ML20066B865: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
OPERATING DATA REPORT DOCKET NO. 50-333 DATE November 1982 C051PLETED BY J . Cook TELEPilONE (315)342-3840 OPERATING STATUS FITZPATRICK                              Notes
: 1. Unit Name:
: 2. Reporting Period:                      821001 - 821031
: 3. Licensed Thermal Power (51WI):                  2436
: 4. Nameplate Rating (Gross MWe):                      883
: 5. Design Electrical Rating (Net 51We):              821
: 6. Maximum Dependable Capacity (Gross MWe): .        830
: 7. Masimum Dependable Capacity (Net MWe):
810
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:                    ,
: 9. Power Lesel To Which Restricted,If Any (Net MWe):              NONE
: 10. Reasons For Restrictions,If Any:
This Month          Yr..to.Date        Cumulatise
: 11. Ilours In Reporting Period                              745                  7296              63673
: 12. Number Ofilours Reactor Was Critical                    494.5                5376.9            44928.1
: 13. Reactor Resene Shutdown flours                              0                      0                            0
: 14. Ilours Generator On.Line                                478.5                5258.1            43701.7
: 15. Unit Reserve Shutdown Hours                                  0                      0                          0
: 16. Gross Thermal Energy Generated (MWH)              1015776            12061416              90462730
: 17. Gross Electrical Energy Generated (MWil)            339140              4081040            30841650
: 18. Net Electrical Energy Generated (MWil)              329095              3960240            29864970
: 19. Unit Senice Factor                                        64.2%                  72.1%                68.6%
: 20. Unit Availability Factor                                  64.2%                  72.1%                68.6%
: 21. Unit Capacity Factor (Using MDC Net)                      54.5%                  67.0%                62.0%
: 22. Unit Capacity Factor (Using DER Net)                      53.8%                  66.1%                57.1%
: 23. Unit Forced Outage Rate                                    35.8%                    7.2%              15.9%
: 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each1:
: 25. If Shut Down At End Of Report Period. Estimated Date d Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                    Forcust              Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION
                                      ~
521'1090221 '821104 PDR ADOCK 05000333 PDR
- R.    -
_ - _ _ _  m  -J
 
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.  . 50-133 UNIT JAFNPP DATE NOVEMBER 1982 COMPLETED BY J. COOK TELEPilONE CL151142-38.40 MONHI      OCTOBER 1982 DAY    AVER AGE DAILY POWER LEVE(.            DAY    AVER AGE DAILY POWER LEVEL (MWe Ne:)                                  (MWe Net) i            19.2                          17 795                            is              67 2
799                            19            367 3
4 797                            20            442 797                            21 450 5
795                            22 512 6
393                          23            636 7
                ---                                          730 g                                          24
                '~~
25            785 9
26 791 io 11 27            794 28 794 12 29 788 13 39 628 34
                ~~~
31            767 15
 
==SUMMARY==
:    The FitzPatrick plant operated at near full thermal power during this reporting period with one outage due to main steam isolation failure and one power reduction for condensate booster pump repair.
 
(.
DOCKET NO.          50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS                                    JAFN FI' UNIT N AME ~
DATE        NOVEMBER 1982 COMPLETED BY          J. COOK REPORT.MONTil OCTOBER 1982                    TELEPIIONE (315)342-3840 n.
No.
                                  -,      .! ?      3      ) .E        Licensee    Eg          o                Cause & Currective Date    i 3?          i    .s i 5        Event    g?        g3                      Action to
                                            $ .,      5    5 e ;5 =!
Report a  mV        o' u
Prevent Recurrence 6
7        821007  -
F      266.5      A        3    82-047        HB    VALVEX      "D" inboard MSIV failure due to disc seperation from stem.
Repaired valve with two anti-rotation pins.
8        821030        S      0          H        4    N/A          HH    PUMPXX      Reduced power for "A" condensate booster pump repair I                    2                                                3                              4 F: Forced            Reason:                                          Method:                          Exlubit G. Inst:uctions S: ScheJ ufed        A Equipment Failure (Explain)                    1-Manual                        for Preparation of Data B Maintenance or Test                            2-Manual Scram.                  Entry Sheets for Licensee C. Refueling                                    3 Automatic Scram.              Event Report (LER) File INUREG.
D Regulatory Restriction                        4-Other (Explain)                0161)
E-Operator Training & License Examination F. Administrative                                                            5 G Operational Error (Explain)                                                    Estubit I . Same Source Il Other (Explain)                                                                                                  +
 
PdWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT
                -NARRATIVE
 
==SUMMARY==
OF OPERATING EXPERIENCE NOVEMBER, 1982 The unit operated at near full thermal power _.for the first orting period..On 821007 six to days of the failure  ofrep'D" the inboard main steam isolation valve and onthe unit tripped due 821030 power was reduced for "A" condensate booster pump repai?r.
At the end of the reporting period the unit is operating at approximately 767 MWe.                                        .
s t
                                                                                        .N.
                                                                \
                                                                                  \.
1 i
                                                                %g i
a t
3 4
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
OCTOBER  1982 WORK REOUEST#                                                                          REPAIR DATE SYSTEM              HOW DETECTED  CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE TIME PON #                                                                              HOURS l'0/15  23    21810          VISUAL      Worn packing            Repacked                                6 HPI-52 10/15  10    18317          OPS        Using pipe wrenches and Replaced valve stems and RHR-755B,                  channel locks on valve handwheels, repacked                  32 756B,757B,                stems 758B 10/15  10    18758          OPS        Handwheels vibrated off Replaced handwheels                      2 RHR-755A, 756A,757A, 758A 10/16  27    18760          OPS        Air line worn through  Replaced damaged portion of air        8
                'L' Target                                        line, wrapped to prevent further Rock                                              abrasion 10/15  23    21801          VISUAL      Blown bonnet gasket    Replaced bonnet gasket                16 AOV-53 10/15  10    16209          N/A        N/A                    Replaced carbon steel cetter pin        3 RHR-14D                                            with stainless steel 10/15  10    16208 RHR-14B        N/A          N/A                    Replaced carbon steel cotter pin        3 with stainless steel 10/14  23    20947        VISUAL        Worn packing          Repacked                                2 Steam Trap Drain Valve 10/14  23    18342        VISUAL        Worn packing          Repacked                                2 HPI-900 1
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & h ECHANICAL MAINTENANCE
 
