VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 84-01 FOR THE MONTH OF JANUARY, 1984
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 84-01 FOR THE MONTH OF JANUARY, 1984
&&Oti!-
&&Oti!-
1
,f DO$KOohohf7 PDR
          ,f   DO$KOohohf7 PDR


i
i
[
[
OPERATING DATA REPORT DOCKET NO.     50-271 l                                                                                               DATE arnein i
OPERATING DATA REPORT DOCKET NO.
f COMPLETED BY       P.J. surRer t                                                                                    TELEPHONE 802/257-7711 t
50-271 l
OPERATING STATUS Notes
DATE arnein i
!        1. Unit Name:           Vermont Yankee
COMPLETED BY P.J. surRer f
: 2. Reporting Period:           _Tann2 rv i       3. Licensed Thermal Power (MWe):         1593
TELEPHONE 802/257-7711 t
: 4. Nameplate Rating (Gross MWe)$           san l       S. Design Electrical Racing (Net MWe):       514(oc) 504(cc)
t OPERATING STATUS Notes
: 6. Maximum Dependable Capacity (Gross MWe):       535 I
: 1. Unit Name:
: 7. Maximum Dependable Capacity (Net MWe): __       504
Vermont Yankee
: 2. Reporting Period:
_Tann2 rv i
: 3. Licensed Thermal Power (MWe):
1593
: 4. Nameplate Rating (Gross MWe)$
san l
S. Design Electrical Racing (Net MWe):
514(oc) 504(cc)
: 6. Maximum Dependable Capacity (Gross MWe):
535 I
: 7. Maximum Dependable Capacity (Net MWe): __
504
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
N/A
N/A
: 9. Power Leve'. to Which Restricted.If Any(Net MWe):             N/A
: 9. Power Leve'. to Which Restricted.If Any(Net MWe):
: 10. Reasons For Restrictions, If Any:                             N/A i
N/A
!                                                            This Month       Yr-to-Date             Cumulative
: 10. Reasons For Restrictions, If Any:
: 11. Hours In Reporting Period                           744               744                   --
N/A i
: 12. Number of Hours Reactor Was Critical                 636.61             636.61               80,335.26
This Month Yr-to-Date Cumulative
]       13. Reactor Reserve Shutdown Houra                         0.00               0.00                     0.00
: 11. Hours In Reporting Period 744 744
: 14. Hours Generator On-Line                             610.7             610.7                 78.103.28
: 12. Number of Hours Reactor Was Critical 636.61 636.61 80,335.26
]       15. Unit Reserve Shutdown Hours                             o nn               0.00                     0.00
]
: 16. Gross Thermal Energy Generated (MWH)           924.182.00         924~.182.00           113.084.861.50
: 13. Reactor Reserve Shutdown Houra 0.00 0.00 0.00
: 17. Gross Electrical Energy Generated (MWH) 312.103.00-       1121108.00             17.60s.1A6.00
: 14. Hours Generator On-Line 610.7 610.7 78.103.28
: 18. Net Electrical Energy Generated (MWH)           299.508.00       '299.508.00             35,664,524.00
]
: 19. Unit Service Factor                                   82.08             82.08                     78.41
: 15. Unit Reserve Shutdown Hours o nn 0.00 0.00
;      20. Unit Availability Factor                             R7 nR             A? na                     7n At
: 16. Gross Thermal Energy Generated (MWH) 924.182.00 924~.182.00 113.084.861.50
: 21. Unit Capacity Factor (Using MDC Net)                 79.87             79.87                     71.04
: 17. Gross Electrical Energy Generated (MWH) 312.103.00-1121108.00 17.60s.1A6.00
: 22. Unit Capacity Factor (Using DER Net)                 78.32             78.32                     69.66
: 18. Net Electrical Energy Generated (MWH) 299.508.00
: 23. Unit Forced Outage Rate                               17.92-             17.92                     7.47
'299.508.00 35,664,524.00
: 19. Unit Service Factor 82.08 82.08 78.41
: 20. Unit Availability Factor R7 nR A? na 7n At
: 21. Unit Capacity Factor (Using MDC Net) 79.87 79.87 71.04
: 22. Unit Capacity Factor (Using DER Net) 78.32 78.32 69.66
: 23. Unit Forced Outage Rate 17.92-17.92 7.47
: 24. Shutdowns Scheduled over' Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled over' Next 6 Months (Type, Date, and Duration of Each):
Refuel and Maintenance Outage' schedule starting 6/16/84 lasting 8 weeks
Refuel and Maintenance Outage' schedule starting 6/16/84 lasting 8 weeks
: 25. If Shut Down- At End Of Report Period, Estimated Date of Startup:                   N/A
: 25. If Shut Down-At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test-Status (Prior to Commercial Operation):                 Forecast-             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-
N/A
                                            ~ '                                                                      '
: 26. Units In Test-Status (Prior to Commercial Operation):
L ,_                                                                                  ~ _ .
Forecast-Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-L,_
~ '
~ _.


