IR 05000244/2002010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ber 18, 2002
{{#Wiki_filter:November 18, 2002


==SUBJECT:==
==SUBJECT:==
Line 34: Line 34:
Sincerely,
Sincerely,
/RA/
/RA/
David C. Lew, Chief Performance Evaluation Branch Division of Reactor Safety Docket No. 50-244 License No. DPR-18 Enclosure: Inspection Report 50-244/02-010 cc w/encl:
David C. Lew, Chief Performance Evaluation Branch Division of Reactor Safety Docket No.
 
50-244 License No.
 
DPR-18 Enclosure: Inspection Report 50-244/02-010 cc w/encl:


Dr. Robert
Dr. Robert
Line 50: Line 54:


No findings of significance were identified.
No findings of significance were identified.
ii


=REPORT DETAILS=
=REPORT DETAILS=
Line 57: Line 59:
==OTHER ACTIVITIES (OA)==
==OTHER ACTIVITIES (OA)==
{{a|4OA2}}
{{a|4OA2}}
==4OA2 Problem Identification and Resolution==
==4OA2 Problem Identification and Resolution==
a.


a. Effectiveness of Problem Identification
Effectiveness of Problem Identification
: (1) Inspection Scope The inspection team reviewed the procedures describing the corrective action process at the R. E. Ginna Nuclear Power Plant. The team reviewed a sample of action reports (AR) and deficiency tags to determine the threshold for identification of problems. The team reviewed logs, control room deficiencies and operator work-arounds, system health reports, work orders, temporary modifications, operating experience reviews, and procedures related to specific issues. In addition, the team interviewed staff and management to determine their understanding of the corrective action program. The specific documents reviewed and referenced during the inspection are listed in the attachment to this inspection report.
: (1) Inspection Scope The inspection team reviewed the procedures describing the corrective action process at the R. E. Ginna Nuclear Power Plant. The team reviewed a sample of action reports (AR) and deficiency tags to determine the threshold for identification of problems. The team reviewed logs, control room deficiencies and operator work-arounds, system health reports, work orders, temporary modifications, operating experience reviews, and procedures related to specific issues. In addition, the team interviewed staff and management to determine their understanding of the corrective action program. The specific documents reviewed and referenced during the inspection are listed in the attachment to this inspection report.


Line 71: Line 75:
The team also identified several other minor problems, such as implementation problems associated with the classification and storage of Precursor reports (for events of very low significance that require no investigative or corrective action); a small amount of boric acid on a safety injection system instrument fitting; and the presence of a screen covering the open end of the standby auxiliary feedwater test tank vent, contrary to the associated drawing. Regarding the details associated with the uncontrolled key ring described above, the team identified some broader concerns relative to key control and accountability. Inventory control for this type of key set, as well as other keys controlled by operations, was weak. There were prior individual key control deficiencies that had been identified via ARs (2001-1325 and 2001-1325), but the lack of an effective key control program was not recognized or addressed. As indicated by the noted examples, the team concluded that the licensee exhibited some weaknesses with regard to problem identification.
The team also identified several other minor problems, such as implementation problems associated with the classification and storage of Precursor reports (for events of very low significance that require no investigative or corrective action); a small amount of boric acid on a safety injection system instrument fitting; and the presence of a screen covering the open end of the standby auxiliary feedwater test tank vent, contrary to the associated drawing. Regarding the details associated with the uncontrolled key ring described above, the team identified some broader concerns relative to key control and accountability. Inventory control for this type of key set, as well as other keys controlled by operations, was weak. There were prior individual key control deficiencies that had been identified via ARs (2001-1325 and 2001-1325), but the lack of an effective key control program was not recognized or addressed. As indicated by the noted examples, the team concluded that the licensee exhibited some weaknesses with regard to problem identification.


b. Prioritization and Evaluation of Issues
b.
 
Prioritization and Evaluation of Issues
: (1) Inspection Scope The team reviewed the ARs and work orders listed in the attachment to this report to assess whether the licensee adequately prioritized and evaluated the identified problems. This review included the causal assessment of each issue (e.g., a root cause analysis or an apparent cause evaluation); and for significant conditions adverse to quality, the extent of condition and determination of corrective actions to preclude recurrence. The team also evaluated the ARs for potential impact on equipment or system operability, reliability or unavailability.
: (1) Inspection Scope The team reviewed the ARs and work orders listed in the attachment to this report to assess whether the licensee adequately prioritized and evaluated the identified problems. This review included the causal assessment of each issue (e.g., a root cause analysis or an apparent cause evaluation); and for significant conditions adverse to quality, the extent of condition and determination of corrective actions to preclude recurrence. The team also evaluated the ARs for potential impact on equipment or system operability, reliability or unavailability.


Line 90: Line 96:
As an example, AR 2002-1809 (diesel generator breaker closed out of phase during testing) emphasized process and procedure weaknesses and enhancements over the potential human performance problems (e.g., self-check techniques, supervisory oversight).
As an example, AR 2002-1809 (diesel generator breaker closed out of phase during testing) emphasized process and procedure weaknesses and enhancements over the potential human performance problems (e.g., self-check techniques, supervisory oversight).


c. Effectiveness of Corrective Actions
c.
 
Effectiveness of Corrective Actions
: (1) Inspection Scope The team reviewed the corrective actions associated with selected ARs to determine whether the actions had addressed the identified causes of the problems. The team also reviewed the licensees timeliness for implementing the corrective actions, and their effectiveness in precluding recurrence for significant conditions adverse to quality. The team also reviewed the non-cited violations issued since the last inspection of the Ginna corrective action program to determine if issues placed in their program had been properly evaluated and corrected.
: (1) Inspection Scope The team reviewed the corrective actions associated with selected ARs to determine whether the actions had addressed the identified causes of the problems. The team also reviewed the licensees timeliness for implementing the corrective actions, and their effectiveness in precluding recurrence for significant conditions adverse to quality. The team also reviewed the non-cited violations issued since the last inspection of the Ginna corrective action program to determine if issues placed in their program had been properly evaluated and corrected.
: (2) Findings Overall, the inspectors determined that corrective actions associated with ARs were effective; and as applicable, corrective actions were adequate to prevent problem recurrence (for significant conditions adverse to quality). The team found that, in general, the corrective actions were completed or scheduled to be completed in a timely manner commensurate with the significance of the issue. The team did not identify corrective actions in the backlog of work that represented an adverse impact on safety.
: (2) Findings Overall, the inspectors determined that corrective actions associated with ARs were effective; and as applicable, corrective actions were adequate to prevent problem recurrence (for significant conditions adverse to quality). The team found that, in general, the corrective actions were completed or scheduled to be completed in a timely manner commensurate with the significance of the issue. The team did not identify corrective actions in the backlog of work that represented an adverse impact on safety.
Line 103: Line 111:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings==
==4OA6 Meetings==
a.
===Exit Meeting Summary===
On October 25, 2002, the team presented the inspection results to Dr. R. Mecredy and members of his staff. During the inspection, no proprietary material was examined or retained by the team.
:
Partial List of Persons Contacted Items Opened & Closed List of Documents Reviewed List of Acronyms
1 of 6 ATTACHMENT A.
PARTIAL LIST OF PERSONS CONTACTED RG&E:
P. Bamford Manager, Operations M. Flaherty Manager, Nuclear Safety & Licensing R. Forgensi Manager, Operational Review J.
Germain Operational Review Analysis T. Harding Licensing Engineer J.