==SUMMARY==
 
OCTOBER 1982 OR  EQ EST DATE  SYSTEM              HOW DETECTED  CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE T 10/16  29    18806        OPS          Maintenance work on    Adjusted limit switches                2.5 MSIV                      valve A0V-86D LO/16  29    14976        N/A          N/A                    Installed new 90% limit switches        95
* MSIV                                              per MI-82-80 A0V-80-A-D IO/15  46    16222        N/A          N/A                    Replaced carbon steel cotter pin          3 ESW-1B                                            with stainless steel LO/13  02-2  16375        VISUAL      Oil leaks              Visual inspection                        3 Grinnell snubbers LO/7  01-125 18235        OPS          Depleted charcoal      Replaced charcoal                        60 Standby Gas                absorption capacity Filter F-2A LO/13  02    20857        TEMPERATURE  Leaking first stage    Replaced first stage                  116 RV-71F        INDICATION  valve LO/10  10    17710        VISUAL      Deteriorated sealtite  Replaced sealtite with NWC type          7 MOV-21A 10/10  23    20995      VISUAL        Eroded / corroded      Replaced fitting                      12 HPCI drain-                fitting line 10/12  27    11360      N/A            N/A                    Completed Step 8 (1-4) of ECR          6 Primary                                            80-16-34 containment Hi-Hi-Rad relays
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                        1 JAMES A. FITZPATRICK NUCLEAR POWER PLANT 2
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
OCTOBER 1982 DATE SYSTEM EO S HOW DETECTED    CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE T 10/12  29  16380            OPS        Pilot disk to stem    Installed two interference fit      192 Caused MSIV                          locking pin sheared    pins instead of one, in both A0V-80D        shutdown                          pilot to stem and piston to main disc                                        .
10/73                          OPS Testing No malfunction. This 29  18796                                                Installed two interference fit      170 MSIV              indicated  valve was not broken  lock pins instead of one, in both A0V-860        valve was                          pilot to stem and piston to main seperated                          disc 10/9    7:  17126            N/A        N/A                    Traced circuits to correct            25 AC-A2, B2                                            drawings i
10/13  71  14975            N/A        N/A                    Drilled t" weepholes in boxes per      16 lE Junction                                          MI-82-082 Boxes 10/15  23  14312            VISUAL      Broken nipple          Replaced nipple                          3 P-1 10/14  23  18330            VISUAL      W'orn packing          Repacked                              20 MOV-14 10/17  71  14891            N/A          N/A                  Performed preventative                10 Bkr-10404                                            maintenance 10/15  71    I4392            N/A          N/A                  Performed preventative                12 Bkr-10614                                            maintenance 10/16  71    14893          N/A          N/A                    Performed preventative                  5 Bkr-10612                                            maintenance 10/15  71    14894          N/A          N/A                    Performed preventative                5 Bkr-10602                                            maintenance
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
OCTOBER 1982 DATE R  O SYSTEM            HOW DETECTED  CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE T ME E
HOURS l'0/15  71    14895        N/A        N/A                    Performed preventative                5 Bkr-10604                                      maintenance
* 10/15    71    14896        N/A        N/A                    Performed preventative              13    ,
Bkr-10660                                      maintenance 10/16    71    14816        N/A        N/A                    Connected temporary power supply      6 IBC-3, 4                                        to nuclear instruments for bus outage and disconnected 10/16    13    19122        VISUAL      Worn packing          Repacked                              6 MOV-16 10/16    13    18537        VISUAL      Worn packing and      Repacked and replaced pressure        6 MOV-131                  thermal cycling        seal 10/16    02    20884        OPS        Worn packing          MOV-53B torqued packing                10 MOV-53B,54B                                    MOV-54B repacked 10/19    27    18870        OPS        Limit switch out of    Adjusted limit switch                4 AOV-132A                adjustment 10/20  93    18861        OPS        No power indication    Replaced lamp          ,
                                                                                                    .5 ECP-D 10/20  27    18869        OPS        Relief valve out of    Reset valve                          17 SV-ll4B                  adj ustment 10/16  34    18801        VISUAL      Blown bonnet gasket    f4achined bonnet to' remove steam    34 FWS-28B                                        cut-replaced gasket 10/16  02    19246        PRESSURE    Worn seal-some        Replaced shaft seal with a          306 P-1B        INDICATION  evidence of thermal    rebuilt cartridge shock
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
T&C  OCTOBER 1982 WORK REQUEST #                                  CAUSE OF      RESULTS OF    ACTION TAKEN  REPAIR DATE  SYSTEM                              HOW DETECTED COMPONENT #                                  MALFUNCTION  MALFUNCTION    TO PRECLUDE  TIME RECURRENCE    HOURS 18219 10/12    02  PS-134C                        IGC          Use, normal    Drain valve    Replaced wear            leaks          drain valve      2  '
18234                                      Use, normal    Test valve    Replaced test 10/12    02  PS-128B                        I&C wear            leaks          valve            .5 20326                                      Possible loose  Red pen        Tightened all 10/11    02  TR-165                        OPS          connection      indicating    connections      18 downscale 20826                                      Defective pre  No bias        Replaced pre 10/14      02 VRM-71F                        I&C          amp            adjustment    amp                4 18142                                      Defective      Indicat6r      Replaced amp, 10/16 02-3    LI-85A                        OPS          amplifier board failed        re-aligned          20 downscale      un2.t 18191                                      Recorder        Recorder      Cleaned and 10/08 02-3    FR/PR-95                      OPS          dirty          sticks        calibrated          3 18215                                      Instrument      Scale out of  Per ISP-3.5 9/30  02-3    'LI-85B                        OPS          drift          calibration    adjusted span      20 and zero 18225                                      Use, normal    Test valve    Replaced 10/12 02-3    PS-52A                        I&C          wear            leaks          valve              1 20332                                                      Vent valves on Replaced vent 10/13 02-3    LIS-72A-D                    I&C          Use            yarways worn  valves            10 18186                                      Defective rod  Unable to      Replaced select 10/11  03      34-39                        OPS          select switch  select rod 34- push button      10 m
18666                                      Broken wire on  Unable t 10/17  03      26-51                        OPS          select switch  select rod 26- Replaced broken 26-si          51            wire                3
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
I&C  OCTOBER 1982 WORK REQUEST #                      CAUSE OF      RESULTS OF    ACTIO?: TAKEN  REPAIR DATE  SYSTEM                  HOW DETECTED COMPONENT #                        MALFUNCTION  MALFUNCTION    TO PRECLUDE    TIME RECURRENCE      HOURS 18866                          Broken wire on  Unable t rod select      select rod 26-Replaced 10/17  03    26-51            OPS                                          broken wire        3 switch          51 20829                          Tests indicated Performed IMP-need to reset        on various Tested units          .
