{{#Wiki_filter:f       .                                                                                                      TSP- 3 A t t a ch rE n t
{{#Wiki_filter:f TSP-3 A t t a ch rE n t
* 33
* 33 Issui 2 50-267 OPERATINC DATA REPORT DOCKET NO.
    '
December 12,I1983 DATE Chuck Fuller CcMPLETED BY TEl.EPHONE (303) 785-2224 OPERATINC STATLG notes 1.
* Issui 2 OPERATINC DATA REPORT                                   DOCKET NO.         50-267 DATE December 12,I1983 CcMPLETED BY           Chuck Fuller TEl.EPHONE         (303) 785-2224 OPERATINC STATLG notes
Unit Name:
: 1. Unit Name:               Fort St. Vrain
Fort St. Vrain 2.
: 2. Reporting Period:         831101 thru 831130
Reporting Period:
: 3. Licensed Thermal Power (Wt):                   842
831101 thru 831130 3.
: 4. Nameplate Rating (Cross We):                   342
Licensed Thermal Power (Wt):
: 5. Design Electrical Rating (Net We):             330
842 4.
: 6. Maximum Dependable Capacity (Cross We):         342
Nameplate Rating (Cross We):
: 7. Maximu:n Dependable Capacity (Net We):         330
342 5.
: 8. If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
Design Electrical Rating (Net We):
None
330 342 6.
: 9. Power Level To Which Restricted If Any (Net We):           231
Maximum Dependable Capacity (Cross We):
: 10. Reasons for Restrictions, If Any:       Restriction to 70% pendine recolution of contractual matters.
330 7.
This Month           Year to Date         Cu:nulative 720                   8,016             38,737
Maximu:n Dependable Capacity (Net We):
: 11. Hours in Reporting Period
8.
: 12. Number of Hours Reactor Vas Critical                    666.0                 5.377.0           25,123.7               ,
If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:
: 13. Reactor Reserve Shutdown Hours                            0.0                       0.0                   0.0
None 9.
: 14. Hours Generator on-I.ine                                553.0                 3,957.I           17,131.6 l
Power Level To Which Restricted If Any (Net We):
: 15. Unit Reserve Shutdown Hours                               0.0                       0.0                   0.0
231 10.
: 16. Gross Thermal Energy Generated (WH)               314,465.8           2.183.434.1           9.124.419.5*
Reasons for Restrictions, If Any:
: 17. Cross Electrical Energy Generated (WR)             100,999                 696.083           3.022.987
Restriction to 70% pendine recolution of contractual matters.
: 18. Net Electrical Energy Generated (WR)                 93,334                 626,197         2,749,307
This Month Year to Date Cu:nulative 720 8,016 38,737 11.
: 19. Unit Service Factor                                      76.8                     49.4                 44.2
Hours in Reporting Period 666.0 5.377.0 25,123.7 12.
: 20. Unit Availability Factor                                 76.8 _                   49.4                 44.2
Number of Hours Reactor Vas Critical 0.0 0.0 0.0 13.
: 21. Unit Capacity Factor (Using MDC Net)                     39.3                     23.7                 21.5 y $     22. rait Capacity ractor (esing DER Net)                     39.3                      23.7                  21.5
Reactor Reserve Shutdown Hours 553.0 3,957.I 17,131.6 l
  *O                                                                       23.2                     50.6                 40.7
14.
  -O     23. Unit Forced Outage Rate c30 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach):           Refueling 1- 15-84 24.
Hours Generator on-I.ine 0.0 0.0 0.0 15.
h MU through 4-13-84, 2,160 hours.
Unit Reserve Shutdown Hours 16.
4
Gross Thermal Energy Generated (WH) 314,465.8 2.183.434.1 9.124.419.5*
: 25. If Shut Down at End of Report Period. Estimated Date of Startup:           N/A O<
17.
N              Units In Test Status (Prior to Cor-ercial Opera tion):               Fo r eca s t         Achieved OT      26.
Cross Electrical Energy Generated (WR) 100,999 696.083 3.022.987 18.
CQ C 0.2                                   INITIAL CRITICALITY                                 N/A                N/A                      _
Net Electrical Energy Generated (WR) 93,334 626,197 2,749,307 76.8 49.4 44.2 19.
INITIAL EL*'CTRICITY                                 N/A               N/A COSiERCIAL OPERATION                                 N/A                 N/A l
Unit Service Factor 20.
Unit Availability Factor 76.8 _
49.4 44.2 39.3 23.7 21.5 21.
Unit Capacity Factor (Using MDC Net) 39.3 23.7 21.5 y $
22.
rait Capacity ractor (esing DER Net)
*O 23.2 50.6 40.7
-O 23.
Unit Forced Outage Rate c30 Refueling 1-15-84 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach):
h through 4-13-84, 2,160 hours.
MU 4
N/A 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
O<
NOT 26.
Units In Test Status (Prior to Cor-ercial Opera tion):
Fo r eca s t Achieved CQ N/A N/A C 0.2 INITIAL CRITICALITY INITIAL EL*'CTRICITY N/A N/A COSiERCIAL OPERATION N/A N/A l
* Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment.
* Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment.