a.
Hotchkiss Manager, Mechanical Maintenance T. Laursen Manager, Emergency Preparedness & Training Support M. Lilley Manager, Quality Assurance R. Marchionda Department Manager, Nuclear Assessment K. McCarthy Operational Review Engineer R. McMahon Operating Experience Engineer R. Mecredy Vice President, Nuclear Operations T. Miller System Engineer N. Olivia Senior Electrical Engineer P. Polfleit Corporate Nuclear Emergency Planner M. Ruby Licensing Engineer M. Smith System Engineer L. Stavalone Trending Analyst R. Teed Manager - Nuclear Security R. Watts Department Manager, Nuclear Training J.


=====Exit Meeting Summary=====
Wayland Manager, I&C/Electrical Maintenance T. White Manager, Balance of Plant Systems J.
On October 25, 2002, the team presented the inspection results to Dr. R. Mecredy and members of his staff. During the inspection, no proprietary material was examined or retained by the team.
 
:    Partial List of Persons Contacted Items Opened & Closed List of Documents Reviewed List of Acronyms
Zapetis Maintenance Rule Coordinator NRC:
K. Kolaczyk Senior Resident Inspector, Ginna D. Lew Branch Chief, Performance Evaluation Branch, Region I C. Welch Resident Inspector, Ginna B.


ATTACHMENT A. PARTIAL LIST OF PERSONS CONTACTED RG&E:
ITEMS OPENED & CLOSED None (cont.)
P. Bamford      Manager, Operations M. Flaherty    Manager, Nuclear Safety & Licensing R. Forgensi    Manager, Operational Review J. Germain      Operational Review Analysis T. Harding      Licensing Engineer J. Hotchkiss    Manager, Mechanical Maintenance T. Laursen      Manager, Emergency Preparedness & Training Support M. Lilley      Manager, Quality Assurance R. Marchionda  Department Manager, Nuclear Assessment K. McCarthy    Operational Review Engineer R. McMahon      Operating Experience Engineer R. Mecredy      Vice President, Nuclear Operations T. Miller      System Engineer N. Olivia      Senior Electrical Engineer P. Polfleit    Corporate Nuclear Emergency Planner M. Ruby        Licensing Engineer M. Smith        System Engineer L. Stavalone    Trending Analyst R. Teed        Manager - Nuclear Security R. Watts        Department Manager, Nuclear Training J. Wayland      Manager, I&C/Electrical Maintenance T. White        Manager, Balance of Plant Systems J. Zapetis      Maintenance Rule Coordinator NRC:
K. Kolaczyk    Senior Resident Inspector, Ginna D. Lew          Branch Chief, Performance Evaluation Branch, Region I C. Welch        Resident Inspector, Ginna B. ITEMS OPENED & CLOSED None 1 of 6 (cont.)


