ML050870118: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:-a I
{{#Wiki_filter:-a I
N-         Point Beach Nuclear Plant
N-Point Beach Nuclear Plant
          .O               Safety + Innovation + Teamwork "I
.O Safety + Innovation + Teamwork "I
A 93                                                 I N
A N
910                              mg=
93 910 I
'N EP Team On Call:     Plan-of-the-Day Meeting                 UDR21: Day 20 Team:        Team:081             50845Days 0815-0845                      to U2R27: 344 Front Office Conference Room         Days to U1R29: 519 Days Since Last HP           Work Week: B05A1                   Safety Event:
mg=
Clock Reset:           Date: Friday, April 23, 2004                       I- 75; 1
'N EP Team On Call:
Plan-of-the-Day Meeting UD R21: Day 20 Team:081 50845Days to U2R27: 344 Team:
0815-0845 Front Office Conference Room Days to U1R29: 519 Days Since Last HP Work Week: B05A1 Safety Event:
Clock Reset:
Date: Friday, April 23, 2004 I-75; 1


        - Plan of1theDay Agenda I
Plan of1theDay Agenda I


==Purpose:==
==Purpose:==
Understand unit status + Ensure ownership and support + Recognize performance
Understand unit status + Ensure ownership and support + Recognize performance
                                              + Improve communications and teamwork
+ Improve communications and teamwork Daily:
:     Daily:
Plant Status - Units I and 2:
A.
[IHS] - Safety B.
[Ops] - Plant Conditions (Units 1&2)
C.
[Ops] - Immediate attention (Pri 2)
D.
[Ops] - Operations' Dept concerns, activil and priorities E.
[Ops] - Status control events (last event)
F.
[Ops] - Regulatory notification / near miss G.
[Ops] - TSACs (active & potential)
H.
[Ops] - Nuisance alarms
: 1.
[Ops] - Operations' Housekeeping Reporl J.
[PA] - Operating Experience K.
[PIt Mgr] - Communications Surveillance Schedule Review:
A.
[PPG Mgr] week rolling schedule B.
[PPG Mgr] - Equipment / system outages Chemistry / RADCON Review. Units 1 and 2:
Integrated Schedule / System Outages:
A.
[Ops] - Operations' work week issues Unit Outage (if applicable):
Administrative:
A. [PPG Mgr] - Plant impact issues Action Items:
Round Table:
Pagers:
AOM.................................................
Chemistry Shift Supervisor...............
Industrial Safety...............................
Maintenance.....................................
Outage Manager..............................
Radiation Protection.........................
Shift Manager...................................
System Engineering.........................
Work Week Manager...................
: Jies,
;es
* Monday:
* Monday:
A. [EP] - Event Response duty list Plant Status - Units I and 2:                                    B. [Ops/Eng] - Fire Protection summary A.    [IHS] - Safety                                            C. [Safety] - Industrial safety action item list & safety performance B.    [Ops] - Plant Conditions (Units 1&2)                      D. [Site Engineering] - Maintenance Rule 'Al' system C.    [Ops] - Immediate attention (Pri 2)                          review D.    [Ops] - Operations' Dept concerns, activil Jies,          E. [Project Mgmt] - Major project status and priorities                                            F. [Business Mgr] - Budget overview E.    [Ops] - Status control events (last event)                G. Excellence Plan review F.    [Ops] - Regulatory notification / near miss;es
A. [EP] - Event Response duty list B. [Ops/Eng] - Fire Protection summary C. [Safety] - Industrial safety action item list & safety performance D. [Site Engineering] - Maintenance Rule 'Al' system review E. [Project Mgmt] - Major project status F. [Business Mgr] - Budget overview G. Excellence Plan review
* Tuesday:
* Tuesday:
G.    [Ops] - TSACs (active & potential)                        A. [RP] - Annual dose summary H.    [Ops] - Nuisance alarms                                    B. [Security] - Security system status & compensatory measures
A. [RP] - Annual dose summary B. [Security] - Security system status & compensatory measures C. [PPG] - Forced outage schedule D. [Site Eng] - Thermal cycle efficiency E. [VP/Director] - INPO follow up & readiness F. [EP] - EP issues G. Human Performance H. Excellence Plan review
: 1.    [Ops] - Operations' Housekeeping Reporl                  C. [PPG] - Forced outage schedule J.    [PA] - Operating Experience                              D. [Site Eng] - Thermal cycle efficiency K.    [PIt Mgr] - Communications                                E. [VP/Director] - INPO follow up & readiness F. [EP] - EP issues Surveillance Schedule Review:                                    G. Human Performance A. [PPG Mgr] week rolling schedule                        H. Excellence Plan review B. [PPG Mgr] - Equipment / system outages
* Wednesday:
* Wednesday:
Chemistry / RADCON Review. Units 1 and 2:                        A. [Training] - Training B. [PPG] - Management Risk Observations Integrated Schedule / System Outages:                            C. [Ops] - Operator Workarounds A.    [Ops] - Operations' work week issues                      D. [Ops] - Leakage list; oil & water E. [EP] - EP Drill Schedule Unit Outage (if applicable):                                      F. [Engr] - Section Xl equipment in double frequency Administrative:                                                  G. [Maint] - Housekeeping issues A. [PPG Mgr] - Plant impact issues                              H. Excellence Plan review
A. [Training] - Training B. [PPG] - Management Risk Observations C. [Ops] - Operator Workarounds D. [Ops] - Leakage list; oil & water E. [EP] - EP Drill Schedule F. [Engr] - Section Xl equipment in double frequency G. [Maint] - Housekeeping issues H. Excellence Plan review
* Thursday:
* Thursday:
Action Items:                                                    A. [EP] - EP Pager Test Results (as applicable)
A. [EP] - EP Pager Test Results (as applicable)
B. [Engr] - Temporary Modifications C. [Ops] - Control Room Panel Deficiency Analysis Round Table:                                                      D. [Ops] - Disabled alarms (Units 1&2)
B. [Engr] - Temporary Modifications C. [Ops] - Control Room Panel Deficiency Analysis D. [Ops] - Disabled alarms (Units 1 &2)
E. [Ops] - Instruments Out-of-Service (Units 1&2)
E. [Ops] - Instruments Out-of-Service (Units 1 &2)
Pagers:                                                          F. [PA] - CAP backlogs G. [Ops] - Out-of-Spec routine readings AOM .................................................            H. Excellence Plan review Chemistry Shift Supervisor...............
F. [PA] - CAP backlogs G. [Ops] - Out-of-Spec routine readings H. Excellence Plan review
* Friday:
* Friday:
Industrial Safety...............................                  A. [Reg Affairs] - Upcoming Licensing/fA Reviews B. [QA] - Quality Assurance update Maintenance.....................................                  C. [Maint] - WR Backlog Outage Manager..............................                      D. Weekend coverage list (Units 1&2)
A. [Reg Affairs] - Upcoming Licensing/fA Reviews B. [QA] - Quality Assurance update C. [Maint] - WR Backlog D. Weekend coverage list (Units 1&2)
E. [EP] - Event response "draft" for next week Radiation Protection.........................                    F. [Engr] - Predictive Monitoring Shift Manager...................................                  G. [PPG Mgr] - Next week's work week summary and highlights System Engineering.........................                      H. [Reg Affairs] - NRC/INPO Perf Indicators Work Week Manager ...................                            I. Excellence Plan review 2
E. [EP] - Event response "draft" for next week F. [Engr] - Predictive Monitoring G. [PPG Mgr] - Next week's work week summary and highlights H. [Reg Affairs] - NRC/INPO Perf Indicators I. Excellence Plan review 2


Point Beach Nuclear Plant Outage 1R28                                                                                              Path                  Picture DAY                     18                                 sN                       Meets Supporting Operational Excellence Outage Radiation Performance                                                                                                                     Doesn't Meet     Exceeds
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 18 Path sN Picture Meets Outage Radiation Performance Doesn't Meet Exceeds
_eay
_eay
                                    -                                    _.'.. __.g-*__-i_
_.'.. __.g-*__-i_
This indicator measures cumulative dose radiation exnosure and                                 Day 18 - April21                                                           I Actual = 1.011 total number of personnel-contamination events (PCE's > 5000                                   Cumulative = 26.886 cpm) during refueling outages. The dose indicator is measured in                               Cumulative Forecast = 61.429 Rem and individual PCE events.
