Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 | Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 Monticello Technical Specifications Section 6.7.A.3 I | ||
U? Nuclear Regulatory Commissio:. | U? Nuclear Regulatory Commissio:. | ||
Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 | Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 License | ||
. DPR-22 Monthly Operating Report J_une. 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant. | |||
Thomas M Parker Manager Nuclear Support Service TMP/mkl C: | //& $ | ||
I Thomas M Parker Manager Nuclear Support Service TMP/mkl C: | |||
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I | |||
I 9207160145 920630 | I 9207160145 920630 | ||
/,)N J | |||
;yDR -ADocg 0y0099$3 PDR | |||
.v | |||
\\ | |||
(/ | (/ | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
COMPLETED BY | 50-263 l | ||
DATE 7-1-92 I | |||
: 1. Unit Name : | COMPLETED BY H. H. | ||
: 2. Reporting period: | Paustian TELEPHONE 612/295-5151 OPERATING STATUS | ||
: 3. Licensed Thermal Power (MWt): | ] Notes | ||
: 4. | ] | ||
: 5. | : 1. Unit Name : | ||
: 6. | Monticello | ||
: 7. | ) | ||
: 8. | ] | ||
: 9. Power Level To Which Restricted, If Any (Net MWe). | : 2. Reporting period: | ||
JUNE | |||
] | |||
) | |||
: 3. Licensed Thermal Power (MWt): | |||
1670 | |||
) | |||
) | |||
: 4. Nameplate Rating (Gross MWe). | |||
569 | |||
) | |||
] | |||
: 5. Design Electrical Rating (Net MWe): | |||
545.4 | |||
] | |||
) | |||
: 6. Maximum Dependable Capacity (Gross MWe): __564 | |||
) | |||
) | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
536 | |||
) | |||
) | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe). | |||
N/A | |||
: 10. Reasons For Restrictions, If Any: __N/A 2 | : 10. Reasons For Restrictions, If Any: __N/A 2 | ||
THIS MONTH | THIS MONTH YR.-TO-DATE CUMULATIVE | ||
: 11. Hours In Reporting Period | : 11. Hours In Reporting Period 720 4367 184104 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 723.0 4149.3 147567.7 | ||
: 13. | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 940. | ||
: 14. | : 14. Hours Cenerator On-Line 720.0 4111.3 144859.2 | ||
: 15. | : 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | ||
: 16. | : 16. Gross Thermal Energy Generated (!GVH) 1199921 6810891 222344468 | ||
: 17. | : 17. Gross Electrical Energy Generated (MWH) 399882 2283826 75173671 | ||
: 18. | : 18. Net Electrical Energy Generated (MWH) 382788 2194770 71896988 | ||
: 19. | : 19. Unit Service Factor 100.0% | ||
: 20. | 94.1% | ||
: 21. | 78.7% | ||
: 22. | : 20. Unit Availability Factor 100.0% | ||
: 23. | 94.1% | ||
: 24. | 78.7% | ||
: 21. Unit Capacity Factor (Using MDC Net) 99.2% | |||
93.8% | |||
72.9% | |||
: 22. Unit Capacity Factor (Using DER Net) 97.5% | |||
92.1% | |||
71.6% | |||
: 23. Unit Forced Outage Rate 0.0% | |||
1.6% | |||
3.8% | |||
: 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) | |||
: Refueling Outage - 1/6/93 - 56 days | : Refueling Outage - 1/6/93 - 56 days | ||
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A | : 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A | ||
: 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | : 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
4 e, _ | 4 e, _ | ||
k | k AVERAGE' DAILY UNIT POWER' LEVEL g | ||
DOCKET NO. | DOCKET NO. | ||
DATE | 50-263 t | ||
MONTH OF' JUNE ll DAY. | UNIT. Monticello___ | ||
DATE 7-1-92 COMPLETED BY H. H. | |||
Paustian TELEPHONE 612/295-5151 MONTH OF' JUNE ll DAY. | |||
14L | AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) | ||
(MWe-Net) 1 535. | |||
528 | 17 532. | ||
5 2 | |||
: 533, 18 534. | |||
8 | -3 526. | ||
E | 19 535. | ||
:10' | 14L 525. | ||
:11'' | 20 535. | ||
p | -5: | ||
l | 528. | ||
29 | .21 536. | ||
:14 | 6-528. | ||
-22 537. | |||
11 6: | -528'.- | ||
23 537. | |||
'7-8 535.- | |||
24 537. | |||
E | |||
<9-- | |||
533. | |||
25 536. | |||
:10' 529. | |||
26. | |||
537. | |||
:11'' | |||
528. | |||
27 537. | |||
p C12 - | |||
525. | |||
_28 534. | |||
l 2137 525 29 536. | |||
:14 518.- | |||
30 534. | |||
'15 527. | |||
11 6: | |||
531. | |||
;e | ;e | ||
~ | |||
INSTRUCTIONS | INSTRUCTIONS | ||
-On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month. | |||
Compute to'the nearest whole megawatt. | |||
e | e l | ||
!!ARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATI!1G EXPERIEt1CE | OF OPERATI!1G EXPERIEt1CE DOCKET 110. | ||
50-263 DATE 7-1+92 COMPLETED BY 11. 11. Paustian TELEPilClJE 612/295-5151 M011Til | |||
._J UlJ 6-1-92 to Power operation. | |||
6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing. | 6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing. | ||
m | m IEIT SUITEDOWNS AND P(NER REUCIICNS - | ||
IEIT SUITEDOWNS AND P(NER REUCIICNS - | D00TT NO. | ||
(MIT NAME Monticello | 50-263 (MIT NAME Monticello DATE 17-01-92 lii2 29hs$5k' | ||
~. | |||
REPORT MONIH June 6 | |||
Duration Reason Mediod LER Systez Cause & Corr m tive No. | |||
Date "Ay(pe (hours) | |||
Shutdown | (2) of No. | ||
Code e | |||
Action (o 1) l Shutdown (4) | |||
i | (5) | ||
i | Prevent Recurrence | ||
-(3) i None r | |||
l r | |||
i 4 | |||
i i | |||
i i | |||
i i | i i | ||
1 i | 1 i | ||
1 | 1 2 | ||
F: Forced | 3 4 | ||
5: Scheduled | F: Forced Reason: | ||
i | Method: | ||
C-Refueling | Draft IEEE Standard 5: Scheduled A-Equipment Failure (Explain) 1-Mainsal 805-1984(P805-DS) i B-Ma1ntenance or Test 2-Mantial Scram C-Refueling 3-Automatic Scram 5 | ||
F-Administrative | i D-Regulator Restriction 4-Other (Explain) | ||
G-Operational Error (Explain) | IEEE Standard 803A-1083 t | ||
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) f I | |||
I | I | ||
-}} | |||
Latest revision as of 04:03, 13 December 2024
| ML20101R689 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 06/30/1992 |
| From: | Parker T, Paustian H NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9207160145 | |
| Download: ML20101R689 (5) | |
Text
Northem States Power Company 414 Nicollet Mall Minneapolis. Mennesota 55401 1927 Telephone (612) 330-5500 July 10, 1992 Monticello Technical Specifications Section 6.7.A.3 I
U? Nuclear Regulatory Commissio:.
