e OPERATING DATA REPORT DOCKET NO.
OPERATING DATA REPORT
50-286 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (9141 739-8200 OPERATING STATUS Indian Point No. 3 Nuclear Power Plant Notes
'                                                                                                                                        DOCKET NO. 50-286 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (9141 739-8200 OPERATING STATUS Notes
: 1. Unit Name:
: 1. Unit Name: Indian Point No. 3 Nuclear Power Plant
: 2. Reporting Period:
: 2. Reporting Period:       Ar'ril 1983
Ar'ril 1983
: 3. Licensed Thermal Power (MWt):             3025
: 3. Licensed Thermal Power (MWt):
: 4. Nctr.eplate Rating (Gress MWe):           1013
3025 1013
: 5. Design i.lectrical Rating (Net MWe):       965
: 4. Nctr.eplate Rating (Gress MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                       926
965
: 7. Maximum Dependable Capacity (Net .MWe):                         891
: 5. Design i.lectrical Rating (Net MWe):
926
: 6. Maximum Dependable Capacity (Gross MWe):
891
: 7. Maximum Dependable Capacity (Net.MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 9. Power Level To Which Restricted,if Any (Net MWe):
: 10. Reasons For Restrictions,if Any:
: 10. Reasons For Restrictions,if Any:
This Month                                   Yr..to.Date             Cumulative
This Month Yr..to.Date Cumulative 719 2879 58,440.0
: 11. Hours In Reporting Period                                       719                                                  2879            58,440.0 0                                                       0            34,090.8
: 11. Hours In Reporting Period 0
0 34,090.8
: 12. Number Of Hours Reactor Was Critical
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours                                   o                                                       o                   n.o
: 13. Reactor Reserve Shutdown Hours o
: 14. Hours Generator On.Line                                           0                                                       0           32.913.1
o n.o
: 15. Unit Reserve Shutdown Hours                                       0                                                       0                   0.0
: 14. Hours Generator On.Line 0
: 16. Gross Thermal Energy Generated (MWH)                             0                                                       0       86.141.4n1_o
0 32.913.1
: 17. Gross Electrical Energy Generated (MWH)                           0                                                       0       26.298.300.0
: 15. Unit Reserve Shutdown Hours 0
: 18. Net Electrical Energy Generated (MWH)                             0                                                       0       25.193.441 0
0 0.0 0
: 19. Unit Service Factor 0                                                       0                 56.3
0 86.141.4n1_o
: 20. Unit Availability Factor                                         0                                                       0                 56.3
: 16. Gross Thermal Energy Generated (MWH) 0 0
: 21. Unit Capacity Factor (Using MDC Net)                             0                                                       0                 as.4
26.298.300.0
: 22. Unit Capacity Factor (Using DER Net)                             0                                                       0                 44.7 0
: 17. Gross Electrical Energy Generated (MWH) 0 0
: 23. Unit Forced Outage Rate                                           0                                                                          14.3
25.193.441 0
: 18. Net Electrical Energy Generated (MWH) 0 0
56.3
: 19. Unit Service Factor 0
0 56.3
: 20. Unit Availability Factor 0
0 as.4
: 21. Unit Capacity Factor (Using MDC Net) 0 0
44.7
: 22. Unit Capacity Factor (Using DER Net) 0 0
14.3
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:
Upon completion of scheduled 25 If Shut Down At End Of Report Period. Estimated Date of Startup:                             Maintenance n e_ navn annn 1983.
Upon completion of scheduled Maintenance n e_ navn annn 1983.
26 Units In Test Status (Prior to Commercial Operation):                                                       Forecast                 Achieved INITIAL CRITICALITY INITIAL ELECTRICITY                                                                                                           ,
25 If Shut Down At End Of Report Period. Estimated Date of Startup:
COMMERCI AL OPERATION 8306160385 830501                                                                                                                           Il PDR ADDCK 05000286 R                         PDR
26 Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 8306160385 830501 Il PDR ADDCK 05000286 R
PDR