                        - _ _ _ .      _.    .-.  ~.   . -                . .. _            . _ _.        - . . -
~.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.         50-271 UNIT     Vermont Yankee DATE     840210 COMPLETED BY             F.J. Burger TELEPHONE             802/257-7711 MONTH     January DAY   AVERAGE DAILY POWER LEVEL                     DAY AVERAGE DAILY POWER LEVEL (MWe-4et)                                     (MWe-Net)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
: 1.                     513                         17.                   517
50-271 UNIT Vermont Yankee DATE 840210 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-4et)
: 2.                     520                         18.                   513
(MWe-Net) 1.
: 3.                     520                         19.                   508
513 17.
: 4.                     520                         20.                   200
517 2.
: 5.                     279                         21.                     0
520 18.
: 6.                       0                         22.                     0 l           7.                     192                         23.                     0
513 3.
: 8.                     447                         24,                   151
520 19.
: 9.                     512                         25.                   398 10,                      521                         26.                   483
508 4.
: 11.                     521                         27,                   502                 _ _ -
520 20.
J
200 5.
: 12.                     519                         28.                   518
279 21.
;        13.                     520                         29.                   516
0 6.
: 14.                     505'                         30.                   521
0 22.
: 15.                     520                         31.                   520
0 l
: 16.                     519 INSTRUCTIONS:
7.
192 23.
0 8.
447 24, 151 9.
512 25.
398 521 26.
483 10, 11.
521 27, 502 J
12.
519 28.
518 13.
520 29.
516 14.
505' 30.
521 15.
520 31.
520 16.
519 INSTRUCTIONS:
On this format, list the average daily unit power. level in MWe-Net for each day in
On this format, list the average daily unit power. level in MWe-Net for each day in
.        .the reporting month. Compute to the nearest whole megawatt.
.the reporting month. Compute to the nearest whole megawatt.
,f i
,f i
l l                                                                         _                ~.                             , ,
l l
~.


