{{#Wiki_filter:4f FIRE PROTECTION MANUAL ACTION CHECKLIST (t     n dft     ?It45, 11t91M)
{{#Wiki_filter:4f FIRE PROTECTION MANUAL ACTION CHECKLIST (t
Manual Action:                           l                       -4                 Date reviewed:
n dft  
Associated mal-operation:         5                 e's        'R.i                             Zg17/         Z 0, ' 1 ~ M,1010,113                               ~   e   No NIA Corhment This MA was previously approved by the staff.                                               v/
?It45, 11t91M)
This MA is completed   ...               ... to prevent this mat-operation.                       Select only I
Manual Action:
                                                                  ... to achieve SSr.
l  
                                        ... in response to this mal-operation.               T While the operator performs this action:
-4 Date reviewed:
Radiation levels would be < I OCFR20 limits.             I/
Associated mal-operation:
Emergency lighting would be provided.             j     -
5 s
Temperature & humidity would not impede the action.
e'  
Fire effects would not impede the action.           /
'R.i Zg17/ Z 0, ' 1 ~ M,1010,113  
Staffing would be adequate not only to perform this action, but also to                             1 operate the reactor and fight the fire.
~
This action must be coordinated with other plant operations.                                     -
e No NIA Corhment This MA was previously approved by the staff.
If so: Communications required for this action I are protected from fire effects.
v/
This MA is completed...  
... to prevent this mat-operation.
Select only I
... to achieve SSr.
... in response to this mal-operation.
T While the operator performs this action:
Radiation levels would be < I OCFR20 limits.
I/
Emergency lighting would be provided. j Temperature & humidity would not impede the action.
Fire effects would not impede the action.  
/
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
If so:
Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.
Special tools are required to complete this action.
If so:   The special tools are dedicated for this action.                             -    -  J The special tools are available from an accessible nearby location.                                                       __._v Theprator can access the space(s) required to complete this action _7                               _        =
If so:
A ladder or special access equipment is needed.                                             a/
The special tools are dedicated for this action.
J The special tools are available from an accessible nearby location.
__._v The prator can access the space(s) required to complete this action _7  
=
A ladder or special access equipment is needed.
a/
If so: lThat equipment is available_
If so: lThat equipment is available_
I from an accessible nearby location.
I from an accessible nearby location.
The operator can reach the location(s) without personal hazard.                             -
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)__                                                           _    _
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)__
This action is adequately described In an approved procedure.                         v/__
This action is adequately described In an approved procedure.
If so:   That procedure is an emergency procedure.                                   vo Operators can readily access the procedural guidance.                               -/
v/__
If so:
That procedure is an emergency procedure.
vo Operators can readily access the procedural guidance.  
-/
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                     =_=_=
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                 _____
The walkdown was timed.  
OJ4 e 194-r 1/
=_=_=
          /        IW g t I/,             /%
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
6 -//S
OJ4 e 194-r  
/
IW g t
I/,  
/%
6 -//S 1/


FIRE PROTECTION MANUAL ACTION CHECKLIST (base ondratit5,     119MU )
FIRE PROTECTION MANUAL ACTION CHECKLIST (base ondratit5, 119MU )
Manual Action:       g           /       -S         3           (S V-:3z3)           Date reviewed:l Associated mal-operation:                                               0-4o   K~,ofce~ Trsae/7o yi No     MIA   ContmenV This MA was previously approved by the staff.                                                 1 This MA is completed ...                 ... to prevent this mal-operation.                           Select only I
Manual Action:
                                                            ... to achieve SSD.
g  
                                    ... in response to this mal-operation.
/  
-S 3
(S V-:3z3)
Date reviewed:l Associated mal-operation:
0-4o K~,ofce~ Trsae/7o yi No MIA ContmenV This MA was previously approved by the staff.
1 This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operator performs this action:
While the operator performs this action:
Radiation levels would be < IOCFR20 limits.               v Emergency lighting would be provided. =l Temperature & humidity would not impede the action.                 1/
Radiation levels would be < IOCFR20 limits.
Fire effects would not impede the action.                             _    ___
v Emergency lighting would be provided. =l Temperature & humidity would not impede the action.
Staffing would be adequate not only to perform this action, but also to               _
1/
operate the reactor and fight the fire.
Fire effects would not impede the action.
This action must be coordinated with other plant operations.                                     -
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
If so: Communications required for this action Iare protected from fire effects.                                             A Special tools are required to complete this action.                                       7 If so: The special tools are dedicated for this action.
This action must be coordinated with other plant operations.
The special tools are available from an accessible nearby location.                                                       /
If so:
The operator can access the space(s) required to complete this action                               _      _
Communications required for this action Iare protected from fire effects.
A ladder or special access equipment is needed.                                                 -
A Special tools are required to complete this action.
If so: That equipment is available from an accessible nearby location.
7 If so:
The operator can reach the location(s) without personal hazard.                       t-This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.  
/
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
If so:
That equipment is available from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
t-This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
'This action is adequately described in an approved procedure.
'This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.                                           -  -
If so:
Operators can readily access the procedural guidance.                       _
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.                             =_=
This action has been verified and validated by a plant walkdown.  
If so: The walkdown used the current procedure.                                       ____=
=_=
If so:
The walkdown used the current procedure.
____=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                         ___
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  
                                                                    * ,I
//I,- g4 S&h e E-g kt IZ-SEA6~
            //I,- g4 S&h         e E-g
4SC
* l, kt       IZ-SEA6~             4SC
*,I
* l,


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 711115. 11I19M2)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 711115. 11I19M 2)
Manual Action:       )     8     Xq < _Sq /a/                 HOG 5   4           l Date reviewed:
Manual Action:  
Associated mal-operation:     5-/)Of24/                                           ,              /     (e 7 C' Yes     No NA   Conment This MA was previously approved by the staff.                                         =     -  =
)
This MA is completed ...               ... to prevent this mal-operation.                             Select only 1
8 Xq < _Sq /a/ HOG 5 4 l Date reviewed:
                                                          ... to achieve SSD.
Associated mal-operation:
                                  ... in response to this mal-operation.             I,,     -
5-/)Of24/  
While the operatorperforms this action:                                                     BE Radiation levels would be < 10CFR20 limits.                 t,/_i Emergency lighting would be provided. /t Temperature & humidity would not impede the action.                                 ___=_=
/
Fire effects would not impede the action.               /
(e 7 C' Yes No NA Conment This MA was previously approved by the staff.  
=  
=
This MA is completed...  
... to prevent this mal-operation.
Select only 1
... to achieve SSD.
... in response to this mal-operation.
I,,
While the operatorperforms this action:
BE Radiation levels would be < 1 OCFR20 limits.
t,/_i Emergency lighting would be provided. /t Temperature & humidity would not impede the action.
___=_=
Fire effects would not impede the action.  
/
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.                                       -
This action must be coordinated with other plant operations.
If so: Communications required for this action I are protected from fire effects.                                                               _    _  _
If so:
Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.                               V1 The special tools are available from an accessible nearby location.
If so:
The special tools are dedicated for this action.
V1 The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action, A ladder or special access etAiipqment is needed.
The operator can access the space(s) required to complete this action, A ladder or special access etAiipqment is needed.
If so: That equipment is available from an accessible nearby location.                                             ,_v/
If so:
The operator can reach the location(s) without personal hazard.                     L/
That equipment is available from an accessible nearby location.  
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)                                                         _
,_v/
The operator can reach the location(s) without personal hazard.
L/
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                                       14=
If so:
Operators can readily access the procedural guidance.                     77 Operator training on this action and the procedure is adequate               =_=_=
That procedure is an emergency procedure.
14=
Operators can readily access the procedural guidance.
77 Operator training on this action and the procedure is adequate  
=_=_=
Operator training on this action and the procedure is current.
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                       =_=_=
The walkdown used the current procedure.
The walkdown was timed.  
=_=_=
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


FIRE PROTECTION MANUAL ACTION CHECKLIST (based an draft71111-05. 1119CQ)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based an draft71111-05. 1119CQ)
Mana Acin                                                                         Date reviewed:
Mana Acin Date reviewed:
mo =                                                                               e     No W/A
mo =
                                                                                                  =
e No W/A dominene This MA was previously approved by the staff.=
dominene This MA was previously approved by the staff.=                                           v This MA is completed ...               ... to prevent this mal-operation.                       Select only I
v  
                                                                ... to achieve SSD. v
=
                                        ... in response to this mal-operation.         x/
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
v
... in response to this mal-operation.
x/
While the operator perfornms this action:
While the operator perfornms this action:
Radiation levels would be < 10CFR20 limits. J Emergency lighting would be provided. t/                                       w31 Temperature & humidity would not impede the action.                 /
Radiation levels would be < 1 OCFR20 limits.
J Emergency lighting would be provided.
t/
Temperature & humidity would not impede the action.  
/
Fire effects would not impede the action. =
Fire effects would not impede the action. =
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action Iare protected from fire effects.
If so:
Special tools are required to complete this action.                                         -
Communications required for this action I are protected from fire effects.
If so: The special tools are dedicated for this action.                                     A/
Special tools are required to complete this action.
The special tools are available                                                       /
If so:
from an accessible nearby location.                                     ___
The special tools are dedicated for this action.
A/
The special tools are available  
/
from an accessible nearby location.
The operator can access the space(s) required to complete this action v/
The operator can access the space(s) required to complete this action v/
A ladder or special access equipment is needed.                                                 ___-
A ladder or special access equipment is needed.
If so:   That equipment is available from an accessible nearby location.                                               7 The operator can reach the location(s) without personal hazard.                     V =
If so:
This manual action can be completed before unrecoverable conditions                       /       2 occur. (Review the thermo-hydraulic timeline.)
That equipment is available from an accessible nearby location.
7 The operator can reach the location(s) without personal hazard.
V =
This manual action can be completed before unrecoverable conditions  
/
2 occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                 _P Operators can readily access the procedural guidance.                   _
If so:
That procedure is an emergency procedure.
_P Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                             _
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                   _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
w31


FIRE PROTECTION MANUAL ACTION CHECKLIST (d   on draft71111.05, 11/19M)
FIRE PROTECTION MANUAL ACTION CHECKLIST (d
Manual Action:                 A   y IA a (-5A             . (l         - '})       Date reviewed:
on draft71111.05, 11/19M)
Associated mal-operation:                                     L u.     p.,&1 ifT-"               7T/J(      Zf
Manual Action:
_                          _                        Yes     No NA ConimenA This MA was previously approved by the staff.                                           =_=_=
A y IA a (-5A  
This MA is completed...                 ... to prevent this mal-operation.                           Select only I
. (l  
                                                                  ... to achieve SSD.       a/,
- '})
                                              ... in response to this mal-operation.             L/
Date reviewed:
While the operatorperfornsthis action:                                             '            g g Radiation levels would be < 10CFR20 limits.               k/
Associated mal-operation:
Emergency lighting would be provided.                 _        =
: u. p.,&
L 1 if T-"
7 T/ ( J Zf Yes No NA ConimenA This MA was previously approved by the staff.  
=_=_=
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
a/,
... in response to this mal-operation.
L/
While the operatorperforns this action:
g g
Radiation levels would be < 10CFR20 limits.
k/
Emergency lighting would be provided.  
=
Temperature & humidity would not impede the action. a/
Temperature & humidity would not impede the action. a/
Fire effects would not impede the action. /
Fire effects would not impede the action.  
/
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.                         a/_                        _
This action must be coordinated with other plant operations.
If so:   Communications required for this action Iare protected from fire effects.                                               t Special tools are required to complete this action.                                             l/
a/_
If so:   The special tools are dedicated for this action.                       =                   __
If so:
Communications required for this action Iare protected from fire effects.
t Special tools are required to complete this action.
l/
If so:
The special tools are dedicated for this action.  
=
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                                     -
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
If so: That equipment is available I from an accessible nearby location.                                                       V/
If so:
The operator can reach the location(s) without personal hazard.                                 -  -
That equipment is available I from an accessible nearby location.
V/
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described In an approved procedure.                         a/_=_=
This action is adequately described In an approved procedure.
If so:   That procedure isan emergency procedure.                                     V/             ADP Operators can readily access the procedural guidance.                         I..     = =
a/_=_=
If so:
That procedure is an emergency procedure.
V/
ADP Operators can readily access the procedural guidance.
I..  
=  
=
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                 _
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on druft 71111.05. 11192)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on druft 71111.05. 11192)
Manual Action:                                                             7.-   WI,    l Date reviewed:
Manual Action:
Associated mal-operation:     ra             ALX               ge             t-                       zf0, FIgi   Yes   No     N/A   commetit This MA was previously approved by the staff.
WI 7.-
This MA is completed ...               ... to prevent this mal-operation.                                 Select only I
l Date reviewed:
                                                        -;..to achieve SSD.              ..
Associated mal-operation: ra ALX ge t-
                                  ... in response to this mal-operation.
: zf0, FIgi Yes No N/A commetit This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only I
-;..to achieve SSD.  
... in response to this mal-operation.
While the operator performs this action:
While the operator performs this action:
Radiation levels would be < I OCFR20 limits.
Radiation levels would be < I OCFR20 limits.
Emergency lighting would be provided.
Emergency lighting would be provided.
Temperature & humidity would not impede the action.
Temperature & humidity would not impede the action.
Fire effects would not impede the action.                   -    =_=
Fire effects would not impede the action.  
Staffing would be adequate not only to perform this action, but also to                                     1 operate the reactor and fight the fire.
=_=
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action are protected from fire effects.
If so:
1 Special tools are required to complete this action.                                   _4O     X2 If so: The special tools are dedicated for this action.                                   _    -      -
Communications required for this action are protected from fire effects.
The special tools are available from an accessible nearby location.                                                           _
Special tools are required to complete this action.
The operator can access the space(s) required to complete this action, A ladder or special access equipment is needed.                                               a       -
_4O 1
If so: That equipment is available/
X2 If so:
Ifrom an accessible nearby location.                                                   _      a The operator can reach the location(s) without personal hazard.                           /-
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action, A ladder or special access equipment is needed.
a If so:
That equipment is available/
Ifrom an accessible nearby location.
a The operator can reach the location(s) without personal hazard.  
/-
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                           ,/
This action is adequately described in an approved procedure.  
If so:   That procedure is an emergency procedure.                                                         /J=A 7' Operators can readily access the procedural guidance.
,/
Operator training on this action and the procedure is adequate                               _
If so:
Operator training on this action and the procedure is current.
That procedure is an emergency procedure.  
/J=A 7' Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
to g           a1                                       6C
to g a1 6C
                /&deg;//<     ~ 4-06/               g                       -
/&deg;//<  
~ 4-06/ g  