This indicator measures cumulative dose radiation exnosure and Day 18 - April21 I
Meets:                 <=75 Rem                   Actual Cum.
total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Exceeds:               <=71 Rem                       Dose:           26.886 Rem Meets: <= 18           Exceeds: <=12             Actual PCE's:                   5
Actual = 1.011 Cumulative = 26.886 Cumulative Forecast = 61.429 Meets:  
_3BM, Stu Thomas                                                                                     I Personnel Contamination Events                                                     Cummulative Dose Exposure 20                                                                                       80 18                                   ,            .IM 16 60
<=75 Rem Actual Cum.
    > 14                                                                                   E
Exceeds:  
* Actual
<=71 Rem Dose:
                            .I                                   -*-Actual
26.886 Rem Meets: <= 18 Exceeds: <=12 Actual PCE's:
    = 12                                                                                    0                                    I                         ---.-
5
                                                              ...  . Forecast            Q 0:
: _3BM, Stu Thomas I
E 10              I,                                                                         40          .                           .                4      Goal o0  8
Personnel Contamination Events Cummulative Dose Exposure 20 18 16
                        .'                                            Goal                 0 so To
> 14
:. 0*.0                                                           0 8,  6
= 12 E 10 o0 8 8, 6 z4 2
                                                                                            .9 20
0 80
                                                                                                        #    A,.......I z4        I 2        ,._4 I      :fI              .
.IM
0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34                                         0 2   4   8   8   10 12 14   16 18   20 22 24 26
.I I,.'
0*.0 I
,._4 I
:fI
-*-Actual Forecast Goal E
00:
0 0
Q so To
.9 60 40 20 I
A,.......I Actual 4
Goal 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 0
2 4
8 8
10 12 14 16 18 20 22 24 26


NUCLEAR POWER BUSINESS UNIT PBNP DAILY CHEMISTRY STATUS REPORT Date: 04/23/04                               Time: 5:00 PARAMETER                               UNIT I                   UNIT 2                             ACTION LEVEL(S)
NUCLEAR POWER BUSINESS UNIT PBNP DAILY CHEMISTRY STATUS REPORT Date: 04/23/04 Time: 5:00 PARAMETER UNIT I UNIT 2 ACTION LEVEL(S)
REACTOR COOLANT Boron, ppm                     2989                     1265                                       N/A Lithium, ppm                     <0.05                     2.47                                 out of range Chloride, ppb                     <5                       <5                                       > 50 Fluoride. ppb                     <5                       <5                                       > 50 Sulfate, ppb                     <5                       <5                                       > 50 Silica, ppb                     860                       414                               > 1000 at power Dissolved H2. cc/kg                   N/A                       34.4                                   < 25, > 50 Specific Activity. uCi/cc             N/A                   1.43E+0                                 >100 / E-Bar 100/E-Bar, uCVcc                     N/A                     164.4 1-131 DE. uCi/cc                   N/A                   2.19E-4                                       > 0.8 RWST Boron, ppm                     2994                     3063 SiO2, ppb                     4140                     5375 BDEB (last done dates)               4114/04 6:00             4/11/04 2:17
REACTOR COOLANT Boron, ppm 2989 1265 N/A Lithium, ppm  
          % Solids                       4.2                       1.13
<0.05 2.47 out of range Chloride, ppb  
        % Boric Acid                     4.4                       2.8 BAST           A                 % Acid - Date & Time               3.69                               4/20/04 10:14 B               % Acid - Date &Time               3.71                               4/20/04 14:54 C                 % Acid - Date & Time               3.81                               4/21/04 10:00 STEAM GENERATORS                   A       I N/A B       A 1.00 r1     B         Action Level I             INPO CPI
<5  
                                                                                                > 1.1 above 30% power (2)
<5  
Chemistry Performance Index (CPI)_                                                                      _  _    _  _  _  _  _  _  _  _  _ _ _
> 50 Fluoride. ppb  
P/S Leak Rate, gpd                   N/A                       0.0                             > 30 or> 60 gpd / hr Cation Cond(1). uS/cm         N/A           N/A     0.0567             0.0563             > 0.8 Sodium. ppb               N/A           N/A       0.2               0.2               > 5                     > 0.8 Chloride, ppb             N/A           N/A       0.2               <0.1             >10                       > 1.6 Sulfate. ppb             N/A           N/A       0.3               0.3             > 10                     > 1.7 pH                 N/A           N/A       9.77               9.77             < 8.5 FEEDWATER                               UNIT I                   UNIT 2                   ActIon Level               INPO CPI Iron, ppb                     N/A                     2.483                         >3                       >5 Copper, ppb                       N/A                     0.030                       > 0.1                     > 0.2 Dissolved 02, ppb                   N/A                       <5                           >5 pH                         N/A                     9.68                       .