Attn: Locumeur Control Desk Washington, DC 20555 MONTICELLD NUCLEAR GENERATING PLANT Docket No. 50-263 License
. DPR-22 Monthly Operating Report J_une. 1992 Attached is the Monthly Operating Report for June, 1992 for the Monticello Nuclear Generating Plant.
//& $
I Thomas M Parker Manager Nuclear Support Service TMP/mkl C:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC-Resident Inspector State of Minnesota - Kris Sanda Attachment-f I
I 9207160145 920630
/,)N J
- yDR -ADocg 0y0099$3 PDR
.v
\\
(/
OPERATING DATA REPORT DOCKET NO.
50-263 l
DATE 7-1-92 I
COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name :
Monticello
)
]
- 2. Reporting period:
JUNE
]
)
- 3. Licensed Thermal Power (MWt):
1670
)
)
- 4. Nameplate Rating (Gross MWe).
569
)
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
)
- 6. Maximum Dependable Capacity (Gross MWe): __564
)
)
- 7. Maximum Dependable Capacity (Net MWe):
536
)
)
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe).
N/A
- 10. Reasons For Restrictions, If Any: __N/A 2
THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720 4367 184104
- 12. Number Of Hours Reactor Was Critical 723.0 4149.3 147567.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.
- 14. Hours Cenerator On-Line 720.0 4111.3 144859.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (!GVH) 1199921 6810891 222344468
- 17. Gross Electrical Energy Generated (MWH) 399882 2283826 75173671
- 18. Net Electrical Energy Generated (MWH) 382788 2194770 71896988
- 19. Unit Service Factor 100.0%
94.1%
78.7%
- 20. Unit Availability Factor 100.0%
94.1%
78.7%
- 21. Unit Capacity Factor (Using MDC Net) 99.2%
93.8%
72.9%
- 22. Unit Capacity Factor (Using DER Net) 97.5%
92.1%
71.6%
- 23. Unit Forced Outage Rate 0.0%
1.6%
3.8%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 1/6/93 - 56 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
4 e, _
k AVERAGE' DAILY UNIT POWER' LEVEL g
DOCKET NO.
50-263 t
UNIT. Monticello___
DATE 7-1-92 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH OF' JUNE ll DAY.
AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 535.
17 532.
5 2
- 533, 18 534.
-3 526.
19 535.
14L 525.
20 535.
-5:
528.
.21 536.
6-528.
-22 537.
-528'.-
23 537.
'7-8 535.-
24 537.
E
<9--
533.
25 536.
- 10' 529.
26.
537.
- 11
528.
27 537.
p C12 -
525.
_28 534.
l 2137 525 29 536.
- 14 518.-
30 534.
'15 527.
11 6:
531.
- e
~
INSTRUCTIONS
-On this' format,. list-the average daily unit power level in MWe-Net for each iday in the reporting month.
Compute to'the nearest whole megawatt.
e l
!!ARRATIVE
SUMMARY
OF OPERATI!1G EXPERIEt1CE DOCKET 110.
50-263 DATE 7-1+92 COMPLETED BY 11. 11. Paustian TELEPilClJE 612/295-5151 M011Til
._J UlJ 6-1-92 to Power operation.
6-30-92 14ote : Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
m IEIT SUITEDOWNS AND P(NER REUCIICNS -
D00TT NO.
50-263 (MIT NAME Monticello DATE 17-01-92 lii2 29hs$5k'
~.
REPORT MONIH June 6
Duration Reason Mediod LER Systez Cause & Corr m tive No.
Date "Ay(pe (hours)
(2) of No.
Code e
Action (o 1) l Shutdown (4)
(5)
Prevent Recurrence
-(3) i None r
l r
i 4
i i
i i
i i
1 i
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard 5: Scheduled A-Equipment Failure (Explain) 1-Mainsal 805-1984(P805-DS) i B-Ma1ntenance or Test 2-Mantial Scram C-Refueling 3-Automatic Scram 5
i D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1083 t
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) f I
I
-