Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992                         Monticello Technical Specifications Section 6.7.A.3 I
Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 Monticello Technical Specifications Section 6.7.A.3 I
U? Nuclear Regulatory Commissio:.
U? Nuclear Regulatory Commissio:.
Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263     License . DPR-22 Monthly Operating Report J_une . 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant.
Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 License
          //& I    $
. DPR-22 Monthly Operating Report J_une. 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant.
Thomas M Parker Manager Nuclear Support Service TMP/mkl C:     Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I
//& $
I Thomas M Parker Manager Nuclear Support Service TMP/mkl C:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I
I 9207160145 920630
I 9207160145 920630
            ;yDR -ADocg 0y0099$3
/,)N J
                                                                                                    /,)N, J
;yDR -ADocg 0y0099$3 PDR
PDR                                                                .v       \
.v
\\
(/
(/


OPERATING DATA REPORT DOCKET NO.     50-263 l                                     .                                                                                                    DATE       7- 1-92 I                                                           -
OPERATING DATA REPORT DOCKET NO.
COMPLETED BY     H. H. Paustian TELEPHONE     612/295-5151 OPERATING STATUS
50-263 l
                                                                                                                                  ] Notes                         ]
DATE 7-1-92 I
: 1. Unit Name :                                                                                 Monticello     )                               ]
COMPLETED BY H. H.
: 2. Reporting period:                                                                             JUNE         ]                               )
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
: 3. Licensed Thermal Power (MWt):                                                                       1670   )                               )
] Notes
: 4.                         Nameplate Rating (Gross MWe).                                               569   )                               ]
]
: 5.                         Design Electrical Rating (Net MWe):                                       545.4   ]                               )
: 1. Unit Name :
: 6.                         Maximum Dependable Capacity (Gross MWe): __564 )                                                                 )
Monticello
: 7.                         Maximum Dependable Capacity (Net MWe):                                       536 )                                 )
)
: 8.                         If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
]
: 9. Power Level To Which Restricted, If Any (Net MWe).                                                               N/A
: 2. Reporting period:
JUNE
]
)
: 3. Licensed Thermal Power (MWt):
1670
)
)
: 4. Nameplate Rating (Gross MWe).
569
)
]
: 5. Design Electrical Rating (Net MWe):
545.4
]
)
: 6. Maximum Dependable Capacity (Gross MWe): __564
)
)
: 7. Maximum Dependable Capacity (Net MWe):
536
)
)
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe).
N/A
: 10. Reasons For Restrictions, If Any: __N/A 2
: 10. Reasons For Restrictions, If Any: __N/A 2
THIS MONTH       YR.-TO-DATE     CUMULATIVE
THIS MONTH YR.-TO-DATE CUMULATIVE
: 11. Hours In Reporting Period                                                                                 720           4367         184104
: 11. Hours In Reporting Period 720 4367 184104
: 12. Number Of Hours Reactor Was Critical                                                                   723.0           4149.3       147567.7
: 12. Number Of Hours Reactor Was Critical 723.0 4149.3 147567.7
: 13.                                 Reactor Reserve Shutdown Hours                                           0.0             0.0         940.
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.
: 14.                                   Hours Cenerator On-Line                                             720.0           4111.3       144859.2
: 14. Hours Cenerator On-Line 720.0 4111.3 144859.2
: 15.                                 Unit Reserve Shutdown Hours                                             0.0             0.0             0.0
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 16.                                 Gross Thermal Energy Generated (!GVH)                               1199921         6810891       222344468
: 16. Gross Thermal Energy Generated (!GVH) 1199921 6810891 222344468
: 17.                                 Gross Electrical Energy Generated (MWH) 399882                                     2283826       75173671
: 17. Gross Electrical Energy Generated (MWH) 399882 2283826 75173671
: 18.                                 Net Electrical Energy Generated (MWH)                               382788         2194770       71896988
: 18. Net Electrical Energy Generated (MWH) 382788 2194770 71896988
: 19.                                 Unit Service Factor                                                 100.0%           94.1%           78.7%
: 19. Unit Service Factor 100.0%
: 20.                                 Unit Availability Factor                                           100.0%           94.1%           78.7%
94.1%
: 21.                                 Unit Capacity Factor (Using MDC Net)                                 99.2%           93.8%           72.9%               -
78.7%
: 22.                                 Unit Capacity Factor (Using DER Net)                                 97.5%           92.1%           71.6%
: 20. Unit Availability Factor 100.0%
: 23.                                 Unit Forced Outage Rate                                               0.0%             1.6%           3.8%
94.1%
: 24.                                 Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
78.7%
: 21. Unit Capacity Factor (Using MDC Net) 99.2%
93.8%
72.9%
: 22. Unit Capacity Factor (Using DER Net) 97.5%
92.1%
71.6%
: 23. Unit Forced Outage Rate 0.0%
1.6%
3.8%
: 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
: Refueling Outage - 1/6/93 - 56 days
: Refueling Outage - 1/6/93 - 56 days
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
: 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