<5  
CONDENSATE                                                                               Action Level Dissolved 02, ppb                   N/A                       3.4                         >10 SAE Flow (scfm)                     N/A                       2.9 NOTE: Bolded items require action by Chemistry                         (2) Best allowable CPI is 1.0 EMERGENT PROBLEMS I SIGNIFICANT ACTIVITIES / OTHER INFORMATION Priority Chemistry equipment currently OOS 4
<5  
> 50 Sulfate, ppb  
<5  
<5  
> 50 Silica, ppb 860 414  
> 1 000 at power Dissolved H2. cc/kg N/A 34.4  
< 25, > 50 Specific Activity. uCi/cc N/A 1.43E+0  
>100 / E-Bar 100/E-Bar, uCVcc N/A 164.4 1-131 DE. uCi/cc N/A 2.19E-4  
> 0.8 RWST Boron, ppm 2994 3063 SiO2, ppb 4140 5375 BDEB (last done dates) 4114/04 6:00 4/11/04 2:17
% Solids 4.2 1.13
% Boric Acid 4.4 2.8 BAST A  
% Acid - Date & Time 3.69 4/20/04 10:14 B  
% Acid - Date & Time 3.71 4/20/04 14:54 C  
% Acid - Date & Time 3.81 4/21/04 10:00 STEAM GENERATORS A
I B
A r1 B Action Level I INPO CPI Chemistry Performance Index N/A 1.00
> 1.1 above 30% power (2)
(C PI)_
P/S Leak Rate, gpd N/A 0.0  
> 30 or> 60 gpd / hr Cation Cond(1). uS/cm N/A N/A 0.0567 0.0563  
> 0.8 Sodium. ppb N/A N/A 0.2 0.2  
> 5  
> 0.8 Chloride, ppb N/A N/A 0.2  
<0.1  
>10  
> 1.6 Sulfate. ppb N/A N/A 0.3 0.3  
> 10  
> 1.7 pH N/A N/A 9.77 9.77  
< 8.5 FEEDWATER UNIT I UNIT 2 ActIon Level INPO CPI Iron, ppb N/A 2.483  
>3  
>5 Copper, ppb N/A 0.030  
> 0.1  
> 0.2 Dissolved 02, ppb N/A  
<5  
>5 pH N/A 9.68 CONDENSATE Action Level Dissolved 02, ppb N/A 3.4  
>10 SAE Flow (scfm)
N/A 2.9 NOTE: Bolded items require action by Chemistry (2) Best allowable CPI is 1.0 EMERGENT PROBLEMS I SIGNIFICANT ACTIVITIES / OTHER INFORMATION Priority Chemistry equipment currently OOS 4


Weekly Core Damage Risk Profile (Safety Monitor)
Weekly Core Damage Risk Profile (Safety Monitor)
IBO5AVIE.O I                                                                                         411812004                                                                                   I   Unit 2 Risk Mgmt. Engr Tom Staskal (x6259)
IBO5AVIE.O I 411812004 I
Work Week Coord: 0CC Projected Risk Level Compared to Average:                                                   154%                               Highest Projiected Risk Level                         YELLOW Actual Risk Level Compared to Average:                                                   0%                                     Highest Actual Risk LvelI Notes: (1)Schedule analyzed using Safety Monitor 3.0 and PRA model Rev. 3.11. (2)This Risk Profile was generated based on schedule Jinformation received on 04116/2004, manually modified 04119104I. Any schedule changes after that date should be re-assessed by either the ISTA. PPG. or PRA in order to ensure the risk profile correctly reflects risk for upcomingp lant activities.,
Unit 2 Risk Mgmt. Engr Tom Staskal (x6259)
Scheduled Activities Unit 1 InMode    5 or 6     _      _  _    _  _      _          _    _  _    _    _  _      _    _    _  _ _
Work Week Coord: 0CC Projected Risk Level Compared to Average:
11-13029 O-SW-00146                   _______                              _______                          _______
154%
TS                         1               j1__
Highest Projiected Risk Level YELLOW Actual Risk Level Compared to Average:
19     . 41                             .-
0%
15                                                                                                                                                                                -RED4 13W-015 12 117 C                                                                                                                                                                                                    -RED
Highest Actual Risk LvelI Notes: (1) Schedule analyzed using Safety Monitor 3.0 and PRA model Rev. 3.11. (2) This Risk Profile was generated based on schedule Jinformation received on 04116/2004, manually modified 04119104I. Any schedule changes after that date should be re-assessed by either the I STA. PPG. or PRA in order to ensure the risk profile correctly reflects risk for upcomingp lant activities.,
Scheduled Activities Unit 1 In Mode 5 or 6 _
11-13029 O-SW-00146 TS 1
j1__
19 41 15
-RED4 13W-015 12 117
-RED 12 -
7 6
5 4
3 2
4
~
- I -
~
i inZ I
_ _ _ _ _ _t C
.0 E
.0 E
12 -
-J
-J 7
- I i. z .:- -.
6 5
,  ,  
4 3
".   I I
2                                                                                                                                  4                                                                                  !
I 1
    - I i. z   .:- - .         .; "
7...:  
I  I
,. I -,
                                                          , . I -,
r, I ' ' ; _ "  
                                                                  - I-I I
   : j _7 ' I  
1
.- . -- ,,
___ _~__t ~
I : ;, -. :,, --  '.  -
7...:
.  I " 1: I  -
.-     -  inZ I.:
 I.. I I
                                              ,    ,          _, I r,I ' '; _ "
_, I :
                                                                              '. . . , : ..    : j _7 ' I t ... ,
4 1
: , 1        4      1 I : ;, -. : , , --
t...
                                                                                                                                                ..     . I I . .: i" I " 1:I - I . . I I
 :, 1  
                                                                                                                                                                              . - ". ,     i" ,'
. I I..: i"
                                                                                                                                                                                                  ;: I ,
- ". ,  i "  ,'  ;:
U                         I                                     I                                   I o       Sunday         I               Monday               2           Tuesday               3        Wednesday              4        Thursday                5            Friday              6    Saturday    7 4/1812004                     4/19/2004                         4/20/2004                           412112004                     412212004                           4123/2004                 412412004 Printed on 411912004 5
I,
I.:
U I
I I
o Sunday I
Monday 2
Tuesday 4/1812004 4/19/2004 4/20/2004 3
Wednesday 4
Thursday 5
412112004 412212004 Friday 4123/2004 6
Saturday 412412004 7
5 Printed on 411912004


A             JC'             f                                 f                   t4 P/o Pa                 7 Plan Stus                                     Rp                   'Xx)4?                       A-5AC     -- AC4b' Committed to Nuclear Excettence              _'
Committed to Nuclear Excettence A
Plant Status Report 5-,agx                                                                                          gig Plant: Point Beach Nuclear Plant                                                                                                                   Date: Friday, April 23, 2004 Operations Report (Summary of Last 24 Hours of Operations):
JC' f
f t4 P/o Pa 7
P lan Stus Rp  
'Xx)4?
A-5AC AC4b' Plant Status Report 5-,a gx gig Plant: Point Beach Nuclear Plant Date: Friday, April 23, 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is in refueling shutdown (Mode 6). Reactor vessel head removed and cavity flooded to rod unlatch height.
Unit I is in refueling shutdown (Mode 6). Reactor vessel head removed and cavity flooded to rod unlatch height.
Unit 2 is at 100% power.
Unit 2 is at 100% power.
Days Without LTA: 580                                                                                     Homeland Security Condition: Yellow
Days Without LTA: 580 Homeland Security Condition: Yellow
                                      -UnitI                                                             -                --              :    Unit2-i PWR             PNVR                   MWE                           MWE                               PWR             PWR                     MWE                       MWE Mode           Level                 (Gross)                         (Net)                           Mode           Level                 (Gross)                     (Net) 6             0%                         0                             0                               1           100%                   542.9                       520.9 Days On Line: 0                     Days Since Last Reactor Trip: 281                                     Days On Line: 155                 Days Since Last Reactor Trip: 287
-UnitI Unit2-i PWR PNVR MWE MWE PWR PWR MWE MWE Mode Level (Gross)
  - -. --      m           :
(Net)
                        '...*              v..:                 Technical SpeciricationActionConditions - .                                       *;-                ;-              *      -
Mode Level (Gross)
Item         Unit         Condition                 Out of Service                 Length               Tech                 Expires                 Responsibility             Equip (Hr/Days)                 Spec                                                                   Expected Number                                                                   RTS Date Date       Time                                                     Date           Time 2RC-508,           2         Out of                   11/9/03       0749               31 Days             3.6.3.A       4/26/04           1900           M. Rosscau             8/27/04 U2C RMW                       service.
(Net) 6 0%
                                            .: - . ;:; ;i. Maor Equipment Out of ServiceorDegraded .                                                  .--.
0 0
Item           Unit               Condition                   Date                 Time                     Work Order Number W                                        Due Date       Responsibility NONE                                                                                                                                                                                         _
1 100%
                                  - ;:--                            Operational Problems'/-Concerns                               .          :        -:;
542.9 520.9 Days On Line: 0 Days Since Last Reactor Trip: 281 Days On Line: 155 Days Since Last Reactor Trip: 287 m
Item                 Unit                             Condition                                           Actions Needed                         Due Date         Responsibility 2RC-508, U2C                       2         Valve comes off shut seat                                     Provide decision tree to Engineering               4/23/04             K. Krause Reactor Makeup                               momentarily when RMW pump                                                     Manager.
v..:
Supply                                       starts.
