{{#Wiki_filter:ENTERGY NUCLEAR NORTHEAST.
{{#Wiki_filter:ENTERGY NUCLEAR NORTHEAST.  
                    .,JAMES A. FITZPATRICK NUCLEAR POWER PLANT P.O.,BOX 110.
.,JAMES A. FITZPATRICK NUCLEAR POWER PLANT P.O.,BOX 110.  
                                    -'/LYCOMING,,NY 13093
-'/LYCOMING,,NY 13093  
      -DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM THESE PROCEDURES ARE EFFECTIVE FRIDAY, AUGUST 2,2002                                         DATE: July 29, 2002 CONTROLLED COPY NUMBER: 34 TO:             U.S.N.R.C. Document Center/Washington, DC FROM:           CATHY IZYK - EMERGENCY PLANNING DEPARTMENT
-DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM THESE PROCEDURES ARE EFFECTIVE FRIDAY, AUGUST 2,2002 DATE: July 29, 2002 CONTROLLED COPY NUMBER: 34 TO:
U.S.N.R.C. Document Center/Washington, DC FROM:
CATHY IZYK - EMERGENCY PLANNING DEPARTMENT


==SUBJECT:==
==SUBJECT:==
EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Enclosed are revisions to your assigned copy of the JAFNPP Emergency Plan and Implementing Procedures. Please remove and DISCARD the old pages. Insert the attached, initial and date this routing sheet and return the completed routing sheet to Cathy Izyk in the Emergency Planning Department within 15 days. If this transmittal is not returned within 15 days, your name will be removed from the controlled list.
EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Enclosed are revisions to your assigned copy of the JAFNPP Emergency Plan and Implementing Procedures. Please remove and DISCARD the old pages. Insert the attached, initial and date this routing sheet and return the completed routing sheet to Cathy Izyk in the Emergency Planning Department within 15 days. If this transmittal is not returned within 15 days, your name will be removed from the controlled list.
                        -.-- VOLUMEI Update List-Dated August 2,2002 DOCUMENT                                 PAGES                           REV. #   INITIALS/DATE SECTION 5                                 REPLACE ALL                         37
VOLUMEI Update List-Dated August 2,2002 DOCUMENT PAGES REV. #
                        "-VOLUME2' Update List Dated August 2. 2002.
INITIALS/DATE SECTION 5 REPLACE ALL 37  
DOCUMENT                                 PAGES                           REV. #   INITIALS/DATE lAP-1                                     REPLACE     ALL                     27 IAP-2                                   - place each ALL currently REPLACE tabs                  sections behind the   23 in your binder EAP-1.1                                   REPLACE ALL                         46 EAP-2                                     REPLACE ALL                         25 EAP-3                                     REPLACE ALL                         23 EAP-4                                   - place pull REPLACE ALL colored              stickers on the attachedmaps                31 EAP-4     _____two                                   out EAP-8                                     REPLACE ALL                         57 EAP-9                                   REPLACE ALL                         10 EAP-10                                   REPLACE ALL                         16 EAP-1I                                   REPLACE ALL                         18 EAP-17                                   REPLACE ALL                         101 VOLUME 3 :Update'List Dated August 2. 2002 DOCUMENT                               PAGES                           REV. #   INITIALS/DATE EAP-42                                   REPLACE ALL                         18 SAP-3                                   REPLACE ALL                         72                 /
"-VOLUME 2' Update List Dated August 2. 2002.
SAP-20                                   REPLACE ALL                         21
DOCUMENT PAGES REV. #
INITIALS/DATE lAP-1 REPLACE ALL 27 IAP-2 REPLACE ALL - place each sections behind the tabs currently in your binder 23 EAP-1.1 REPLACE ALL 46 EAP-2 REPLACE ALL 25 EAP-3 REPLACE ALL 23 EAP-4 REPLACE ALL - place attached stickers on the 31 EAP-4
_____two colored pull out maps EAP-8 REPLACE ALL 57 EAP-9 REPLACE ALL 10 EAP-10 REPLACE ALL 16 EAP-1I REPLACE ALL 18 EAP-17 REPLACE ALL 101 VOLUME 3 :Update'List Dated August 2. 2002 DOCUMENT PAGES REV. #
INITIALS/DATE EAP-42 REPLACE ALL 18 SAP-3 REPLACE ALL 72  
/
SAP-20 REPLACE ALL 21


EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST     I               CNRrEt flOP \T?I,        I
EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST I
                                                                                      ?/-,
CNRrEt flOP "Date of Issue:
LLLýý                  yv I
August 2, 2002 NProeeure N/A Procedure TABLE OF CONTENTS
"Dateof Issue:         August 2, 2002 August 2, 2002 NProeeure                   Procedure                       j. Dat6   'of       Us ,e'of, Las~t     rocedure N/A            TABLE OF CONTENTS                  REV. 19       02/98         N/A IAP-1         EMERGENCY PLAN IMPLEMENTATION     REV. 27       08/02         Continuous CHECKLIST IAP-2           CLASSIFICATION OF EMERGENCY       REV. 23       08/02         Continuous CONDITIONS EAP-I.1         OFFSITE NOTIFICATIONS             REV. 46       08/02         Informational EAP-2           PERSONNEL INJURY                 REV. 25       08/02         Informational EAP-3           FIRE                             REV. 23       08/02         Informational EAP-4           DOSE ASSESSMENT CALCULATIONS     REV. 31       08/02         Reference EAP-4.1         RELEASE RATE DETERMINATION       REV. 14       06/02         Reference EAP-5.1         DELETED (02/94)
: j. Dat6 'of Us,e'of, Las~t rocedure REV. 19 02/98 N/A IAP-1 EMERGENCY PLAN IMPLEMENTATION REV. 27 08/02 Continuous CHECKLIST IAP-2 CLASSIFICATION OF EMERGENCY REV. 23 08/02 Continuous CONDITIONS EAP-I.1 OFFSITE NOTIFICATIONS REV. 46 08/02 Informational EAP-2 PERSONNEL INJURY REV. 25 08/02 Informational EAP-3 FIRE REV. 23 08/02 Informational EAP-4 DOSE ASSESSMENT CALCULATIONS REV. 31 08/02 Reference EAP-4.1 RELEASE RATE DETERMINATION REV. 14 06/02 Reference EAP-5.1 DELETED (02/94)
EAP-5.2         DELETED (04/91)
EAP-5.2 DELETED (04/91)
EAP-5.3         ONSITE/OFFSITE DOWNWIND SURVEYS   REV. 8       06/02         Informational AND ENVIRONMENTAL MONITORING EAP-6           IN-PLANT EMERGENCY SURVEY/ENTRY   REV. 16       06/02         Informational EAP-7.1         DELETED (02/94)
EAP-5.3 ONSITE/OFFSITE DOWNWIND SURVEYS REV.
EAP-7.2       DELETED (02/94)
8 06/02 Informational AND ENVIRONMENTAL MONITORING EAP-6 IN-PLANT EMERGENCY SURVEY/ENTRY REV. 16 06/02 Informational EAP-7.1 DELETED (02/94)
EAP-8         PERSONNEL ACCOUNTABILITY           REV. 57       08/02         Reference EAP-9           SEARCH AND RESCUE OPERATIONS     REV. 10     08/02         Informational EAP-10         PROTECTED AREA EVACUATION         REV. 16       08/02         Informational EAP-11         SITE EVACUATION                   REV. 18       08/02         Informational DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12         RELEASE OF RADIOACTIVE MATERIAL TO REV. 11     04/02         Reference LAKE ONTARIO EAP-13         DAMAGE CONTROL                     REV. 14       06/02         Informational EAP-14.1       TECHNICAL SUPPORT CENTER           REV. 22       04/02         Informational ACTIVATION EAP-14.2       EMERGENCY OPERATIONS FACILITY     REV. 20       04/02         Informational ACTIVATION EAP-14.5       OPERATIONAL SUPPORT CENTER         REV. 14       03/00         Informational ACTIVATION AND OPERATION                                     I Page 1 of 2
EAP-7.2 DELETED (02/94)
EAP-8 PERSONNEL ACCOUNTABILITY REV. 57 08/02 Reference EAP-9 SEARCH AND RESCUE OPERATIONS REV.
10 08/02 Informational EAP-10 PROTECTED AREA EVACUATION REV. 16 08/02 Informational EAP-11 SITE EVACUATION REV. 18 08/02 Informational DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12 RELEASE OF RADIOACTIVE MATERIAL TO REV.
11 04/02 Reference LAKE ONTARIO EAP-13 DAMAGE CONTROL REV.
14 06/02 Informational EAP-14.1 TECHNICAL SUPPORT CENTER REV. 22 04/02 Informational ACTIVATION EAP-14.2 EMERGENCY OPERATIONS FACILITY REV. 20 04/02 Informational ACTIVATION EAP-14.5 OPERATIONAL SUPPORT CENTER REV. 14 03/00 Informational ACTIVATION AND OPERATION I
Page 1 of 2
\\T?I, I
yv ?/-,
LLLýý I
August 2, 2002