4 e, _           ;
4 e, _
k                                   AVERAGE' DAILY UNIT POWER' LEVEL g             ,
k AVERAGE' DAILY UNIT POWER' LEVEL g
DOCKET NO.             50-263                 t UNIT. Monticello___
DOCKET NO.
DATE       7- 1-92 COMPLETED BY H. H. Paustian TELEPHONE         612/295-5151               ,
50-263 t
MONTH OF' JUNE ll DAY.       AVERAGE DAILY POWER LEVEL                   DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1                   535.                                 17                       532.
UNIT. Monticello___
          --      5 2                   533,                                 18                       534.
DATE 7-1-92 COMPLETED BY H. H.
                  -3                     526.                                 19                       535.
Paustian TELEPHONE 612/295-5151 MONTH OF' JUNE ll DAY.
14L                     525.                                 20                       535.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
                  -5:                     528.                               .21                         536.
(MWe-Net) 1 535.
528.                                                          537.
17 532.
6-                                                      -22
5 2
                  '7-                    -528'.-                               23                       537.
: 533, 18 534.
8                   535.-                                 24                       537.                           ,
-3 526.
E                 <9--                     533.                                 25                       536.
19 535.
:10'                       529.                                 26.                     537.                           <
14L 525.
:11''                     528.                                 27                       537.
20 535.
p               C12 -                     525.             _                _28                         534.
-5:
l           2137                       525 -
528.
29                       536.
.21 536.
:14                       518.-                                 30                       534.
6-528.
                '15                       527.
-22 537.
11 6:                     531.
-528'.-
23 537.
'7-8 535.-
24 537.
E
<9--
533.
25 536.
:10' 529.
26.
537.
:11''
528.
27 537.
p C12 -
525.
_28 534.
l 2137 525 29 536.
:14 518.-
30 534.
'15 527.
11 6:
531.
;e
;e
    ~
~
INSTRUCTIONS
INSTRUCTIONS
                  -On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month. Compute to'the nearest whole megawatt.
-On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month.
Compute to'the nearest whole megawatt.


e
e l
              . l        !!ARRATIVE  
!!ARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATI!1G EXPERIEt1CE                                                 -
OF OPERATI!1G EXPERIEt1CE DOCKET 110.
                .                                                  DOCKET 110. 50-263
50-263 DATE 7-1+92 COMPLETED BY 11. 11. Paustian TELEPilClJE 612/295-5151 M011Til
                      -                                                  DATE                       7- 1+92 COMPLETED BY   11 . 11 . Paustian TELEPilClJE 612/295-5151 M011Til     ._J UlJ 6-1-92 to   Power operation.
._J UlJ 6-1-92 to Power operation.
6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.


m   .
m IEIT SUITEDOWNS AND P(NER REUCIICNS -
IEIT SUITEDOWNS AND P(NER REUCIICNS -                 D00TT NO.     50-263                       ' ,
D00TT NO.
(MIT NAME Monticello
50-263 (MIT NAME Monticello DATE 17-01-92 lii2 29hs$5k'
* DATE 17-01-92                               .            ..
~.
REPORT MONIH    June                                      lii2 29hs$5k'                   ~.
REPORT MONIH June 6
* 6 No.                    Date                                Duration Reason Mediod         LER   Systez     .                Cause & Corr m tive "Ay(pe
Duration Reason Mediod LER Systez Cause & Corr m tive No.
: 1) (hours)       (2)     of       No. Code     e                       Action (o l
Date "Ay(pe (hours)
Shutdown             (4) (5)                 Prevent Recurrence
(2) of No.
                                                                                                    -(3) i None                                                                                                                                                                                         r l
Code e
r 4
Action (o 1) l Shutdown (4)
i                                                                                                                                                                                                                             i i
(5)
i                                                                                                                                                                                                                             !
Prevent Recurrence
-(3) i None r
l r
i 4
i i
i i
i i
i i
1 i
1 i
1                                                         2                                                 3                     4                                                                         ;
1 2
F: Forced                                               Reason:                                           Method:               Draft IEEE Standard                                                     !
3 4
5: Scheduled                                             A-Equipment Failure (Explain)                     1-Mainsal           805-1984(P805-DS)                                                       ;
F: Forced Reason:
i                                                                             B-Ma1ntenance or Test                             2-Mantial Scram                                                                               !
Method:
C-Refueling                                       3-Automatic Scram   5                                                                         i D-Regulator Restriction                           4-Other (Explain)     IEEE Standard 803A-1083                                                 t E-Operator Training & License Examination                                                                                                       ;
Draft IEEE Standard 5: Scheduled A-Equipment Failure (Explain) 1-Mainsal 805-1984(P805-DS) i B-Ma1ntenance or Test 2-Mantial Scram C-Refueling 3-Automatic Scram 5
F-Administrative                                                                                                                               '
i D-Regulator Restriction 4-Other (Explain)
G-Operational Error (Explain)                                                                                                                   ;
IEEE Standard 803A-1083 t
.                                                                              H-Other (Explain)                                                                                                                               f I
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) f I
I
I
                                                                                -            -            .      .                  .                    . -_      _        _ _ _ _ _ - _ _ _ - _      _ ___ _ -}}
-}}