C.
2 of 6 C.


LIST OF  
LIST OF  
Line 123: Line 144:
Procedures:
Procedures:
Plant Operations Review Committee Operating Procedure, Rev. 53
Plant Operations Review Committee Operating Procedure, Rev. 53
AP-RCP.1     Reactor Coolant Pump Seal Malfunction, Rev. 14
AP-RCP.1
AR-AA-3       Alarm Response Procedure - Standby AFW Tank, Rev. 6
Reactor Coolant Pump Seal Malfunction, Rev. 14
AR-B-17       Alarm Response Procedure - Seal Flow, Rev. 12
AR-AA-3
EP-2-P-0168   Maintenance Rule Monitoring, Rev. 5
Alarm Response Procedure - Standby AFW Tank, Rev. 6
FR-C.2       Response to Degraded Core Cooling, Rev. 16
AR-B-17
FR-H.1       Response to Loss of Secondary Heat Sink, Rev. 27
Alarm Response Procedure - Seal Flow, Rev. 12
FR-I.3       Response to Voids in Reactor Vessel, Rev. 16
EP-2-P-0168
GC-76.10     Installation, Testing and Inspection of Wire and Cable, Rev. 5
Maintenance Rule Monitoring, Rev. 5
IP-CAP-1     Abnormal Condition Tracking Initiation or Notification (Action) Report,
FR-C.2
Response to Degraded Core Cooling, Rev. 16
FR-H.1
Response to Loss of Secondary Heat Sink, Rev. 27
FR-I.3
Response to Voids in Reactor Vessel, Rev. 16
GC-76.10
Installation, Testing and Inspection of Wire and Cable, Rev. 5
IP-CAP-1
Abnormal Condition Tracking Initiation or Notification (Action) Report,
Rev. 14
Rev. 14
IP-DES-1     Technical Staff Request, Rev. 3
IP-DES-1
IP-IIT-5     Snubber Inspection and Testing Program, Rev. 1
Technical Staff Request, Rev. 3
IP-NPD-4     Nuclear Operations Group Work Prioritization, Rev. 6
IP-IIT-5
IP-NPD-6     Nuclear Safety Audit and Review Board (NSARB), Rev. 4
Snubber Inspection and Testing Program, Rev. 1
IP-RDM-3     Ginna Records, Rev. 5
IP-NPD-4
IP-SEP-2     Self Assessment, Rev. 4
Nuclear Operations Group Work Prioritization, Rev. 6
IP-SEP-3     Ginna Station Management Observation, Coaching and Tours
IP-NPD-6
Nuclear Safety Audit and Review Board (NSARB), Rev. 4
IP-RDM-3
Ginna Records, Rev. 5
IP-SEP-2
Self Assessment, Rev. 4
IP-SEP-3
Ginna Station Management Observation, Coaching and Tours
Program, Rev. 2
Program, Rev. 2
S-16.13       RWST Water Makeup to Accumulators, Rev. 30
S-16.13
T-44.1       Condensate Test Tank for Standby AFW Pumps Filling or Draining,
RWST Water Makeup to Accumulators, Rev. 30
T-44.1
Condensate Test Tank for Standby AFW Pumps Filling or Draining,
Rev. 17
Rev. 17
A-1603.0     Overview of the Ginna Station Work Control System, Revision 19
A-1603.0
A-1603.1     Work Request / Trouble Report Initiation, Revision 14
Overview of the Ginna Station Work Control System, Revision 19
A-1603.2     Work Order Initiation, Revision 15
A-1603.1
A-1603.6     Post Maintenance / Modification Testing, Revision 8
Work Request / Trouble Report Initiation, Revision 14
A-1603.8     Work Order Processing for Emergency and/or After Hours
A-1603.2
Work Order Initiation, Revision 15
A-1603.6
Post Maintenance / Modification Testing, Revision 8
A-1603.8
Work Order Processing for Emergency and/or After Hours
Maintenance, Revision 7
Maintenance, Revision 7
2.12       Inoperability of Equipment Important to a Safety, Revision 41
2.12
2.4       Control of Limiting Conditions for Operating Equipment, Revision 119
Inoperability of Equipment Important to a Safety, Revision 41
G-ORS-01     Screening Committee Guideline, Revision 50
2.4
IP-CAP-1.1   Operability and Past Operability Determination Checklist, Revision 2
Control of Limiting Conditions for Operating Equipment, Revision 119
IP-CAP-1.4   AR Extension Request, Revision 1
G-ORS-01
IP-CAP-1.8   Effectiveness Review Form, Revision 0
Screening Committee Guideline, Revision 50
IP-CAP-2     Root Cause Analysis for Equipment Failures, Revision 4
IP-CAP-1.1
IP-CAP-4     Problem Solving, Revision 1
Operability and Past Operability Determination Checklist, Revision 2
IP-CAP-5     Event Trending Process, Revision 1
IP-CAP-1.4
IP-CAP-6     10CFR021 Screening, Evaluating, and Reporting, Revision 2
AR Extension Request, Revision 1
IP-HPE-1     Human Performance Event Evaluation Process, Revision 3
IP-CAP-1.8
IP-NPD-4     Nuclear Operations Group Work Prioritization, Revision 6
Effectiveness Review Form, Revision 0
IP-PSH-1     Integrated Work Schedule, Revision 6
IP-CAP-2
IP-PSH-2     Integrated Work Schedule Risk Management, Revision 6
Root Cause Analysis for Equipment Failures, Revision 4
OP-2.3.1     Draining & Operation at Reduced Inventory of the Reactor Coolant
IP-CAP-4
Problem Solving, Revision 1
IP-CAP-5
Event Trending Process, Revision 1
IP-CAP-6
10CFR021 Screening, Evaluating, and Reporting, Revision 2
IP-HPE-1
Human Performance Event Evaluation Process, Revision 3
IP-NPD-4
Nuclear Operations Group Work Prioritization, Revision 6
IP-PSH-1
Integrated Work Schedule, Revision 6
IP-PSH-2
Integrated Work Schedule Risk Management, Revision 6
OP-2.3.1
Draining & Operation at Reduced Inventory of the Reactor Coolant
System, Revision 71
System, Revision 71
SPG-02       Integrated Work Schedule Schedulers Handbook, Revision 11
SPG-02
Integrated Work Schedule Schedulers Handbook, Revision 11
(cont.)
of 6
of 6
(cont.)
Non-Cited Violations:
Non-Cited Violations:
NCV 2001-06-01 Failure to Perform Flow Rate Determinations as per ODCM
NCV 2001-06-01
NCV 2001-08-01 Failure to Include Acceptance Criteria in Procedures
Failure to Perform Flow Rate Determinations as per ODCM
NCV 2001-08-02 Failure to Implement MSIV Surveillance Requirement
NCV 2001-08-01
NCV 2001-09-01 Inappropriate Procedures During Service Water Pump Motor
Failure to Include Acceptance Criteria in Procedures
NCV 2001-08-02
Failure to Implement MSIV Surveillance Requirement
NCV 2001-09-01
Inappropriate Procedures During Service Water Pump Motor
Replacement
Replacement
NCV 2001-10-01 Failure to Identify Seismic Issue with Containment Isolation Valve
NCV 2001-10-01
NCV 2002-02-01 RCS Make-up Flow Paths Were Inappropriately Isolated
Failure to Identify Seismic Issue with Containment Isolation Valve
NCV 2002-02-02 Improper Source Range Detector Calibration
NCV 2002-02-01
NCV 2002-03-01 Failure to Control/Evaluate Compensatory Fire Protection Measure
RCS Make-up Flow Paths Were Inappropriately Isolated
NCV 2002-03-02 Unlocked Technical Specification High Radiation Area
NCV 2002-02-02
NCV 2002-09-01 Failure to Utilize Mobile Loudspeakers for Transient Population
Improper Source Range Detector Calibration
NCV 2001-09-02 Failure to Correct Equipment & Human Performance Problems
NCV 2002-03-01
Failure to Control/Evaluate Compensatory Fire Protection Measure
NCV 2002-03-02
Unlocked Technical Specification High Radiation Area
NCV 2002-09-01
Failure to Utilize Mobile Loudspeakers for Transient Population
NCV 2001-09-02
Failure to Correct Equipment & Human Performance Problems
Quality Assurance Audits:
Quality Assurance Audits:
2000-0014-BKS         Corrective Action & Operating Experience Programs
2000-0014-BKS
2001-0004-DHK         Emergency Response Plan
Corrective Action & Operating Experience Programs
2001-0009-JMT         Engineering and Configuration Control Audit
2001-0004-DHK
2001-0010-RTD         Problem Identification and Resolution Process Audit
Emergency Response Plan
2001-0013-TGT         Operations Audit
2001-0009-JMT
2001-0017-PJH         Audit of Ginna Station Technical Specifications
Engineering and Configuration Control Audit
2002-0001-JMT         ODCM and REMP Audit
2001-0010-RTD
2002-0002-TGT         Maintenance Audit
Problem Identification and Resolution Process Audit
2002-0003-BKS         Cooperative Management Assessment Program
2001-0013-TGT
2002-0004-RTD         Emergency Preparedness Audit
Operations Audit
2002-0006-DHK         Radiation Protection Audit
2001-0017-PJH
Audit of Ginna Station Technical Specifications
2002-0001-JMT
ODCM and REMP Audit
2002-0002-TGT
Maintenance Audit
2002-0003-BKS
Cooperative Management Assessment Program
2002-0004-RTD
Emergency Preparedness Audit
2002-0006-DHK
Radiation Protection Audit
Self-Assessments:
Self-Assessments:
2001-0025       Corrective Action Process Effectiveness
 