r public service company e odemeda Ja' '.         16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN:   Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555
r public service company e odemeda Ja' '.
16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN:
Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.
20555


==Reference:==
==Reference:==
Line 59: Line 79:


==Dear Sir:==
==Dear Sir:==
Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported.
Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported.
Very truly ycurs, b   ]YYb.<d Don W. Warembourg v q
Very truly ycurs, b ]YYb.<d q Don W. Warembourg v
Manager, Nuclear Production Enclosure cc:   Mr. John T. Collins DWW/dkh i/l ggfWO SE@ g y r! Y
Manager, Nuclear Production Enclosure cc:
                              . - . - - - -            .    .-    .    ..- _      . - - _. .}}
Mr. John T. Collins DWW/dkh i/lggfWO SE@ g y r! Y
. - - _..}}

Latest revision as of 22:36, 14 December 2024

Revised Monthly Operating Rept for Nov 1983
ML20080A574
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/30/1983
From: Fuller C, Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
P-84037, NUDOCS 8402060129
Download: ML20080A574 (2)


Text

f TSP-3 A t t a ch rE n t

  • 33 Issui 2 50-267 OPERATINC DATA REPORT DOCKET NO.

December 12,I1983 DATE Chuck Fuller CcMPLETED BY TEl.EPHONE (303) 785-2224 OPERATINC STATLG notes 1.

Unit Name:

Fort St. Vrain 2.

Reporting Period:

831101 thru 831130 3.

Licensed Thermal Power (Wt):

842 4.

Nameplate Rating (Cross We):

342 5.

Design Electrical Rating (Net We):

330 342 6.

Maximum Dependable Capacity (Cross We):

330 7.

Maximu:n Dependable Capacity (Net We):

8.

If Changes Oc. cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Cive Reasons:

None 9.

Power Level To Which Restricted If Any (Net We):

231 10.

Reasons for Restrictions, If Any:

Restriction to 70% pendine recolution of contractual matters.

This Month Year to Date Cu:nulative 720 8,016 38,737 11.

Hours in Reporting Period 666.0 5.377.0 25,123.7 12.

Number of Hours Reactor Vas Critical 0.0 0.0 0.0 13.

Reactor Reserve Shutdown Hours 553.0 3,957.I 17,131.6 l

14.

Hours Generator on-I.ine 0.0 0.0 0.0 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (WH) 314,465.8 2.183.434.1 9.124.419.5*

17.

Cross Electrical Energy Generated (WR) 100,999 696.083 3.022.987 18.

Net Electrical Energy Generated (WR) 93,334 626,197 2,749,307 76.8 49.4 44.2 19.

Unit Service Factor 20.

Unit Availability Factor 76.8 _

49.4 44.2 39.3 23.7 21.5 21.

Unit Capacity Factor (Using MDC Net) 39.3 23.7 21.5 y $

22.

rait Capacity ractor (esing DER Net)

  • O 23.2 50.6 40.7

-O 23.

Unit Forced Outage Rate c30 Refueling 1-15-84 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Lach):

h through 4-13-84, 2,160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br />.

MU 4

N/A 25.

If Shut Down at End of Report Period. Estimated Date of Startup:

O<

NOT 26.

Units In Test Status (Prior to Cor-ercial Opera tion):

Fo r eca s t Achieved CQ N/A N/A C 0.2 INITIAL CRITICALITY INITIAL EL*'CTRICITY N/A N/A COSiERCIAL OPERATION N/A N/A l

  • Includes a +7.5 E.F.P.D. Cycle 3 burnup adjustment.

r public service company e odemeda Ja' '.

16805 WCR 19 1/2, Platteville, Colorado 80651 January 31, 1984 Fort St. Vrain Unit #1 P-84037 Office of Inspection and Enforcement ATTN:

Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Reference:

Facility Operating License No. DPR-34 Docket No. 50-267

Dear Sir:

Enclosed please find a revision to our Monthly Operations Report for the month of November, 1983, which reflects a correction to the monthly " Hours Generator On-Line" value previously reported.

Very truly ycurs, b ]YYb.<d q Don W. Warembourg v

Manager, Nuclear Production Enclosure cc:

Mr. John T. Collins DWW/dkh i/lggfWO SE@ g y r! Y