Technical SpeciricationActionConditions -.
Unit 2, Excess                     2         Inadequate excess letdown flow.                                     Open and inspect, 2CV-285.                     517/04             N. Stuart Letdown Flow 2RE-215, 2HX-46 Air               2         Elevated indication, temperature                                 4 step action plan is developed.               5/14104             B. Carberry Ejector Gas Monitor                           related.                                                       Scheduled completion is 5/14/04.
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)
2P-2A, Charging                   2         Excessive seal leakage/prevents                                       WO 0400329, Priority 3.                     4/29/04         R. Brittingham Pump                                         continuous use of pump.
Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2
"B" Safety Injection               2         4% difference between LT-934 and                                 IC continue troubleshooting to                 4/23104             J. Helbing Accumulator Level                             LT-935.                                                           determine cause of deviation.
Out of 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosscau 8/27/04 U2C RMW service.
Transmitter Deviation                                                                                                 Evaluation due today.
.: -. ; ;i.
                                                              .~~~     __            _        _                                                                              _.      _    -__
Maor Equipment Out of ServiceorDegraded.
      .  .                            -    .              :'i.   >    ; -:i. ;PAggregate       Review of Issues:.                   -^;                   -              :      .    - -    : -
Item Unit Condition Date Time W
Item                 Unit                           Condition                                             Actions Planned                       Due Date         Responsibility NON EII I         ,                ~         ,          ,, .                        .,,*,,
Work Order Number Due Date Responsibility NONE Operational Problems'/-Concerns Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2
r       i.,     table Events
Valve comes off shut seat Provide decision tree to Engineering 4/23/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.
                                                                                                    ,,',      p,''Repo           a.          -
Supply starts.
                                                                                                                                              ,-a;.                  .,            -    -
Unit 2, Excess 2
I                                     .          ON I                                                                             ~NONEI Page 1 of 2 6
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
517/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14104 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14/04.
2P-2A, Charging 2
Excessive seal leakage/prevents WO 0400329, Priority 3.
4/29/04 R. Brittingham Pump continuous use of pump.
"B" Safety Injection 2
4% difference between LT-934 and IC continue troubleshooting to 4/23104 J. Helbing Accumulator Level LT-935.
determine cause of deviation.
Transmitter Deviation Evaluation due today.
.~~~
:'i.  
-:i.  
;PAggregate Review of Issues:.  
-^;
Item Unit Condition Actions Planned Due Date Responsibility NON EII I  
~
r i.,  
,-a;.
p,''Repo table Events
: a.
I ON I  
~NONEI Page 1 of 2 6


NMta Committed to Nuclear E~cellencej     r Plant Status Report
NMta Committed to Nuclear E~cellencej r
                          -.      -                .- OutstandingOperabilityDeterminations..--!,''
Plant Status Report OutstandingOperabilityDeterminations..--!,''
NONE
NONE i.-.-  
                                              .      ^.        i.-.-
^.
Protected Equipment                 .
Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump / P-38A Aux Feedwater Motor-Driven Pump /
2P-29, Aux Feedwater Turbine-Driven Pump / P-38A Aux Feedwater Motor-Driven Pump /
P-32A,B,C,D,E,F Service Water Pumps I K-2A/B Instrument Air Compressors I K-3A/B Service Air Compressors I G-Ol/G-02/G-03/G-04 Emergency Diesel Generators I Unit 1 Nozzle Dam Panels and Associated Equipment
P-32A,B,C,D,E,F Service Water Pumps I K-2A/B Instrument Air Compressors I K-3A/B Service Air Compressors I G-Ol/G-02/G-03/G-04 Emergency Diesel Generators I Unit 1 Nozzle Dam Panels and Associated Equipment
                                                    - L--oad Changes (Planned or Unplanned),
- L--oad Changes (Planned or Unplanned),
NONE
NONE
:.Reactor Coolant System Leakage-.                                       -
:.Reactor Coolant System Leakage-.
Unit 1                                             Unit 2 Unidentified (gpm)                                     0 .                                            0.04 (No leak rate determined due to draindown)
Unit 1 Unit 2 Unidentified (gpm) 0 0.04 (No leak rate determined due to draindown)
Identified (gpm)                                   0                                             0.04
Identified (gpm) 0 0.04 Major Tests and Evolutions Scheduled in Next 24 Hours Secure PAB ventilation for W-30A/B, F-23/F-29 PAB exhaust filter fan work.
                            *; ; - .      Major Tests and Evolutions Scheduled in Next 24 Hours             -  -
Secure PAB ventilation for W-30A/B, F-23/F-29 PAB exhaust filter fan work.
Align G-02 to IA-05 and 2A-05 for IB-42 outage. -
Align G-02 to IA-05 and 2A-05 for IB-42 outage. -
A       A             F             I               /               ((               /741, De-energize IB42.                 'q A IL #,U, . -V0      "                      idt _0 -- T----7 Alt(IA.   -   '--  , J ffl-t   , - ,
A A
I---       G=   r,-= 7- --- -                    -
F I  
/
((  
/741, De-energize IB42.
'q A IL #,U,. -V 0 idt _0 -- T----7 Alt(IA. -
, J ffl-t
I---
G=
r,-= 7- --- -
Page 2 of 2 7
Page 2 of 2 7


Committed to Nuclear Excelnc                       ,
Committed to Nuclear Excelnc Outage Status Report Plant:
Outage Status Report Plant:           Point Beach Unit I                                                   Day: Friday                                   Today's Date / Time:             4/23104             0400 Outage Duration: Day                             20   Of             A 28 Day Scheduled Refueling Outage I...           -~     ;        4-.
Point Beach Unit I Day:
                                                                      -  ..  "-1
Friday Today's Date / Time:
4/23104 0400 Outage Duration: Day 20 Of A 28 Day Scheduled Refueling Outage
"-1
~!~
t I...  
-~
4
:Safetv Sta tu -s.
:Safetv Sta tu -s.
1.
: 1.
                                                                                                                                                    ~!~ I t            ;
I Industrial - Within the last 12 hours OSHA Recordables 0
Industrial - Within the last 12 hours OSHA Recordables                                   0                   First Aid cases         I         Significant near misses                 0 Total for this outage                               1 Summary: Individual bumped head on valve (was wearing a hard hat), reported a sore neck and back, no medical attention Irequired.
First Aid cases I
Radiological Dose outage to date                             26.886                                               Projected to date       61.429                             Outage Goal                       *75 R Difference                                       -34.543                                                                                                         Number of PCEs                       5 Summary:
Significant near misses 0
Nuclear Significant human performance errors and events in last 24 hours                                                     0 Summary: 4121/04 - Incore T/C Column Protective Sleeve Installation Under Evaluation
Total for this outage 1
            <.  ,    ...          .    -. -    i-           -,.    .;          ;'<        ,i:t           d 'S       ''  '-i   ,  ;        ,  :   ,                                      ,-
Summary: Individual bumped head on valve (was wearing a hard hat), reported a sore neck and back, no medical attention Irequired.