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-286 Indian Point UNIT         No. 3 DATE     May 1,   1983 COMPLETED BY           L. Kelly TELEPHONE       (914) 739-8200 MON 111     April 1983 DAY       AVERAGE DAILY POWER LEVEL                           DAY       AVERAGE DAILY POWER LE\ EL IMWe-Net)                                                   (MWe-Net) 1                           0                                 g7                       0 2                           0                                 18                       0 3                           0                                 19                       0 4                           0                               20                       0 5                           0                               21                       0 6                           0                               22                       0 7                           0                               23                       0 8                           0                               24                       0 9                           O                               23                       0 10                           0                               26                       0 1I                           O                               27                       0-12                           0                               23                       0 13                           0                               29                       0 14                           0                               30                       0 15                           0                               31 16                           0 INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 Indian Point UNIT No. 3 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MON 111 April 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LE\\ EL IMWe-Net)
(MWe-Net) 1 0
g7 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 O
23 0
10 0
26 0
1I O
27 0-12 0
23 0
13 0
29 0
14 0
0 30 15 0
31 16 0
INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
(9/77)


O +
O
50-286      .,
+
UNIT SIIUTDOWNS AND POWER REDUCTIONS                     DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME             NO. 3 DATE May 1, 1983 REPORT MONT1f April 1983                    COMPLETED BY L- Kelly TELEPHONE 914-739-0200 re.
50-286 UNIT NAME NO. 3 DATE May 1, 1983 COMPLETED BY L-Kelly REPORT MONT1f April 1983 TELEPHONE 914-739-0200 re.2
2                            -
.3 to 3 5"
                                                                                                                        =
=
                                                                                                                        .2 _e ra E
ra C 'A Eicensee
                                                                                                                                        .3 to 3 2 C 'A    Eicensee ct         5"
.2 _e E
: c.                   Cause & Corrective No.                         Date     g         3g         g   ,g g 5       Event       5'-E        E.3                        Action to
2 ct c.
                                                                                                                        $E           $  j di g     Report #   <N C jU                     Prevent Recurrence d
Cause & Corrective 5'-E E.3 Action to No.
n 04                               82/03/25   s           719     B&C     N/A                   N/A         N/A   Unit in a scheduled cycle III-IV Refueling and Maintenance Outage.
Date g
I                                               2                                                 3                               4 F: Forced                       Reason:                                             Method:                             Exhibit F-Instructions S: Scheduled                     A Equipment Failure (Explain)                       1-Manual                           for Preparation of Data B-Maintenance of Test                               2-Manual Scram.                     Entry Sheets for Licensee C-Refueling                                         3. Automatic Scram.                 Event Report (LER) File (NUREG-D-Regulatory Restriction                           4-Ot her ( Explain)                 0161)
3g g
E-Operator Training & License Examination F-Administ rative                                                                 5 G-Operational Error (Explain)                                                           Exhibit II- Same Source (9/77)                                               Il-Ot her ( E xplain )
,g g 5 Event
$E j di g Report #
<N C jU Prevent Recurrence d
n 04 82/03/25 s
719 B&C N/A N/A N/A Unit in a scheduled cycle III-IV Refueling and Maintenance Outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit F-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling
: 3. Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)
E-Operator Training & License Examination F-Administ rative 5
G-Operational Error (Explain)
Exhibit II-Same Source (9/77)
Il-Ot her ( E xplain )


