{{#Wiki_filter:.. _  . . . _ _ _  ._    _ . _ . _      ___._ -__ _ _ _ _. - _ . _ _ _ _ . _ _ _ _ . _ _ . _ . - _
{{#Wiki_filter:..
I i
I i
i I                           VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT I
i I
MONTH       June             YEAR 1982 i
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT I
MONTH June YEAR 1982 i
l i
l i
APPROVED:
APPROVED:
1 l
1 l
                                                                                            /
/
h STATIONMANA%R 1
h STATIONMANA%R 1
8208120150 820715 PDR ADOCK 05000338 R                 PDR
8208120150 820715 PDR ADOCK 05000338 R
PDR


OPERATING DATA REPORT DOCKET NO.       50-338 DATE     07-07-82 COMPLETED BY       G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:               North Anna 1
50-338 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes 1.
: 2. Reporting Period:         June 1982
Unit Name:
: 3. Licensed Thermal Power (MWt):                 2775
North Anna 1 2.
: 4. Nameplate Rating (Gross MWe):                   947
Reporting Period:
: 5. Design Electrical Rating (Net MWe):             907
June 1982 3.
: 6. Maximum Dependable Capacity (Gross MWe):       918
Licensed Thermal Power (MWt):
: 7. Maximum Dependable Capacity (Net MWe):         865
2775 4.
: 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
Nameplate Rating (Gross MWe):
NA
947 5.
: 9. Power Level To Which Restricted, If Any (Net MWe):                     N/A
Design Electrical Rating (Net MWe):
: 10. Reasons For Restrictions, If Any:                                       N/A This Month     Yr.-to-Date         Cumulative
907 6.
: 11. Hours In Reporting Period                         720         4,343                 35,664
Maximum Dependable Capacity (Gross MWe):
: 12. Number of Hours Reactor Was Critical               0         3,129.9               26,958.2
918 7.
: 13. Reactor Reserve Shutdown Hours                     0             21.5                 256.4
Maximum Dependable Capacity (Net MWe):
: 14. Hours Generator On-Line                             0         3,022.9               26,375.9
865 8.
: 15. Unit Reserve Shutdown Hours                         0             0                     0
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
: 16. Gross Thermal Energy Generated (MWH)               0     7,941,328             68,255,580
NA 9.
: 17. Gross Electrical Energy Generated (MWH)             0     2,537,888             21,783,410
Power Level To Which Restricted, If Any (Net MWe):
: 18. Net Electrical Energy Generated (MWH)               0     2,396,973             20,519,889
N/A
: 19. Unit Service Factor                                 0             69.6                   74.0
: 10. Reasons For Restrictions, If Any:
: 20. Unit Availability Factor                           0             69.6                   74.0
N/A This Month Yr.-to-Date Cumulative 11.
: 21. Unit Capacity Factor (Using MDC Net)               0             63.8                   66.5
Hours In Reporting Period 720 4,343 35,664 12.
: 22. Unit Capacity Factor (Using DER Net)               0             60.9                   63.4
Number of Hours Reactor Was Critical 0
: 23. Unit Forced Outage Rate                             0             7.3                   5.1
3,129.9 26,958.2 13.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reactor Reserve Shutdown Hours 0
Fall Maintenance Outage 11-05-82 thru 11-15-82
21.5 256.4 14.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:             08-03-82
Hours Generator On-Line 0
: 26. Units In Test Status (Prior to Commercial Operation):
3,022.9 26,375.9 15.
Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 0 7,941,328 68,255,580 17.
Gross Electrical Energy Generated (MWH) 0 2,537,888 21,783,410 18.
Net Electrical Energy Generated (MWH) 0 2,396,973 20,519,889 19.
Unit Service Factor 0
69.6 74.0 20.
Unit Availability Factor 0
69.6 74.0 21.
Unit Capacity Factor (Using MDC Net) 0 63.8 66.5 22.
Unit Capacity Factor (Using DER Net) 0 60.9 63.4 23.
Unit Forced Outage Rate 0
7.3 5.1 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance Outage 11-05-82 thru 11-15-82 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
08-03-82 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


