 1. Letter from G. R. Horn to NRC dated May 5,1995, " Proposed Change No.142 to the CNS Technical Specifications, Diesel Generator Enhancements" | ||
: 2. Letter from G. R. Horn to NRC dated July 14,1995, " Revision to Proposed Change No.142 to Technical Specifications, Diesel Generator Enhancements" The Nebraska Public Power District (District) requests that Proposed Change No.142 to the Cooper Nuclear Station (CNS) Technical Specifications, " Diesel Generator Enhancements," be revised as described below and detailed in Attachment 1. These revisions result from discussions held with the NRC Stafron the subject proposed change, and involve only changes to the bases section for the requested changes. Therefore, the previous significant hazards | : 2. Letter from G. R. Horn to NRC dated July 14,1995, " Revision to Proposed Change No.142 to Technical Specifications, Diesel Generator Enhancements" The Nebraska Public Power District (District) requests that Proposed Change No.142 to the Cooper Nuclear Station (CNS) Technical Specifications, " Diesel Generator Enhancements," be revised as described below and detailed in Attachment 1. | ||
These revisions result from discussions held with the NRC Stafron the subject proposed change, and involve only changes to the bases section for the requested changes. Therefore, the previous significant hazards cvaluation and its conclusions remain valid. | |||
On November 1,1995, the District participated in a teleconference with the NRC Staff to respond to questions concerning the proposed change. As a result of those discussions, the District agreed to revise portions of the proposed bases sections to provide improved clarity. | |||
The originally proposed language was consistent with that published in NUREG-1433, | |||
" Standard Technical Specifications, General Electric Plants, BWR/4 (STS). However, the NRC Staff raised concerns regarding the possible interpretation of three specific areas. | |||
: 1. Bases Section 3.5 included the following statement: "Immediate shutdown could cause grid instability, which could result in a total loss of AC power." The NRC Staff raised the concern that this language could be construed as being in conflict with the General Design Criterion 17. The Districts's interpretation of this language, adopted from the STS, is that an immediate shutdown would create a greater risk for initiation of a grid stability event when compared with a controlled shutdown over a 12 hour period. However, to prevent any misinterpretation of those bases, the District agreed to remove the statement. | : 1. Bases Section 3.5 included the following statement: "Immediate shutdown could cause grid instability, which could result in a total loss of AC power." The NRC Staff raised the concern that this language could be construed as being in conflict with the General Design Criterion 17. The Districts's interpretation of this language, adopted from the STS, is that an immediate shutdown would create a greater risk for initiation of a grid stability event when compared with a controlled shutdown over a 12 hour period. However, to prevent any misinterpretation of those bases, the District agreed to remove the statement. | ||
: 2. Bases Section 4.5 included the following statement:"According to Generic Letter 84-15,24 hours is a reasonable time to confirm that the OPERABLE diesel generator is not affected by the same problem as the inoperable diesel generator." While Generic Letter 84-15 implies this position, it d - - ot explicitly state ".. 24 hours is a reasonable time..." | : 2. Bases Section 4.5 included the following statement:"According to Generic Letter 84-15,24 hours is a reasonable time to confirm that the OPERABLE diesel generator is not affected by the same problem as the inoperable diesel generator." While Generic Letter 84-15 implies this position, it d - - ot explicitly state ".. 24 hours is a reasonable time..." | ||
Therefore. this statementi u h 4n deleted. | , U' \\ ; | ||
9603120414 960305 | Therefore. this statementi u h 4n deleted. | ||
9603120414 960305 i | |||
PDR ADOCK 05000298 h | |||