e .
e.
MONTHLY MAINTENANCE REPORT April 1983 MONTH MWRI     DATE               EQUIPMENT                     MALFUNCTION         CORRECTlVE ACTION 3483 4-D4-83   Emergency Diesel Generator     Inlet seals leak         Replaced seals
MONTHLY MAINTENANCE REPORT April 1983 MONTH MWRI DATE EQUIPMENT MALFUNCTION CORRECTlVE ACTION 3483 4-D4-83 Emergency Diesel Generator Inlet seals leak Replaced seals
                  #32 Lube Oil Pump 3429 4-06-83   Check Valve 897A               Gasket leak               Peplaced gasket 3544 4-11-83   Fan Cooler Unit #32 Spool       Gasket leak               Replaced gasket Piece 3550 4-13-83   Component Cooling Pump #32     Breaker malfunction       Adjusted switch 480 Volt Breaker 3555 4-18-83   Pressurizer Block Valve         Torque switch malfunction Replaced torque switch MOV-536 3465 4-22-83   Auxiliary Boiler $eed           Joint leak               Rewelded Pump #33 Recirculation Line 3558 4-25-83   Fan Cooler Unit #35 Service     Broken Spur Gear         Replaced gear Water Inlet Valve-SWN 41E 3560 4-25-83   Fan Cooler Unit #35 Air Line   Air line leak             Replaced tubing to Damper B                                                                                 -
#32 Lube Oil Pump 3429 4-06-83 Check Valve 897A Gasket leak Peplaced gasket 3544 4-11-83 Fan Cooler Unit #32 Spool Gasket leak Replaced gasket Piece 3550 4-13-83 Component Cooling Pump #32 Breaker malfunction Adjusted switch 480 Volt Breaker 3555 4-18-83 Pressurizer Block Valve Torque switch malfunction Replaced torque switch MOV-536 3465 4-22-83 Auxiliary Boiler $eed Joint leak Rewelded Pump #33 Recirculation Line 3558 4-25-83 Fan Cooler Unit #35 Service Broken Spur Gear Replaced gear Water Inlet Valve-SWN 41E 3560 4-25-83 Fan Cooler Unit #35 Air Line Air line leak Replaced tubing to Damper B 3567 4-26-83 Purge Exhaust Valve PCV-ll70 Improper indication Replaced limit switch t
t 3567 4-26-83   Purge Exhaust Valve PCV-ll70   Improper indication       Replaced limit switch Position Indicator 3292 4-27-83 - Weld Channel Rack 18 Test       Leak at Fitting           Replaced fitting Connection
Position Indicator 3292 4-27-83 Weld Channel Rack 18 Test Leak at Fitting Replaced fitting Connection


3 H N 8 T O 9 N I 1 O T M C l   A i
3 H
E p   V A   I T
N 8
C E
T O
R R
9 N
O C
I 1
T R
O T
O P
M C
l A
ir E
p V
A I
TC ERRO C
TRO PER I
YR N
O O
G I
E T
T C
A N
C UF C
LA M
I Y
LH e
TN OM TN T
E R
E R
I Y
M O
R      N O      O G      I E      T T      C A      N C      U F
P P
C      L A
I E
          &      M I
U R
Y L
Q E
H            e T
OT GN I
N O
I ITO N
M T
ETAD I
N      T E      R M      O P       P I       E U       R Q
R.W
E       O T
G N
I I
I T
O N
E T
A D
I R.
W


4
4
Line 106: Line 178:
0
0


e POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. BOX 215 8UCHAN AN. N. Y.1o511 T E L.s PMo N c: 914 739.82o0 May 9, 1983 Y                     IP-LK-1325 Dochet No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
e POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. BOX 215 8UCHAN AN. N. Y.1o511 T E L.s PMo N c: 914 739.82o0 May 9, 1983 Y
IP-LK-1325 Dochet No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555


==Dear Sir:==
==Dear Sir:==
Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of April, 1983.
Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of April, 1983.
Very truly yours, 5
Very truly yours, 5
John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James A. Allen, Acting Regional Administrator Office of Inspection and Enforcement
John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James A. Allen, Acting Regional Administrator Office of Inspection and Enforcement
              -Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle
-Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO gf(
* New York, New York 10019 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO J. P. Bayne, WPO                                                       gf(
J. P. Bayne, WPO l
l INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339}}
INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339}}

Latest revision as of 02:37, 15 December 2024

Monthly Operating Rept for Apr 1983
ML20076H062
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/01/1983
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
IP-LK-1325, NUDOCS 8306160385
Download: ML20076H062 (7)


Text

..

e OPERATING DATA REPORT DOCKET NO.