Mode:                    0 Hot Standby (Mode 3)                             a   Hot Shutdown (AMode 4) E Cold Shutdown (AMode 5)                               3 Refueling Shutdown (Mode 6)
Radiological Dose outage to date 26.886 Projected to date 61.429 Outage Goal  
RCS:                   Temperature:                 95                                             Pressure: Vented to Atmosphere               RV Level: Rod Latch Height Time to Boil:                             19 hours
*75 R Difference  
          ;            ,ht Reactivity:                   Yellow                     Core Cooling:                             Green             Power Availability:                 Green Containment:                 Yellow                     Inventory:                                 Green             Spent Fuel Pool Cooling:           N/A i             Shutdown Safety-Ass'esmnetProtectedEquipment-                       e       ::
-34.543 Number of PCEs 5
Unit I A and B Steam Generator Nozzle Dams and Associated Equipment Major ctivities Completed in Lst 24 Hours,,                                                             Critical Path'nd Near Critical Path Activities'(Neit 24 Hoursl                         '
Summary:
Nuclear Significant human performance errors and events in last 24 hours 0
Summary: 4121/04 - Incore T/C Column Protective Sleeve Installation Under Evaluation i-  
,i :t d  
'S  
'-i Mode:
0 Hot Standby (Mode 3) a Hot Shutdown (AMode 4) E Cold Shutdown (AMode 5) 3 Refueling Shutdown (Mode 6)
RCS:
Temperature:
95 Pressure:
Vented to Atmosphere RV Level:
Rod Latch Height Time to Boil:
19 hours
,ht Reactivity:
Yellow Core Cooling:
Green Power Availability:
Green Containment:
Yellow Inventory:
Green Spent Fuel Pool Cooling:
N/A i
Shutdown Safety-Ass'esmnetProtectedEquipment-e Unit I A and B Steam Generator Nozzle Dams and Associated Equipment Major ctivities Completed in Lst 24 Hours,,
Critical Path'nd Near Critical Path Activities'(Neit 24 Hoursl
* Incore T/C Column Protective Sleeve Installation
* Incore T/C Column Protective Sleeve Installation
* Rod Unlatch
* Rod Unlatch
* Cavity Flooded to Rod Unlatch Height
* Cavity Flooded to Rod Unlatch Height
* Remove Upper Internals 1BS/G Sludge Lancing i-.-:               .,-.
* Remove Upper Internals 1B S/G Sludge Lancing i-.-:  
                              <..            .:R.             ':'                          Signiricant Outtndn Issue                     '              ; ''''        '.                .:;          -i Date           l                                                                         Issue                                                         'Due               Responsibility 4103/04             Repair Blowdown Tank Leakage                                                                                                         4/30/04               Scott Manthei 4/04/04               IP2A Charging Pump Troubleshooting                                                                                                 4/30/04                   Clay Hill 4/08/04             Incorporate Lessons Learned from IST Reduced Inventory Orange Path                                                                 4/25/04                 Dave Dyzak 4/22/04             Procedure Changes to Allow Hoses thru Hatch during Fuel Motion                                                                     4/23/04                   Clay Hill 4/22/04               IP-IOB RHR Pump Return to Service Plan                                                                                             4/24/04                 Steve Bach 4/22/04             RP-1 C SFP Pump Operability Requirements                                                                                             4/23/04                   Ken Sokol
.:R.
                                                                                                                                                                              .o.r.es.
Signiricant Outtndn Issue  
: King> Ucom le t6o~ii is                             .        .~
-i Date l
Scheduled                                   Actual           '                                 Scheduled                        -Actual   A' Date '       Time ' 2 Date'                                 'Time -.                           'Date:
Issue  
45Date4             Time 0 0Time Cooldown <200_                           4/03/04         2100                     4/03/04               2230                 >200t     .eatup 4/25m04               0900 Head Lift                               4/09/04         0900                     4/21/04             1550         Initial               4/28/04               1100 Refueled                                 4/14/04         0300                                                       On-Line               4/30/04               0100 8
'Due Responsibility 4103/04 Repair Blowdown Tank Leakage 4/30/04 Scott Manthei 4/04/04 IP2A Charging Pump Troubleshooting 4/30/04 Clay Hill 4/08/04 Incorporate Lessons Learned from IST Reduced Inventory Orange Path 4/25/04 Dave Dyzak 4/22/04 Procedure Changes to Allow Hoses thru Hatch during Fuel Motion 4/23/04 Clay Hill 4/22/04 IP-IOB RHR Pump Return to Service Plan 4/24/04 Steve Bach 4/22/04 RP-1 C SFP Pump Operability Requirements 4/23/04 Ken Sokol
.o.r.es.
: K > U com ing 6o~
le t ii is  
.~
Scheduled Actual Scheduled A'  
-Actual Date '
Time ' 2 Date'  
'Time -.
'Date:
Time 45Date4 0 0Time Cooldown <200_
4/03/04 2100 4/03/04 2230  
.eatup
>200t 4/25m04 0900 Head Lift 4/09/04 0900 4/21/04 1550 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 8


P 0 I N T     B E A C H     N U C L E A R     P L A N T                     05:44 Friday, April 23, 2004 12 WEEK SURVEILLANCES - MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUl)
P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23, 2004 12 WEEK SURVEILLANCES -
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID           GRP FRO CALLUP         DESCRIPTION           LAST         DUED       SKED       TSDUE       10%         25%         DEFER       ACT P81 40 0306530 CC-00779           MM SWl M-RELVLV       REPLACE RELIEF VAL                 05/07/2003 05/22/2004.             09/30/2003 05/06/2004.05/15/2004 128NS PB-O-740308970--------------M------M--RE------REPLACE--RELIEF--VAL--02/13/2004--06/14/2004------1/27/2004---02/02/2006.--------
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUl)
PR0 74 0308971 DA-030558 MM 8A1 M-RELVLV                 REPLACE RELIEF VAL                 02/13/2004 06/14/2004             . 11/27/2004 02/02/2006.             COW~
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10%
PRO 74 0308972 DA-03055D         MM   BAl M-RELVLV     REPLACE RELIEF VAL                 02/13/2004 06/14/2004             . 11/27/2004 02/02/2006.             COIAI P81 40,0214362 ICP-02.001 IC CW1 P81-1                   RP AND SG ANALOG T 12129/2003 03/22/2004                   03/29/2004 03/31/2004 04/12/2004.05/03/2004 NO-PX PS1 40 0214363 ICP-02.007 IC CWl PSI                     POWER RANGE NIS TE 12/30/2003 03/23/2004                   03/30/2004 04/01/2004 04/13/2004.05/03/2004 NO-PX P81 40 0214364-----P-........IC .C....P8 2-- --- P-AND-S--ANALOG--T-01/05/2004 03/24/2004     --            ---    04/05/2004--04/02/2004--0-/19/2004.05/03/2004------P     -
25%
P51 40 0214371 ICP-02.001 IC CWI PB1-2                   RP AND SG ANALOG T 01/07/2004 03/29/2004                   04/07/2004 04/07/2004 04/219/2004.05/03/2004 NO-PX P-840-- -9950082I    -C--0-.00   IC---W -- ------ ----  P-LOGIC TEST -     - -R-02/03/2004 03/30/2004-             04/03/2004 04/05/2004---04/13/2004.05/03/2004 NO--P-X PBI 40 0214375 ICP-02.001 IC CWI P81-4                   RP AND SG ANALOG T 01/07/2004 03/31/2004                   04/07/2004 04/09/2004 04/21/2004.05/03/2004 NO-PX P8176 .. .0215117 ------ APR------A-R----             CALIBRATE---A-----E--10/01/2002 04/01/2004
DEFER ACT P81 40 0306530 CC-00779 MM SWl M-RELVLV REPLACE RELIEF VAL 05/07/2003 05/22/2004.