2002-0023       Effectiveness of Corrective Actions for Areas for Improvement
2001-0025
Corrective Action Process Effectiveness
2002-0023
Effectiveness of Corrective Actions for Areas for Improvement
Identified During January 2001 Self-Evaluation
Identified During January 2001 Self-Evaluation
2002-0031       Effectiveness Review of Contamination Control During Reactor
2002-0031
Effectiveness Review of Contamination Control During Reactor
Cavity Decontamination
Cavity Decontamination
2002-0041       Quality Control Program Preparedness
2002-0041
2002-0042       Self-Assessment of NCV Related to Reduced Inventory
Quality Control Program Preparedness
2002-0043       Self-Assessment of NCV Related to the Alert Notification System
2002-0042
Self-Assessment of NCV Related to Reduced Inventory
2002-0043
Self-Assessment of NCV Related to the Alert Notification System
(cont.)
of 6
of 6
(cont.)
Action Reports: (* Denotes CR generated as a result of this inspection; P denotes a Precursor Report)
Action Reports: (* Denotes CR generated as a result of this inspection; P denotes a Precursor Report)
1997-1447       2001-1702            2002-0150P                2002-0878                2002-1997
1997-1447
2000-0188        2001-1749            2002-0161                  2002-0904                2002-2035
2000-0188
2000-1176        2001-1757            2002-0163                  2002-0931                2002-2035
2000-1176
2000-1268        2001-1764            2002-0193                  2002-0948                2002-2060
2000-1268
2000-1301        2001-1767            2002-0193                  2002-0976                2002-2097
2000-1301
2000-1489        2001-1774            2002-0195                  2002-1014                2002-2116
2000-1489
2000-1630        2001-1802            2002-0195                  2002-1022                2002-2260
2000-1630
2001-0001P      2001-1840           2002-0237P                2002-1028                2002-2261
2001-0001P
2001-0013P      2001-1867            2002-0244P                2002-1028                2002-2271*
2001-0013P
2001-0131P      2001-1879            2002-0266                  2002-1146                2002-2272*
2001-0131P
2001-0141P      2001-1888            2002-0371                  2002-1146                2002-2273*
2001-0141P
2001-0326P      2001-1921            2002-0371                  2002-1149                2002-2277
2001-0326P
2001-0393P      2001-1921            2002-0417                  2002-1151                2002-2283*
2001-0393P
2001-0457P      2001-1943            2002-0421                  2002-1151                2002-2286*
2001-0457P
2001-0517P      2001-1969            2002-0479                 2002-1170                2002-2287*
2001-0517P
2001-0676        2001-2091            2002-0492                  2002-1202                2002-2288*
2001-0676
2001-0740P      2001-2131            2002-0530                  2002-1362                2002-2289*
2001-0740P
2001-0783        2001-2140            2002-0530                  2002-1508                2002-2290*
2001-0783
2001-0862        2001-2227            2002-0530                  2002-1564                2002-2300*
2001-0862
2001-0923        2001-2245            2002-0538                  2002-1593                2002-2303*
2001-0923
2001-1070P      2001-2245            2002-0541                  2002-1596                2002-2304*
2001-1070P
2001-1148        2001-4355            2002-0595P                2002-1634               2002-2308*
2001-1148
2001-1325        2002-0038            2002-0661                  2002-1663                2002-2309*
2001-1325
2001-1341        2002-0070            2002-0670P                2002-1753                2002-2311*
2001-1341
2001-1365        2002-0101            2002-0730P                2002-1759                2002-2405
2001-1365
2001-1395        2002-0109            2002-0756                  2002-1770                2002-2405*
2001-1395
2001-1465        2002-0126            2002-0766                  2002-1809                2002-2411*
2001-1465
2001-1632        2002-0127            2002-0821                  2002-1849
2001-1632
2001-1691        2002-0142            2002-0822                  2002-1941
2001-1691
2001-1702
2001-1749
2001-1757
2001-1764
2001-1767
2001-1774
2001-1802
2001-1840
2001-1867
2001-1879
2001-1888
2001-1921
2001-1921
2001-1943
2001-1969
2001-2091
2001-2131
2001-2140
2001-2227
2001-2245
2001-2245
2001-4355
2002-0038
2002-0070
2002-0101
2002-0109
2002-0126
2002-0127
2002-0142
2002-0150P
2002-0161
2002-0163
2002-0193
2002-0193
2002-0195
2002-0195
2002-0237P
2002-0244P
2002-0266
2002-0371
2002-0371
2002-0417
2002-0421
2002-0479
2002-0492
2002-0530
2002-0530
2002-0530
2002-0538
2002-0541
2002-0595P
2002-0661
2002-0670P
2002-0730P
2002-0756
2002-0766
2002-0821
2002-0822
2002-0878
2002-0904
2002-0931
2002-0948
2002-0976
2002-1014
2002-1022
2002-1028
2002-1028
2002-1146
2002-1146
2002-1149
2002-1151
2002-1151
2002-1170
2002-1202
2002-1362
2002-1508
2002-1564
2002-1593
2002-1596
2002-1634
2002-1663
2002-1753
2002-1759
2002-1770
2002-1809
2002-1849
2002-1941
2002-1997
2002-2035
2002-2035
2002-2060
2002-2097
2002-2116
2002-2260
2002-2261
2002-2271*
2002-2272*
2002-2273*
2002-2277
2002-2283*
2002-2286*
2002-2287*
2002-2288*
2002-2289*
2002-2290*
2002-2300*
2002-2303*
2002-2304*
2002-2308*
2002-2309*
2002-2311*
2002-2405
2002-2405*
2002-2411*
Work Orders:
Work Orders:
WO-20103571 Repair Lug Crimps on the B Service Water Pump
WO-20103571 Repair Lug Crimps on the B Service Water Pump
Line 244: Line 447:
WO-20202266 Install PCR 2002-0027, Replace Emergency Siren System
WO-20202266 Install PCR 2002-0027, Replace Emergency Siren System
WO-20202387 Reach Rod to V-214 Needs to Be Replaced
WO-20202387 Reach Rod to V-214 Needs to Be Replaced
(cont.)
of 6
of 6
(cont.)
Miscellaneous Documents:
Miscellaneous Documents:
PORC Meeting Minutes for meetings 2001-0041; 2001-0042; 2001-0049; 2002-0004;
PORC Meeting Minutes for meetings 2001-0041; 2001-0042; 2001-0049; 2002-0004;
Line 262: Line 465:
Nuclear Emergency Response Plan, Revision 20
Nuclear Emergency Response Plan, Revision 20
ProActive Assessment of Workplace Factors (PAOWF), August 2002
ProActive Assessment of Workplace Factors (PAOWF), August 2002
of 6
  (cont.)
  (cont.)
D.      ACRONYMS
ADAMS      Agencywide Documents Access and Management System
AFW        Auxiliary Feedwater
AOV        Air Operated Valve
AR        Action Report
CFR        Code of Federal Regulations
EDG        Emergency Diesel Generator
I&C        Instruments & Controls
MSIV      Main Steam Isolation Valve
NCV        Non-Cited Violation
NRC        Nuclear Regulatory Commission
NSARB      Nuclear Safety Audit Review Board
ODCM      Offsite Dose Calculation Manual
PAOWF      ProActive Assessment of Workplace Factors
PARS      Publicly Available Records System
PCR        Plant Change Request
PI        Performance Indicator
PORC      Plant Operations Review Committee
QA        Quality Assurance
RCS        Reactor Coolant System
REMP      Radiological Environmental Monitoring Program
RG&E      Rochester Gas and Electric Corporation
RWST      Reactor Water Storage Tank
SDP        Significance Determination Process
TM        Temporary Modification
TS        Technical Specification
WO        Work Order
of 6
of 6
D.
ACRONYMS
ADAMS Agencywide Documents Access and Management System
AFW
Auxiliary Feedwater
AOV
Air Operated Valve
AR
Action Report
CFR
Code of Federal Regulations
EDG
Emergency Diesel Generator
I&C
Instruments & Controls
MSIV
Main Steam Isolation Valve
NCV
Non-Cited Violation
NRC
Nuclear Regulatory Commission
NSARB Nuclear Safety Audit Review Board
ODCM
Offsite Dose Calculation Manual
PAOWF ProActive Assessment of Workplace Factors
PARS
Publicly Available Records System
PCR
Plant Change Request
PI
Performance Indicator
PORC
Plant Operations Review Committee
QA
Quality Assurance
RCS
Reactor Coolant System
REMP
Radiological Environmental Monitoring Program
RG&E
Rochester Gas and Electric Corporation
RWST
Reactor Water Storage Tank
SDP
Significance Determination Process
TM
Temporary Modification
TS
Technical Specification
WO
Work Order
}}
}}