FIRE PROTECTION MANUAL ACTION CHECKLIST (bsedonhraft711 1 t06. 11119 )
FIRE PROTECTION MANUAL ACTION CHECKLIST (bsedonhraft711 1 t06. 11119 )
Manual Action:               7B &#xa3;9             M%6t               6 l               Date reviewed:
Manual Action:
Associated mal-operation: lC-WZ %tAGO                       ?,d I       C4) 5111_111 I         00 121,111119M                                                       Yes   No WA Commhnt This MA was previously approved by the staff.                                                 e/
7B  
This MA is completed ...                   ... to prevent this mal-operation.           .I/         Select only I
&#xa3;9 M%6t 6
                                                            ... to achieve SSD.
l Date reviewed:
                                      ... in response to this mal-operation.
Associated mal-operation: lC-WZ %tAGO  
While the operatorperformsthis action:
?,d I C4) 5111_ 111 I 00 121,111119M Yes No WA Commhnt This MA was previously approved by the staff.
Radiation levels would be < 10CFR20 limits.                           -
e/
This MA is completed...  
... to prevent this mal-operation.  
.I/
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operatorperforms this action:
Radiation levels would be < 1 OCFR20 limits.
Emergency lighting would be provided.
Emergency lighting would be provided.
Temperature & humidity would not impede the action.                             -
Temperature & humidity would not impede the action.
Fire effects would not impede the action. a/                 -
Fire effects would not impede the action. a/
Staffing would be adequate not only to perform this action, but also to                               1 operate the reactor and fight the fire.                                                 _
Staffing would be adequate not only to perform this action, but also to 1
This action must be coordinated with other plant operations.                                 a/
operate the reactor and fight the fire.
If so: lCommunications required for this action I are protected from fire effects.                                                         x/
This action must be coordinated with other plant operations.
Special tools are required to complete this action.                                           7 If so:   The special tools are dedicated for this action.
a/
The special tools are available from an accessible nearby location.                                          .
If so: lCommunications required for this action I are protected from fire effects.
x/
Special tools are required to complete this action.
7 If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
Ifso: i That equipment is available I from an accessible nearby location.                                           v/
If so: i That equipment is available I from an accessible nearby location.
v/
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.                                                   AoD Operators can readily access the procedural guidance.                         _    =   =
If so:
That procedure is an emergency procedure.
AoD Operators can readily access the procedural guidance.  
=  
=
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.                                         =_=_=
If so:
The walkdown used the current procedure.  
=_=_=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
Line 220: Line 391:
I-A -S4. -
I-A -S4. -
FIRE PROTECTION MANUAL ACTION CHECKLIST (based onaft 7111105, t1/19102)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based onaft 7111105, t1/19102)
Manual Action: l)             ,                ecC.4'                           i2'   5   Date reviewed:
Manual Action: l) ecC.4' i2' 5
Associated mal-operation:         ,J,/           l7         *<;_            1_         6           s41 Yes   No     N/A   Comment This MA was previously approved by the staff.                                                 a/
Date reviewed:
This MA is completed ...               ... to prevent this mal-operation.                                 Select only 1 to achieve SSD.
Associated mal-operation:  
                                  ... in response to this mal-operation.
,J,/
l7 1_
6 s41 Yes No N/A Comment This MA was previously approved by the staff.
a/
This MA is completed...  
... to prevent this mal-operation.
Select only 1 to achieve SSD.
... in response to this mal-operation.
While the operator perforns this action:
While the operator perforns this action:
Radiation levels would be < I0CFR20 limits.
Radiation levels would be < I0CFR20 limits.
Emergency lighting would be provided.                   z           =
Emergency lighting would be provided.
Temperature & humidity would not impede the action.                                                     0 Fire effects would not impede the action.                   7   -
z  
Staffing would be adequate not only to perform this action, but also to                                   1 operate the reactor and fight the fire.                                            .
=
This action must be coordinated with other plant operations.                               a/
Temperature & humidity would not impede the action.
If so:   Communications required for this action I are protected from fire effects.                                                           A/
0 Fire effects would not impede the action.
Special tools are required to complete this action.                                                 -
7 Staffing would be adequate not only to perform this action, but also to 1
If so: The special tools are dedicated for this action.                                                   IJv/I/
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
a/
If so:
Communications required for this action I are protected from fire effects.
A/
Special tools are required to complete this action.
If so:
The special tools are dedicated for this action.
IJv/I/
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action                   a/
The operator can access the space(s) required to complete this action a/
A ladder or special access equipment is needed. /                         A/
A ladder or special access equipment is needed.
If so: That equipment is available from an accessible nearby location.                                                                 l/
A/  
The operator can reach the location(s) without personal hazard.                               -      -
/
If so:
That equipment is available from an accessible nearby location.
l/
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                                 -
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                       1/
If so:
Operators can readily access the procedural guidance.                       l Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
That procedure is an emergency procedure.
1/
Operators can readily access the procedural guidance.
l Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                       _
The walkdown used the current procedure.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


FIRE PROTECTION MANUAL ACTION CHECKLIST                                     3       p<
FIRE PROTECTION MANUAL ACTION CHECKLIST 3
(ad n d71raf T -6111192)               Orb 6   ~       t 1"55 Manual Action:         ff           (9)Zw (V                     ell     z         Date reviewed:
p<
Associated mal-operation:         /?;'                           sS Yes     No     N/A   Comment This MA was previously approved by the staff.                                 =___=
(ad n d71raf T  
This MA is completed ...               ... to prevent this mal-operation.   ./                   Select only 1
-6111192)
                                                        ... to achieve SSD.
Orb 6  
                                  ... in response to this mal-operation.
~
While the operatorperformsthis action:
t 1"55 Manual Action:
Radiation levels would be < IOCFR20 limits.       v_
ff (9 )Zw (V ell z
Emergency lighting would be provided.         V           l_1 refe6 Temperature & humidity would not impede the action.         J       =_=
Date reviewed:
Dr Fire effects would not impede the action.       J       =__
Associated mal-operation:  
Staffing would be adequate not only to perform this action, but also to                             1 operate the reactor and fight the fire.                                       a/
/?;'
This action must be coordinated with other plant operations.                   =____
sS Yes No N/A Comment This MA was previously approved by the staff.  
If so:   Communications required for this action I are protected from fire effects.                                     ___
=___=
Special tools are required to complete this action.                                   a/
This MA is completed...  
If so:   The special tools are dedicated for this action.
... to prevent this mal-operation.  
The special tools are available from an accessible nearby location.                                                 v x
./
The operator can access the space(s) required to complete this action       *        -
Select only 1
A ladder or special access equipment Is needed.
... to achieve SSD.
If so: That equipment Is available                                                                     7 Ifrom an accessible nearby location.
... in response to this mal-operation.
The operator can reach the location(s) without personal hazard.               V_                       _    _
While the operatorperforms this action:
Radiation levels would be < IOCFR20 limits.
v_
Emergency lighting would be provided.
V l_1 Temperature & humidity would not impede the action.
J  
=_=
Fire effects would not impede the action.
J  
=__
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
a/
This action must be coordinated with other plant operations.  
=____
If so:
Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.
a/
If so:
The special tools are dedicated for this action.
The special tools are available x
from an accessible nearby location.
v The operator can access the space(s) required to complete this action A ladder or special access equipment Is needed.
If so:
That equipment Is available 7
Ifrom an accessible nearby location.
The operator can reach the location(s) without personal hazard.
V_
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                 V If so: That procedure is an emergency procedure.                                                   AD/
This action is adequately described in an approved procedure.
V If so:
That procedure is an emergency procedure.
AD/
Operators can readily access the procedural guidance.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.                             _      ___
If so:
The walkdown was timed.                                               _      _
The walkdown used the current procedure.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
ref e6 Dr


4-FIRE PROTECTION MANUAL ACTION CHECKLIST pdow n7111m45, 1nsw Ya -5 Manual Action:                                       (l     id Ax ,/Ac~c.       Date reviewed:
4-FIRE PROTECTION MANUAL ACTION CHECKLIST pdow n7111m45, 1nsw Ya  
                                                                                                    -Zt/
-5 Manual Action:
l  
-Zt/
Ax
(
,/
id Ac~c.
Date reviewed:
Associated mal-operation:lBy<$CDit,.S_//8o
Associated mal-operation:lBy<$CDit,.S_//8o
__~~~~~~~a         o                                           Yes     o   NIA   Comm~nt This MA was previously approved by the staff.                                                   _    _    _
__~~~~~~~a o Yes o NIA Comm~nt This MA was previously approved by the staff.
This MA is completed ...                 ... to prevent this mal-operation. zV__               Select only 1 to achieve SSD.
This MA is completed...  
                                      ... in response to this mal-operation.
... to prevent this mal-operation.
zV__
Select only 1 to achieve SSD.
... in response to this mal-operation.
While the operator performs this action:
While the operator performs this action:
Radiation levels would be < 10CFR20 limits.           /_
Radiation levels would be < 10CFR20 limits.  
Emergency lighting would be provided.         /
/_
Temperature & humidity would not impede the action.           C/
Emergency lighting would be provided.  
Fire effects would not Impede the action.           -
/
Staffing would be adequate not only to perform this action, but also to           /
Temperature & humidity would not impede the action.
operate the reactor and fight the fire.                                         /
C/
This action must be coordinated with other plant operations.                         a/
Fire effects would not Impede the action.
If so: Communications required for this action are protected from fire effects.                                                 a Special tools are required to complete this action.                         =____=
Staffing would be adequate not only to perform this action, but also to  
If so:   The special tools are dedicated for this action.                           _        IX The special tools are available from an accessible nearby location.                                                 7 The operator can access the space(s) required to complete this action         v/
/
A ladder or special access equipment is needed.                                     -      _-
operate the reactor and fight the fire.  
If so: That equipment is available I from an accessible nearby location.
/
The operator can reach the location(s) without personal hazard.                 V This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action must be coordinated with other plant operations.
This action is adequately described in an approved procedure.                 l/__=
a/
If so:   That procedure is an emergency procedure.
If so:
Operators can readily access the procedural guidance.                 a/
Communications required for this action are protected from fire effects.
Operator training on this action and the procedure is adequate       _____
a Special tools are required to complete this action.  
Operator training on this action and the procedure is current.
=____=
This action has been verified and validated by a plant walkdown.                     =_=
If so:
If so: The walkdown used the current procedure.
The special tools are dedicated for this action.
The walkdown was timed.                                               _____
IX The special tools are available from an accessible nearby location.
7 The operator can access the space(s) required to complete this action v/
A ladder or special access equipment is needed.
If so:
That equipment is available I from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
V This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
l/__=
If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.
a/
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.  
=_=
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
V~-?4r 43a(                 6 7,R-16K'6         x'               "
V~-?4r 43a(
6 7,R-16K'6 x'  


