ML20070H022: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:;     - s uu- 4 e .       nun m;o4                                             ,
{{#Wiki_filter:;
I
- s uu-4 e.
                                                                                        .l' i
nun m;o4 I
.l i
i i
i i
i i                                                                                           l l                                                                                         I i                                                                                         !
i i
l Ivan Sellin, NRC commissioner
l i
:          US Nuclear Regulatory Commission                                             l i           11555 Rockville Pike                                                         l i           Rockville, MD             20852 f
Ivan Sellin, NRC commissioner US Nuclear Regulatory Commission i
i July 11, 1994 i          Ret      Power Authority State of New York Power, J.A. FitzPatrick l
11555 Rockville Pike i
Nuclear Plant                                                       ;
Rockville, MD 20852 f
i          
i July 11, 1994 Power Authority State of New York Power, J.A. FitzPatrick i
Ret l
Nuclear Plant i


==Dear Mr. Sellin,==
==Dear Mr. Sellin,==
i We are requesting the schedule for the inspection of the core l
i We are requesting the schedule for the inspection of the core l
i ehroud for cracts at the Power Authority State of New York Power,           l J.A. FitsPatrick Nuclear Plant.
ehroud for cracts at the Power Authority State of New York Power, i
5 In addition, we are requesting the schedule and inspection f-            program for the reactor internals at J.A. FitsPetrick Nuclear Plant because the NRC is now studying the vulnerability of l
5 J.A. FitsPatrick Nuclear Plant.
l' cracking of the twenty-four othar reactor internals. If there is           ;
In addition, we are requesting the schedule and inspection program for the reactor internals at J.A. FitsPetrick Nuclear f-Plant because the NRC is now studying the vulnerability of l
l            not a schedule available for the~other reactor internals for-i               inspection, piemoo indicate why this is not important et this
cracking of the twenty-four othar reactor internals. If there is l'
.              time.
not a schedule available for the~other reactor internals for-l i
Sincerely,                                                                 ;
inspection, piemoo indicate why this is not important et this time.
-                                        /
Sincerely,
l' Cindy         gne' 510 W. First St. So.
/
l Cindy gne' 510 W. First St. So.
Fult n N.Y. 13039
Fult n N.Y. 13039
                    $+                   '
$+
:              Linda Downing
Linda Downing l
!  l            R.D.#2 Box 395 5
R.D.#2 Box 395 Mexico, N.Y.
* Mexico, N.Y.           13126 T
13126 5
~
T
~
j Ronald Scrudato, Ph.D.
j Ronald Scrudato, Ph.D.
~
~
l                                                                                     ;
l Raymond Peterson, Ph.D.
Raymond Peterson, Ph.D.
Kevin Bond Oswego County CARE (Conservation and Renewable Energy) 9407210074 940711 PDR ADOCK 05000333 Ic.
Kevin Bond Oswego County CARE (Conservation and Renewable Energy) 9407210074 940711 PDR     ADOCK 05000333 Ic.
P PDR r
uv, r
uv,
P*                  PDR
*L.
                  *L.
Q
Q
_     >}}
_}}

Latest revision as of 09:38, 16 December 2024

Requests Schedule for Insp of Core Shroud for Cracks at Plant
ML20070H022
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/11/1994
From: Downing L, Gagne C
AFFILIATION NOT ASSIGNED
To: Selin I, The Chairman
NRC COMMISSION (OCM)
References
NUDOCS 9407210074
Download: ML20070H022 (1)


Text

- s uu-4 e.

nun m;o4 I

.l i

i i

i i

l i

Ivan Sellin, NRC commissioner US Nuclear Regulatory Commission i

11555 Rockville Pike i

Rockville, MD 20852 f

i July 11, 1994 Power Authority State of New York Power, J.A. FitzPatrick i

Ret l

Nuclear Plant i

Dear Mr. Sellin,

i We are requesting the schedule for the inspection of the core l

ehroud for cracts at the Power Authority State of New York Power, i

5 J.A. FitsPatrick Nuclear Plant.

In addition, we are requesting the schedule and inspection program for the reactor internals at J.A. FitsPetrick Nuclear f-Plant because the NRC is now studying the vulnerability of l

cracking of the twenty-four othar reactor internals. If there is l'

not a schedule available for the~other reactor internals for-l i

inspection, piemoo indicate why this is not important et this time.

Sincerely,

/

l Cindy gne' 510 W. First St. So.

Fult n N.Y. 13039

$+

Linda Downing l

R.D.#2 Box 395 Mexico, N.Y.

13126 5

T

~

j Ronald Scrudato, Ph.D.

~

l Raymond Peterson, Ph.D.

Kevin Bond Oswego County CARE (Conservation and Renewable Energy) 9407210074 940711 PDR ADOCK 05000333 Ic.

P PDR r

uv,

  • L.

Q

_