{{#Wiki_filter:}}
{{#Wiki_filter:1 O-I consumers                                                                                        !
power James W Cook 0                                                        Vice President - Projects, Engineering and Construction General offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 August 27, 1982 Mr Harold R Denton, Director Office of Nuclear Reactor Regulation Att: Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 REVISED MIDLAND PUMP & VALVE INSERVICE TESTING PLAN FILE: 0505.16 SERIAL:                18799
 
==REFERENCE:==
J W COOK LETTER TO H R DENTON DATED JULY 21, 1982 ENCLOSURE: REVISION 1 FOR THE " PUMP AND VALVE INSERVICE TESTING PLAN FOR CONSUMERS POWER COMPANY MIDLAND PLANT UNITS 1 AND 2" Enclosed with this letter are ten controlled copies (Controlled Copies 22-31) of Revision I for the " Pump and Valve Inservice Testing Plan for Consumers Power Company Midland Plant Units 1 and 2," which was initially submitted by our above referenced correspondence of July 21, 1982. The enclosed revisions are necessary to correct an inadvertent omission and typographical errors present in the first issue of the plan. This revision does not change the technical content or intent of the plan.                        Please insert the attached revised pages and discard those superceded pages present in the plan.
Consumers Power reserves the right to revise this plan if changes are made to Section XI of the ASME Code which Consumers Power Company determines to be in its best interests to implement and which are authorized by means of a change to 10 CFR 50.55a or which clarify the intent of existing versions of the ASME Code. It should also be recognized that revisions to this plan may become necessary because of changes in the design or construction of the plant.
JWC/JGB/RLT/mkh Boo l CC RJCook, Midland Resident Inspector, w/o RHernan, NRC, w/o FCCherny, NRC, w/o oc0882-0215a100 8209230349 820827 PDR ADOCK 05000329 A                        PDR
 
4 I
DOCUMENT TRANSMITTAL AND ACKNOWLEDGEMENT To: Harold R Denton, Director Issue Date:                    September. 20, 1982 Office of Nuclear Reactor Return To:                  D M Budzik Regulation                                          Consumers Power Company Division of Licensing                                  1945 West Parnall Road US Nuclear Regulatory Commission                      Jackson, MI 49201 Washington, DC 20555                                    Room P-24-517A Transmittal Return Date:    October 11, 1982 TRANSMITTAL o Attached are revisions for the Controlled Copy No          of the " PUMP AND VALVE INSERVICE TESTING PLAN FOR CONSUMERS POWER COMPANY MIDLAND UNITS 1 AND 2."
o  New or revised pages, figures or tables listed below are to be placed in the above Pump and Valve Inservice Test Plan DOCUMENTS          REVISION NO        ISSUE DATE L0EP                    1              August 1982 Page 10-4              1              August 1982 Page 10-7              1              August 1982 1
Page 10-8              1              August 1982 Please sign, date and return this transmittal form to the person indicated above.
ACKNOWLEDGEMENT My copy has been brought to current, status and superseded material discarded.
My address is the same.
My address is as follows:
Signature                                    Date                  Manual No (Verify) miO882-0216a100
                                            ._. .}}

Revision as of 09:37, 6 January 2021

Forwards Revision 1 to Pump & Valve Inservice Testing Plan for CPC Midland Plant Units 1 & 2, Correcting Inadvertent Omission & Typographical Errors Present in Original Plan Submitted 820721
ML20065C340
Person / Time
Site: Midland
Issue date: 08/27/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065C344 List:
References
18799, NUDOCS 8209230349
Download: ML20065C340 (2)


Text

1 O-I consumers  !

power James W Cook 0 Vice President - Projects, Engineering and Construction General offices: 1945 West Parnell Road, Jackson, MI 49201 e (517) 788 0453 August 27, 1982 Mr Harold R Denton, Director Office of Nuclear Reactor Regulation Att: Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 REVISED MIDLAND PUMP & VALVE INSERVICE TESTING PLAN FILE: 0505.16 SERIAL: 18799

REFERENCE:

J W COOK LETTER TO H R DENTON DATED JULY 21, 1982 ENCLOSURE: REVISION 1 FOR THE " PUMP AND VALVE INSERVICE TESTING PLAN FOR CONSUMERS POWER COMPANY MIDLAND PLANT UNITS 1 AND 2" Enclosed with this letter are ten controlled copies (Controlled Copies 22-31) of Revision I for the " Pump and Valve Inservice Testing Plan for Consumers Power Company Midland Plant Units 1 and 2," which was initially submitted by our above referenced correspondence of July 21, 1982. The enclosed revisions are necessary to correct an inadvertent omission and typographical errors present in the first issue of the plan. This revision does not change the technical content or intent of the plan. Please insert the attached revised pages and discard those superceded pages present in the plan.

Consumers Power reserves the right to revise this plan if changes are made to Section XI of the ASME Code which Consumers Power Company determines to be in its best interests to implement and which are authorized by means of a change to 10 CFR 50.55a or which clarify the intent of existing versions of the ASME Code. It should also be recognized that revisions to this plan may become necessary because of changes in the design or construction of the plant.

JWC/JGB/RLT/mkh Boo l CC RJCook, Midland Resident Inspector, w/o RHernan, NRC, w/o FCCherny, NRC, w/o oc0882-0215a100 8209230349 820827 PDR ADOCK 05000329 A PDR

4 I

DOCUMENT TRANSMITTAL AND ACKNOWLEDGEMENT To: Harold R Denton, Director Issue Date: September. 20, 1982 Office of Nuclear Reactor Return To: D M Budzik Regulation Consumers Power Company Division of Licensing 1945 West Parnall Road US Nuclear Regulatory Commission Jackson, MI 49201 Washington, DC 20555 Room P-24-517A Transmittal Return Date: October 11, 1982 TRANSMITTAL o Attached are revisions for the Controlled Copy No of the " PUMP AND VALVE INSERVICE TESTING PLAN FOR CONSUMERS POWER COMPANY MIDLAND UNITS 1 AND 2."

o New or revised pages, figures or tables listed below are to be placed in the above Pump and Valve Inservice Test Plan DOCUMENTS REVISION NO ISSUE DATE L0EP 1 August 1982 Page 10-4 1 August 1982 Page 10-7 1 August 1982 1

Page 10-8 1 August 1982 Please sign, date and return this transmittal form to the person indicated above.

ACKNOWLEDGEMENT My copy has been brought to current, status and superseded material discarded.

My address is the same.

My address is as follows:

Signature Date Manual No (Verify) miO882-0216a100