Latest revision as of 14:21, 16 January 2025

IR 05000244-02-010, on 10/07/2002 - 10/25/2002, R. E. Ginna Nuclear Power Plant; Biennial Baseline Inspection of the Identification and Resolution of Problems
ML023220481
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/18/2002
From: David Lew
NRC/RGN-I/DRS/PEB
To: Mecredy R
Rochester Gas & Electric Corp
References
IR-02-010
Download: ML023220481 (16)


Text

November 18, 2002

SUBJECT:

GINNA - NRC PROBLEM IDENTIFICATION & RESOLUTION INSPECTION REPORT 50-244/02-010

Dear Mr. Mecredy:

On October 25, 2002, the NRC completed a team inspection at the R. E. Ginna Facility. The enclosed inspection report documents the inspection findings, which were discussed with you and members of your staff during an exit meeting conducted on October 25, 2002.

The inspection was an examination of activities conducted under your license as they related to the identification and resolution of problems, and compliance with the Commissions rules and regulations and the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

On the basis of the sample selected for review, there were no findings of significance identified during this inspection. The team concluded that problems were properly identified, evaluated, and resolved withing the problem identification and resolution programs. However, during the inspection, several examples of minor problems were identified, including conditions adverse to quality that had not been entered into the corrective action program, narrowly focused Action Report evaluations, and some ineffective corrective actions.

In accordance with 10CFR2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web-site at http://www.nrc.gov/reading-rm/adams.html (the Public Reading Room).

Sincerely,

/RA/

David C. Lew, Chief Performance Evaluation Branch Division of Reactor Safety Docket No.

50-244 License No.

DPR-18 Enclosure: Inspection Report 50-244/02-010 cc w/encl:

Dr. Robert

SUMMARY OF FINDINGS

IR 05000244/02-010; on October 7 - 25, 2002; R. E. Ginna Nuclear Power Plant; biennial baseline inspection of the identification and resolution of problems.

The inspection was conducted by two regional inspectors and one contractor. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.

Identification and Resolution of Problems The team concluded that, in general, problems were properly identified, evaluated, and corrected. The licensees effectiveness at problem identification was acceptable overall.

However, the NRC identified several minor deficiencies which were not identified or entered into the licensees corrective action system. While some minor exceptions were noted, the licensee adequately prioritized and evaluated problems that were entered into the corrective action program. Corrective actions, when specified, were generally implemented in a timely manner.

Licensee audits and self-assessments were found to be adequate. On the basis of interviews conducted during this inspection, workers at the site felt free to input safety findings into the corrective action program.

No findings of significance were identified.

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA2 Problem Identification and Resolution

a.

Effectiveness of Problem Identification

(1) Inspection Scope The inspection team reviewed the procedures describing the corrective action process at the R. E. Ginna Nuclear Power Plant. The team reviewed a sample of action reports (AR) and deficiency tags to determine the threshold for identification of problems. The team reviewed logs, control room deficiencies and operator work-arounds, system health reports, work orders, temporary modifications, operating experience reviews, and procedures related to specific issues. In addition, the team interviewed staff and management to determine their understanding of the corrective action program. The specific documents reviewed and referenced during the inspection are listed in the attachment to this inspection report.

The team reviewed a sample of quality assurance (QA) audits and surveillances, and departmental self-assessments in the areas of operations, maintenance, engineering, radiation protection, security, emergency preparedness, training, and the corrective action program itself. The review was to determine if assessment findings were entered into the corrective action program, and if the corrective actions were properly completed to resolve identified deficiencies. The team evaluated the effectiveness of the audits and self-assessments by comparing the associated results against self-revealing and NRC-identified findings.

The team conducted several plant walk-downs of safety-related, risk significant areas to verify that observable system equipment and plant material adverse conditions were identified and entered into the corrective action program. The team also attended routine work control and management meetings to understand the interface between the corrective action program and the work control process.

(2) Findings Overall, the licensees effectiveness at problem identification was acceptable. The QA audits were self-critical and generally consistent with the teams findings. However, the team identified several minor deficiencies which were not identified or entered into the licensees corrective action system. Some examples for which the licensee subsequently initiated ARs are as follows.
  • The team found an auxiliary operators key ring lying on a structural support near a valve in the B diesel generator room. One of the keys on this ring operated locked valves and breakers throughout the plant. The key ring did not contain security or high radiation area keys, however, this set of keys was not identified as missing for about the one week they were subsequently determined to have been missing. The licensee initiated AR 2002-2272 in response to this discovery, and confirmed the proper alignment of components, as appropriate.
  • The team identified that the bend radius for one of the cables associated with the B safety-related battery was smaller than the acceptance limit. This particular cable was notably shorter in length than other battery cables. The operability of the battery was not impacted, however, the configuration did not conform to the design and installation criterion (AR 2002-2283 written).