                                                                                              --        04/30/2004--04/02/2004--05/25/2004--08/17/2004.-------
09/30/2003 05/06/2004.05/15/2004 128NS PB-O-74 0308970--------------M------M--RE------REPLACE--RELIEF--VAL--02/13/2004--06/14/2004------1/27/2004---02/02/2006.--------
PB1 76 02151182 I-02.             IC 8M2PI APR          -RP       CLOIBRATESTA-     TR 102/01/020/2003/   00 2    053/2004 04/03/2004 05/25/2004 08/17/2004.05/3200             8EMP P81..76..0214022..A.........MMV..3......R3.RE.OVE..VALVE..FROM..04/01/2004..04/22/2004.....07/19/2004...12/30/2004....128.M P81 76 0215122 ICP-020           APRICM2 A8-R           UPNDERSRGQUNCYO RE 010/07/2002 04/01/2004 042/0404/08/2004 05/25/2004 08/23/2004.0513200                       8EMP P81--76 -0215123A-2-1-4
PR0 74 0308971 DA-030558 MM 8A1 M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 11/27/2004 02/02/2006.
                    --          APR -- M A-R--    -  UNDERFREQ--ENCY-REL 10/07/2002---04/01/2004 05/08/2004-
COW~
                                                                                                            --      04/08/2004 05/25/2004- 08/23/2004.             128EM--
PRO 74 0308972 DA-03055D MM BAl M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 11/27/2004 02/02/2006.
P81 76 0215120 8-03               APR 1M2 A-R-1         CALIBRATE 18-03 TE 109/018/2002 04/01/2004 05/303/2004 03/020/2004 05/25/2004 08/04/2004.                   128EM P81 76 02151218 8-04             APR 1M2 A-R-I         CALIBRATE 1A-04 TE 10/06/2002 04/01/2004 04/23/2004 04/07/2004 05/25/2004 08/22/2004.                       128EM P81 76 0310189   AFV   01         EPIM3A2 CV-1T-       RMVT- SEVALV  PEROM   0/820       04/01/2004 05/16/2004 050/20       07/19/2004 02/304/2005.             128MM P81 76 03019512 A52-049           EPT M2 AS-O0         UNST-CHECKUVALV   CL 109/207/2002 04/01/2004 04/23/2004 03/22/2004     05/25/2004 08/06/2004.             128EM P-81 -
COIAI P81 40,0214362 ICP-02.001 IC CW1 P81-1 RP AND SG ANALOG T 12129/2003 03/22/2004 03/29/2004 03/31/2004 04/12/2004.05/03/2004 NO-PX PS1 40 0214363 ICP-02.007 IC CWl PSI POWER RANGE NIS TE 12/30/2003 03/23/2004 03/30/2004 04/01/2004 04/13/2004.05/03/2004 NO-PX P81 40 0214364-----P-........IC  
0301953 CV-
.C....P8 --
                  --      04A-EPT 1M-2       -S-------
2 ---
ST-CHECK VALVE   CL --  -
P-AND-S--ANALOG--T-01/05/2004 03/24/2004 04/05/2004--
09/22/2002         -04/01/2004 04/23/2004 03/24/2004   05/25/2004 08/08/2004.             128-E-N--
04/02/2004--0-/19/2004.05/03/2004------P P51 40 0214371 ICP-02.001 IC CWI PB1-2 RP AND SG ANALOG T 01/07/2004 03/29/2004 04/07/2004 04/07/2004 04/219/2004.05/03/2004 NO-PX P-8 --
P81 77 03019542 C52-1048 EPT M2 AS-R~                     1ST-CHRECKUVALV   CL 109/26/2002 04/01/2004 04/29/2004 03/28/2004     05/25/2004 08/123/2004.             128EM P81 77 03019552 8-0033             EPT M2 AS-RO1         1ST-CHECK VALVE   CL 09/25/2002 04/01/2004 04/25/2004'03/27/2004       05/25/2004 08/11/2004.             128EN PB0 76 02010963 G-0               EMI G3   C lP EA2    1   VT2YARMELECTRICA      06/15/2002 04/01/2004 05/15/0405/07/       200   06/05/2004 09/104/2004.             C2lEN P8O 76 020195148   0-029         EMT M2 E-R 0         MOITOC EMERGENCY       09/17/2002 04/01/2004 04/0/2004~ 03/19/2004 05/25/2004 08/03/2004.                   128EM P80 76 020195149   0-02 4A EMT M2 ES-R 0               MOISTORE EM LERGECY 09/17/2002 04/01/2004 04/05/2004 03/19/2004 05/25/2004 08/03/2004.                     128EM P81 76 0300803 IC-----------IC               P
40
                                          ------ ----- N---AXIAL-O--SE CA --- -11/08/2002 04/01/2004--05/-9/2004-05/10/2004--05/25/2004--09/24/2004.-------
-9950082 I
PS1 76 0300804 CP-020304B EP IC M2 PS               NISTPOWER RANGLVECL01021/2002 04/01/2004 05/20/2004 04/22/2004 05/25/2004 09/06/2004.                       128EC PB1 76 0300805 ICV-020383         E IC M2 PS8 01-       INT-CERMDIT RANGE     1L09/10/2002 04/01/2004 05/05/2004 04/11/2004 05/25/2004 08/26/2004.                 128EN P8176 .. .0300806 .............. IC..M P..-..SOURCE
-C--0-.00 ---
                                                  ...            RANGE
IC W
                                                                      .. N.TR.10/11/2002..04/01/2004..05/05/2004..04/12/2004..05/25/2004...08/27/2004.
P-LOGIC TEST -
                                                                              ...                                                                                    2C PB1 76 0300807 FICE-BARR15           IC M2 P1-i                     N RNSEACTOR PROECION     10/06/2002 04/01/2004 05/02/2004 04/07/2004 05/25/2004 08/22/2004.                   128EM PR1 76 0300096   GC-01.           ENI G1M   P8-A       2VEARPRESLUEC MTRIGA 09/29/2002 04/01/2004 04/27/2004 033/20           05/25/2004 08/15/2004.             C28AC PR1 76 03001810   CP02.01         MIC M2 P8-R         RPOSYTOREMETRIPELOG 109/14/2002 04/01/2004 05/15/2004 04/15/2004 05/25/2004 08/030/2004.                   128EM PR1 76 03001514 GC-02.017           IC M2 P8-1         RPOSYTOREMEAUTEMAT     109/06/2002 04/01/2004 05/05/2004 04/07/2004 05/25/2004 08/22/2004.                 128EM
-R-02/03/2004 03/30/2004-04/03/2004 04/05/2004---04/13/2004.05/03/2004 NO--P-X PBI 40 0214375 ICP-02.001 IC CWI P81-4 RP AND SG ANALOG T 01/07/2004 03/31/2004 04/07/2004 04/09/2004 04/21/2004.05/03/2004 NO-PX P81..
76
.0215117 ------
APR------A-R----
CALIBRATE---A-----E--10/01/2002 04/01/2004 04/30/2004--04/02/2004--05/25/2004--08/17/2004.-------
PB1 76 02151182 I-02.