Latest revision as of 04:03, 13 December 2024

Monthly Operating Rept for June 1992 for Monticello Nuclear Generating Plant
ML20101R689
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/30/1992
From: Parker T, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9207160145
Download: ML20101R689 (5)


Text

Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 Monticello Technical Specifications Section 6.7.A.3 I

U? Nuclear Regulatory Commissio:.

Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 License

. DPR-22 Monthly Operating Report J_une. 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant.

//& $

I Thomas M Parker Manager Nuclear Support Service TMP/mkl C:

Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I

I 9207160145 920630

/,)N J

yDR -ADocg 0y0099$3 PDR

.v

\\

(/

OPERATING DATA REPORT DOCKET NO.

50-263 l

DATE 7-1-92 I

COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

1. Unit Name :

Monticello

)

]

2. Reporting period:

JUNE

]

)

3. Licensed Thermal Power (MWt):

1670

)

)

4. Nameplate Rating (Gross MWe).

569

)

]

5. Design Electrical Rating (Net MWe):

545.4

]

)

6. Maximum Dependable Capacity (Gross MWe): __564

)

)

7. Maximum Dependable Capacity (Net MWe):

536

)

)

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe).

N/A

10. Reasons For Restrictions, If Any: __N/A 2

THIS MONTH YR.-TO-DATE CUMULATIVE

11. Hours In Reporting Period 720 4367 184104
12. Number Of Hours Reactor Was Critical 723.0 4149.3 147567.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.
14. Hours Cenerator On-Line 720.0 4111.3 144859.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (!GVH) 1199921 6810891 222344468
17. Gross Electrical Energy Generated (MWH) 399882 2283826 75173671
18. Net Electrical Energy Generated (MWH) 382788 2194770 71896988
19. Unit Service Factor 100.0%

94.1%

78.7%

20. Unit Availability Factor 100.0%

94.1%

78.7%

21. Unit Capacity Factor (Using MDC Net) 99.2%

93.8%

72.9%

22. Unit Capacity Factor (Using DER Net) 97.5%

92.1%

71.6%

23. Unit Forced Outage Rate 0.0%

1.6%

3.8%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
Refueling Outage - 1/6/93 - 56 days
25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

4 e, _

k AVERAGE' DAILY UNIT POWER' LEVEL g

DOCKET NO.

50-263 t

UNIT. Monticello___

DATE 7-1-92 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH OF' JUNE ll DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 535.

17 532.

5 2

533, 18 534.

-3 526.

19 535.

14L 525.

20 535.

-5:

528.

.21 536.

6-528.

-22 537.

-528'.-

23 537.

'7-8 535.-

24 537.

E

<9--

533.

25 536.

10' 529.

26.

537.

11

528.

27 537.

p C12 -

525.

_28 534.

l 2137 525 29 536.

14 518.-

30 534.

'15 527.

11 6:

531.

e

~

INSTRUCTIONS

-On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month.

Compute to'the nearest whole megawatt.

e l

!!ARRATIVE

SUMMARY

OF OPERATI!1G EXPERIEt1CE DOCKET 110.

50-263 DATE 7-1+92 COMPLETED BY 11. 11. Paustian TELEPilClJE 612/295-5151 M011Til

._J UlJ 6-1-92 to Power operation.

6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

m IEIT SUITEDOWNS AND P(NER REUCIICNS -

D00TT NO.

50-263 (MIT NAME Monticello DATE 17-01-92 lii2 29hs$5k'

~.

REPORT MONIH June 6

Duration Reason Mediod LER Systez Cause & Corr m tive No.

Date "Ay(pe (hours)

(2) of No.

Code e

Action (o 1) l Shutdown (4)

(5)

Prevent Recurrence

-(3) i None r

l r

i 4

i i

i i

i i

1 i

1 2

3 4

F: Forced Reason:

Method:

Draft IEEE Standard 5: Scheduled A-Equipment Failure (Explain) 1-Mainsal 805-1984(P805-DS) i B-Ma1ntenance or Test 2-Mantial Scram C-Refueling 3-Automatic Scram 5

i D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1083 t

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) f I

I

-