3 .        -+-L4           -w-UNIT SiluTDOWNS AND POWER REDUCTIONS                         DOCKET No       50-271 UNIT NAME       Vermont Yankee REPORT MONTil   Janua ry                                 DATE       840210 COMPLETED BY       F.J. Burger TELEPllONE       802/257-7711 No.                    E '2 m       o   $
3
Date   y   7;y     g     y ;; g     License   gr            $,n                    Cause & Corrective Action to rt#                   0                       ""          "'#"" "
-+-L4
x    g                             u 8
-w-UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET No 50-271 UNIT NAME Vermont Yankee REPORT MONTil Janua ry DATE 840210 COMPLETED BY F.J.
84-01   840105   F   40.4     A       3     84-01         llA       MECFUN   A pressure spike on the turbine generator hydraulic control system caused the plant to scram. The system was flushed and
Burger TELEPllONE 802/257-7711 E '2
              .                                                                      returned to service.
$,n Cause & Corrective m
84-02   840114   S     0       B.     4       N/A         IIA       ZZZZZZ   Power Reduction for Turbine Generator and Power                   RB       CONROD     Control Rod Surveillance.
o No.
Reductli n 84-03   840120   F   93.0     A       1       N/A         IIC       llTEXCII   Failure of one of two expansion joints on the main condenser forced the plant to shut down. Both expansion joints were replaced and the unit was put back in service.
Date y
F: Forced         Reason:                                       Method:                           Exhibit G- Instructions S: Scheduled     A-Equipment Failure (Explain)                     l- Manual                     for Preparation of Data B-Maintenance or Test                             2- Manual Scram               Entry Sheets for Licensee C-Refueling                                       3- Automatic Scram           Event Report (LER) File                       l D-Regulatory Restriction                           4- Other (Explain)
7;y g
E-Operator Training & License Examination                                       (NUREG 0161)
y ;; g gr License Action to rt#
F-Administrative                                                             5 G-Operational Error (Explain)                                                   Exhibit I - Same Source II-Other (Explain) 7/80
0 x
g u
8 84-01 840105 F
40.4 A
3 84-01 llA MECFUN A pressure spike on the turbine generator hydraulic control system caused the plant to scram.
The system was flushed and returned to service.
84-02 840114 S
0 B.
4 N/A IIA ZZZZZZ Power Reduction for Turbine Generator and Power RB CONROD Control Rod Surveillance.
Reductli n 84-03 840120 F
93.0 A
1 N/A IIC llTEXCII Failure of one of two expansion joints on the main condenser forced the plant to shut down.
Both expansion joints were replaced and the unit was put back in service.
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File l
D-Regulatory Restriction 4-Other (Explain)
(NUREG 0161)
E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain)
II-Other (Explain) 7/80


DOCKET NO.       50-271 UNIT       VermanL._Yanken DATE       8_4R210 COflPI,ETED fly     F . .I . Burger TEI.EPil0NE       802/257-7711 SAFETY REl.ATED MAINTENANCE                                                                               (
DOCKET NO.
NATURE OF                                     MAI.FIINCTION
50-271 UNIT VermanL._Yanken DATE 8_4R210 COflPI,ETED fly F..I. Burger TEI.EPil0NE 802/257-7711 SAFETY REl.ATED MAINTENANCE
                                                                          ~
(
EQkIIPMENT             MAINTENANCE         NIIMBER           CAllSE                 RESill.T     CORRECTIVE ACTION There was no major safety related naintenance                           N/A                 N/A               N/A                   N/A               N/A required for the month of
NATURE OF MAI.FIINCTION EQkIIPMENT MAINTENANCE NIIMBER CAllSE RESill.T CORRECTIVE ACTION
                                                                                                                                                                                          )
~
There was no major safety related naintenance N/A N/A N/A N/A N/A required for the month of
)
January.
January.
9 4
9 4
_ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _      _ - - _ _ _ - - - -                                                                                            ^ - - - - ~ - - - - - - -~
^ - - - - ~ - - - - -
- -~


1
1
. .    ~
~
DOCKET NO. 50-271 UNIT   Vermont Yankee DATE   840210 COMPLETED BY   F.J. Bureer TELEPHONE   802/257-7711 REPORT MONTH January
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 840210 COMPLETED BY F.J. Bureer TELEPHONE 802/257-7711 REPORT MONTH January


