Arizona Public Service Company P.o. BOX 21666. PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | |||
Arizona Public Service Company P.o. BOX 21666 . PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | |||
==Subject:== | ==Subject:== | ||
Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests. | Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests. | ||
File: | File: | ||
84-019-026; D.4.33.2 | |||
==Reference:== | ==Reference:== | ||
| Line 31: | Line 32: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B), | The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B), | ||
and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984. | and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984. | ||
- Due to the extensive ' investigation and evaluation required, it is now expected that this information will be finalized by April 2, 1984, at which-time a complete report will be submitted. | |||
There is no-new -information or ' change to the Interim Report at this time. | There is no-new -information or ' change to the Interim Report at this time. | ||
Very truly yours, 4 | Very truly yours, 4 | ||
I$ nom E. E. Van Brunt, Jr. | I$ nom E. E. Van Brunt, Jr. | ||
APS Vice President, Nuclear | APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db | ||
.cc:.See Page Two i | |||
8403130449 840228 PDR ADOCK 05000528 | |||
-L - | |||
PDR. | |||
/ L7-2) 8 ll | |||
1: | 1: | ||
1 W | 1 W | ||
ih | |||
.Mr. T. W. B s op DER 83-64 Page Two- | |||
- cc: | |||
W. E. Ide | Richard DeYoung, Director | ||
- Office of Inspection and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr. | |||
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza | |||
P. P. Klute | . J.-Vorees J. R. Bynum P. P. Klute A. C. Gehr' | ||
,KW. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher H. D. Foster | |||
- D.'R. Hawkinson | |||
- L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost | |||
- J. Self | |||
- D. Canady 1 | |||
Records Center Institute of Nuclear Power Operations | Records Center Institute of Nuclear Power Operations | ||
- 1100 Circle 75 Parkway, Suite 1500 | |||
- Atlanta, CA 30339. | |||
5 i | 5 i | ||
O 1 | O 1 | ||
y r | |||
---m | |||
-}} | |||
Latest revision as of 23:15, 13 December 2024
| ML20087D577 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/28/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-28966-BSK, DER-83-64, NUDOCS 8403130449 | |
| Download: ML20087D577 (2) | |
Text
,
t
_t."
_ p. -
Arizona Public Service Company P.o. BOX 21666. PHOENIX, ARIZONA 85036 February 28, 1984 ANPP-28966-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Caks Office Park 1450 Maria Lane - Suite 210 Walnut. Creek,. CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating Tc Pressure Relief Valves By Target Rock Failed To' Meet Pre-Requisite Tests.
File:
84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Johnson and R. Tucker on September 28, 1983 (B) ANPP-28096, dated, October 26, 1983 (Interim Report)
(C) ANPP-28096, dated, January 26,1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),
and.a Time Extension requested by Reference (C). At that time, it was estimated that a Final-Report would be available by March 5, 1984.
- Due to the extensive ' investigation and evaluation required, it is now expected that this information will be finalized by April 2, 1984, at which-time a complete report will be submitted.
There is no-new -information or ' change to the Interim Report at this time.
Very truly yours, 4
I$ nom E. E. Van Brunt, Jr.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db
.cc:.See Page Two i
8403130449 840228 PDR ADOCK 05000528
-L -
PDR.
/ L7-2) 8 ll
1:
1 W
ih
.Mr. T. W. B s op DER 83-64 Page Two-
- cc:
Richard DeYoung, Director
- Office of Inspection and Enforcement U. - S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza
. J.-Vorees J. R. Bynum P. P. Klute A. C. Gehr'
,KW. J. Stubblefield W. G. Bingham-R. L. Patterson R. W. Welcher H. D. Foster
- D.'R. Hawkinson
- L. E. Vorderbrueggen G. A. Fiore11i S. R. Frost
- J. Self
- D. Canady 1
Records Center Institute of Nuclear Power Operations
- 1100 Circle 75 Parkway, Suite 1500
- Atlanta, CA 30339.
5 i
O 1
y r
---m
-