EM ERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST Date of Issue:         August 2, 2002 Procedure                     Procedure                                       Revision   Date of       Use of Number                           Title                                       Number       Last     Procedure
EM ERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST Date of Issue:
_______________________________Review Prede EAP-14.6       HABITABILITY OF THE EMERGENCY                         REV. 14         10/98     Informational FACILITIES EAP- 15         EMERGENCY RADIATION EXPOSURE                         REV. 11         06/02 CRITERIA AND CONTROL                                                               Informational EAP-16         PUBLIC INFORMATION PROCEDURE                         REV. 6           02/98     Informational EAP-16.2       JOINT NEWS CENTER OPERATION                           REV. 0             02/02     Informational EAP-17         EMERGENCY ORGANIZATION STAFFING                       REV. 101         08/02     Informational EAP- 18       DELETED (12/93)
August 2, 2002 Procedure Procedure Revision Date of Use of Number Title Number Last Procedure
EAP-19         EMERGENCY USE OF POTASSIUM IODINE                     REV   21           04/01 (KI)                                                                                 Informational EAP-20         POST ACCIDENT SAMPLE, OFFSITE                         REV     9         06/02 SHIPMENT AND ANALYSIS                                                               Reference EAP-21         DELETED (12/85)
_______________________________Review Prede EAP-14.6 HABITABILITY OF THE EMERGENCY REV.
EAP-22         DELETED (02/98)
14 10/98 Informational FACILITIES EAP-15 EMERGENCY RADIATION EXPOSURE REV.
EAP-23         EMERGENCY ACCESS CONTROL                               REV. 11           06/02     Informational EAP-24         EOF VEHICLE AND PERSONNEL                               REV   9           06/02 DECONTAMINATION                                                                     Informational EAP-25       DELETED (02/94)
11 06/02 Informational CRITERIA AND CONTROL EAP-16 PUBLIC INFORMATION PROCEDURE REV.
6 02/98 Informational EAP-16.2 JOINT NEWS CENTER OPERATION REV. 0 02/02 Informational EAP-17 EMERGENCY ORGANIZATION STAFFING REV.
101 08/02 Informational EAP-18 DELETED (12/93)
EAP-19 EMERGENCY USE OF POTASSIUM IODINE REV 21 04/01 Informational (KI)
EAP-20 POST ACCIDENT SAMPLE, OFFSITE REV 9
06/02 Reference SHIPMENT AND ANALYSIS EAP-21 DELETED (12/85)
EAP-22 DELETED (02/98)
EAP-23 EMERGENCY ACCESS CONTROL REV.
11 06/02 Informational EAP-24 EOF VEHICLE AND PERSONNEL REV 9
06/02 Informational DECONTAMINATION EAP-25 DELETED (02/94)
Page 2 of 2}}
Page 2 of 2}}

Latest revision as of 16:15, 16 January 2025

Transmittal of Revisions to James A. Fitzpatrick Nuclear Power Plant Emergency Plan & Implementing Procedures
ML022310367
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/29/2002
From: Izyk C
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML022310367 (3)


Text

ENTERGY NUCLEAR NORTHEAST.

.,JAMES A. FITZPATRICK NUCLEAR POWER PLANT P.O.,BOX 110.

-'/LYCOMING,,NY 13093

-DOCUMENT TRANSMITTAL AND RECEIPT ACKNOWLEDGEMENT FORM THESE PROCEDURES ARE EFFECTIVE FRIDAY, AUGUST 2,2002 DATE: July 29, 2002 CONTROLLED COPY NUMBER: 34 TO:

U.S.N.R.C. Document Center/Washington, DC FROM:

CATHY IZYK - EMERGENCY PLANNING DEPARTMENT

SUBJECT:

EMERGENCY PLAN AND IMPLEMENTING PROCEDURES Enclosed are revisions to your assigned copy of the JAFNPP Emergency Plan and Implementing Procedures. Please remove and DISCARD the old pages. Insert the attached, initial and date this routing sheet and return the completed routing sheet to Cathy Izyk in the Emergency Planning Department within 15 days. If this transmittal is not returned within 15 days, your name will be removed from the controlled list.

VOLUMEI Update List-Dated August 2,2002 DOCUMENT PAGES REV. #

INITIALS/DATE SECTION 5 REPLACE ALL 37

"-VOLUME 2' Update List Dated August 2. 2002.