10/11  03    HCU (var)        I&C                                          per WRED          50 18126                          Corrosion on    Full in/ full connector pins  out light      Cleaned 10/14  07    10-39            OPS inop connector          21 18237                                          Verify core    Hand probed tops for D      tip tubes for 10/17  07    Tip D            RXA          None machine        tops 8
18243                          VR2 in mean    No downscale IRM B            I&C                                              aced 10/08  07                                    sqyare analog  trip on 14 unit            IRM B Connector 18425 rV 28-21A          Replaced 10/11  07    LPRM 28-21        OPS en        d wnscale      connector          9 18511                          Dirty                          Gleaned and connector      12-45D 10/11  07    'LPRM 12-45      OPS under vessel    downscale      tightened          5 connector 18901                            .            Recorder not n set t PR-46B          OPS                          indicating      Adjusted gain      2 10/29  07 normal 18969                                          No lights      Replaced bulbs, 10/25  07    34-07            OPS          Bad bulbs      for rod 34-07,  ran IMP-3.7        3 26-15 18972                                                          Reset inop 10/21  07    APRM E            OPS          None            None            ]j    !      #
* 1 18988                                            e  rod Checked as 10/26  07 APRMS            RXA          None                            requested          11.5 se@o M s
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
I&C OCTOBER 1982
                                                          #                  ES                          A DATE        SYSTEM                                                    HOW DETECTED CO PONENT ] #                            LFUNC ON    ML                      Cl REC              S 18990                              Momentum of                                  None, rec.
                                                                                                                                                                ~
10/24            07                                Tip D                  OPS Re d                    light selector switch                              chng 1 ch at a  4' time 19544                              Rod select      RBM A won't                  Replaced          ,
10/12              07                                26-47                  OPS          push button    select for                    select push    7 failed          26-47                        button 19654                              Dirty 10/11              07                                LPRM 20-29              OPS          connector c            or under vessel                                                  3 19738                              Rod select      RBM B won't                  Replaced 10/12            07                                  10-35                OPS          Push button    select for                    s6 lect push 5
failed          10-35                        button 21752                                                Disch. press 10/01            08                                Air Comp                OPS          Vibration      gauge broken                  Replaced gauge  4 18987                              Possible        Lower than                    Charged X-104D 10/27            16                                Elec Pens              OPS          leakage        normal pressure C/X-101C/X-                  15 103A 18928                                                MV outpot at 10/26            16-1                          -DPIT-102                    I&C                          zero, n                      R      d eg        changes                      b 18759                              V2 voltage      Spurious Calibrated 10/17            17                                RM-150B                OPS          high from power downscale                    per  ISP-19    6 srg            trips 18810                              Defective      Chart paper                  Replaced 10/12            17 RR-433                OPS chart drive    not                          chart drive 4
motor          advancing                    motor 20934                  OPS ImPr Per probe                                Set    Proper 8/13              17                                RIS-459                                              Ins drift hi voltage                                    voltage        4 18158                              Br during      Br indicator                  Replaced 9/22              20                                FR-528                I&C          ISP-15          arm                          indicator arm  8
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
I&C  OCTOBER 1982 WORK REQUEST #                    CAUSE OF        RESULTS OF    ACTION TAKEN  REPAIR DATE  SYSTEM                  HOW DETECTED                                    TO PRECLUDE COMPONENT #                      MALFUNCTION      MALFUNCTION                  TIME RECURRENCE    HOURS 20834                          Numerous adj    Several        Reca11brateo 10/14  20    DWL sumps          I&C        during          instruments out all sump            .
operation        of calibration  loops            300 18218                        Analyzer        Hydrogen        Calibrated 10/06  27                                  "**d*d          analyzer                          12 '
HfAZ-101A        OPS                  .
calibration      downscale      Per ISP-30 14856 L  se guide    switen not Tightened bar' n 90%        e  t, 10 10/16  29    A0V-86D            OPS r e set switch 14976                        Modification of Post work        Calibrated 90%
10/16  29    A0V-80A-D        OPS        90% limit        calibration    suitches          30 switch 18865                        90% switch      Relays not  . Corrected A0V-80A          OPS        wiring          energized with 10/16  29                                  error            valve open      wiring error      15
                                                                                    ""U 10/17  29 18867 A0V-86D          OPS Cam upper plate loose 90% switch won't reset    hk setpoint 6
22001                                          Check 10/26  46    ~PI-ll2A          OPS        None            calibration    None required      1 22059                          Rear cable      Recorder will  Installed cable 10/27  68    TR-103            OPS          disconnected    not operate    calibrated        6 14863                        V61tmeter out Station battery Calibrated 10/04  71    Bat. A vm        OPS          of calibration  low volts      indicator          4 20831                                                          Verified 10/08  71    RPS-EPA            I&C        None            None            setpoints          2 20836                          Routine  .
ation of                Calibrated 10/17  71    10600 BUS          I&C                        None            10600 BUS relays  198
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
I&C  OCTOBER 1982 WORK REQUEST #                      CAUSE OF      RESULTS OF    Tl    K  REPAIR DATE                                                                                  SYSTEM                  HOW DETECTED COMPONENT #                        MALFUNCTION  MALFUNCTION RECURRENCE HOURS 22104 10614                                        Check relay  Checked as 10/28                                                                                    71                      OPS            None set points    directed      8*
18814                          Defective    Supervisory  Replaced 10/22                                                                                    76    Zone 2          OPS            input module  alarm in      module        32 ,
18973                          Defective    Supervisory  Replaced 10/26                                                                                    76    Zone 12          OPS            input module  alarm in      module        16 17610                          Loose pointer Select switch Tightened as 10/12                                                                                    93    Temp Selec      OPS            dial          out of synch  required      12}}