The team also identified several other minor problems, such as implementation problems associated with the classification and storage of Precursor reports (for events of very low significance that require no investigative or corrective action); a small amount of boric acid on a safety injection system instrument fitting; and the presence of a screen covering the open end of the standby auxiliary feedwater test tank vent, contrary to the associated drawing. Regarding the details associated with the uncontrolled key ring described above, the team identified some broader concerns relative to key control and accountability. Inventory control for this type of key set, as well as other keys controlled by operations, was weak. There were prior individual key control deficiencies that had been identified via ARs (2001-1325 and 2001-1325), but the lack of an effective key control program was not recognized or addressed. As indicated by the noted examples, the team concluded that the licensee exhibited some weaknesses with regard to problem identification.

b.

Prioritization and Evaluation of Issues

(1) Inspection Scope The team reviewed the ARs and work orders listed in the attachment to this report to assess whether the licensee adequately prioritized and evaluated the identified problems. This review included the causal assessment of each issue (e.g., a root cause analysis or an apparent cause evaluation); and for significant conditions adverse to quality, the extent of condition and determination of corrective actions to preclude recurrence. The team also evaluated the ARs for potential impact on equipment or system operability, reliability or unavailability.

The team reviewed the backlog of operations, maintenance and engineering issues to determine if issues were properly prioritized, and if individually or collectively, they represented an increased risk due to the delay of corrective actions. The team also reviewed the status and plans to correct equipment problems identified in system health reports and the Maintenance Rule documents. The team attended the daily screening and management meetings to evaluate the licensees ability to assess AR significance and identify if the initial determination of operability and reportability were correct.

The team observed portions of the onsite Plant Operations Review Committee (PORC)and the offsite Nuclear Safety Audit Review Board (NSARB), and reviewed the minutes of past meetings, to determine if the associated reviews were critical of the sites activities.

(2) Findings The team concluded that, in general, the licensee adequately prioritized and evaluated the issues and concerns entered into the AR process. Operability and reportability determinations were accurately performed in a timely fashion. Overall, the root cause analyses reviewed were thorough, determined the root cause and contributing causes, and recommended corrective actions that correlated to the identified causes. As required, corrective actions were generally identified and implemented to preclude recurrence for significant conditions adverse to quality. The overall backlog of issues appeared reasonable and properly evaluated for risk.

Notwithstanding the overall acceptable performance in this area, the team identified some minor instances where the Ginna staff had not properly prioritized or evaluated conditions adverse to quality. These examples are described as follows.

  • AR 2002-0613 discussed a plant configuration where three of the five possible make-up paths were isolated from the reactor coolant system (RCS) while in a reduced inventory condition. This issue was previously characterized as a non-cited violation for the failure to follow procedures. During this inspection, the team noted the following with respect to the AR: 1) the event was not considered to be a Significant Condition Adverse to Quality; 2) the AR was prioritized improperly low as a Priority 3 with an evaluation due date in June 2002; 3) the AR was improperly determined to be non-consequential from a human impact consideration; and (4)an Extension Request was submitted and approved to extend the investigation completion date to November 2002, which would be about eight months after the event. The extension basis focused on clarifying the valve line-up procedures; and the safety significance was noted as None as the licensee considered this to be only a refueling outage concern.

The team determined the licensees actions taken to date and planned addressed the specific valve issue and not the human performance nature of why the Work Control Supervisor allowed the tags to be hung. Also, the team judged that the licensees event classification, prioritization, and human impact consideration minimized the potential safety impact. A more appropriate characterization likely would have necessitated a more rigorous and timely root cause analysis. Further, while the AR noted that an apparent cause was to be performed for a human performance event, the evaluation had not been completed as of the time of this inspection. Because the human performance causal analysis was not yet completed in a timely manner, the potential exists that relevant information may not be captured or recalled. Finally, the team considered the original issue to be a Significant Condition Adverse to Quality because it resulted in a reduced number of available make-up sources designed to mitigate the consequences of a draindown event while already in a reduced RCS inventory configuration. Although a similar or repeat occurrence had not resulted due to the ineffective processing and evaluation (including corrective actions) of this AR, the team concluded that the licensees overall response to this condition did not display a conservative safety focus. The licensee initiated AR 2002-2427 to address these concerns.

  • In some cases, the priority level was not in alignment with event significance and procedure guidance. For example, AR 2002-2097 involved an equipment problem that resulted in a reactivity excursion (99.5% to slightly greater than 100%) due to an unexpected dilution, but was assigned Priority 4 (trending). Consistent with the guidance provided in procedure IP-NPD-4, Nuclear Operations Group Work Prioritization, it should have been Priority 2 (unexpected reactivity excursion such as a significant dilution). The team concluded that although the priority was incorrect, the licensee adequately evaluated and corrected the associated condition.

The licensee initiated AR 2002-2461 to address the incorrect priority assignment.

  • The team concluded that AR evaluations involving human performance appeared less detailed and probing than those evaluations involving equipment performance.

As an example, AR 2002-1809 (diesel generator breaker closed out of phase during testing) emphasized process and procedure weaknesses and enhancements over the potential human performance problems (e.g., self-check techniques, supervisory oversight).

c.

Effectiveness of Corrective Actions

(1) Inspection Scope The team reviewed the corrective actions associated with selected ARs to determine whether the actions had addressed the identified causes of the problems. The team also reviewed the licensees timeliness for implementing the corrective actions, and their effectiveness in precluding recurrence for significant conditions adverse to quality. The team also reviewed the non-cited violations issued since the last inspection of the Ginna corrective action program to determine if issues placed in their program had been properly evaluated and corrected.
(2) Findings Overall, the inspectors determined that corrective actions associated with ARs were effective; and as applicable, corrective actions were adequate to prevent problem recurrence (for significant conditions adverse to quality). The team found that, in general, the corrective actions were completed or scheduled to be completed in a timely manner commensurate with the significance of the issue. The team did not identify corrective actions in the backlog of work that represented an adverse impact on safety.

Notwithstanding, the team identified some minor instances where the licensees corrective actions were weak, and examples are described below.