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at77.98% of rated thermal power for the month.
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at77.98%
Gross electrical generation was 312108   MWH or 77.69%of design electrical capacity.
of rated thermal power for the month.
Gross electrical generation was 312108 MWH or 77.69%of design electrical capacity.
Operating Summarv The fo11cwing is a chronological description of plant operations including
Operating Summarv The fo11cwing is a chronological description of plant operations including
        .other pertinent items of interest for the month:
.other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.86% of Rated Thermal Power.
At the beginning of the reporting period the plant was operating at 99.86% of Rated Thermal Power.
840105     At 1252 hrs the Reactor scrammed due to a pressure spf.ke.
840105 At 1252 hrs the Reactor scrammed due to a pressure spf.ke.
840106     At 2035 hrs the Reactor went critical.
840106 At 2035 hrs the Reactor went critical.
840107     At 0514 hrs the Turbine was back on line.
840107 At 0514 hrs the Turbine was back on line.
840114     At 0730 hrs a power reduction was initiated for Turbine Generator and Control Rod Surveillance Testing.
840114 At 0730 hrs a power reduction was initiated for Turbine Generator and Control Rod Surveillance Testing.
840114     At 0930 hrs a return to full power was initiated.
840114 At 0930 hrs a return to full power was initiated.
840120     At 0645 hrs a plant shut down was initiated to replace main condenser expansion joints.
840120 At 0645 hrs a plant shut down was initiated to replace main condenser expansion joints.
840120     At 1258 hrs the Turbine Generato'r was removed from service.
840120 At 1258 hrs the Turbine Generato'r was removed from service.
840120     At 1645 hrs the Reactor was suberitical.
840120 At 1645 hrs the Reactor was suberitical.
840123     At 2026 hrs the Reactor went critical.
840123 At 2026 hrs the Reactor went critical.
840124     At 0955 hrs the Turbine Generator went back on line.
840124 At 0955 hrs the Turbine Generator went back on line.
At the end of the reporting period ~ the plant was operating at 99.81%
At the end of the reporting period ~ the plant was operating at 99.81%
of Rated Thermal Power.
of Rated Thermal Power.


l VERMONT YANKEE NUCLEAR POWER CORPORATION                                               !
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 84-039 February 10, 1984 U.S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, DC 20555
P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 84-039 February 10, 1984 U.S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, DC   20555


==Dear Sir:==
==Dear Sir:==
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Power Station for the month of January, 1984.
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Power Station for the month of January, 1984.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
b*
b*
Warren P. Murphy Vice President and Manager of Operations FJB/dre 9
Warren P. Murphy Vice President and Manager of Operations FJB/dre d
d W
9W v
                                                                                    &      v
.}}
.}}

Latest revision as of 01:47, 14 December 2024

Monthly Operating Repot for Jan 1984
ML20086N172
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/31/1984
From: Burger F, Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
VYV-84-039, VYV-84-39, NUDOCS 8402170269
Download: ML20086N172 (7)


Text

-

VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 84-01 FOR THE MONTH OF JANUARY, 1984

&&Oti!-

,f DO$KOohohf7 PDR

i

[

OPERATING DATA REPORT DOCKET NO.

50-271 l

DATE arnein i

COMPLETED BY P.J. surRer f

TELEPHONE 802/257-7711 t

t OPERATING STATUS Notes

1. Unit Name:

Vermont Yankee

2. Reporting Period:

_Tann2 rv i

3. Licensed Thermal Power (MWe):

1593

4. Nameplate Rating (Gross MWe)$

san l

S. Design Electrical Racing (Net MWe):

514(oc) 504(cc)

6. Maximum Dependable Capacity (Gross MWe):

535 I

7. Maximum Dependable Capacity (Net MWe): __

504

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

N/A

9. Power Leve'. to Which Restricted.If Any(Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A i

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 744
12. Number of Hours Reactor Was Critical 636.61 636.61 80,335.26

]

13. Reactor Reserve Shutdown Houra 0.00 0.00 0.00
14. Hours Generator On-Line 610.7 610.7 78.103.28

]

15. Unit Reserve Shutdown Hours o nn 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 924.182.00 924~.182.00 113.084.861.50
17. Gross Electrical Energy Generated (MWH) 312.103.00-1121108.00 17.60s.1A6.00
18. Net Electrical Energy Generated (MWH) 299.508.00

'299.508.00 35,664,524.00

19. Unit Service Factor 82.08 82.08 78.41
20. Unit Availability Factor R7 nR A? na 7n At
21. Unit Capacity Factor (Using MDC Net) 79.87 79.87 71.04
22. Unit Capacity Factor (Using DER Net) 78.32 78.32 69.66
23. Unit Forced Outage Rate 17.92-17.92 7.47
24. Shutdowns Scheduled over' Next 6 Months (Type, Date, and Duration of Each):

Refuel and Maintenance Outage' schedule starting 6/16/84 lasting 8 weeks

25. If Shut Down-At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test-Status (Prior to Commercial Operation):

Forecast-Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-L,_

~ '

~ _.