APR IC 8M2PI  
-RP CLOIBRATESTA-TR 102/01/020/200 2
3/
00 053/2004 04/03/2004 05/25/2004 08/17/2004.05/3200 8EMP P81..76..0214022..A.........MMV..3......R3.RE.OVE..VALVE..FROM..04/01/2004..04/22/2004.....07/19/2004...12/30/2004....128.M P81 76 0215122 ICP-020 APRI CM2 A8-R UPNDERSRGQUNCYO RE 010/07/2002 04/01/2004 042/0404/08/2004 05/25/2004 08/23/2004.0513200 8EMP P81--76  
-0215123 --
A-2-1-4 APR M --
A-R UNDERFREQ--ENCY-REL 10/07/2002---04/01/2004 05/08/2004- 04/08/2004 05/25/2004- 08/23/2004.
128EM--
P81 76 0215120 8-03 APR 1M2 A-R-1 CALIBRATE 18-03 TE 109/018/2002 04/01/2004 05/303/2004 03/020/2004 05/25/2004 08/04/2004.
128EM P81 76 02151218 8-04 APR 1M2 A-R-I CALIBRATE 1A-04 TE 10/06/2002 04/01/2004 04/23/2004 04/07/2004 05/25/2004 08/22/2004.
128EM P81 76 0310189 AFV 01 EPIM 3A2 CV-1T-RMVT-SE VALV PEROM 0/820 04/01/2004 05/16/2004 050/20 07/19/2004 02/304/2005.
128MM P81 76 03019512 A52-049 EPT M2 AS-O0 UNST-CHECKUVALV CL 109/207/2002 04/01/2004 04/23/2004 03/22/2004 05/25/2004 08/06/2004.
128EM P-81 -7 0301953 CV- 04A -EPT 1M-2  
-S -------ST-CHECK VALVE CL 09/22/2002  
-04/01/2004 04/23/2004 03/24/2004 05/25/2004 08/08/2004.
128-E-N--
P81 77 03019542 C52-1048 EPT M2 AS-R~
1ST-CHRECKUVALV CL 109/26/2002 04/01/2004 04/29/2004 03/28/2004 05/25/2004 08/123/2004.
128EM P81 77 03019552 8-0033 EPT M2 AS-RO1 1ST-CHECK VALVE CL 09/25/2002 04/01/2004 04/25/2004'03/27/2004 05/25/2004 08/11/2004.
128EN PB0 76 02010963 G-0 EMI G3 EA2 C lP 1
VT2 YARM ELECTRICA 06/15/2002 04/01/2004 05/15/0405/07/
200 06/05/2004 09/104/2004.
C2lEN P8O 76 020195148 0-029 EMT M2 E-R 0 MOITO C EMERGENCY 09/17/2002 04/01/2004 04/0/2004~ 03/19/2004 05/25/2004 08/03/2004.
128EM P80 76 020195149 0-02 4A EMT M2 ES-R 0
MOISTORE EM LERGECY 09/17/2002 04/01/2004 04/05/2004 03/19/2004 05/25/2004 08/03/2004.
128EM P81 76 0300803 IC-----------IC P  
-- N---AXIAL-O--SE ---
CA
-11/08/2002 --
04/01/2004--05/-9/2004-05/10/2004--05/25/2004--09/24/2004.-------
PS1 76 0300804 CP-020304B EP IC M2 PS NISTPOWER RANGLVE CL01021/2002 04/01/2004 05/20/2004 04/22/2004 05/25/2004 09/06/2004.
128EC PB1 76 0300805 ICV-020383 E IC M2 PS8 01-INT-CERMDIT RANGE 1L09/10/2002 04/01/2004 05/05/2004 04/11/2004 05/25/2004 08/26/2004.
128EN P81..
76
.0300806.............. IC..M P..-..SOURCE RANGE N.TR.10/11/2002..04/01/2004..05/05/2004..04/12/2004..05/25/2004...08/27/2004.
2C PB1 76 0300807 FICE-BARR15 IC M2 P1-i RNSEACTOR N PROECION 10/06/2002 04/01/2004 05/02/2004 04/07/2004 05/25/2004 08/22/2004.
128EM PR1 76 0300096 GC-01.
ENI G1M P8-A 2VEARPRESLUEC MTRIGA 09/29/2002 04/01/2004 04/27/2004 033/20 05/25/2004 08/15/2004.
C28AC PR1 76 03001810 CP02.01 M IC M2 P8-R RPOSYTOREMETRIPELOG 109/14/2002 04/01/2004 05/15/2004 04/15/2004 05/25/2004 08/030/2004.
128EM PR1 76 03001514 GC-02.017 IC M2 P8-1 RPOSYTOREMEAUTEMAT 109/06/2002 04/01/2004 05/05/2004 04/07/2004 05/25/2004 08/22/2004.
128EM


P 0 I N T       B E A C H     N U C L E A R     P LA N T                     05:44 Friday, Aprit 23, 2004     2 12 WEEK SURVEILLANCES - MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUI)
P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, Aprit 23, 2004 2
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP                     DESCRIPTION             LAST         CUED       SKED       TSDUE       1OX         25%         DEFER   ACT P81 76 0300812 ICP-02.018 IC IM2 PBI-1                     RX TRIP BKR AND TU 10/05/2002 04/01/2004 05/07/2004 04/06/2004 05/25/2004 08/21/2004.                     1281C P81 76 0300813 ICP-02.019 IC 1HZ PBI-STARTU SAFEGUARDS LOGIC T 10/05/2002 04/01/2004 05/03/2004 04/06/2004 05/25/2004 08/2112004.                                     1281C P81 76 0300814 ICP-..........IC         ........... L     RP.. .AND .....
12 WEEK SURVEILLANCES -
ANALOG      09/29.2..0..04/01/2004..05/07/2004..03/31/2004..05/25/2004..08/15/2004..18C
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUI)
                                                                                          .T ..
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST CUED SKED TSDUE 1OX 25%
P81 76 0300815 ICP 02.020 IC 1M2 P81-RD.                   RP AND SG ANALOG T 09/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.                     1281C P81 76 0300816...............IC         .............. R AND.. G.ANALOG
DEFER ACT P81 76 0300812 ICP-02.018 IC IM2 PBI-1 RX TRIP BKR AND TU 10/05/2002 04/01/2004 05/07/2004 04/06/2004 05/25/2004 08/21/2004.
                                                                          ...         09..9.200...04/01/2004..05/07/2004..03/31/2004..05/25/..004.08/15..2004.
1281C P81 76 0300813 ICP-02.019 IC 1HZ PBI-STARTU SAFEGUARDS LOGIC T 10/05/2002 04/01/2004 05/03/2004 04/06/2004 05/25/2004 08/2112004.
                                                                                          .T ..                                                                            2C Pa1l7 0300817 ICP-02.020 IC lM2 PB1-RL                     RP AND SG ANALOG T 09/29/2002 04/01/2004 05/08/2004 03/31/2004 05/25/2004 08/15/2004.                     1281C P81--76 0300818 IC-      0
1281C P81 76 0300814 ICP-..........IC  
                          -----    C IM P -- ----- RP AND- SG A-ALOG T --
........... L RP  
10/14/2002 04/01/2004 05/16/2004   04/15/2004---05/25/2004--08/30/2004.           2 --C --
.AND.....
P81 76 0300819 ICP-02.020 IC IM2 PBI-2H                     RP AND SG ANALOG T 109/14/2002 04/01/2004 05/16/2004 04/315/2004 05/25/2004 08/30/2004.                   1281C P81 76- 0300834 CP-0-- 0 -- ---- IC 1H P81-              - BORIC-ACID CONTROL--09/24/2002 04/01/2004 04/23/2004 -        03/26/2004
ANALOG
                                                                                                                                ---    05/25/2004- 08/10/2004.                 C P81 76 0300836 ICP-02.022 IC 1HZ PSIY                       CONTAINDME NTASOM L 09/19/2002 04/01/2004 05/07/2004 03/21/2004 05/25/2004 08/05/2004.                     1281C P81 76 0300839 ICP ............ IC......81..NI                   .PO.ERRA.GE
.T..