UNIT SHUTDOWNS AND POWER REDUCTIONS                           DOCKET NO.         50-338
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
  ;                                                                                                  UNIT NAME         North Anna 1 DATE     07-07-82 REPORT MONTH   JUNE                                   COMPLETED BY     G. D. Scheitendorf TELEPHONE     (703) 894-5151 X2502 Type Duration Reason 2 l
50-338 UNIT NAME North Anna 1 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Scheitendorf TELEPHONE (703) 894-5151 X2502 l
No. Date                           Method of     Licensee         System   Component     Cause & Corrective (Hours)             Shutting       **"                        Code             Action to Down Reactor3 Report #             *4          5 Prevent Recurrence 82-10                 720       The scheduled refueling outage continues l
2 No.
1             2                                               3                       4 F: Forced   Reason:                                         Method:                 Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain)                   1-Manual                 for Preparation of Data B-Maintenance or Test                           2-Manual Scram.         Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram       Event Report (LER) File D-Regulatory Restriction                         4-Continuations           (NUREG-0161) l                 E-Operator Training & License Examination 5-Load Reduction l                 F-Administrative                                 9-Other G-Operational Error (Explain)                                             5 l
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)
H-Other (Explain)                                                         Exhibit H - Same Source
Shutting 3
*4 Code Action to 5
Down Reactor Report #
Prevent Recurrence 82-10 720 The scheduled refueling outage continues l
1 2
3 4
F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161) l E-Operator Training & License Examination 5-Load Reduction l
F-Administrative 9-Other 5
l G-Operational Error (Explain)
H-Other (Explain)
Exhibit H - Same Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE   07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTl!         June DAY   AVERAGE DAILY POWER LEVEL           DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                   (MWe-Net) 1               0                         17                 0 2               0                         18                 0 3               0                         19                 0 4               0                         20                 0   _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
5               0                         21                 0 6               0                         22                 0 7               0                         23                 0 8               0                         24                 0 9               0                         25                 0 10               0                         26                 0 11               0                         27                 0 12               0                         28                 0 13               0                         29                 0 14                 0                       30                 0 15                 0                       31                 0 l
50-338 UNIT NA-1 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTl!
16                 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
l 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l
l


OPERATING DATA REPORT DOCKET NO.     50-339 DATE     07-07-82 COMPLETED BY     G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:               North Anna 2
50-339 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes 1.
: 2. Reporting Period:         June   1982
Unit Name:
: 3. Licensed Thermal Power (MWt):                 2775
North Anna 2 2.
: 4. Nameplate Rating (Gross MWe):                   947
Reporting Period:
: 5. Design Electrical Rating (Net MWe):             907
June 1982 3.
: 6. Maximum Dependable Capacity (Gross MWe):       939
Licensed Thermal Power (MWt):
: 7. Maximum Dependable Capacity (Net MWe):         890
2775 4.
: 8. If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
Nameplate Rating (Gross MWe):
NA
947 5.
: 9. Power Level To Which Restricted, If Any (Net MWe):                         N/A
Design Electrical Rating (Net MWe):
: 10. Reasons For Restrictions, If Any:                                         N/A This Month       Yr.-to-Date         Cumulative
907 6.
: 11. Hours In Reporting Period                         720             4,343               13,535
Maximum Dependable Capacity (Gross MWe):
: 12. Number of Hours Reactor Was Critical             491.4           1,973.1             9,387.9
939 7.
: 13. Reactor Reserve Shutdown Hours                     8.5             54.9             1,688.1
Maximum Dependable Capacity (Net MWe):
: 14. Hours Generator On-Line                           468.2           1,905.3             9,364.7
890 8.
: 15. Unit Reserve Shutdown Hours                         0                 0                     0 j 16. Gross Thermal Energy Generated (MWH)         960,712       4,687,916___         23,470,757
If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
: 17. Gross Electrical Energy Generated (MWH)       315,535       1,549,226             7,864,458
NA 9.
: 18. Net Electrical Energy Generated (MWH)         294,637       1,466,297             7,468,713
Power Level To Which Restricted, If Any (Net MWe):
: 19. Unit Service Factor                               65.0             43.9                 69.2 l
N/A
: 20. Unit Availability Factor                           65.0             43.9                 69.2 1
: 10. Reasons For Restrictions, If Any:
: 21. Unit Capacity Factor (Using MDC Net)               46.0             37.9                 62.0
N/A This Month Yr.-to-Date Cumulative 11.
; 22. Unit Capacity Factor (Using DER Net)               45.1             37.2                 60.8 l 23. Unit Forced Outage Rate                             1.8             5.9                 15.9
Hours In Reporting Period 720 4,343 13,535 12.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Number of Hours Reactor Was Critical 491.4 1,973.1 9,387.9 13.
Reactor Reserve Shutdown Hours 8.5 54.9 1,688.1 14.
Hours Generator On-Line 468.2 1,905.3 9,364.7 15.
Unit Reserve Shutdown Hours 0
0 0
j 16.
Gross Thermal Energy Generated (MWH) 960,712 4,687,916___
23,470,757 17.
Gross Electrical Energy Generated (MWH) 315,535 1,549,226 7,864,458 18.
Net Electrical Energy Generated (MWH) 294,637 1,466,297 7,468,713 19.
Unit Service Factor 65.0 43.9 69.2 l
20.
Unit Availability Factor 65.0 43.9 69.2 1
21.
Unit Capacity Factor (Using MDC Net) 46.0 37.9 62.0 22.
Unit Capacity Factor (Using DER Net) 45.1 37.2 60.8 l
23.
Unit Forced Outage Rate 1.8 5.9 15.9 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l Fall Maintenance Outage 10-15-82 thru 10-25-82 l
l Fall Maintenance Outage 10-15-82 thru 10-25-82 l
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
25.
: 26. Units In Test Status (Prior to Commercial Operation):
If Shut Down At End Of Report Period, Estimated Date of Startup:
Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