b-FIRE PROTECTION MANUAL ACTION CHECKLIST 5 us    m (based an dft 7111105, 11fl'02)
b-5 m
Manual Action: lf             r       /1-.4           3     de   /                 Date reviewed:
us FIRE PROTECTION MANUAL ACTION CHECKLIST (based an dft 7111105, 11fl'02)
Associated mal-operation: l                                               a               S .7r4ouo
Manual Action: lf r  
_ill                                                                             MA Comment This MA was previously approved by the staff.
/1-.4 3 de  
This MA is completed ...                 ... to prevent this mal-operation.         V     _        Select only I
/
                                                          ....to achieve SSD.
Date reviewed:
                                  ... in response to this mal-operation.             V   &%
Associated mal-operation: l  
While the operatorperformsthis action:
.7r4ouo a
Radiation levels would be <1 OCFR20 limits.               vewcc4 Emergency lighting would be provided.                   /
S
_ill MA Comment This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
V Select only I
....to achieve SSD.
... in response to this mal-operation.
V While the operatorperforms this action:
Radiation levels would be <1 OCFR20 limits.
vewcc4 Emergency lighting would be provided.  
/
Temperature & humidity would not impede the action.
Temperature & humidity would not impede the action.
Fire effects would not impede the action.               /
Fire effects would not impede the action.  
Staffing would be adequate not only to perform this action, but also to                               1 operate the reactor and fight the fire.                                             ___
/
This action must be coordinated with other plant operations.                                     -/
Staffing would be adequate not only to perform this action, but also to 1
If so:   Communications required for this action are protected from fire effects.
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.  
-/
If so:
Communications required for this action are protected from fire effects.
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.                                           V The special tools are available from an accessible nearby location.
If so:
The operator can access the space(s) required to complete this action               v     -
The special tools are dedicated for this action.
A ladder or special access equipment is needed.                                     iZ     -
V The special tools are available from an accessible nearby location.
If so: That equipment is available I from an accessible nearby location.                                         V The operator can reach the location(s) without personal hazard.                             -  -
The operator can access the space(s) required to complete this action v
A ladder or special access equipment is needed.
iZ If so:
That equipment is available I from an accessible nearby location.
V The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                       T       -
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                                 -    A Operators can readily access the procedural guidance.                         /
T If so:
That procedure is an emergency procedure.
A Operators can readily access the procedural guidance.  
/
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                           _
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                               _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST                                 44 (basd don aft 711115. 1 l192) ,A1 ~
FIRE PROTECTION MANUAL ACTION CHECKLIST 44 (basd on d
I Manual Action:   5AZ/           A$       TJ       3     ; 'g     3lC                    Date reviewed:
aft 711115. 1 l192) 1
Associated mal-operation:     Spe           s                 ,      &        ma     /e5a Yes           NoN/A Comment This MA was previously approved by the staff.                                                             __/
,A ~
This MA is completed ...               ... to prevent this mal-operation.             -'.      v"Ai     Select only I
I Manual Action: 5AZ/
                                                          ... to achieve SSD.
A $ TJ 3  
                                  ... in response to this mal-operation.               Vi' 3 While the operatorperforms this action:                                               = -
; 'g 3 l C Date reviewed:
Radiation levels would be <1 OCFR20 limits.                     /   7s Emergency lighting would be provided.                 V       _
Associated mal-operation:
Temperature & humidity would not impede the action.                           =
Spe s ma  
Fire effects would not impede the action.                   /
/e5a Yes No N/A Comment This MA was previously approved by the staff.
Staffing would be adequate not only to perform this action, but also to                                   1 operate the reactor and fight the fire.
__/
This action must be coordinated with other plant operations.                       lT7a If so: l Communications required for this action I are protected from fire effects.
This MA is completed...  
Special tools are required to complete this action.                         $ =
... to prevent this mal-operation.
If so: The special tools are dedicated for this action.
v"Ai Select only I
... to achieve SSD.
... in response to this mal-operation.
Vi' 3
While the operatorperforms this action:  
=
Radiation levels would be < 1 OCFR20 limits.  
/
7s Emergency lighting would be provided.
V Temperature & humidity would not impede the action.  
=
Fire effects would not impede the action.  
/
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
lT7a If so: l Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.  
$ =
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action                     /
The operator can access the space(s) required to complete this action  
A ladder or special access equipment is needed.                                         7     -
/
If so: That equipment is available from an accessible nearby location.                                                             _/
A ladder or special access equipment is needed.
7 If so:
That equipment is available from an accessible nearby location.
_/
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This action is adequately described in an approved procedure.                         a/
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.
a/
Operators can readily access the procedural guidance.                               a/
If so:
Operator training on this action and the procedure is adequate                                 _
That procedure is an emergency procedure.
Operator training on this action and the procedure is current.
Operators can readily access the procedural guidance.
This action has been verified and validated by a plant walkdown.                                         _    _=
a/
If so: The walkdown used the current procedure.                                                           _
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
_=
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                           ___
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft71111 05, 1111902)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft71111 05, 1111902)
Manual Action:                     lI ffJ   1 SD          0                             Date reviewed:
Manual Action:
Associated mal-operation:                             CID B       y Yes   No     IA Comment This MA was previously approved by the staff.
I ffJ l
This MA is completed ...               ... to prevent this mal-operation.             V=             Select only I
SD 1
                                                          ... to achieve SSD.
0 Date reviewed:
                                  ... in response to this mal-operation.
Associated mal-operation:
While the operatorperformsthis action:
C ID B
Radiation levels would be < IOCFR20 limits.                   L/
y Yes No IA Comment This MA was previously approved by the staff.
Emergency lighting would be provided.                         =
This MA is completed...  
Temperature & humidity would not impede the action.                   a     -
... to prevent this mal-operation.
Fire effects would not impede the action.               -=
V=
Staffing would be adequate not only to perform this action, but also to                                 1 operate the reactor and fight the fire.
Select only I
This action must be coordinated with other plant operations.                                   LI/
... to achieve SSD.
If so: Communications required for this action I are protected from fire effects.                                               a Special tools are required to complete this action.                                   =_                       ___
... in response to this mal-operation.
If so:   The special tools are dedicated for this action.=                                   =       o The special tools are available from an accessible nearby location._
While the operatorperforms this action:
The operator can access the space(s) required to complete this action                     7/
Radiation levels would be < IOCFR20 limits.
A ladder or special access equipment is needed.                                 =LI/_
L/
If so:   That equipment s availablev from an accessible nearby location._
Emergency lighting would be provided.  
The operator can reach the location(s) without personal hazard.                         VI"       I This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
=
This action is adequately described in an approved procedure.                                             /
Temperature & humidity would not impede the action.
If so: That procedure is an emergency procedure.
a Fire effects would not impede the action.  
Operators can readily access the procedural guidance.                         LI/_=
-=
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
LI/
If so:
Communications required for this action I are protected from fire effects.
a Special tools are required to complete this action.  
=_
If so:
The special tools are dedicated for this action.=  
=
o The special tools are available from an accessible nearby location._
The operator can access the space(s) required to complete this action 7/
A ladder or special access equipment is needed.  
=LI/_
If so:
That equipment s availablev from an accessible nearby location._
The operator can reach the location(s) without personal hazard.
VI" I
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.  
/
If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.
LI/_=
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                   ___
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7111105. 111191m)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7111105. 111191m)
Manual Action: l g &#xa2;                                               I Q&     V(-         Date reviewed:
Manual Action: l g  
&#xa2; I Q&
V(-
Date reviewed:
Associated mal-operain fB f>z nG5/g/)
Associated mal-operain fB f>z nG5/g/)
_;                  Yes     No   N/A Comnent This MA was previously approved by the staff.                                                         __=
Yes No N/A Comnent This MA was previously approved by the staff.
This MA is completed ...                 ... to prevent this mal-operation.           V               Select only I
__=
                                                          ... to rchieve SSD.
This MA is completed...  
                                  ... in response to this mal-operation.
... to prevent this mal-operation.
While the operatorperfornsthis action:
V Select only I
Radiation levels would be < I OCFR20 limits.             v/
... to rchieve SSD.
Emergency lighting would be provided.                                 __=
... in response to this mal-operation.
Temperature & humidity would not impede the action. v                         =
While the operatorperforns this action:
Fire effects would not impede the action. A/                 og Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Radiation levels would be < I OCFR20 limits.
v/
Emergency lighting would be provided.
__=
Temperature & humidity would not impede the action.
v  
=
Fire effects would not impede the action. A/
og Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action are protected from fire effects.                                           1 Special tools are required to complete this action.                                 A /
If so:
If so:   The special tools are dedicated for this action.
Communications required for this action are protected from fire effects.
The special tools are available from an accessible nearby location.                                                     a/
1 Special tools are required to complete this action.
The operator can access the space(s) required to complete this action                   ,'
A  
A ladder or special access equipment is needed.                                                     -
/
If so: That equipment is available Ifrom an accessible nearby location.
If so:
The operator can reach the location(s) without personal hazard.                       L/
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
a/
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
If so:
That equipment is available Ifrom an accessible nearby location.
The operator can reach the location(s) without personal hazard.
L/
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                             /
This action is adequately described in an approved procedure.  
If so: That procedure is an emergency procedure.
/
Operators can readily access the procedural guidance.                                       __        _
If so:
Operator training on this action and the procedure is adequate               ___
That procedure is an emergency procedure.
Operator training on this action and the procedure is current.
Operators can readily access the procedural guidance.
This action has been verified and validated by a plant walkdown.                                       _
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
If so: The walkdown used the current procedure.                                             l The walkdown was timed.                                                               _
This action has been verified and validated by a plant walkdown.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                         _
If so:
The walkdown used the current procedure.
l The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST j                                           A (n andmft71111-M. IMW   ) l             P     a     '
FIRE PROTECTION MANUAL ACTION CHECKLIST j A
Manual Action:                           /       *-$A-                       A       Dbtereviewed:
(n andmft71111-M.
Associated mal-operation:         S'5                 C t Hil ,1 .5 ,1 .. Yes   No   N/A   Comn enti This MA was previously approved by the staff.                                     _    7 This MA is completed ...               ... to prevent this mal-operation.         _                Select only I to achieve SSD.
IMW )
                                  ... in response to this mal-operation.
l P
While the operator perforrns this action:                                                           EWES=
a Manual Action:  
Radiation levels would be < 10CFR20 limits.             \/
/  
Emergency lighting would be provided.         797 Temperature & humidity would not impede the action.             (/
*-$A-A Dbtereviewed:
Fire effects would not impede the action.             _                  i   I   UVv Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Associated mal-operation:
This action must be coordinated with other plant operations.                       _____
S'5 C t Hil  
If so:   Communications required for this action                                     J I are protected from fire effects.
,1.5,1..
Special tools are required to complete this action.                                       v/
Yes No N/A Comn enti This MA was previously approved by the staff.
Ifso:   The special tools are dedicated for this action.                           =
7 This MA is completed...  
The special tools are available                                                       /
... to prevent this mal-operation.
Select only I to achieve SSD.
... in response to this mal-operation.
While the operator perforrns this action:
EWES=
Radiation levels would be < 10CFR20 limits.  
\\/
Emergency lighting would be provided. 797 Temperature & humidity would not impede the action.
(/
Fire effects would not impede the action.
UVv i
I Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
If so:
Communications required for this action J
I are protected from fire effects.
Special tools are required to complete this action.
v/
If so:
The special tools are dedicated for this action.  
=
The special tools are available  
/
from an accessible nearby location.
from an accessible nearby location.
The operator can access the space(s) required to complete this action                   v           __        _
The operator can access the space(s) required to complete this action v
A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
Ifso: That equipment is available from an accessible nearby location.
If so:
The operator can reach the location(s) without personal hazard.                     /
That equipment is available from an accessible nearby location.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)J This action is adequately described in an approved procedure.                   J Ifso: That procedure is an emergency procedure.
The operator can reach the location(s) without personal hazard.  
Operators can readily access the procedural guidance.                           -    -
/
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)J This action is adequately described in an approved procedure.
J If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.                                   ____=
If so:
The walkdown was timed.                                                   _____
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                               _
____=
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


FIRE PROTECTION MANUAL ACTION CHECKLIST e(band an dft 71111-06,11I9M)
FIRE PROTECTION MANUAL ACTION CHECKLIST e(band an dft 71111-06,11I9M)
CAi24)
CAi 24)
Manual Action:         ly'                             C' ATs  &c       S ['     Date reviewed:
Manual Action:
ly' C ' AT s c
S ['
Date reviewed:
Associated mal-operation:
Associated mal-operation:
Yes     No     N/A Comment This MA was previously approved by the staff.                                                     _
Yes No N/A Comment This MA was previously approved by the staff.
This MA is completed ...                 ... to prevent this mal-operation.             =/         Select only I
This MA is completed...  
                                                          ... to achieve SSD.
... to prevent this mal-operation.  
                                  ... in response to this mal-operation.
=/
While the operatorperformsthis action:                                         msmam Radiation levels would be < 10CFR20 limits.               /
Select only I
Emergency lighting would be provided.           _      =     =
... to achieve SSD.
Temperature & humidity would not impede the action.             /
... in response to this mal-operation.
While the operatorperforms this action:
msmam Radiation levels would be < 1 OCFR20 limits.  
/
Emergency lighting would be provided.  
=  
=
Temperature & humidity would not impede the action.  
/
Fire effects would not impede the action.
Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action are protected from fire effects.                                       a Special tools are required to complete this action.
If so:
If so: The special tools are dedicated for this action.
Communications required for this action are protected from fire effects.
The special tools are available                                         _      _
a Special tools are required to complete this action.
from an accessible nearby location._
If so:
The operator can access the space(s) required to complete this action             .=-
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location._
The operator can access the space(s) required to complete this action  
.=-
A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
If so: That equipment is availablel Ifrom an accessible nearby location.                                     _C The operator can reach the location(s) without personal hazard.
If so:
That equipment is availablel Ifrom an accessible nearby location.
_C The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                   v" If so: That procedure is an emergency procedure.                                               -      D Operators can readily access the procedural guidance.                         -      -
This action is adequately described in an approved procedure.
Operator training on this action and the procedure is adequate         _____
v" If so:
Operator training on this action and the procedure is current.
That procedure is an emergency procedure.
D Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.                                             _
If so:
The walkdown was timed.                                               ___          _
The walkdown used the current procedure.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.__
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.__