~.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-271 UNIT Vermont Yankee DATE 840210 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 MONTH January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-4et)

(MWe-Net) 1.

513 17.

517 2.

520 18.

513 3.

520 19.

508 4.

520 20.

200 5.

279 21.

0 6.

0 22.

0 l

7.

192 23.

0 8.

447 24, 151 9.

512 25.

398 521 26.

483 10, 11.

521 27, 502 J

12.

519 28.

518 13.

520 29.

516 14.

505' 30.

521 15.

520 31.

520 16.

519 INSTRUCTIONS:

On this format, list the average daily unit power. level in MWe-Net for each day in

.the reporting month. Compute to the nearest whole megawatt.

,f i

l l

~.

3

-+-L4

-w-UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET No 50-271 UNIT NAME Vermont Yankee REPORT MONTil Janua ry DATE 840210 COMPLETED BY F.J.

Burger TELEPllONE 802/257-7711 E '2

$,n Cause & Corrective m

o No.

Date y

7;y g

y ;; g gr License Action to rt#

0 x

g u

8 84-01 840105 F

40.4 A

3 84-01 llA MECFUN A pressure spike on the turbine generator hydraulic control system caused the plant to scram.

The system was flushed and returned to service.

84-02 840114 S

0 B.

4 N/A IIA ZZZZZZ Power Reduction for Turbine Generator and Power RB CONROD Control Rod Surveillance.

Reductli n 84-03 840120 F

93.0 A

1 N/A IIC llTEXCII Failure of one of two expansion joints on the main condenser forced the plant to shut down.

Both expansion joints were replaced and the unit was put back in service.

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File l

D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain)

II-Other (Explain) 7/80

DOCKET NO.

50-271 UNIT VermanL._Yanken DATE 8_4R210 COflPI,ETED fly F..I. Burger TEI.EPil0NE 802/257-7711 SAFETY REl.ATED MAINTENANCE

(

NATURE OF MAI.FIINCTION EQkIIPMENT MAINTENANCE NIIMBER CAllSE RESill.T CORRECTIVE ACTION

~

There was no major safety related naintenance N/A N/A N/A N/A N/A required for the month of

)

January.

9 4

^ - - - - ~ - - - - -

- -~

1

~

DOCKET NO.

50-271 UNIT Vermont Yankee DATE 840210 COMPLETED BY F.J. Bureer TELEPHONE 802/257-7711 REPORT MONTH January

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at77.98%

of rated thermal power for the month.

Gross electrical generation was 312108 MWH or 77.69%of design electrical capacity.

Operating Summarv The fo11cwing is a chronological description of plant operations including

.other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at 99.86% of Rated Thermal Power.

840105 At 1252 hrs the Reactor scrammed due to a pressure spf.ke.

840106 At 2035 hrs the Reactor went critical.

840107 At 0514 hrs the Turbine was back on line.

840114 At 0730 hrs a power reduction was initiated for Turbine Generator and Control Rod Surveillance Testing.

840114 At 0930 hrs a return to full power was initiated.

840120 At 0645 hrs a plant shut down was initiated to replace main condenser expansion joints.

840120 At 1258 hrs the Turbine Generato'r was removed from service.

840120 At 1645 hrs the Reactor was suberitical.

840123 At 2026 hrs the Reactor went critical.

840124 At 0955 hrs the Turbine Generator went back on line.

At the end of the reporting period ~ the plant was operating at 99.81%

of Rated Thermal Power.

VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 84-039 February 10, 1984 U.S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, DC 20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Power Station for the month of January, 1984.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.

b*

Warren P. Murphy Vice President and Manager of Operations FJB/dre d