Revision as of 01:07, 6 January 2021

Monthly Operating Rept for Oct 1982
ML20066B865
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/04/1982
From: Jackie Cook
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20066B861 List:
References
NUDOCS 8211090221
Download: ML20066B865 (13)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-333 DATE November 1982 C051PLETED BY J . Cook TELEPilONE (315)342-3840 OPERATING STATUS FITZPATRICK Notes

1. Unit Name:
2. Reporting Period: 821001 - 821031
3. Licensed Thermal Power (51WI): 2436
4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net 51We): 821
6. Maximum Dependable Capacity (Gross MWe): . 830
7. Masimum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: ,
9. Power Lesel To Which Restricted,If Any (Net MWe): NONE
10. Reasons For Restrictions,If Any:

This Month Yr..to.Date Cumulatise

11. Ilours In Reporting Period 745 7296 63673
12. Number Ofilours Reactor Was Critical 494.5 5376.9 44928.1
13. Reactor Resene Shutdown flours 0 0 0
14. Ilours Generator On.Line 478.5 5258.1 43701.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1015776 12061416 90462730
17. Gross Electrical Energy Generated (MWil) 339140 4081040 30841650
18. Net Electrical Energy Generated (MWil) 329095 3960240 29864970
19. Unit Senice Factor 64.2% 72.1% 68.6%
20. Unit Availability Factor 64.2% 72.1% 68.6%
21. Unit Capacity Factor (Using MDC Net) 54.5% 67.0% 62.0%
22. Unit Capacity Factor (Using DER Net) 53.8% 66.1% 57.1%
23. Unit Forced Outage Rate 35.8% 7.2% 15.9%
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date d Startup:
26. Units In Test Status (Prior to Commercial Operation): Forcust Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION

~

521'1090221 '821104 PDR ADOCK 05000333 PDR

- R. -

_ - _ _ _ m -J

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. . 50-133 UNIT JAFNPP DATE NOVEMBER 1982 COMPLETED BY J. COOK TELEPilONE CL151142-38.40 MONHI OCTOBER 1982 DAY AVER AGE DAILY POWER LEVE(. DAY AVER AGE DAILY POWER LEVEL (MWe Ne:) (MWe Net) i 19.2 17 795 is 67 2