FIRE PROTECTION MANUAL ACTION CHECKLIST (bawd ondaft 7111l-05. 111 WV)       A~         l,716 AlsoZi Manual Action:         /$ 5A)-      7-7         1       e6 ,0e                     Date reviewed:
FIRE PROTECTION MANUAL ACTION CHECKLIST l,716 (bawd ondaft 7111l-05. 1 11 WV)
Associated mal-operation:         Ax         God                     e;igX           2J7e ~7     /z//&/o Yes   No   N/A   Comthent This MA was previously approved by the staff.                                           _
A~
This MA is completed ...                 ... to prevent this mal-operation.                           Select only I
AlsoZi Manual Action:  
                                                          ... to achieve SSD.         /
/$ 5A) 7-7 1
                                    ... in response to this mal-operation.
e6,0e Date reviewed:
Associated mal-operation:
Ax God e;igX 2J7e  
~7  
/z//&/o Yes No N/A Comthent This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.  
/
... in response to this mal-operation.
While the operatorperforms this action:
While the operatorperforms this action:
Radiation levels would be < I OCFR20 limits. A/
Radiation levels would be < I OCFR20 limits.
Emergency lighting would be provided.               _                a Temperature & humidity would not impede the action. 1                     -  -
A/
Fire effects would not impede the action. ;/
Emergency lighting would be provided.
Staffing would be adequate not only to perform this action, but also to                               1 operate the reactor and fight the fire.                                                     _
a Temperature & humidity would not impede the action. 1 Fire effects would not impede the action.  
This action must be coordinated with other plant operations.                                         _          _
;/
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
If so: l Communications required for this action are protected from fire effects._/
If so: l Communications required for this action are protected from fire effects._/
Special tools are required to complete this action.                                                 _        _  _
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.
If so:
The special tools are available                                                         LI/
The special tools are dedicated for this action.
The special tools are available LI/
from an accessible nearby location.
from an accessible nearby location.
The operator can access the space(s) required to complete this action u A ladder or special access equipment is needed.                                                     __
The operator can access the space(s) required to complete this action u A ladder or special access equipment is needed.
If so: ; That equipment is available jfrom an accessible nearby location.
If so: ; That equipment is available jfrom an accessible nearby location.
The operator can reach the location(s) without personal hazard.                     V/
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)                                       V This action is adequately described in an approved procedure.
V/
If so: That procedure is an emergency procedure.                                 a/_____
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
V This action is adequately described in an approved procedure.
If so:
That procedure is an emergency procedure.
a/_____
Operators can readily access the procedural guidance.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate =_=_=
Operator training on this action and the procedure is adequate  
=_=_=
l Operator training on this action and the procedure is current.
l Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.                                     _
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                           _
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                 _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


Notes:
Notes:
Line 512: Line 933:
II 4.
II 4.
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on drt711 1506, 11I1IV2)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on drt711 1506, 11I1IV2)
ManualAction:             ed bL/-           /5c0-270                               Date reviewed:
ManualAction:
Associated mal-operation:                       -          Tc4a
ed bL/-  
                                                                        'c                       270 A. 7, 7 77/7/Z Yes   No   WA Coniment This MA was previously approved by the staff._
/5c0-270 Date reviewed:
This MA is completed ...                 ... to prevent this mal-operation.                         Select only I
Associated mal-operation:  
                                                                  ... to achieve SSD.       v
'c Tc4a 270 A. 7, 7 77/7/Z Yes No WA Coniment This MA was previously approved by the staff._
                                          ... in response to this mal-operation.
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
v
... in response to this mal-operation.
While the operatorperforms this action:
While the operatorperforms this action:
Radiation levels would be < 10CFR20 limits.                   j   -
Radiation levels would be < 1 OCFR20 limits.
Emergency lighting would be provided.               v/     =   =
j Emergency lighting would be provided.
Temperature & humidity would not impede the action.                 l/
v/  
Fire effects would not impede the action.               7A         _
=  
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
=
Temperature & humidity would not impede the action.
l/
Fire effects would not impede the action.
7A Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: l Communications required for this action I are protected from fire effects.                                             x/
If so: l Communications required for this action I are protected from fire effects.
x/
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action                                               IP '
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
If so:
If so:   That equipment is available from an accessible nearby location.                                       _
That equipment is available from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                     =         -
This action is adequately described in an approved procedure.  
If so: That procedure is an emergency procedure.                                             -    -  AJ Operators can readily access the procedural guidance.
=
If so:
That procedure is an emergency procedure.
AJ Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                           .
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
IP


I P Notes:
I P
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


FIRE PROTECTION MANUAL ACTION CHECKLIST (basedancdaft71II-O5.11II9V2)
FIRE PROTECTION MANUAL ACTION CHECKLIST (basedancdaft71II-O5. 11II9V2)
Manual Action:                             x-       1,L91                           Date reviewed:
Manual Action:
Associated mal-operation:                                         j                     ;!
x-1,L91 Date reviewed:
Ves   =No     N/A   Comment This MA was previously approved by the staff.                                                     _      _=
Associated mal-operation:
This MA is completed ...                 ... to prevent this mal-operation.                         Select only I
j Ves =No N/A Comment This MA was previously approved by the staff.
                                                          ... to achieve SSD.
_=
                                  ... in response to this mal-operation.               -
This MA is completed...  
While the operatorperformsthis action:
... to prevent this mal-operation.
Radiation levels would be < I OCFR20 limits.             /             _
Select only I
Emergency lighting would be provided.           =     v_=
... to achieve SSD.
Temperature & humidity would not impede the action.           .___]_l_
... in response to this mal-operation.
Fire effects would not impede the action.         37 Staffing would be adequate not only to perform this action, but also to                             1 operate the reactor and fight the fire.
While the operatorperforms this action:
This action must be coordinated with other plant operations.                             vX Ifso: Communications required for this action Iare protected from fire effects.                                       v/
Radiation levels would be < I OCFR20 limits.  
Special tools are required to complete this action.                                   V_
/
Ifso: The special tools are dedicated for this action.                           -/
Emergency lighting would be provided.  
=
v_=
Temperature & humidity would not impede the action.  
.___]_l_
Fire effects would not impede the action.
37 Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
vX If so:
Communications required for this action Iare protected from fire effects.
v/
Special tools are required to complete this action.
V_
If so:
The special tools are dedicated for this action.  
-/
The special tools are available_
The special tools are available_
from an accessible nearby location.                                                   v/
from an accessible nearby location.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                         v If so: That equipment is available Ifrom an accessible nearby location.                                                   r The operator can reach the location(s) without personal hazard.                         -"
v/
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
v If so:
That equipment is available Ifrom an accessible nearby location.
r The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is'an emergency procedure.
If so:
Operators can readily access the procedural guidance.                         -      -
That procedure is'an emergency procedure.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.                                 =_=_=
If so:
The walkdown was timed.                                                             _
The walkdown used the current procedure.  
=_=_=
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


Line 576: Line 1,037:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7Ill .5. 11)19)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7Ill.5.
Manual Ac             /                           -    2     I                     Date reviewed:
11)19)
Associated mal-operation:   I                         -/Z/.M/
Manual Ac  
WWWON-ji~gi                                             Yes No N/A Comment This MA was previously approved by the staff.                                         ____
/
This MA is completed ...                 ... to prevent this mal-operation.                         Select only I
2 I
                                                            ... to achieve SSD.
Date reviewed:
                                    ... in response to this mal-operation.
Associated mal-operation: I  
-/Z/.M/
WWWON-ji~gi Yes No N/A Comment This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operatorperforms this action:
While the operatorperforms this action:
Radiation levels would be < I OCFR20 limits.                 V     =
Radiation levels would be < I OCFR20 limits.
Emergency lighting would be provided.                     = =
V  
Temperature & humidity would not impede the action.                   x/
=
Emergency lighting would be provided.  
=  
=
Temperature & humidity would not impede the action.
x/
Fire effects would not impede the action.
Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to                             1 operate the reactor and fight the fire.                                                       _
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action I are protected from fire effects.
If so:
Special tools are required to complete this action.                             =I__=
Communications required for this action I are protected from fire effects.
If so: The special tools are dedicated for this action.                                 _
Special tools are required to complete this action.  
=I__=
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                               a/
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
If so: lThat equipment is available                                                               _
a/
I from an accessible nearby location.                                         _
If so: lThat equipment is available I from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                                       By Operators can readily access the procedural guidance.
If so:
That procedure is an emergency procedure.
By Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                         =_=_=
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                   _
The walkdown was timed.  
                                                                                                              -D
=_=_=
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  
-D


Notes:
Notes:
Line 612: Line 1,093:


AJ FIRE PROTECTION MANUAL ACTION CHECKLIST (bodondraft 71 I 5, 1)19Ig2)
AJ FIRE PROTECTION MANUAL ACTION CHECKLIST (bodondraft 71 I 5, 1)19Ig2)
Manual Actionl                                                                   Date reviewed:
Manual Actionl Date reviewed:
Associated mal-operation:aotaug_'-/rz Yes   No   NA   Comment This MA was previously approved by the staff.                                   =
Associated mal-operation:aotaug_'-/rz Yes No NA Comment This MA was previously approved by the staff.  
This MA is completed ...                 ... to prevent this mal-operation.     _              Select only I
=
                                                            ... to achieve SSD.
This MA is completed...  
                                      ... in response to this mal-operation.
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operatorperforrns this action:
While the operatorperforrns this action:
Radiation levels would be < OCFR20 limits.             I" Emergency lighting would be provided.           LZ 1!
Radiation levels would be < OCFR20 limits.
I" Emergency lighting would be provided.
LZ 1!
Temperature & humidity would not impede the action.
Temperature & humidity would not impede the action.
Fire effects would not impede the action.       a/
Fire effects would not impede the action.
a/
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action are protected from fire effects.                                           V Special tools are required to complete this action.
If so:
If so: The special tools are dedicated for this action.                                     c/
Communications required for this action are protected from fire effects.
The special tools are available from an accessible nearby location.                                               L/
V Special tools are required to complete this action.
The operator can access the space(s) required to complete this actionj           ,-            W'
If so:
                                                                                                    ,L-U1 AfcL    e 14tr,   _wz A ladder or special access equipment is needed.                                 =     __=_,_______
The special tools are dedicated for this action.
If so: That equipment is available from an accessible nearby location.
c/
The operator can reach the location(s) without personal hazard.               _=
The special tools are available from an accessible nearby location.
L/
The operator can access the space(s) required to complete this actionj W'
AfcL e
,L-U1
: 14tr,
_wz A ladder or special access equipment is needed.  
=
__=_,_______
If so:
That equipment is available from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
_=
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                   LX If so: That procedure is an emergency procedure.                                       -    -
This action is adequately described in an approved procedure.
Operators can readily access the procedural guidance.                     7 Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
LX If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.
7 Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                 _____
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                           ___
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft1111.05. 11I19M)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft 1111.05. 11I19M)
Manual Action:             'S*Date                                                           reviewed:
Manual Action:  
Associated mal-operation: l~             S  .- t04p        y     c-z         Z     :21Rgo                     r Yes     No   N/A conmenf This MA was previously approved by the staff.
'S *Date reviewed:
This MA is completed ...                 ... to prevent this mal-operation.                             Select only
Associated mal-operation: l~  
                                                            ... to achieve SSD.
.- t04 S
                                    ... in response to this mal-operation.
p y
c-z Z
:21Rgo r
Yes No N/A conmenf This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only  
... to achieve SSD.
... in response to this mal-operation.
While the operatorperforms this action:
While the operatorperforms this action:
Radiation levels would be < IOCFR20 limits.                 l=
Radiation levels would be < IOCFR20 limits.
Emergency lighting would be provided.                 v       _1 Temperature & humidity would not impede the action.                 l/_=_=___                           _
l=
Fire effects would not impede the action.               -
Emergency lighting would be provided.
Staffing would be adequate not only to perform this action, but also to                                   1 operate the reactor and fight the fire.
v
This action must be coordinated with other plant operations.                     a/
_1 Temperature & humidity would not impede the action.
If so: l Communications required for this action are protected from fire effects.                                                                               l Special tools are required to complete this action.
l/_=_=___
If so: The special tools are dedicated for this action.
Fire effects would not impede the action.
The special tools are available from an accessible nearby location.                                                       V The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                                 v/
Staffing would be adequate not only to perform this action, but also to 1
If so:   That equipment is available I from an accessible nearby location.                                                         V The operator can reach the location(s) without personal hazard.                                         So a S12 This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)                                                           _
operate the reactor and fight the fire.
This action is adequately described in an approved procedure.                         a/
This action must be coordinated with other plant operations.
If so:   That procedure is an emergency procedure.                                                       AiP U/
a/
Operators can readily access the procedural guidance.
If so: l Communications required for this action are protected from fire effects.
l Special tools are required to complete this action.
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
V The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
v/
If so:
That equipment is available I from an accessible nearby location.
V The operator can reach the location(s) without personal hazard.
S12 So a This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
a/
If so:
That procedure is an emergency procedure.
U/
AiP Operators can readily access the procedural guidance.
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.
If so:
The walkdown was timed.                                                                 _
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                 _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
          .~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-


A0 FIRE PROTECTION MANUAL ACTION CHECKLIST (bued onaft71           12)
A0 FIRE PROTECTION MANUAL ACTION CHECKLIST (bued onaft71
: 5. 11119X Manual Action:                                                                         Date reviewed:
: 5. 11119X 12)
Associated mal-operation:           '    j.r.                        '  __ qj                       (g5/
Manual Action:
1 2 Yes     No NA Commebt This MA was previously approved by the staff.                                                       _
Date reviewed:
This MA is completed ...               ... to prevent this mal-operation.                           Select only I
Associated mal-operation:
                                                            ... to achieve SSD.                   -
: j.
qj (g5/
1
: r.
2 Yes No NA Commebt This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
in response to this mal-operation.
in response to this mal-operation.
While the operator performs this action:
While the operator performs this action:
Radiation levels would be < 10CFR20 limits.             a/
Radiation levels would be < 10CFR20 limits.
Emergency lighting would be provided.               t/ _-'
a/
Temperature & humidity would not impede the action.                 V Fire effects would not impede the action.
Emergency lighting would be provided.
Staffing would be adequate not only to perform this action, but also to                             1 operate the reactor and fight the fire.
t/ _-'
This action must be coordinated with other plant operations.                       -=
Temperature & humidity would not impede the action.
If so: Communications required for this action I are protected from fire effects.
V Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.  
-=
If so:
Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                       C/
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
If so:   That equipment is available                                                     /                 4 from an accessible nearby location.                                       v/
C/
If so:
That equipment is available  
/
4 from an accessible nearby location.
v/
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                             a/
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.                                   v=
a/
Operators can readily access the procedural guidance.                         /     -  -
If so:
Operator training on this action and the procedure is adequate                             __=_=
That procedure is an emergency procedure.
v=
Operators can readily access the procedural guidance.  
/
Operator training on this action and the procedure is adequate
__=_=
Operator training on this action and the procedure is current.
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.
If so:
The walkdown used the current procedure.
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                 _
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
                -.                                                                                      I
I