50-286 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (9141 739-8200 OPERATING STATUS Indian Point No. 3 Nuclear Power Plant Notes

1. Unit Name:
2. Reporting Period:

Ar'ril 1983

3. Licensed Thermal Power (MWt):

3025 1013

4. Nctr.eplate Rating (Gress MWe):

965

5. Design i.lectrical Rating (Net MWe):

926

6. Maximum Dependable Capacity (Gross MWe):

891

7. Maximum Dependable Capacity (Net.MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative 719 2879 58,440.0

11. Hours In Reporting Period 0

0 34,090.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours o

o n.o

14. Hours Generator On.Line 0

0 32.913.1

15. Unit Reserve Shutdown Hours 0

0 0.0 0

0 86.141.4n1_o

16. Gross Thermal Energy Generated (MWH) 0 0

26.298.300.0

17. Gross Electrical Energy Generated (MWH) 0 0

25.193.441 0

18. Net Electrical Energy Generated (MWH) 0 0

56.3

19. Unit Service Factor 0

0 56.3

20. Unit Availability Factor 0

0 as.4

21. Unit Capacity Factor (Using MDC Net) 0 0

44.7

22. Unit Capacity Factor (Using DER Net) 0 0

14.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:

Upon completion of scheduled Maintenance n e_ navn annn 1983.

25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 8306160385 830501 Il PDR ADDCK 05000286 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 Indian Point UNIT No. 3 DATE May 1, 1983 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MON 111 April 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LE\\ EL IMWe-Net)

(MWe-Net) 1 0

g7 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 O

23 0

10 0

26 0

1I O

27 0-12 0

23 0

13 0

29 0

14 0

0 30 15 0

31 16 0

INSTRUCTIONS On this format. list the average daily unit power lesel in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

O

+

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNIT NAME NO. 3 DATE May 1, 1983 COMPLETED BY L-Kelly REPORT MONT1f April 1983 TELEPHONE 914-739-0200 re.2

.3 to 3 5"

=

ra C 'A Eicensee

.2 _e E

2 ct c.

Cause & Corrective 5'-E E.3 Action to No.

Date g

3g g

,g g 5 Event

$E j di g Report #

<N C jU Prevent Recurrence d

n 04 82/03/25 s

719 B&C N/A N/A N/A Unit in a scheduled cycle III-IV Refueling and Maintenance Outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit F-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling

3. Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5

G-Operational Error (Explain)

Exhibit II-Same Source (9/77)

Il-Ot her ( E xplain )

e.

MONTHLY MAINTENANCE REPORT April 1983 MONTH MWRI DATE EQUIPMENT MALFUNCTION CORRECTlVE ACTION 3483 4-D4-83 Emergency Diesel Generator Inlet seals leak Replaced seals

  1. 32 Lube Oil Pump 3429 4-06-83 Check Valve 897A Gasket leak Peplaced gasket 3544 4-11-83 Fan Cooler Unit #32 Spool Gasket leak Replaced gasket Piece 3550 4-13-83 Component Cooling Pump #32 Breaker malfunction Adjusted switch 480 Volt Breaker 3555 4-18-83 Pressurizer Block Valve Torque switch malfunction Replaced torque switch MOV-536 3465 4-22-83 Auxiliary Boiler $eed Joint leak Rewelded Pump #33 Recirculation Line 3558 4-25-83 Fan Cooler Unit #35 Service Broken Spur Gear Replaced gear Water Inlet Valve-SWN 41E 3560 4-25-83 Fan Cooler Unit #35 Air Line Air line leak Replaced tubing to Damper B 3567 4-26-83 Purge Exhaust Valve PCV-ll70 Improper indication Replaced limit switch t

Position Indicator 3292 4-27-83 Weld Channel Rack 18 Test Leak at Fitting Replaced fitting Connection

3 H

N 8

T O

9 N

I 1

O T

M C

l A

ir E

p V

A I

TC ERRO C

TRO PER I

YR N

O O

G I

E T

T C

A N

C UF C

LA M

I Y

LH e

TN OM TN T

E R

M O

P P

I E

U R

Q E

OT GN I

I ITO N

ETAD I

R.W

4

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

Unit repairs, modifications and preventive maintenance are proceeding as scheduled.

Steam generators girth welds have been completed, s

0

e POWER AUTHORITY OF THE STATE OF NEW YORK INDIAN POINT NO. 3 NUCLEAR POWER PLANT P. O. BOX 215 8UCHAN AN. N. Y.1o511 T E L.s PMo N c: 914 739.82o0 May 9, 1983 Y

IP-LK-1325 Dochet No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of April, 1983.

Very truly yours, 5

John C. Brons Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James A. Allen, Acting Regional Administrator Office of Inspection and Enforcement