799 19 367 3

4 797 20 442 797 21 450 5

795 22 512 6

393 23 636 7

--- 730 g 24

'~~

25 785 9

26 791 io 11 27 794 28 794 12 29 788 13 39 628 34

~~~

31 767 15

SUMMARY

The FitzPatrick plant operated at near full thermal power during this reporting period with one outage due to main steam isolation failure and one power reduction for condensate booster pump repair.

(.

DOCKET NO. 50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS JAFN FI' UNIT N AME ~

DATE NOVEMBER 1982 COMPLETED BY J. COOK REPORT.MONTil OCTOBER 1982 TELEPIIONE (315)342-3840 n.

No.

-, .! ? 3 ) .E Licensee Eg o Cause & Currective Date i 3? i .s i 5 Event g? g3 Action to

$ ., 5 5 e ;5 =!

Report a mV o' u

Prevent Recurrence 6

7 821007 -

F 266.5 A 3 82-047 HB VALVEX "D" inboard MSIV failure due to disc seperation from stem.

Repaired valve with two anti-rotation pins.

8 821030 S 0 H 4 N/A HH PUMPXX Reduced power for "A" condensate booster pump repair I 2 3 4 F: Forced Reason: Method: Exlubit G. Inst:uctions S: ScheJ ufed A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File INUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F. Administrative 5 G Operational Error (Explain) Estubit I . Same Source Il Other (Explain) +

PdWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT

-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE NOVEMBER, 1982 The unit operated at near full thermal power _.for the first orting period..On 821007 six to days of the failure ofrep'D" the inboard main steam isolation valve and onthe unit tripped due 821030 power was reduced for "A" condensate booster pump repai?r.

At the end of the reporting period the unit is operating at approximately 767 MWe. .

s t

.N.

\

\.

1 i

%g i

a t

3 4

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

OCTOBER 1982 WORK REOUEST# REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME PON # HOURS l'0/15 23 21810 VISUAL Worn packing Repacked 6 HPI-52 10/15 10 18317 OPS Using pipe wrenches and Replaced valve stems and RHR-755B, channel locks on valve handwheels, repacked 32 756B,757B, stems 758B 10/15 10 18758 OPS Handwheels vibrated off Replaced handwheels 2 RHR-755A, 756A,757A, 758A 10/16 27 18760 OPS Air line worn through Replaced damaged portion of air 8

'L' Target line, wrapped to prevent further Rock abrasion 10/15 23 21801 VISUAL Blown bonnet gasket Replaced bonnet gasket 16 AOV-53 10/15 10 16209 N/A N/A Replaced carbon steel cetter pin 3 RHR-14D with stainless steel 10/15 10 16208 RHR-14B N/A N/A Replaced carbon steel cotter pin 3 with stainless steel 10/14 23 20947 VISUAL Worn packing Repacked 2 Steam Trap Drain Valve 10/14 23 18342 VISUAL Worn packing Repacked 2 HPI-900 1

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & h ECHANICAL MAINTENANCE

SUMMARY

OCTOBER 1982 OR EQ EST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 10/16 29 18806 OPS Maintenance work on Adjusted limit switches 2.5 MSIV valve A0V-86D LO/16 29 14976 N/A N/A Installed new 90% limit switches 95

  • MSIV per MI-82-80 A0V-80-A-D IO/15 46 16222 N/A N/A Replaced carbon steel cotter pin 3 ESW-1B with stainless steel LO/13 02-2 16375 VISUAL Oil leaks Visual inspection 3 Grinnell snubbers LO/7 01-125 18235 OPS Depleted charcoal Replaced charcoal 60 Standby Gas absorption capacity Filter F-2A LO/13 02 20857 TEMPERATURE Leaking first stage Replaced first stage 116 RV-71F INDICATION valve LO/10 10 17710 VISUAL Deteriorated sealtite Replaced sealtite with NWC type 7 MOV-21A 10/10 23 20995 VISUAL Eroded / corroded Replaced fitting 12 HPCI drain- fitting line 10/12 27 11360 N/A N/A Completed Step 8 (1-4) of ECR 6 Primary 80-16-34 containment Hi-Hi-Rad relays

POWER AUTHORITY OF THE STATE OF NEW YORK 1 JAMES A. FITZPATRICK NUCLEAR POWER PLANT 2