FIRE PROTECTION MANUAL ACTION CHECKLIST (bsd ondraft llIt5. 11I9W)
FIRE PROTECTION MANUAL ACTION CHECKLIST (bsd on draft llIt5. 11I9W)
Manual Action:                         ,C' - c        -              jLS(&#xa2;\ Date reviewed:
Manual Action:
Associated mal-operation:       It                             ,T                       Z/t8     Z-,
c
Yes   No NA Coiment This MA was previously approved by the staff.                                       L/
,C' jLS(&#xa2;\\ Date reviewed:
This MA is completed ...                 ... to prevent this mal-operation.                 Select only I
Associated mal-operation:
                                                        ... to achieve SSD.
It Z-,
                                    ... in response to this mal-operation.     -
,T Z/t8 Yes No NA Coiment This MA was previously approved by the staff.
L/
This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.  
... in response to this mal-operation.
While the operator performs this action:
While the operator performs this action:
Radiation levels would be < IOCFR20 limits.         t/
Radiation levels would be < IOCFR20 limits.
Emergency lighting would be provided.         V                           l Temperature & humidity would not impede the action.             /
t/
Emergency lighting would be provided.
V l
Temperature & humidity would not impede the action.  
/
Fire effects would not impede the action.
Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to                     1 operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
This action must be coordinated with other plant operations.
If so: Communications required for this action I are protected from fire effects.                                       v Special tools are required to complete this action.                         =           -
If so:
If so: The special tools are dedicated for this action.                         -    -
Communications required for this action I are protected from fire effects.
v Special tools are required to complete this action.  
=
If so:
The special tools are dedicated for this action.
The special tools are available l from an accessible nearby location.
The special tools are available l from an accessible nearby location.
The operator can access the space(s) required to complete this action                 V A ladder or special access equipment is needed.
The operator can access the space(s) required to complete this action V
If so: That equipment Is available
A ladder or special access equipment is needed.
[from an accessible nearby location.                                     _
If so:
That equipment Is available
[from an accessible nearby location.
The operator can reach the location(s) without personal hazard._
The operator can reach the location(s) without personal hazard._
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.                 x     -
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                               v/     -  -
x If so:
That procedure is an emergency procedure.
v/
Operators can readily access the procedural guidance.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.                             =_=_=
If so:
The walkdown used the current procedure.  
=_=_=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA._
The walkdown demonstrated that the action can be completed within the time window required by the FSSA._
Line 740: Line 1,315:


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05, 1111W0)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05, 1111W0)
Manual Action:                                                                           lly- Date reviewed:
Manual Action:
Associated mal-operation:           l         J                           /     }
lly-Date reviewed:
Yes     No   WA   Corhment This MA was previously approved by the staff.
Associated mal-operation:
This MA is completed ...                 ... to prevent this mal-operation.                                 Select only I
l J  
                                                            ... to achieve SSD.
/  
                                  ... in response to this mal-operation.                 _
}
While the operatorperforms this action:                                                     f Radiation levels would be < I OCFR20 limits.                   7/
Yes No WA Corhment This MA was previously approved by the staff.
Emergency lighting would be provided.                   =       _I=       A_ ___ a, Temperature & humidity would not impede the action.                     V                 __XL)___
This MA is completed...  
Fire effects would not impede the action.                 A/
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operatorperforms this action:
f Radiation levels would be < I OCFR20 limits.
7/
Emergency lighting would be provided.  
=
_I=
A_ a, Temperature & humidity would not impede the action.
V
__XL)___
Fire effects would not impede the action.
A/
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.                                   v_7-If so: l Communications required for this action I are protected from fire effects.
This action must be coordinated with other plant operations.
Special tools are required to complete this action.                                     =_=_i If so:. The special tools are dedicated for this action.                                             l/'
v_7-If so: l Communications required for this action I are protected from fire effects.
The special tools are available from an accessible nearby location.                                                         to The operator can access the space(s) required to complete this action                     V A ladder or special access equipment is needed.
Special tools are required to complete this action.  
If so: That equipment is available from an accessible nearby location.
=_=_i If so:.
The special tools are dedicated for this action.
l/'
The special tools are available from an accessible nearby location.
to The operator can access the space(s) required to complete this action V
A ladder or special access equipment is needed.
If so:
That equipment is available from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.
If so:
Operators can readily access the procedural guidance.                     =             -
That procedure is an emergency procedure.
Operator training on this action and the procedure is adequate                             X       ______
Operators can readily access the procedural guidance.  
=
Operator training on this action and the procedure is adequate X
Operator training on this action and the procedure is current.
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown._
This action has been verified and validated by a plant walkdown._
If so: The walkdown used the current procedure.                                           =_=_=
If so:
The walkdown used the current procedure.  
=_=_=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                     _
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


Ip FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft71111.5, 11192 Manual Action:         g                                       /                       Date reviewed:
Ip FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft71111.5, 11192 Manual Action:
Associated mal-operation:       SPwy/       A 57                                         -2Spur           7AZ WOWVP/W     ~M                                   Yes     No   N/A   Commeni This MA was previously approved by the staff.                                   l=           :7 This MA is completed ...                 ... to prevent this mal-operation.                           Select only I
g  
                                                              ... to achieve SSD.
/
                                      ... in response to this mal-operation.         a/       -    -
Date reviewed:
While the operatorperforms this action:                           A d Radiation levels would be < I OCFR20 limits.             _      =     =
Associated mal-operation:
Emergency lighting would be provided.                     a/
SPwy/
Temperature & humidity would not impede the action.                 -                  lo     e Fire effects would not impede the action.                         _  _
A 57  
Staffing would be adequate not only to perform this action, but also to                               1 1DIX7t9    V) operate the reactor and fight the fire.                                           vl- 7                 7.,   n This action must be coordinated with other plant operations.
-2Spur 7AZ WOWVP/W  
If so: Communications required for this action                                                                       r I are protected from fire effects.                                           ________
~ M Yes No N/A Commeni This MA was previously approved by the staff.
Special tools are required to complete this action.                                                 _        _
l=
If so:   The special tools are dedicated for this action.
:7 This MA is completed...  
The special tools are available from an accessible nearby location.                                                     V/
... to prevent this mal-operation.
The operator can access the space(s) required to complete this action               =
Select only I
... to achieve SSD.
... in response to this mal-operation.
a/
While the operatorperforms this action:
A d Radiation levels would be < I OCFR20 limits.  
=  
=
Emergency lighting would be provided.
a/
Temperature & humidity would not impede the action.
lo e
Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
vl-7 1 1DIX7t9 V) 7.,
n This action must be coordinated with other plant operations.
If so:
Communications required for this action r
I are protected from fire effects.
Special tools are required to complete this action.
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
V/
The operator can access the space(s) required to complete this action  
=
A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
If so:   That equipment is available                                               V/     .<,/
If so:
That equipment is available V/  
.<,/
from an accessible nearby location.
from an accessible nearby location.
The operator can reach the location(s) without personal hazard.                                           e td This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
The operator can reach the location(s) without personal hazard.
This action is adequately described in an approved procedure.                       /
e t d This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
If so: That procedure is an emergency procedure.                                   t/                 D Operators can readily access the procedural guidance.                     LO_____
This action is adequately described in an approved procedure.  
Operator training on this action and the procedure is adequate =                   =_=
/
If so:
That procedure is an emergency procedure.
t/
D Operators can readily access the procedural guidance.
LO_____
Operator training on this action and the procedure is adequate  
=  
=_=
Operator training on this action and the procedure is current.
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.                         =
This action has been verified and validated by a plant walkdown.  
If so: The walkdown used the current procedure.
=
The walkdown was timed.                                                   =       =_=
If so:
The walkdown used the current procedure.
The walkdown was timed.  
=  
=_=
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
N
_I
_I
_      _~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
N
_ _ _~~~~~~~~~~~~~~~~~~~~~~
_ __~~~~~~~~~~~~~~~~~~~~~~
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
S
S


FIRE PROTECTION MANUAL ACTION CHECKLIST (band on daftt1F05. 11f19M Manual Action:       ,'        "lzJr                 zJA;cA -r.e       aZ 77      Date reviewed:
FIRE PROTECTION MANUAL ACTION CHECKLIST (band on daftt1F05. 11f19M Manual Action:  
Associated mal-operation:     Bond o{1 AS               r   .6                 7           ///8 Yes       No NA   Comment This MA was previously approved by the staff.                                             1 This MA is completed ...               ... to prevent this mal-operation.                         Select only I
" lzJr zJ A;cA -r.e aZ 7 7 Date reviewed:
                                                        ... to achieve SSD.
Associated mal-operation:
                                  ... in response to this mal-operation.
Bond o{1 AS r  
While the operatorperforms this action:
.6 7  
///8 Yes No NA Comment This MA was previously approved by the staff.
1 This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
While the operator performs this action:
Radiation levels would be < I OCFR20 limits.
Radiation levels would be < I OCFR20 limits.
Emergency lighting would be provided.           __a/
Emergency lighting would be provided.
Temperature & humidity would not impede the action.           l/
__a/
Fire effects would not impede the action.             /         -
Temperature & humidity would not impede the action.
Staffing would be adequate not only to perform this action, but also to                         _
l/
operate the reactor and fight the fire.                                         A,               _      _l This action must be coordinated with other plant operations.                       =         -
Fire effects would not impede the action.  
If so: Communications required for this action are protected from fire effects.
/
Special tools are required to complete this action.                             /     .
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
If so:   The special tools are dedicated for this action.                       ./_i/
A,
_l This action must be coordinated with other plant operations.  
=
If so:
Communications required for this action are protected from fire effects.
Special tools are required to complete this action.  
/
If so:
The special tools are dedicated for this action.  
./_i/
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action                           _
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
If so:
If so: That equipment is available Ifrom an accessible nearby location.                                                 V/
That equipment is available Ifrom an accessible nearby location.
The operator can reach the location(s) without personal hazard.                           -/
V /
The operator can reach the location(s) without personal hazard.  
-/
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                               _=P Operators can readily access the procedural guidance.               ./
If so:
That procedure is an emergency procedure.
_=P Operators can readily access the procedural guidance.  
./
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.                                 __
This action has been verified and validated by a plant walkdown.
If so:   The walkdown used the current procedure.
If so:
The walkdown was timed.                                               _____
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                         _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  


I I",
I I",
Line 837: Line 1,498:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7lI.05, 11119M)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft 7lI.05, 11119M)
Manual Action:     l         4<e.         Of       /         5.r-y3           t         Date reviewed:
Manual Action:
Associated mal-operation:                                               d9     ^Api                         (Z/fZ-
l 4<e.
                                                                                                            /12l1/
Of  
_Yes l~o     lN/A   Comment This MA was previously approved by the staff.
/
This MA is completed ...               ... to prevent this mal-operation.                                 Select only I to achieve SSD.         '
5.r-y3 t
                                  ... in response to this mal-operation.
Date reviewed:
While the operatorperforms this action:                                       Adi Radiation levels would be < IOCFR20 limits. A[f Emergency lighting would be provided.                                 _
Associated mal-operation:
Temperature & humidity would not impede the action.                 7_                   _
12l1/
Fire effects would not impede the action.                 _
d9 ^Api  
/
(Z/fZ-Yes l~o lN/A Comment This MA was previously approved by the staff.
This MA is completed...  
... to prevent this mal-operation.
Select only I to achieve SSD.  
... in response to this mal-operation.
While the operatorperforms this action:
Adi Radiation levels would be < IOCFR20 limits. A[f Emergency lighting would be provided.
Temperature & humidity would not impede the action. 7_
Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.
This action must be coordinated with other plant operations.                             v                     )   s If so: Communications required for this action Iare protected from fire effects.                                                 I/
This action must be coordinated with other plant operations.
v  
)
s If so:
Communications required for this action I are protected from fire effects.
I/
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.                                 =_=__
If so:
The special tools are available from an accessible nearby location.                                                           V_
The special tools are dedicated for this action.  
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.                                                   /
=_=__
If so:   That equipment is available Ifrom an accessible nearby location.                                                           L/
The special tools are available from an accessible nearby location.
V_
The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.  
/
If so:
That equipment is available Ifrom an accessible nearby location.
L/
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions                                           '
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.                                       _____
If so:
Operators can readily access the procedural guidance.                               /__
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.  
/__
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                         ___
The walkdown used the current procedure.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