DOCUMENT PAGES REV. #

INITIALS/DATE lAP-1 REPLACE ALL 27 IAP-2 REPLACE ALL - place each sections behind the tabs currently in your binder 23 EAP-1.1 REPLACE ALL 46 EAP-2 REPLACE ALL 25 EAP-3 REPLACE ALL 23 EAP-4 REPLACE ALL - place attached stickers on the 31 EAP-4

_____two colored pull out maps EAP-8 REPLACE ALL 57 EAP-9 REPLACE ALL 10 EAP-10 REPLACE ALL 16 EAP-1I REPLACE ALL 18 EAP-17 REPLACE ALL 101 VOLUME 3 :Update'List Dated August 2. 2002 DOCUMENT PAGES REV. #

INITIALS/DATE EAP-42 REPLACE ALL 18 SAP-3 REPLACE ALL 72

/

SAP-20 REPLACE ALL 21

EMERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST I

CNRrEt flOP "Date of Issue:

August 2, 2002 NProeeure N/A Procedure TABLE OF CONTENTS

j. Dat6 'of Us,e'of, Las~t rocedure REV. 19 02/98 N/A IAP-1 EMERGENCY PLAN IMPLEMENTATION REV. 27 08/02 Continuous CHECKLIST IAP-2 CLASSIFICATION OF EMERGENCY REV. 23 08/02 Continuous CONDITIONS EAP-I.1 OFFSITE NOTIFICATIONS REV. 46 08/02 Informational EAP-2 PERSONNEL INJURY REV. 25 08/02 Informational EAP-3 FIRE REV. 23 08/02 Informational EAP-4 DOSE ASSESSMENT CALCULATIONS REV. 31 08/02 Reference EAP-4.1 RELEASE RATE DETERMINATION REV. 14 06/02 Reference EAP-5.1 DELETED (02/94)

EAP-5.2 DELETED (04/91)

EAP-5.3 ONSITE/OFFSITE DOWNWIND SURVEYS REV.

8 06/02 Informational AND ENVIRONMENTAL MONITORING EAP-6 IN-PLANT EMERGENCY SURVEY/ENTRY REV. 16 06/02 Informational EAP-7.1 DELETED (02/94)

EAP-7.2 DELETED (02/94)

EAP-8 PERSONNEL ACCOUNTABILITY REV. 57 08/02 Reference EAP-9 SEARCH AND RESCUE OPERATIONS REV.

10 08/02 Informational EAP-10 PROTECTED AREA EVACUATION REV. 16 08/02 Informational EAP-11 SITE EVACUATION REV. 18 08/02 Informational DOSE ESTIMATED FROM AN ACCIDENTAL EAP-12 RELEASE OF RADIOACTIVE MATERIAL TO REV.

11 04/02 Reference LAKE ONTARIO EAP-13 DAMAGE CONTROL REV.

14 06/02 Informational EAP-14.1 TECHNICAL SUPPORT CENTER REV. 22 04/02 Informational ACTIVATION EAP-14.2 EMERGENCY OPERATIONS FACILITY REV. 20 04/02 Informational ACTIVATION EAP-14.5 OPERATIONAL SUPPORT CENTER REV. 14 03/00 Informational ACTIVATION AND OPERATION I

Page 1 of 2

\\T?I, I

yv ?/-,

LLLýý I

August 2, 2002

EM ERGENCY PLAN IMPLEMENTING PROCEDURES/VOLUME 2 UPDATE LIST Date of Issue:

August 2, 2002 Procedure Procedure Revision Date of Use of Number Title Number Last Procedure

_______________________________Review Prede EAP-14.6 HABITABILITY OF THE EMERGENCY REV.

14 10/98 Informational FACILITIES EAP-15 EMERGENCY RADIATION EXPOSURE REV.

11 06/02 Informational CRITERIA AND CONTROL EAP-16 PUBLIC INFORMATION PROCEDURE REV.

6 02/98 Informational EAP-16.2 JOINT NEWS CENTER OPERATION REV. 0 02/02 Informational EAP-17 EMERGENCY ORGANIZATION STAFFING REV.

101 08/02 Informational EAP-18 DELETED (12/93)

EAP-19 EMERGENCY USE OF POTASSIUM IODINE REV 21 04/01 Informational (KI)

EAP-20 POST ACCIDENT SAMPLE, OFFSITE REV 9

06/02 Reference SHIPMENT AND ANALYSIS EAP-21 DELETED (12/85)

EAP-22 DELETED (02/98)

EAP-23 EMERGENCY ACCESS CONTROL REV.

11 06/02 Informational EAP-24 EOF VEHICLE AND PERSONNEL REV 9

06/02 Informational DECONTAMINATION EAP-25 DELETED (02/94)

Page 2 of 2