UNIT SHUTDOWNS AND POWER REDUCTIONS                               DOCKET NO.       50-339 UNIT NAME         North Anna 2 DATE       07-07-82 REPORT MONTH         JUNE                       COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Duration Reason             Method of       Licensee       System   Component Cause & Corrective (Hours)                     Shutting       Event         Code     Code               Action to 3                     4         5 Down Reactor   Report #                             Prevent Recurrence 82-09       820611     S                 243.3         C                 4             NA           NA         NA       Continuation of Refueling outage.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
82-10         820611     F                   4.7         B                 1             NA           NA         NA       Normal rampdown to generator off line to pe,rform turbine Overspeed test.
50-339 UNIT NAME North Anna 2 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Duration Reason Method of Licensee System Component Cause & Corrective (Hours)
82-11       820616     F                   3.8         B                 1             NA           NA         NA       Normal rampdown to generator off line to balance the turbine.
Shutting Event Code Code Action to 3
4 5
Down Reactor Report #
Prevent Recurrence 82-09 820611 S
243.3 C
4 NA NA NA Continuation of Refueling outage.
82-10 820611 F
4.7 B
1 NA NA NA Normal rampdown to generator off line to pe,rform turbine Overspeed test.
82-11 820616 F
3.8 B
1 NA NA NA Normal rampdown to generator off line to balance the turbine.
i i
i i
i 1                 2                                                                     3                       4 F: Forced       Reason:                                                               Method:                 Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain)                                           1-Manual               for preparation of Data B-Maintenance or Test                                                 2-Manual Scram.         Entry Sheets for Licensee C-Refueling                                                           3-Automatic Scram       Event Report (LER) File D-Regulatory Restriction                                             4-Continuations         (NUREG-0161)
i 1
E-Operator Training & License Examination                             5-Load Reduction F-Administrative                                                     9-Other G-Operational Error (Explain)                                                                 5 H-Other (Explain)                                                                             Exhibit H - Same Source
2 3
4 F: Forced Reason:
Method:
Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE   07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH         June DAY   AVERAGE DAILY POWER LEVEL           DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                   (MWe-Net) 1               0                         17               420.0 2               0                         18               657.3 3               0                         19               736.1 4               0                         20               833.1 5               0                         21               849.4 6               0                         22               862.0 7               0                         23               820.8 8               0                         24               839.0 9               0                         25               856.5 10               0                         26               851.9 11               82.8                       27               862.7 12             201.7                         28               862.7 13             213.8                       29               871.4 14             209.8                       30               874.3 15             206.7                       31                 0 16             165.1 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.}}
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-339 UNIT NA-2 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 420.0 2
0 18 657.3 3
0 19 736.1 4
0 20 833.1 5
0 21 849.4 6
0 22 862.0 7
0 23 820.8 8
0 24 839.0 9
0 25 856.5 10 0
26 851.9 11 82.8 27 862.7 12 201.7 28 862.7 13 213.8 29 871.4 14 209.8 30 874.3 15 206.7 31 0
16 165.1 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.}}

Latest revision as of 23:28, 16 December 2024

Monthly Operating Repts for June 1982
ML20062F791
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/07/1982
From: Schmitendorf G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20062F789 List:
References
NUDOCS 8208120150
Download: ML20062F791 (6)


Text

..