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

OCTOBER 1982 DATE SYSTEM EO S HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 10/12 29 16380 OPS Pilot disk to stem Installed two interference fit 192 Caused MSIV locking pin sheared pins instead of one, in both A0V-80D shutdown pilot to stem and piston to main disc .

10/73 OPS Testing No malfunction. This 29 18796 Installed two interference fit 170 MSIV indicated valve was not broken lock pins instead of one, in both A0V-860 valve was pilot to stem and piston to main seperated disc 10/9 7: 17126 N/A N/A Traced circuits to correct 25 AC-A2, B2 drawings i

10/13 71 14975 N/A N/A Drilled t" weepholes in boxes per 16 lE Junction MI-82-082 Boxes 10/15 23 14312 VISUAL Broken nipple Replaced nipple 3 P-1 10/14 23 18330 VISUAL W'orn packing Repacked 20 MOV-14 10/17 71 14891 N/A N/A Performed preventative 10 Bkr-10404 maintenance 10/15 71 I4392 N/A N/A Performed preventative 12 Bkr-10614 maintenance 10/16 71 14893 N/A N/A Performed preventative 5 Bkr-10612 maintenance 10/15 71 14894 N/A N/A Performed preventative 5 Bkr-10602 maintenance

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

OCTOBER 1982 DATE R O SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME E

HOURS l'0/15 71 14895 N/A N/A Performed preventative 5 Bkr-10604 maintenance

  • 10/15 71 14896 N/A N/A Performed preventative 13 ,

Bkr-10660 maintenance 10/16 71 14816 N/A N/A Connected temporary power supply 6 IBC-3, 4 to nuclear instruments for bus outage and disconnected 10/16 13 19122 VISUAL Worn packing Repacked 6 MOV-16 10/16 13 18537 VISUAL Worn packing and Repacked and replaced pressure 6 MOV-131 thermal cycling seal 10/16 02 20884 OPS Worn packing MOV-53B torqued packing 10 MOV-53B,54B MOV-54B repacked 10/19 27 18870 OPS Limit switch out of Adjusted limit switch 4 AOV-132A adjustment 10/20 93 18861 OPS No power indication Replaced lamp ,

.5 ECP-D 10/20 27 18869 OPS Relief valve out of Reset valve 17 SV-ll4B adj ustment 10/16 34 18801 VISUAL Blown bonnet gasket f4achined bonnet to' remove steam 34 FWS-28B cut-replaced gasket 10/16 02 19246 PRESSURE Worn seal-some Replaced shaft seal with a 306 P-1B INDICATION evidence of thermal rebuilt cartridge shock

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

T&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 18219 10/12 02 PS-134C IGC Use, normal Drain valve Replaced wear leaks drain valve 2 '

18234 Use, normal Test valve Replaced test 10/12 02 PS-128B I&C wear leaks valve .5 20326 Possible loose Red pen Tightened all 10/11 02 TR-165 OPS connection indicating connections 18 downscale 20826 Defective pre No bias Replaced pre 10/14 02 VRM-71F I&C amp adjustment amp 4 18142 Defective Indicat6r Replaced amp, 10/16 02-3 LI-85A OPS amplifier board failed re-aligned 20 downscale un2.t 18191 Recorder Recorder Cleaned and 10/08 02-3 FR/PR-95 OPS dirty sticks calibrated 3 18215 Instrument Scale out of Per ISP-3.5 9/30 02-3 'LI-85B OPS drift calibration adjusted span 20 and zero 18225 Use, normal Test valve Replaced 10/12 02-3 PS-52A I&C wear leaks valve 1 20332 Vent valves on Replaced vent 10/13 02-3 LIS-72A-D I&C Use yarways worn valves 10 18186 Defective rod Unable to Replaced select 10/11 03 34-39 OPS select switch select rod 34- push button 10 m

18666 Broken wire on Unable t 10/17 03 26-51 OPS select switch select rod 26- Replaced broken 26-si 51 wire 3

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTIO?: TAKEN REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 18866 Broken wire on Unable t rod select select rod 26-Replaced 10/17 03 26-51 OPS broken wire 3 switch 51 20829 Tests indicated Performed IMP-need to reset on various Tested units .