hY,O w' | |||
) | |||
D w | |||
mmmmm etm n nr | |||
3 | 3 | ||
*l l | *l l | ||
NLS960038 | NLS960038 | ||
- March 5,1996 Page 2 of 3 | |||
: 3. Confusion existed in Bases Section 4.9 concerning the discussion of the requirements in Surveillance Requirement 4.9.A.2.a.2 (six-month surveillance test) to log the time required to reach rated voltage and frequency. The intent of this discussion was to indicate that the starting time requirements would apply during the six-month fast start, but would not apply during a modified (" slow") start. Following further discussions, the District agreed to delete the last two paragraphs of the proposed Bases Section 4.9 on page 200. | : 3. Confusion existed in Bases Section 4.9 concerning the discussion of the requirements in Surveillance Requirement 4.9.A.2.a.2 (six-month surveillance test) to log the time required to reach rated voltage and frequency. The intent of this discussion was to indicate that the starting time requirements would apply during the six-month fast start, but would not apply during a modified (" slow") start. Following further discussions, the District agreed to delete the last two paragraphs of the proposed Bases Section 4.9 on page 200. | ||
Provided in Attachment 1 are the marked-up pages showing the above described revisions to the previously proposed' changes. A compilation of the proposed changes (as originally | Provided in Attachment 1 are the marked-up pages showing the above described revisions to the previously proposed' changes. A compilation of the proposed changes (as originally submitted in Reference 1 and subsequently revised by Reference 2 and again by this letter) are provided in Attachment 2. This revision to Proposed Change No.142 does not result in a change to the significant hazards evaluation submitted in Reference 1, nor its conclusions. | ||
submitted in Reference 1 and subsequently revised by Reference 2 and again by this letter) are | By copy of this letter and attachment, the appropriate State of Nebraska official is being notified in accordance with 10 CFR 50.91(b)(1). Copies to the NRC Region IV Office and the CNS Resident Inspector are also being sent in accordance with 10 CFR 50.4(b)(2). | ||
By copy of this letter and attachment, the appropriate State of Nebraska official is being notified in accordance with 10 CFR 50.91(b)(1). Copies to the NRC Region IV Office and the CNS Resident Inspector are also being sent in accordance with 10 CFR 50.4(b)(2). | |||
Should you have any questions or require any additional information, please contact me. | Should you have any questions or require any additional information, please contact me. | ||
Sin rely, j | |||
/A G. | |||
rn V e-Pr sident, Nuclear GRH/MJB Attachments cc: Redonal Administrator USNRC - Region IV Senior Resident Inspector USNRC - Cooper Nuclear Station Senior Project Manager USNRC - NRR Project Directorate IV-1 Director, Department of Health State of Nebraska NPG Distribution | |||
* i NLS960038 March 5,1996 Page 3 of 3 1 | |||
NLS960038 March 5,1996 Page 3 of 3 1 | STATE OF NEBRASKA | ||
STATE OF NEBRASKA | ) | ||
)ss PLATTE COUNTY | |||
G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledg and belief. | ) | ||
G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledg and belief. | |||
j | |||
Subscribed in my presence and sworn to before me this E day of DM | /.bi | ||
ODGALN0fEllahellistradp Itl tat.PFLASTEREA IIrGemsEsBus.1%IIIS NO'fARY MJBLIC | %u x | ||
~~ | |||
G[ R. Horn ~ | |||
Subscribed in my presence and sworn to before me this E day of DM | |||
,1996. | |||
ODGALN0fEllahellistradp Itl tat.PFLASTEREA IIrGemsEsBus.1%IIIS NO'fARY MJBLIC l | |||
;}} | ;}} | ||
Latest revision as of 05:19, 13 December 2024
| ML20100R436 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/05/1996 |
| From: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20100R439 | List: |
| References | |
| NLS960038, NUDOCS 9603120414 | |
| Download: ML20100R436 (3) | |
Text
.
V g
GENERAL OFFICE P.O. BOX 499 COLUMBUS. NE0RASKA 68602 0499 Nebraska Public Power District
- i"AxW'E'is'n'"'
m..