  • In a period of less than two years, there were four occurrences where service air header pressure was decreased due to the use of an air-operated vacuum cleaner. This was an undesirable condition that could potentially challenge the instrument air system, which is normally cross-connected to service air and provides motive force for several safety and risk significant systems (e.g., main steam isolation valves and feedwater regulating valves). Some of the licensees corrective actions included various administrative controls to ensure that personnel split the service and instrument air headers (prior to using the vacuum). However, these actions were repeatedly ineffective until the licensee implemented a corrective action to lock the vacuum cleaner, with the key in the control of the Shift Supervisor. The team determined that the use of the vacuum cleaner had not caused a plant transient, and neither the service air nor the instrument air system is safety related. Thus the failure to implement effective corrective actions was not a violation of NRC regulations. However, the lack of effective actions for these occurrences was noteworthy because the condition could have contributed to or caused a plant transient. The licensee initiated AR 2002-2428 in response to these concerns.
  • Several ARs have been initiated following NRCs identification of deficiencies associated with tracking equipment unavailability time for the NRC performance indicators (PI). The errors were minor in nature and magnitude, and none of the errors would have changed the affected PI color (threshold). However, the team determined that the licensees actions to date have not been effective in preventing continued errors (AR 2002-2463 written).

d. Assessment of Safety Conscious Work Environment

(1) Inspection Scope During the inspection, the team interviewed plant staff to determine if conditions existed at the site which would result in personnel being hesitant to raise safety concerns to Ginna management and/or the NRC.
(2) Findings No findings of significance were identified.

4OA6 Meetings

a.

Exit Meeting Summary

On October 25, 2002, the team presented the inspection results to Dr. R. Mecredy and members of his staff. During the inspection, no proprietary material was examined or retained by the team.

Partial List of Persons Contacted Items Opened & Closed List of Documents Reviewed List of Acronyms

1 of 6 ATTACHMENT A.

PARTIAL LIST OF PERSONS CONTACTED RG&E:

P. Bamford Manager, Operations M. Flaherty Manager, Nuclear Safety & Licensing R. Forgensi Manager, Operational Review J.

Germain Operational Review Analysis T. Harding Licensing Engineer J.

Hotchkiss Manager, Mechanical Maintenance T. Laursen Manager, Emergency Preparedness & Training Support M. Lilley Manager, Quality Assurance R. Marchionda Department Manager, Nuclear Assessment K. McCarthy Operational Review Engineer R. McMahon Operating Experience Engineer R. Mecredy Vice President, Nuclear Operations T. Miller System Engineer N. Olivia Senior Electrical Engineer P. Polfleit Corporate Nuclear Emergency Planner M. Ruby Licensing Engineer M. Smith System Engineer L. Stavalone Trending Analyst R. Teed Manager - Nuclear Security R. Watts Department Manager, Nuclear Training J.

Wayland Manager, I&C/Electrical Maintenance T. White Manager, Balance of Plant Systems J.

Zapetis Maintenance Rule Coordinator NRC:

K. Kolaczyk Senior Resident Inspector, Ginna D. Lew Branch Chief, Performance Evaluation Branch, Region I C. Welch Resident Inspector, Ginna B.

ITEMS OPENED & CLOSED None (cont.)

2 of 6 C.

LIST OF

DOCUMENTS REVIEWED

Procedures:

Plant Operations Review Committee Operating Procedure, Rev. 53

AP-RCP.1

Reactor Coolant Pump Seal Malfunction, Rev. 14

AR-AA-3

Alarm Response Procedure - Standby AFW Tank, Rev. 6

AR-B-17

Alarm Response Procedure - Seal Flow, Rev. 12

EP-2-P-0168

Maintenance Rule Monitoring, Rev. 5

FR-C.2

Response to Degraded Core Cooling, Rev. 16

FR-H.1

Response to Loss of Secondary Heat Sink, Rev. 27

FR-I.3

Response to Voids in Reactor Vessel, Rev. 16

GC-76.10

Installation, Testing and Inspection of Wire and Cable, Rev. 5

IP-CAP-1

Abnormal Condition Tracking Initiation or Notification (Action) Report,

Rev. 14

IP-DES-1

Technical Staff Request, Rev. 3

IP-IIT-5

Snubber Inspection and Testing Program, Rev. 1

IP-NPD-4

Nuclear Operations Group Work Prioritization, Rev. 6

IP-NPD-6

Nuclear Safety Audit and Review Board (NSARB), Rev. 4

IP-RDM-3

Ginna Records, Rev. 5

IP-SEP-2

Self Assessment, Rev. 4

IP-SEP-3

Ginna Station Management Observation, Coaching and Tours

Program, Rev. 2

S-16.13

RWST Water Makeup to Accumulators, Rev. 30

T-44.1

Condensate Test Tank for Standby AFW Pumps Filling or Draining,

Rev. 17

A-1603.0

Overview of the Ginna Station Work Control System, Revision 19

A-1603.1

Work Request / Trouble Report Initiation, Revision 14

A-1603.2

Work Order Initiation, Revision 15

A-1603.6

Post Maintenance / Modification Testing, Revision 8

A-1603.8

Work Order Processing for Emergency and/or After Hours

Maintenance, Revision 7

2.12

Inoperability of Equipment Important to a Safety, Revision 41

2.4

Control of Limiting Conditions for Operating Equipment, Revision 119

G-ORS-01

Screening Committee Guideline, Revision 50

IP-CAP-1.1

Operability and Past Operability Determination Checklist, Revision 2

IP-CAP-1.4

AR Extension Request, Revision 1

IP-CAP-1.8

Effectiveness Review Form, Revision 0

IP-CAP-2

Root Cause Analysis for Equipment Failures, Revision 4

IP-CAP-4

Problem Solving, Revision 1

IP-CAP-5

Event Trending Process, Revision 1

IP-CAP-6

10CFR021 Screening, Evaluating, and Reporting, Revision 2

IP-HPE-1

Human Performance Event Evaluation Process, Revision 3

IP-NPD-4

Nuclear Operations Group Work Prioritization, Revision 6

IP-PSH-1

Integrated Work Schedule, Revision 6

IP-PSH-2

Integrated Work Schedule Risk Management, Revision 6

OP-2.3.1

Draining & Operation at Reduced Inventory of the Reactor Coolant

System, Revision 71

SPG-02

Integrated Work Schedule Schedulers Handbook, Revision 11

(cont.)

of 6

Non-Cited Violations:

NCV 2001-06-01

Failure to Perform Flow Rate Determinations as per ODCM

NCV 2001-08-01

Failure to Include Acceptance Criteria in Procedures

NCV 2001-08-02

Failure to Implement MSIV Surveillance Requirement

NCV 2001-09-01

Inappropriate Procedures During Service Water Pump Motor

Replacement

NCV 2001-10-01

Failure to Identify Seismic Issue with Containment Isolation Valve

NCV 2002-02-01

RCS Make-up Flow Paths Were Inappropriately Isolated

NCV 2002-02-02

Improper Source Range Detector Calibration

NCV 2002-03-01

Failure to Control/Evaluate Compensatory Fire Protection Measure

NCV 2002-03-02

Unlocked Technical Specification High Radiation Area

NCV 2002-09-01

Failure to Utilize Mobile Loudspeakers for Transient Population

NCV 2001-09-02

Failure to Correct Equipment & Human Performance Problems

Quality Assurance Audits:

2000-0014-BKS

Corrective Action & Operating Experience Programs

2001-0004-DHK

Emergency Response Plan

2001-0009-JMT

Engineering and Configuration Control Audit

2001-0010-RTD

Problem Identification and Resolution Process Audit

2001-0013-TGT

Operations Audit

2001-0017-PJH

Audit of Ginna Station Technical Specifications

2002-0001-JMT

ODCM and REMP Audit

2002-0002-TGT

Maintenance Audit

2002-0003-BKS

Cooperative Management Assessment Program

2002-0004-RTD

Emergency Preparedness Audit

2002-0006-DHK

Radiation Protection Audit

Self-Assessments:

2001-0025

Corrective Action Process Effectiveness

2002-0023

Effectiveness of Corrective Actions for Areas for Improvement

Identified During January 2001 Self-Evaluation

2002-0031

Effectiveness Review of Contamination Control During Reactor

Cavity Decontamination

2002-0041

Quality Control Program Preparedness

2002-0042

Self-Assessment of NCV Related to Reduced Inventory

2002-0043

Self-Assessment of NCV Related to the Alert Notification System

(cont.)

of 6

Action Reports: (* Denotes CR generated as a result of this inspection; P denotes a Precursor Report)

1997-1447

2000-0188

2000-1176

2000-1268

2000-1301

2000-1489

2000-1630

2001-0001P

2001-0013P

2001-0131P

2001-0141P

2001-0326P

2001-0393P

2001-0457P

2001-0517P

2001-0676

2001-0740P

2001-0783

2001-0862

2001-0923

2001-1070P

2001-1148

2001-1325

2001-1341

2001-1365

2001-1395

2001-1465

2001-1632

2001-1691

2001-1702

2001-1749

2001-1757

2001-1764

2001-1767

2001-1774

2001-1802

2001-1840

2001-1867

2001-1879

2001-1888

2001-1921

2001-1921

2001-1943

2001-1969

2001-2091

2001-2131

2001-2140

2001-2227

2001-2245

2001-2245

2001-4355

2002-0038

2002-0070

2002-0101

2002-0109

2002-0126

2002-0127

2002-0142

2002-0150P

2002-0161

2002-0163

2002-0193

2002-0193

2002-0195

2002-0195

2002-0237P

2002-0244P

2002-0266

2002-0371

2002-0371

2002-0417

2002-0421

2002-0479

2002-0492

2002-0530

2002-0530

2002-0530

2002-0538

2002-0541

2002-0595P

2002-0661

2002-0670P

2002-0730P

2002-0756

2002-0766

2002-0821

2002-0822

2002-0878

2002-0904

2002-0931

2002-0948

2002-0976

2002-1014

2002-1022

2002-1028

2002-1028

2002-1146

2002-1146

2002-1149

2002-1151

2002-1151

2002-1170

2002-1202

2002-1362

2002-1508

2002-1564

2002-1593

2002-1596

2002-1634

2002-1663

2002-1753

2002-1759

2002-1770

2002-1809

2002-1849

2002-1941

2002-1997

2002-2035

2002-2035

2002-2060

2002-2097

2002-2116

2002-2260

2002-2261

2002-2271*

2002-2272*

2002-2273*

2002-2277

2002-2283*

2002-2286*

2002-2287*

2002-2288*

2002-2289*

2002-2290*

2002-2300*

2002-2303*

2002-2304*

2002-2308*

2002-2309*

2002-2311*

2002-2405

2002-2405*

2002-2411*

Work Orders:

WO-20103571 Repair Lug Crimps on the B Service Water Pump

WO-20103583 Repair Lug Crimps on the A, C, & D Service Water Pumps

WO-20200848 Trouble shoot and repair AOV-371, Indicates Mid-Position but 25%

Open (related to AR 2002-0756)

WO-20201827 Repair A Containment Sump Pump Level Switch (LS-2039)

WO-20202034 Operations Suspects That V-214 Leaks By

WO-20202266 Install PCR 2002-0027, Replace Emergency Siren System

WO-20202387 Reach Rod to V-214 Needs to Be Replaced

(cont.)

of 6

Miscellaneous Documents:

PORC Meeting Minutes for meetings 2001-0041; 2001-0042; 2001-0049; 2002-0004;

2002-0007; 2002-0014; 2002-0021; 2002-0024; 2002-0028; 2002-0035; 2002-0040;

2002-0042; 2002-0045; 2002-0048

Nuclear Safety Audit Review Board (NSRB) Minutes for meetings 243, 244, and 245

Modification PCR-2002-0012, Relocate the Siren Central Control Unit to Ginna

Modification PCR-2002-0027, Replace Emergency Siren System

Temporary Modification 2000-0007, A S/G Blow-down Corrosion Product Sampler,

Rev. 1

Temporary Modification 2001-0012, Temporary SI Accumulator Makeup Pump, Rev. 1

Updated Final Safety Analysis Report

5059SCRN-2002-0524, Replace Emergency Siren System (related to WO-20202266)

Maintenance Department Monthly Performance Indicator Report (i.e. - backlog),

September 2002

Nuclear Emergency Response Plan, Revision 20

ProActive Assessment of Workplace Factors (PAOWF), August 2002

(cont.)

of 6

D.

ACRONYMS

ADAMS Agencywide Documents Access and Management System

AFW

Auxiliary Feedwater

AOV

Air Operated Valve

AR

Action Report

CFR

Code of Federal Regulations

EDG

Emergency Diesel Generator

I&C

Instruments & Controls

MSIV

Main Steam Isolation Valve

NCV

Non-Cited Violation

NRC

Nuclear Regulatory Commission

NSARB Nuclear Safety Audit Review Board

ODCM

Offsite Dose Calculation Manual

PAOWF ProActive Assessment of Workplace Factors

PARS

Publicly Available Records System

PCR

Plant Change Request

PI

Performance Indicator

PORC

Plant Operations Review Committee

QA

Quality Assurance

RCS

Reactor Coolant System

REMP

Radiological Environmental Monitoring Program

RG&E

Rochester Gas and Electric Corporation

RWST

Reactor Water Storage Tank

SDP

Significance Determination Process

TM

Temporary Modification

TS

Technical Specification

WO

Work Order