10/11 03 HCU (var) I&C per WRED 50 18126 Corrosion on Full in/ full connector pins out light Cleaned 10/14 07 10-39 OPS inop connector 21 18237 Verify core Hand probed tops for D tip tubes for 10/17 07 Tip D RXA None machine tops 8

18243 VR2 in mean No downscale IRM B I&C aced 10/08 07 sqyare analog trip on 14 unit IRM B Connector 18425 rV 28-21A Replaced 10/11 07 LPRM 28-21 OPS en d wnscale connector 9 18511 Dirty Gleaned and connector 12-45D 10/11 07 'LPRM 12-45 OPS under vessel downscale tightened 5 connector 18901 . Recorder not n set t PR-46B OPS indicating Adjusted gain 2 10/29 07 normal 18969 No lights Replaced bulbs, 10/25 07 34-07 OPS Bad bulbs for rod 34-07, ran IMP-3.7 3 26-15 18972 Reset inop 10/21 07 APRM E OPS None None ]j  ! #

  • 1 18988 e rod Checked as 10/26 07 APRMS RXA None requested 11.5 se@o M s

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C OCTOBER 1982

  1. ES A DATE SYSTEM HOW DETECTED CO PONENT ] # LFUNC ON ML Cl REC S 18990 Momentum of None, rec.

~

10/24 07 Tip D OPS Re d light selector switch chng 1 ch at a 4' time 19544 Rod select RBM A won't Replaced ,

10/12 07 26-47 OPS push button select for select push 7 failed 26-47 button 19654 Dirty 10/11 07 LPRM 20-29 OPS connector c or under vessel 3 19738 Rod select RBM B won't Replaced 10/12 07 10-35 OPS Push button select for s6 lect push 5

failed 10-35 button 21752 Disch. press 10/01 08 Air Comp OPS Vibration gauge broken Replaced gauge 4 18987 Possible Lower than Charged X-104D 10/27 16 Elec Pens OPS leakage normal pressure C/X-101C/X- 15 103A 18928 MV outpot at 10/26 16-1 -DPIT-102 I&C zero, n R d eg changes b 18759 V2 voltage Spurious Calibrated 10/17 17 RM-150B OPS high from power downscale per ISP-19 6 srg trips 18810 Defective Chart paper Replaced 10/12 17 RR-433 OPS chart drive not chart drive 4

motor advancing motor 20934 OPS ImPr Per probe Set Proper 8/13 17 RIS-459 Ins drift hi voltage voltage 4 18158 Br during Br indicator Replaced 9/22 20 FR-528 I&C ISP-15 arm indicator arm 8

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM HOW DETECTED TO PRECLUDE COMPONENT # MALFUNCTION MALFUNCTION TIME RECURRENCE HOURS 20834 Numerous adj Several Reca11brateo 10/14 20 DWL sumps I&C during instruments out all sump .

operation of calibration loops 300 18218 Analyzer Hydrogen Calibrated 10/06 27 "**d*d analyzer 12 '

HfAZ-101A OPS .

calibration downscale Per ISP-30 14856 L se guide switen not Tightened bar' n 90% e t, 10 10/16 29 A0V-86D OPS r e set switch 14976 Modification of Post work Calibrated 90%

10/16 29 A0V-80A-D OPS 90% limit calibration suitches 30 switch 18865 90% switch Relays not . Corrected A0V-80A OPS wiring energized with 10/16 29 error valve open wiring error 15

""U 10/17 29 18867 A0V-86D OPS Cam upper plate loose 90% switch won't reset hk setpoint 6

22001 Check 10/26 46 ~PI-ll2A OPS None calibration None required 1 22059 Rear cable Recorder will Installed cable 10/27 68 TR-103 OPS disconnected not operate calibrated 6 14863 V61tmeter out Station battery Calibrated 10/04 71 Bat. A vm OPS of calibration low volts indicator 4 20831 Verified 10/08 71 RPS-EPA I&C None None setpoints 2 20836 Routine .

ation of Calibrated 10/17 71 10600 BUS I&C None 10600 BUS relays 198

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF Tl K REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION RECURRENCE HOURS 22104 10614 Check relay Checked as 10/28 71 OPS None set points directed 8*

18814 Defective Supervisory Replaced 10/22 76 Zone 2 OPS input module alarm in module 32 ,

18973 Defective Supervisory Replaced 10/26 76 Zone 12 OPS input module alarm in module 16 17610 Loose pointer Select switch Tightened as 10/12 93 Temp Selec OPS dial out of synch required 12