Line 870: Line 1,554:
I~~~~~~~~~~~~~~~~_
I~~~~~~~~~~~~~~~~_


% F FIRE PROTECTION MANUAL ACTION CHECKLIST (basedondrft71111-0. 111192)                         I '     'Y ManualAction:                         .*ZT -               &#xa3; 331                             Date reviewed:
% F FIRE PROTECTION MANUAL ACTION CHECKLIST (basedondrft71111-0. 111192)
Associated mal-operation:I5                                   0P       4                   e s       _    ___
I ' 'Y
Y/       No NA       Comment This MA was previously approved by the staff.                                       =             7 This MA is completed ...                 ... to prevent this mal-operation.                                 Select only I
ManualAction:  
                                                              ... to achieve SSD.
.*ZT -
                                        ... in response to this mal-operation.           v While the operatorperforms this action:                                                                   minim Radiation levels would be < OCFR20 limits.                   /     #e Emergency lighting would be provided.                       7     -
&#xa3; 331 Date reviewed:
Temperature & humidity would not impede the action.               _
Associated mal-operation:I5 0P 4 e
Fire effects would not impede the action.             U/
s Y/
Staffing would be adequate not only to perform this action, but also to                                     1 operate the reactor and fight the fire.
l No NA Comment This MA was previously approved by the staff.  
This action must be coordinated with other plant operations.                                         -
=
7 This MA is completed...  
... to prevent this mal-operation.
Select only I
... to achieve SSD.
... in response to this mal-operation.
v While the operatorperforms this action:
minim Radiation levels would be < OCFR20 limits.  
/  
#e Emergency lighting would be provided.
7 Temperature & humidity would not impede the action.
Fire effects would not impede the action.
U/
Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.
If so: l Communications required for this action I are protected from fire effects.
If so: l Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.                               _____-40 If so: The special tools are dedicated for this action.
Special tools are required to complete this action.
The special tools are available from an accessible nearby location.                                                       t/
_____-40 If so:
The operator can access the space(s) required to complete this action <7                       -    -
The special tools are dedicated for this action.
A ladder or special access equipment is needed.                                                       -
The special tools are available from an accessible nearby location.
If so: That equipment is available I from an accessible nearby location.                                                             _
t/
The operator can reach the location(s) without personal hazard.                                 -    -
The operator can access the space(s) required to complete this action <7 A ladder or special access equipment is needed.
This manual action can be completed before unrecoverable conditions                     /
If so:
occur. (Review the thermo-hydraulic timeline.)                                       V/
That equipment is available I from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions  
/
occur. (Review the thermo-hydraulic timeline.)
V/
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so: That procedure is an emergency procedure.                                               -    -
If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance._
Operators can readily access the procedural guidance._
Operator training on this action and the procedure is adequate             =_=_=
Operator training on this action and the procedure is adequate  
Operator training on this action and the procedure is current.             =
=_=_=
Operator training on this action and the procedure is current.  
=
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.                                 _          _        =
If so:
The walkdown was timed.                                                            .
The walkdown used the current procedure.  
=
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


Line 902: Line 1,611:


FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05. 1111902)
FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05. 1111902)
Manual Action:             l?
Manual Action:
P     /('25         .      c                                 Date reviewed:
l?
Associated mal-operation:                                       P6 O         1       a 4iA - .7Xy      AceZ.//8/
P  
                                          -!                                          Yes     No     NA   Comment This MA was previously approved by the staff.                                     =_a/
/('25 c
This MA is completed ...               ... to prevent this mal-operation.                                 Select only 1
Date reviewed:
                                                          ... to achieve SSD.
Associated mal-operation:
in response to this mal-operation. v/
P
While the operatorperforms this action:                                                     M           I Radiation levels would be < 10CFR20 limits.                 _=0 Emergency lighting would be provided.                   7 Temperature & humidity would not impede the action.                 _      -        -      t_    .,
.7y 6 O 1
Fire effects would not impede the action.               ,
a 4i A - X AceZ.//8/
Staffing would be adequate not only to perform this action, but also to .
Yes No NA Comment This MA was previously approved by the staff.  
operate the reactor and fight the fire.                                             V This action must be coordinated with other plant operations.
=_a/
If so: Communications required for this action are protected from fire effects.
This MA is completed...  
... to prevent this mal-operation.
Select only 1
... to achieve SSD.
in response to this mal-operation.
v/
While the operatorperforms this action:
M I
Radiation levels would be < 1 OCFR20 limits.
_=0 Emergency lighting would be provided.
7 Temperature & humidity would not impede the action.
t Fire effects would not impede the action.
Staffing would be adequate not only to perform this action, but also to.
operate the reactor and fight the fire.
V This action must be coordinated with other plant operations.
If so:
Communications required for this action are protected from fire effects.
Special tools are required to complete this action.
Special tools are required to complete this action.
If so: The special tools are dedicated for this action.v The special tools are available from an accessible nearby location.                                                           a The operator can access the space(s) required to complete this action v/
If so:
The special tools are dedicated for this action.v The special tools are available from an accessible nearby location.
a The operator can access the space(s) required to complete this action v/
A ladder or special access equipment is needed.
A ladder or special access equipment is needed.
If so: That equipment is available from an accessible nearby location._
If so:
That equipment is available from an accessible nearby location._
The operator can reach the location(s) without personal hazard.
The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.                                   -        =_=________
If so:
That procedure is an emergency procedure.  
=_=________
Operators can readily access the procedural guidance.
Operators can readily access the procedural guidance.
Operator training on this action and the procedure is adequate                                   _
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.  
This action has been verified and validated by a plant walkdown.                           =
=
If so: The walkdown used the current procedure.                             =       =
If so:
The walkdown used the current procedure.  
=  
=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.


I Notes:
Notes:I
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.


.j FIRE PROTECTION MANUAL ACTION CHECKLIST                                           4 Lbt  jo55f~
.j FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft 71111 06, 1111912) 4 Lbt jo55f~
(based on draft 71111 06, 1111912)
Manual Action: l  
Manual Action: l                     /cZ3,           Amp-2-/Akse-c 2 {.     /CS-27         / Date reviewed:
/cZ3, Amp /Akse-c 2 {.  
Associated rnal-operation:                                                             )qq                   /Z   (S Yes     No     WA   Comment This MA was previously approved by the staff.                                                   t/
/CS-27  
This MA is completed ...               ... to prevent this mal-operation.                                     Select only I
/
                                                            ... to achieve SSD.
Date reviewed:
                                    ... in response to this mal-operation. i/71 While the operatorperforms this action:                                                                                       leaI Radiation levels would be < I OCFR20 limits. -                       L/
Associated rnal-operation:  
Emergency lighting would be provided.                           v/_                       ,
)qq  
Temperature & humidity would not impede the action.                     _
/Z (S Yes No WA Comment This MA was previously approved by the staff.
Fire effects would not impede the action.                 ,/
t/
Staffing would be adequate not only to perform this action, but also to                                       119 operate the reactor and fight the fire.                                                                                 C This action must be coordinated with other plant operations.
This MA is completed...  
If so: Communications required for this action are protected from fire effects.                         i/.q                                               Cr4 Special tools are required to complete this action.                                             v/I"_
... to prevent this mal-operation.
If so: The special tools are dedicated for this action.                                   -      -
Select only I
... to achieve SSD.
... in response to this mal-operation.
i/71 While the operator performs this action:
Radiation levels would be < I OCFR20 limits. -
L/
Emergency lighting would be provided.
v/_
Temperature & humidity would not impede the action.
Fire effects would not impede the action.  
,/
Staffing would be adequate not only to perform this action, but also to 119 operate the reactor and fight the fire.
C This action must be coordinated with other plant operations.
If so:
Communications required for this action are protected from fire effects.
i/.q Cr4 Special tools are required to complete this action.
v/I"_
If so:
The special tools are dedicated for this action.
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action_
The operator can access the space(s) required to complete this action_
A ladder or special access equipment is needed.                                                         -
A ladder or special access equipment is needed.
If so: lThat equipment is available_
If so: lThat equipment is available_
Ifrom an accessible nearby location.                                                           t The operator can reach the location(s) without personal hazard.
Ifrom an accessible nearby location.
t The operator can reach the location(s) without personal hazard.
This manual action can be completed before unrecoverable conditions occur. (Review the therrno-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the therrno-hydraulic timeline.)
This action is adequately described in an approved procedure.                               a/_                              _
This action is adequately described in an approved procedure.
If so:   That procedure is an emergency procedure.
a/_
Operators can readily access the procedural guidance.                                     =       -
If so:
That procedure is an emergency procedure.
Operators can readily access the procedural guidance.  
=
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.
If so:
The walkdown was timed.                                                                 _
The walkdown used the current procedure.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                           _
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.
leaI


Notes:
Notes:
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
: 1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.
_      _~~~~~~~~~~~~~
_~~~~~~~~~~~~~


FIRE PROTECTION MANUAL ACTION CHECKLIST                             ~
FIRE PROTECTION MANUAL ACTION CHECKLIST  
(ad endmf71111 05 1119                 S   C Manual Action-:         o         z               6   z   Lo/TA Hi                          Date reviewed:
~
Associated mal-operation:       2/s.a 'cj-->,4J-                         4f     20&                   -    bZ//5 Yes   No     NIA     Corment This MA was previously approved by the staff.                                   =_=_=
(ad endmf71111 05 1119 S
This MA is completed ...                 ... to prevent this mal-operation.                           Select only 1
C Manual Action-:
                                                        ... to achieve SSD.
o z
                                  ... in response to this mal-operation.         V While the operator performs this action:
6 z
Radiation levels would be < I OCFR20 limits.                       _      H4     r.. ekC -Q-a-Emergency lighting would be provided.
Hi Lo/TA Date reviewed:
Temperature & humidity would not impede the action.           LI     -
Associated mal-operation: 2/s.a 'cj-->,4J-4f 20&
Fire effects would not impede the action.         _    _                      s Staffing would be adequate not only to perform this action, but also to                               1                 Ver--On operate the reactor and fight the fire.
bZ//5 Yes No NIA Corment This MA was previously approved by the staff.  
This action must be coordinated with other plant operations.                     =   -      =
=_=_=
Ifso: l Communications required for this action I are protected from fire effects.
This MA is completed...  
Special tools are required to complete this action.                                                                     f7 If so:   The special tools are dedicated for this action.                       __=____
... to prevent this mal-operation.
Select only 1
... to achieve SSD.
... in response to this mal-operation.
V While the operator performs this action:
Radiation levels would be < I OCFR20 limits.
H4 r..
ekC Emergency lighting would be provided.
Temperature & humidity would not impede the action.
LI Fire effects would not impede the action.
s Staffing would be adequate not only to perform this action, but also to 1
operate the reactor and fight the fire.
This action must be coordinated with other plant operations.  
=  
=
If so: l Communications required for this action I are protected from fire effects.
Special tools are required to complete this action.
If so:
The special tools are dedicated for this action.
__=____
The special tools are available from an accessible nearby location.
The special tools are available from an accessible nearby location.
The operator can access the space(s) required to complete this action                       __=
The operator can access the space(s) required to complete this action
A ladder or special access equipment is needed.                                       v/
__=
Ifso: l That equipment is available I from an accessible nearby location.
A ladder or special access equipment is needed.
The operator can reach the location(s) without personal hazard.                 1. _
v/
If so: l That equipment is available I from an accessible nearby location.
The operator can reach the location(s) without personal hazard.
: 1.
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)
This action is adequately described in an approved procedure.
This action is adequately described in an approved procedure.
Ifso: That procedure is an emergency procedure.                         =     O37           -
If so:
Operators can readily access the procedural guidance.                 _                    _      _=
That procedure is an emergency procedure.  
Operator training on this action and the procedure is adequate                                           X Operator training on this action and the procedure is current.
=
O37 Operators can readily access the procedural guidance.
_=
Operator training on this action and the procedure is adequate X
Operator training on this action and the procedure is current.
This action has been verified and validated by a plant walkdown.
This action has been verified and validated by a plant walkdown.
If so: The walkdown used the current procedure.                                 =     =_=
If so:
The walkdown used the current procedure.  
=  
=_=
The walkdown was timed.
The walkdown was timed.
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.                                       _
The walkdown demonstrated that the action can be completed within the time window required by the FSSA.  
              /o -/                   )bG/A,               a.6.}}
/o -/  
)bG /A, a.6.
-Q-a-Ver--On f 7}}

Latest revision as of 05:39, 16 January 2025

Inspector Notes and Regional Checklist Evaluating Manual Operator Actions During Shearon Harris Fire Protection Inspection (NRC IR 05-400/02-11)
ML040090282
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/17/2002
From:
NRC/RGN-II
To:
References
FOIA/PA-2003-0358 IR-02-011
Download: ML040090282 (47)


Text

4f FIRE PROTECTION MANUAL ACTION CHECKLIST (t

n dft

?It45, 11t91M)

Manual Action:

l

-4 Date reviewed:

Associated mal-operation:

5 s

e'

'R.i Zg17/ Z 0, ' 1 ~ M,1010,113

~

e No NIA Corhment This MA was previously approved by the staff.

v/

This MA is completed...

... to prevent this mat-operation.

Select only I

... to achieve SSr.

... in response to this mal-operation.

T While the operator performs this action:

Radiation levels would be < I OCFR20 limits.

I/

Emergency lighting would be provided. j Temperature & humidity would not impede the action.

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

J The special tools are available from an accessible nearby location.

__._v The prator can access the space(s) required to complete this action _7

=

A ladder or special access equipment is needed.

a/

If so: lThat equipment is available_

I from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)__

This action is adequately described In an approved procedure.

v/__

If so:

That procedure is an emergency procedure.

vo Operators can readily access the procedural guidance.

-/

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

_=_

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

OJ4 e 194-r

/

IW g t

I/,

/%

6 -//S 1/

FIRE PROTECTION MANUAL ACTION CHECKLIST (base ondratit5, 119MU )

Manual Action:

g

/

-S 3

(S V-:3z3)

Date reviewed:l Associated mal-operation:

0-4o K~,ofce~ Trsae/7o yi No MIA ContmenV This MA was previously approved by the staff.