G. R. HORN Vice-President, Nuclear (402) 563 5518 NLS960038 March 5,1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject:
Revision to Proposed Change No.142 to Technical Specifications Diesel Generator Enhancements Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46
References:
- 1. Letter from G. R. Horn to NRC dated May 5,1995, " Proposed Change No.142 to the CNS Technical Specifications, Diesel Generator Enhancements"
- 2. Letter from G. R. Horn to NRC dated July 14,1995, " Revision to Proposed Change No.142 to Technical Specifications, Diesel Generator Enhancements" The Nebraska Public Power District (District) requests that Proposed Change No.142 to the Cooper Nuclear Station (CNS) Technical Specifications, " Diesel Generator Enhancements," be revised as described below and detailed in Attachment 1.
These revisions result from discussions held with the NRC Stafron the subject proposed change, and involve only changes to the bases section for the requested changes. Therefore, the previous significant hazards cvaluation and its conclusions remain valid.
On November 1,1995, the District participated in a teleconference with the NRC Staff to respond to questions concerning the proposed change. As a result of those discussions, the District agreed to revise portions of the proposed bases sections to provide improved clarity.
The originally proposed language was consistent with that published in NUREG-1433,
" Standard Technical Specifications, General Electric Plants, BWR/4 (STS). However, the NRC Staff raised concerns regarding the possible interpretation of three specific areas.
- 1. Bases Section 3.5 included the following statement: "Immediate shutdown could cause grid instability, which could result in a total loss of AC power." The NRC Staff raised the concern that this language could be construed as being in conflict with the General Design Criterion 17. The Districts's interpretation of this language, adopted from the STS, is that an immediate shutdown would create a greater risk for initiation of a grid stability event when compared with a controlled shutdown over a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period. However, to prevent any misinterpretation of those bases, the District agreed to remove the statement.
- 2. Bases Section 4.5 included the following statement:"According to Generic Letter 84-15,24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a reasonable time to confirm that the OPERABLE diesel generator is not affected by the same problem as the inoperable diesel generator." While Generic Letter 84-15 implies this position, it d - - ot explicitly state ".. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a reasonable time..."
, U' \\ ;
Therefore. this statementi u h 4n deleted.
9603120414 960305 i
PDR ADOCK 05000298 h
hY,O w'
)
D w
mmmmm etm n nr
3
- l l
NLS960038
- March 5,1996 Page 2 of 3
- 3. Confusion existed in Bases Section 4.9 concerning the discussion of the requirements in Surveillance Requirement 4.9.A.2.a.2 (six-month surveillance test) to log the time required to reach rated voltage and frequency. The intent of this discussion was to indicate that the starting time requirements would apply during the six-month fast start, but would not apply during a modified (" slow") start. Following further discussions, the District agreed to delete the last two paragraphs of the proposed Bases Section 4.9 on page 200.
Provided in Attachment 1 are the marked-up pages showing the above described revisions to the previously proposed' changes. A compilation of the proposed changes (as originally submitted in Reference 1 and subsequently revised by Reference 2 and again by this letter) are provided in Attachment 2. This revision to Proposed Change No.142 does not result in a change to the significant hazards evaluation submitted in Reference 1, nor its conclusions.
By copy of this letter and attachment, the appropriate State of Nebraska official is being notified in accordance with 10 CFR 50.91(b)(1). Copies to the NRC Region IV Office and the CNS Resident Inspector are also being sent in accordance with 10 CFR 50.4(b)(2).
Should you have any questions or require any additional information, please contact me.
Sin rely, j
/A G.
rn V e-Pr sident, Nuclear GRH/MJB Attachments cc: Redonal Administrator USNRC - Region IV Senior Resident Inspector USNRC - Cooper Nuclear Station Senior Project Manager USNRC - NRR Project Directorate IV-1 Director, Department of Health State of Nebraska NPG Distribution
- i NLS960038 March 5,1996 Page 3 of 3 1
STATE OF NEBRASKA
)
)ss PLATTE COUNTY
)
G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this correspondence on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledg and belief.
j
/.bi
%u x
~~
G[ R. Horn ~
Subscribed in my presence and sworn to before me this E day of DM
,1996.
ODGALN0fEllahellistradp Itl tat.PFLASTEREA IIrGemsEsBus.1%IIIS NO'fARY MJBLIC l