I i

i I

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT I

MONTH June YEAR 1982 i

l i

APPROVED:

1 l

/

h STATIONMANA%R 1

8208120150 820715 PDR ADOCK 05000338 R

PDR

OPERATING DATA REPORT DOCKET NO.

50-338 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes 1.

Unit Name:

North Anna 1 2.

Reporting Period:

June 1982 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

918 7.

Maximum Dependable Capacity (Net MWe):

865 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 4,343 35,664 12.

Number of Hours Reactor Was Critical 0

3,129.9 26,958.2 13.

Reactor Reserve Shutdown Hours 0

21.5 256.4 14.

Hours Generator On-Line 0

3,022.9 26,375.9 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 0 7,941,328 68,255,580 17.

Gross Electrical Energy Generated (MWH) 0 2,537,888 21,783,410 18.

Net Electrical Energy Generated (MWH) 0 2,396,973 20,519,889 19.

Unit Service Factor 0

69.6 74.0 20.

Unit Availability Factor 0

69.6 74.0 21.

Unit Capacity Factor (Using MDC Net) 0 63.8 66.5 22.

Unit Capacity Factor (Using DER Net) 0 60.9 63.4 23.

Unit Forced Outage Rate 0

7.3 5.1 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Fall Maintenance Outage 11-05-82 thru 11-15-82 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

08-03-82 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-338 UNIT NAME North Anna 1 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Scheitendorf TELEPHONE (703) 894-5151 X2502 l

2 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting 3

  • 4 Code Action to 5

Down Reactor Report #

Prevent Recurrence 82-10 720 The scheduled refueling outage continues l

1 2

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161) l E-Operator Training & License Examination 5-Load Reduction l

F-Administrative 9-Other 5

l G-Operational Error (Explain)

H-Other (Explain)

Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-338 UNIT NA-1 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTl!

June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

l 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l

OPERATING DATA REPORT DOCKET NO.

50-339 DATE 07-07-82 COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 OPERATING STATUS Notes 1.

Unit Name:

North Anna 2 2.

Reporting Period:

June 1982 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

939 7.

Maximum Dependable Capacity (Net MWe):

890 8.

If Changes occur in capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 720 4,343 13,535 12.

Number of Hours Reactor Was Critical 491.4 1,973.1 9,387.9 13.

Reactor Reserve Shutdown Hours 8.5 54.9 1,688.1 14.

Hours Generator On-Line 468.2 1,905.3 9,364.7 15.

Unit Reserve Shutdown Hours 0

0 0

j 16.

Gross Thermal Energy Generated (MWH) 960,712 4,687,916___

23,470,757 17.

Gross Electrical Energy Generated (MWH) 315,535 1,549,226 7,864,458 18.

Net Electrical Energy Generated (MWH) 294,637 1,466,297 7,468,713 19.

Unit Service Factor 65.0 43.9 69.2 l

20.

Unit Availability Factor 65.0 43.9 69.2 1

21.

Unit Capacity Factor (Using MDC Net) 46.0 37.9 62.0 22.

Unit Capacity Factor (Using DER Net) 45.1 37.2 60.8 l

23.

Unit Forced Outage Rate 1.8 5.9 15.9 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

l Fall Maintenance Outage 10-15-82 thru 10-25-82 l

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 07-07-82 REPORT MONTH JUNE COMPLETED BY G. D. Schmitendorf TELEPHONE (703) 894-5151 X2502 Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

4 5

Down Reactor Report #

Prevent Recurrence 82-09 820611 S

243.3 C

4 NA NA NA Continuation of Refueling outage.

82-10 820611 F

4.7 B

1 NA NA NA Normal rampdown to generator off line to pe,rform turbine Overspeed test.

82-11 820616 F

3.8 B

1 NA NA NA Normal rampdown to generator off line to balance the turbine.

i i

i 1

2 3

4 F: Forced Reason:

Method:

Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain)

Exhibit H - Same Source

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-339 UNIT NA-2 DATE 07-07-82 COMPLETED BY G. Schmitendorf TELEPHONE 703-894-5151X2502 MONTH June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 420.0 2

0 18 657.3 3

0 19 736.1 4

0 20 833.1 5

0 21 849.4 6

0 22 862.0 7

0 23 820.8 8

0 24 839.0 9

0 25 856.5 10 0

26 851.9 11 82.8 27 862.7 12 201.7 28 862.7 13 213.8 29 871.4 14 209.8 30 874.3 15 206.7 31 0

16 165.1 INSTRUCTIONS On this format, list the average daily unit power level in NWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.