1 This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < IOCFR20 limits.

v Emergency lighting would be provided. =l Temperature & humidity would not impede the action.

1/

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action Iare protected from fire effects.

A Special tools are required to complete this action.

7 If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

/

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

t-This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

'This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

_

If so:

The walkdown used the current procedure.

____=

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

//I,- g4 S&h e E-g kt IZ-SEA6~

4SC

  • ,I
  • l,

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 711115. 11I19M 2)

Manual Action:

)

8 Xq < _Sq /a/ HOG 5 4 l Date reviewed:

Associated mal-operation:

5-/)Of24/

/

(e 7 C' Yes No NA Conment This MA was previously approved by the staff.

=

=

This MA is completed...

... to prevent this mal-operation.

Select only 1

... to achieve SSD.

... in response to this mal-operation.

I,,

While the operatorperforms this action:

BE Radiation levels would be < 1 OCFR20 limits.

t,/_i Emergency lighting would be provided. /t Temperature & humidity would not impede the action.

___=_=

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

V1 The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action, A ladder or special access etAiipqment is needed.

If so:

That equipment is available from an accessible nearby location.

,_v/

The operator can reach the location(s) without personal hazard.

L/

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

14=

Operators can readily access the procedural guidance.

77 Operator training on this action and the procedure is adequate

_=_

Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

_=_

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based an draft71111-05. 1119CQ)

Mana Acin Date reviewed:

mo =

e No W/A dominene This MA was previously approved by the staff.=

v

=

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

v

... in response to this mal-operation.

x/

While the operator perfornms this action:

Radiation levels would be < 1 OCFR20 limits.

J Emergency lighting would be provided.

t/

Temperature & humidity would not impede the action.

/

Fire effects would not impede the action. =

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

A/

The special tools are available

/

from an accessible nearby location.

The operator can access the space(s) required to complete this action v/

A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location.

7 The operator can reach the location(s) without personal hazard.

V =

This manual action can be completed before unrecoverable conditions

/

2 occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

_P Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

w31

FIRE PROTECTION MANUAL ACTION CHECKLIST (d

on draft71111.05, 11/19M)

Manual Action:

A y IA a (-5A

. (l

- '})

Date reviewed:

Associated mal-operation:

u. p.,&

L 1 if T-"

7 T/ ( J Zf Yes No NA ConimenA This MA was previously approved by the staff.

_=_

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

a/,

... in response to this mal-operation.

L/

While the operatorperforns this action:

g g

Radiation levels would be < 10CFR20 limits.

k/

Emergency lighting would be provided.

=

Temperature & humidity would not impede the action. a/

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

a/_

If so:

Communications required for this action Iare protected from fire effects.

t Special tools are required to complete this action.

l/

If so:

The special tools are dedicated for this action.

=

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so:

That equipment is available I from an accessible nearby location.

V/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described In an approved procedure.

a/_=_=

If so:

That procedure is an emergency procedure.

V/

ADP Operators can readily access the procedural guidance.

I..

=

=

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on druft 71111.05. 11192)

Manual Action:

WI 7.-

l Date reviewed:

Associated mal-operation: ra ALX ge t-

zf0, FIgi Yes No N/A commetit This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I

-;..to achieve SSD.

... in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < I OCFR20 limits.

Emergency lighting would be provided.

Temperature & humidity would not impede the action.

Fire effects would not impede the action.

_

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

Special tools are required to complete this action.

_4O 1

X2 If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action, A ladder or special access equipment is needed.

a If so:

That equipment is available/

Ifrom an accessible nearby location.

a The operator can reach the location(s) without personal hazard.

/-

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

,/

If so:

That procedure is an emergency procedure.

/J=A 7' Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

to g a1 6C

/°//<

~ 4-06/ g

FIRE PROTECTION MANUAL ACTION CHECKLIST (bsedonhraft711 1 t06. 11119 )

Manual Action:

7B

£9 M%6t 6

l Date reviewed:

Associated mal-operation: lC-WZ %tAGO

?,d I C4) 5111_ 111 I 00 121,111119M Yes No WA Commhnt This MA was previously approved by the staff.

e/

This MA is completed...

... to prevent this mal-operation.

.I/

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < 1 OCFR20 limits.

Emergency lighting would be provided.

Temperature & humidity would not impede the action.

Fire effects would not impede the action. a/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

a/

If so: lCommunications required for this action I are protected from fire effects.

x/

Special tools are required to complete this action.

7 If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so: i That equipment is available I from an accessible nearby location.

v/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

AoD Operators can readily access the procedural guidance.

=

=

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

_=_

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

I-A -S4. -

FIRE PROTECTION MANUAL ACTION CHECKLIST (based onaft 7111105, t1/19102)

Manual Action: l) ecC.4' i2' 5

Date reviewed:

Associated mal-operation:

,J,/

l7 1_

6 s41 Yes No N/A Comment This MA was previously approved by the staff.

a/

This MA is completed...

... to prevent this mal-operation.

Select only 1 to achieve SSD.

... in response to this mal-operation.

While the operator perforns this action:

Radiation levels would be < I0CFR20 limits.

Emergency lighting would be provided.

z

=

Temperature & humidity would not impede the action.

0 Fire effects would not impede the action.

7 Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

a/

If so:

Communications required for this action I are protected from fire effects.

A/

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

IJv/I/

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action a/

A ladder or special access equipment is needed.

A/

/

If so:

That equipment is available from an accessible nearby location.

l/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

1/

Operators can readily access the procedural guidance.

l Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST 3

p<

(ad n d71raf T

-6111192)

Orb 6

~

t 1"55 Manual Action:

ff (9 )Zw (V ell z

Date reviewed:

Associated mal-operation:

/?;'

sS Yes No N/A Comment This MA was previously approved by the staff.

___

This MA is completed...

... to prevent this mal-operation.

./

Select only 1

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < IOCFR20 limits.

v_

Emergency lighting would be provided.

V l_1 Temperature & humidity would not impede the action.

J

_

Fire effects would not impede the action.

J

=__

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

a/

This action must be coordinated with other plant operations.

=____

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

a/

If so:

The special tools are dedicated for this action.

The special tools are available x

from an accessible nearby location.

v The operator can access the space(s) required to complete this action A ladder or special access equipment Is needed.

If so:

That equipment Is available 7

Ifrom an accessible nearby location.

The operator can reach the location(s) without personal hazard.

V_

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

V If so:

That procedure is an emergency procedure.

AD/

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

ref e6 Dr

4-FIRE PROTECTION MANUAL ACTION CHECKLIST pdow n7111m45, 1nsw Ya

-5 Manual Action:

l

-Zt/

Ax

(

,/

id Ac~c.

Date reviewed:

Associated mal-operation:lBy<$CDit,.S_//8o

__~~~~~~~a o Yes o NIA Comm~nt This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

zV__

Select only 1 to achieve SSD.

... in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < 10CFR20 limits.

/_

Emergency lighting would be provided.

/

Temperature & humidity would not impede the action.

C/

Fire effects would not Impede the action.

Staffing would be adequate not only to perform this action, but also to

/

operate the reactor and fight the fire.

/

This action must be coordinated with other plant operations.

a/

If so:

Communications required for this action are protected from fire effects.

a Special tools are required to complete this action.

____

If so:

The special tools are dedicated for this action.

IX The special tools are available from an accessible nearby location.

7 The operator can access the space(s) required to complete this action v/

A ladder or special access equipment is needed.

If so:

That equipment is available I from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

V This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

l/__=

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

a/

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

_

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

V~-?4r 43a(

6 7,R-16K'6 x'

b-5 m

us FIRE PROTECTION MANUAL ACTION CHECKLIST (based an dft 7111105, 11fl'02)

Manual Action: lf r

/1-.4 3 de

/

Date reviewed:

Associated mal-operation: l

.7r4ouo a

S

_ill MA Comment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

V Select only I

....to achieve SSD.

... in response to this mal-operation.

V While the operatorperforms this action:

Radiation levels would be <1 OCFR20 limits.

vewcc4 Emergency lighting would be provided.

/

Temperature & humidity would not impede the action.

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

-/

If so:

Communications required for this action are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

V The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action v

A ladder or special access equipment is needed.

iZ If so:

That equipment is available I from an accessible nearby location.

V The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

T If so:

That procedure is an emergency procedure.

A Operators can readily access the procedural guidance.

/

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST 44 (basd on d

aft 711115. 1 l192) 1

,A ~

I Manual Action: 5AZ/

A $ TJ 3

'g 3 l C Date reviewed

Associated mal-operation:

Spe s ma

/e5a Yes No N/A Comment This MA was previously approved by the staff.

__/

This MA is completed...

... to prevent this mal-operation.

v"Ai Select only I

... to achieve SSD.

... in response to this mal-operation.

Vi' 3

While the operatorperforms this action:

=

Radiation levels would be < 1 OCFR20 limits.

/

7s Emergency lighting would be provided.

V Temperature & humidity would not impede the action.

=

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

lT7a If so: l Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

$ =

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action

/

A ladder or special access equipment is needed.

7 If so:

That equipment is available from an accessible nearby location.

_/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_

This action is adequately described in an approved procedure.

a/

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

a/

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

_=

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft71111 05, 1111902)

Manual Action:

I ffJ l

SD 1

0 Date reviewed:

Associated mal-operation:

C ID B

y Yes No IA Comment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

V=

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < IOCFR20 limits.

L/

Emergency lighting would be provided.

=

Temperature & humidity would not impede the action.

a Fire effects would not impede the action.

-=

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

LI/

If so:

Communications required for this action I are protected from fire effects.

a Special tools are required to complete this action.

=_

If so:

The special tools are dedicated for this action.=

=

o The special tools are available from an accessible nearby location._

The operator can access the space(s) required to complete this action 7/

A ladder or special access equipment is needed.

=LI/_

If so:

That equipment s availablev from an accessible nearby location._

The operator can reach the location(s) without personal hazard.

VI" I

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

/

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

LI/_=

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7111105. 111191m)

Manual Action: l g

¢ I Q&

V(-

Date reviewed:

Associated mal-operain fB f>z nG5/g/)

Yes No N/A Comnent This MA was previously approved by the staff.

__=

This MA is completed...

... to prevent this mal-operation.

V Select only I

... to rchieve SSD.

... in response to this mal-operation.

While the operatorperforns this action:

Radiation levels would be < I OCFR20 limits.

v/

Emergency lighting would be provided.

__=

Temperature & humidity would not impede the action.

v

=

Fire effects would not impede the action. A/

og Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

1 Special tools are required to complete this action.

A

/

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

a/

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so:

That equipment is available Ifrom an accessible nearby location.

The operator can reach the location(s) without personal hazard.

L/

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

/

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

l The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST j A

(n andmft71111-M.

IMW )

l P

a Manual Action:

/

  • -$A-A Dbtereviewed:

Associated mal-operation:

S'5 C t Hil

,1.5,1..

Yes No N/A Comn enti This MA was previously approved by the staff.

7 This MA is completed...

... to prevent this mal-operation.

Select only I to achieve SSD.

... in response to this mal-operation.

While the operator perforrns this action:

EWES=

Radiation levels would be < 10CFR20 limits.

\\/

Emergency lighting would be provided. 797 Temperature & humidity would not impede the action.

(/

Fire effects would not impede the action.

UVv i

I Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action J

I are protected from fire effects.

Special tools are required to complete this action.

v/

If so:

The special tools are dedicated for this action.

=

The special tools are available

/

from an accessible nearby location.

The operator can access the space(s) required to complete this action v

A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

/

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)J This action is adequately described in an approved procedure.

J If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

____=

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

FIRE PROTECTION MANUAL ACTION CHECKLIST e(band an dft 71111-06,11I9M)

CAi 24)

Manual Action:

ly' C ' AT s c

S ['

Date reviewed:

Associated mal-operation:

Yes No N/A Comment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

=/

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

msmam Radiation levels would be < 1 OCFR20 limits.

/

Emergency lighting would be provided.

=

=

Temperature & humidity would not impede the action.

/

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

a Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location._

The operator can access the space(s) required to complete this action

.=-

A ladder or special access equipment is needed.

If so:

That equipment is availablel Ifrom an accessible nearby location.

_C The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

v" If so:

That procedure is an emergency procedure.

D Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.__

FIRE PROTECTION MANUAL ACTION CHECKLIST l,716 (bawd ondaft 7111l-05. 1 11 WV)

A~

AlsoZi Manual Action:

/$ 5A) 7-7 1

e6,0e Date reviewed:

Associated mal-operation:

Ax God e;igX 2J7e

~7

/z//&/o Yes No N/A Comthent This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

/

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < I OCFR20 limits.

A/

Emergency lighting would be provided.

a Temperature & humidity would not impede the action. 1 Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so: l Communications required for this action are protected from fire effects._/

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available LI/

from an accessible nearby location.

The operator can access the space(s) required to complete this action u A ladder or special access equipment is needed.

If so: ; That equipment is available jfrom an accessible nearby location.

The operator can reach the location(s) without personal hazard.

V/

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

V This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

a/_____

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate

_=_

l Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

a

II 4.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on drt711 1506, 11I1IV2)

ManualAction:

ed bL/-

/5c0-270 Date reviewed:

Associated mal-operation:

'c Tc4a 270 A. 7, 7 77/7/Z Yes No WA Coniment This MA was previously approved by the staff._

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

v

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < 1 OCFR20 limits.

j Emergency lighting would be provided.

v/

=

=

Temperature & humidity would not impede the action.

l/

Fire effects would not impede the action.

7A Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so: l Communications required for this action I are protected from fire effects.

x/

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

=

If so:

That procedure is an emergency procedure.

AJ Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

IP

I P

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

FIRE PROTECTION MANUAL ACTION CHECKLIST (basedancdaft71II-O5. 11II9V2)

Manual Action:

x-1,L91 Date reviewed:

Associated mal-operation:

j Ves =No N/A Comment This MA was previously approved by the staff.

_=

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < I OCFR20 limits.

/

Emergency lighting would be provided.

=

v_=

Temperature & humidity would not impede the action.

.___]_l_

Fire effects would not impede the action.

37 Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

vX If so:

Communications required for this action Iare protected from fire effects.

v/

Special tools are required to complete this action.

V_

If so:

The special tools are dedicated for this action.

-/

The special tools are available_

from an accessible nearby location.

v/

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

v If so:

That equipment is available Ifrom an accessible nearby location.

r The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is'an emergency procedure.

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

_=_

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft7Ill.5.

11)19)

Manual Ac

/

2 I

Date reviewed:

Associated mal-operation: I

-/Z/.M/

WWWON-ji~gi Yes No N/A Comment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < I OCFR20 limits.

V

=

Emergency lighting would be provided.

=

=

Temperature & humidity would not impede the action.

x/

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

I__

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

a/

If so: lThat equipment is available I from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

By Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

_=_

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

-D

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

AJ FIRE PROTECTION MANUAL ACTION CHECKLIST (bodondraft 71 I 5, 1)19Ig2)

Manual Actionl Date reviewed:

Associated mal-operation:aotaug_'-/rz Yes No NA Comment This MA was previously approved by the staff.

=

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforrns this action:

Radiation levels would be < OCFR20 limits.

I" Emergency lighting would be provided.

LZ 1!

Temperature & humidity would not impede the action.

Fire effects would not impede the action.

a/

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

V Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

c/

The special tools are available from an accessible nearby location.

L/

The operator can access the space(s) required to complete this actionj W'

AfcL e

,L-U1

14tr,

_wz A ladder or special access equipment is needed.

=

__=_,_______

If so:

That equipment is available from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

_=

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

LX If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

7 Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based ondraft 1111.05. 11I19M)

Manual Action:

'S *Date reviewed:

Associated mal-operation: l~

.- t04 S

p y

c-z Z

21Rgo r

Yes No N/A conmenf This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Radiation levels would be < IOCFR20 limits.

l=

Emergency lighting would be provided.

v

_1 Temperature & humidity would not impede the action.

l/_=_=___

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

a/

If so: l Communications required for this action are protected from fire effects.

l Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

V The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

v/

If so:

That equipment is available I from an accessible nearby location.

V The operator can reach the location(s) without personal hazard.

S12 So a This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

a/

If so:

That procedure is an emergency procedure.

U/

AiP Operators can readily access the procedural guidance.

Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

A0 FIRE PROTECTION MANUAL ACTION CHECKLIST (bued onaft71

5. 11119X 12)

Manual Action:

Date reviewed:

Associated mal-operation:

j.

qj (g5/

1

r.

2 Yes No NA Commebt This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < 10CFR20 limits.

a/

Emergency lighting would be provided.

t/ _-'

Temperature & humidity would not impede the action.

V Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

-=

If so:

Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

C/

If so:

That equipment is available

/

4 from an accessible nearby location.

v/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

a/

If so:

That procedure is an emergency procedure.

v=

Operators can readily access the procedural guidance.

/

Operator training on this action and the procedure is adequate

__=_=

Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

I

FIRE PROTECTION MANUAL ACTION CHECKLIST (bsd on draft llIt5. 11I9W)

Manual Action:

c

,C' jLS(¢\\ Date reviewed:

Associated mal-operation:

It Z-,

,T Z/t8 Yes No NA Coiment This MA was previously approved by the staff.

L/

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < IOCFR20 limits.

t/

Emergency lighting would be provided.

V l

Temperature & humidity would not impede the action.

/

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so:

Communications required for this action I are protected from fire effects.

v Special tools are required to complete this action.

=

If so:

The special tools are dedicated for this action.

The special tools are available l from an accessible nearby location.

The operator can access the space(s) required to complete this action V

A ladder or special access equipment is needed.

If so:

That equipment Is available

[from an accessible nearby location.

The operator can reach the location(s) without personal hazard._

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

x If so:

That procedure is an emergency procedure.

v/

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

_=_

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA._

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

e

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05, 1111W0)

Manual Action:

lly-Date reviewed:

Associated mal-operation:

l J

/

}

Yes No WA Corhment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

f Radiation levels would be < I OCFR20 limits.

7/

Emergency lighting would be provided.

=

_I=

A_ a, Temperature & humidity would not impede the action.

V

__XL)___

Fire effects would not impede the action.

A/

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

v_7-If so: l Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

=_=_i If so:.

The special tools are dedicated for this action.

l/'

The special tools are available from an accessible nearby location.

to The operator can access the space(s) required to complete this action V

A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

=

Operator training on this action and the procedure is adequate X

Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown._

If so:

The walkdown used the current procedure.

_=_

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

Ip FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft71111.5, 11192 Manual Action:

g

/

Date reviewed:

Associated mal-operation:

SPwy/

A 57

-2Spur 7AZ WOWVP/W

~ M Yes No N/A Commeni This MA was previously approved by the staff.

l=

7 This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

a/

While the operatorperforms this action:

A d Radiation levels would be < I OCFR20 limits.

=

=

Emergency lighting would be provided.

a/

Temperature & humidity would not impede the action.

lo e

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

vl-7 1 1DIX7t9 V) 7.,

n This action must be coordinated with other plant operations.

If so:

Communications required for this action r

I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

V/

The operator can access the space(s) required to complete this action

=

A ladder or special access equipment is needed.

If so:

That equipment is available V/

.<,/

from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

e t d This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

/

If so:

That procedure is an emergency procedure.

t/

D Operators can readily access the procedural guidance.

LO_____

Operator training on this action and the procedure is adequate

=

_

Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

=

If so:

The walkdown used the current procedure.

The walkdown was timed.

=

_

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

N

_I

_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

_ _ _~~~~~~~~~~~~~~~~~~~~~~

_~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

S

FIRE PROTECTION MANUAL ACTION CHECKLIST (band on daftt1F05. 11f19M Manual Action:

" lzJr zJ A;cA -r.e aZ 7 7 Date reviewed:

Associated mal-operation:

Bond o{1 AS r

.6 7

///8 Yes No NA Comment This MA was previously approved by the staff.

1 This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

While the operator performs this action:

Radiation levels would be < I OCFR20 limits.

Emergency lighting would be provided.

__a/

Temperature & humidity would not impede the action.

l/

Fire effects would not impede the action.

/

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

A,

_l This action must be coordinated with other plant operations.

=

If so:

Communications required for this action are protected from fire effects.

Special tools are required to complete this action.

/

If so:

The special tools are dedicated for this action.

./_i/

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

If so:

That equipment is available Ifrom an accessible nearby location.

V /

The operator can reach the location(s) without personal hazard.

-/

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

_=P Operators can readily access the procedural guidance.

./

Operator training on this action and the procedure Is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

I I",

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft 7lI.05, 11119M)

Manual Action:

l 4<e.

Of

/

5.r-y3 t

Date reviewed:

Associated mal-operation:

12l1/

d9 ^Api

/

(Z/fZ-Yes l~o lN/A Comment This MA was previously approved by the staff.

This MA is completed...

... to prevent this mal-operation.

Select only I to achieve SSD.

... in response to this mal-operation.

While the operatorperforms this action:

Adi Radiation levels would be < IOCFR20 limits. A[f Emergency lighting would be provided.

Temperature & humidity would not impede the action. 7_

Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

v

)

s If so:

Communications required for this action I are protected from fire effects.

I/

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

=_=__

The special tools are available from an accessible nearby location.

V_

The operator can access the space(s) required to complete this action A ladder or special access equipment is needed.

/

If so:

That equipment is available Ifrom an accessible nearby location.

L/

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

/__

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering oher actions which must be completed in approximately the lsame time period on the timeline.

I~~~~~~~~~~~~~~~~_

% F FIRE PROTECTION MANUAL ACTION CHECKLIST (basedondrft71111-0. 111192)

I ' 'Y

ManualAction:

.*ZT -

£ 331 Date reviewed:

Associated mal-operation:I5 0P 4 e

s Y/

l No NA Comment This MA was previously approved by the staff.

=

7 This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

v While the operatorperforms this action:

minim Radiation levels would be < OCFR20 limits.

/

  1. e Emergency lighting would be provided.

7 Temperature & humidity would not impede the action.

Fire effects would not impede the action.

U/

Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

If so: l Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

_____-40 If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

t/

The operator can access the space(s) required to complete this action <7 A ladder or special access equipment is needed.

If so:

That equipment is available I from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions

/

occur. (Review the thermo-hydraulic timeline.)

V/

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance._

Operator training on this action and the procedure is adequate

_=_

Operator training on this action and the procedure is current.

=

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

=

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

FIRE PROTECTION MANUAL ACTION CHECKLIST (based on daft 71111.05. 1111902)

Manual Action:

l?

P

/('25 c

Date reviewed:

Associated mal-operation:

P

.7y 6 O 1

a 4i A - X AceZ.//8/

Yes No NA Comment This MA was previously approved by the staff.

=_a/

This MA is completed...

... to prevent this mal-operation.

Select only 1

... to achieve SSD.

in response to this mal-operation.

v/

While the operatorperforms this action:

M I

Radiation levels would be < 1 OCFR20 limits.

_=0 Emergency lighting would be provided.

7 Temperature & humidity would not impede the action.

t Fire effects would not impede the action.

Staffing would be adequate not only to perform this action, but also to.

operate the reactor and fight the fire.

V This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.v The special tools are available from an accessible nearby location.

a The operator can access the space(s) required to complete this action v/

A ladder or special access equipment is needed.

If so:

That equipment is available from an accessible nearby location._

The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)_

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

=_=________

Operators can readily access the procedural guidance.

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

=

If so:

The walkdown used the current procedure.

=

=

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

Notes:I

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

.j FIRE PROTECTION MANUAL ACTION CHECKLIST (based on draft 71111 06, 1111912) 4 Lbt jo55f~

Manual Action: l

/cZ3, Amp /Akse-c 2 {.

/CS-27

/

Date reviewed:

Associated rnal-operation:

)qq

/Z (S Yes No WA Comment This MA was previously approved by the staff.

t/

This MA is completed...

... to prevent this mal-operation.

Select only I

... to achieve SSD.

... in response to this mal-operation.

i/71 While the operator performs this action:

Radiation levels would be < I OCFR20 limits. -

L/

Emergency lighting would be provided.

v/_

Temperature & humidity would not impede the action.

Fire effects would not impede the action.

,/

Staffing would be adequate not only to perform this action, but also to 119 operate the reactor and fight the fire.

C This action must be coordinated with other plant operations.

If so:

Communications required for this action are protected from fire effects.

i/.q Cr4 Special tools are required to complete this action.

v/I"_

If so:

The special tools are dedicated for this action.

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action_

A ladder or special access equipment is needed.

If so: lThat equipment is available_

Ifrom an accessible nearby location.

t The operator can reach the location(s) without personal hazard.

This manual action can be completed before unrecoverable conditions occur. (Review the therrno-hydraulic timeline.)

This action is adequately described in an approved procedure.

a/_

If so:

That procedure is an emergency procedure.

Operators can readily access the procedural guidance.

=

Operator training on this action and the procedure is adequate Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

leaI

Notes:

1. Evaluate this attribute while considering other actions which must be completed in approximately the same time period on the timeline.

_~~~~~~~~~~~~~

FIRE PROTECTION MANUAL ACTION CHECKLIST

~

(ad endmf71111 05 1119 S

C Manual Action-:

o z

6 z

Hi Lo/TA Date reviewed:

Associated mal-operation: 2/s.a 'cj-->,4J-4f 20&

bZ//5 Yes No NIA Corment This MA was previously approved by the staff.

_=_

This MA is completed...

... to prevent this mal-operation.

Select only 1

... to achieve SSD.

... in response to this mal-operation.

V While the operator performs this action:

Radiation levels would be < I OCFR20 limits.

H4 r..

ekC Emergency lighting would be provided.

Temperature & humidity would not impede the action.

LI Fire effects would not impede the action.

s Staffing would be adequate not only to perform this action, but also to 1

operate the reactor and fight the fire.

This action must be coordinated with other plant operations.

=

=

If so: l Communications required for this action I are protected from fire effects.

Special tools are required to complete this action.

If so:

The special tools are dedicated for this action.

__=____

The special tools are available from an accessible nearby location.

The operator can access the space(s) required to complete this action

__=

A ladder or special access equipment is needed.

v/

If so: l That equipment is available I from an accessible nearby location.

The operator can reach the location(s) without personal hazard.

1.

This manual action can be completed before unrecoverable conditions occur. (Review the thermo-hydraulic timeline.)

This action is adequately described in an approved procedure.

If so:

That procedure is an emergency procedure.

=

O37 Operators can readily access the procedural guidance.

_=

Operator training on this action and the procedure is adequate X

Operator training on this action and the procedure is current.

This action has been verified and validated by a plant walkdown.

If so:

The walkdown used the current procedure.

=

_

The walkdown was timed.

The walkdown demonstrated that the action can be completed within the time window required by the FSSA.

/o -/

)bG /A, a.6.

-Q-a-Ver--On f 7