                                                                            .. C.A.09/27/2002..04/01/2004...04/21/2004..03/29/2004..05/25/2004..08/..3/2004.
09/29.2..0..04/01/2004..05/07/2004..03/31/2004..05/25/2004..08/15/2004..18C P81 76 0300815 ICP 02.020 IC 1M2 P81-RD.
                                                                                      ..                                                                                    81 P8I 76 0300840 ICP-02.020 IC 1HZ P811                       OPS AND CRNAOSSOVE 10/04/2002 04/01/2004 04/28/2004 04/05/2004 05/25/2004 08/20/2004.                     1281C P81 76 0300841.....P ......... IC           P.1
RP AND SG ANALOG T 09/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.
                                            ......          .. C..4.29..1.RP..INS..09/22/200 04/01/2004
1281C P81 76 0300816...............IC R
                                                                                                    ...        04/26.200...03/24/2004..05/25/2004..08/08/2004........
AND G.ANALOG  
pal 7 0300842 ICP-02.020 IC 1M2 P81-1                       ICP 4.29S2 ORAL-3 R 10/15/2002 04/01/2004 05/16/2004 04/16/2004 05/25/2004 08/31/2004.                     1281C P81--76 0300843 I-P-
.T..
                    --          9-IC P8         --- ROD-INSERTION LIM-I-10/08/2002 04/01/2004 04/29/2004--04/09/2004--05/25/2004
09..9.200...04/01/2004..05/07/2004..03/31/2004..05/25/..004.08/15..2004.
                                                                                                                  ---                              08/24/2004.         1-----C P81 76 0300844 ICP-04.034 IC 1H2 P81                       BRCONACINME    ONTHYROG 09/29/2002 04/01/2004 04/28/2004 03/31/2004 05/25/2004 08/15/2004.               1281C
2C Pa1l7 0300817 ICP-02.020 IC lM2 PB1-RL RP AND SG ANALOG T 09/29/2002 04/01/2004 05/08/2004 03/31/2004 05/25/2004 08/15/2004.
__ P81 76 0300847 ICP-04.022 IC 1H2 PS1                       SOTEAIMGENERTO WIP09/219/2002 04/01/2004 05/07/2004 03/23/2004 05/25/2004 08/07/2004.                     1281C P81 76 03008396 ICP-04.026 IC 1HZ P81                       HIVPAST   RPANGATRIX     109/17/2002 04/01/2004 05/218/2004 04/18/2004 05/25/2004 09/02/2004.             1281C P81 76 02104106 IC-04206       MMV ZM2 P-R1               REOVESHAND     /REPLACE 11/142/199 04/01/2004 04/08/2004 04/19/2004 09/10/2004 05/29/2005.                 128MC P81 77 0215886 OICP-040293A 0P6             PHI            IC-43A9, RHRPUM       AN09/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.               1280P P81 77 0215887 -ITP-04009 IPC 1HZ POT                       IC-4329-LOW HEA       R 10/11/2002 04/01/2004 03/29/2004 04/12/2004 05/25/2004 08/21/2004.                 1281C P81 77 0215888 -ICP-040293C0P 1HZ POTRO                       INSERTIGH HEAD 10/07/2002 04/01/2004 05/21/2004 04/08/2004 05/25/2004 08/23/2004.                       1281C T-0005B 0P6 1H -- - ---
1281C P81--76 0300818 -
P81- 77 -0215890 ----                                     IT-O---CONT--   SPRAY 10/07/2002-04/01/2004--05/07/2004-04/08/2004 05/25/2004 08/23/2004.05/01/2004----280P P81 77 0215893   -ICP-040034I   0P61     H     I         IOT-ZOINIET       1YDPOR 09/30/2002 04/01/2004 04/22/2004 04/01/2004 05/25/2004 08/16/2004.                 1281C P81 77 0215898 OITP-04270       IPC I2 PHT                 STEAM GENERATOR WI 09/26/2002 04/01/2004 04/29/2004 03/28/2004 05/25/2004 08/07/2004.                       1281C PR1 77 0218589   OIT-30207 ICP        GOT Z GT-280A               DISE MSSTRU 09/18/2002 04/01/2004 05/07/2004 032/20 05/25/2004 08/04/2004.0620204                       8OIA P81 77 02150089   -ICP-10150 IPC 1HZ PO1                   S AT- 1 AFP DATISC 10/12/2002 04/01/2004 05/10/2004 04/13/2004 05/25/2004 08/028/2004.                     1281C S
IC 0
P81 70 0215901 O-T0206         MMV     HZMMOT              RT-2908,IP-Z9LAFP 10/14/2002 04/01/2004 05/14/2004 04/15/2004 05/25/2004 08/30/2004.                       128MM P81 70 021598502 -IT-0200C 0P6 1HZ OT                     IT-CIAC, COMPLHETE       10/107/2002 04/01/2004 05/22/2004 04/08/2004 05/25/2004 08/23/2004.050/041280P
C IM P
RP AND-SG A-ALOG T 10/14/2002 04/01/2004 05/16/2004 04/15/2004---05/25/2004--08/30/2004.
2 C
P81 76 0300819 ICP-02.020 IC IM2 PBI-2H RP AND SG ANALOG T 109/14/2002 04/01/2004 05/16/2004 04/315/2004 05/25/2004 08/30/2004.
1281C P81 76- 0300834 CP-0 0
IC 1H P81 BORIC-ACID CONTROL--09/24/2002 04/01/2004 04/23/2004 03/26/2004 05/25/2004- 08/10/2004. ---
C P81 76 0300836 ICP-02.022 IC 1HZ PSIY CONTAINDME NTASOM L 09/19/2002 04/01/2004 05/07/2004 03/21/2004 05/25/2004 08/05/2004.
1281C P81 76 0300839 ICP............IC......81..NI  
.PO.ER..
RA.GE C.A.09/27/2002..04/01/2004...04/21/2004..03/29/2004..05/25/2004..08/..3/2004.
81 P8I 76 0300840 ICP-02.020 IC 1HZ P811 OPS AND CRNAOSSOVE 10/04/2002 04/01/2004 04/28/2004 04/05/2004 05/25/2004 08/20/2004.
1281C P81 76 0300841.....P.........
IC P.1 C..4.29..1.RP..INS..09/22/200 04/01/2004 04/26.200...03/24/2004..05/25/2004..08/08/2004........
pal 7 0300842 ICP-02.020 IC 1M2 P81-1 ICP 4.29S2 ORAL-3 R 10/15/2002 04/01/2004 05/16/2004 04/16/2004 05/25/2004 08/31/2004.
1281C P81--76 0300843 I-P-9-IC P8  
--- ROD-INSERTION LIM-I-10/08/2002 04/01/2004 04/29/2004--04/09/2004--05/25/2004 08/24/2004.
1-----C P81 76 0300844 ICP-04.034 IC 1H2 P81 BRCON ACINME ONTHYROG 09/29/2002 04/01/2004 04/28/2004 03/31/2004 05/25/2004 08/15/2004.
1281C P81 76 0300847 ICP-04.022 IC 1H2 PS1 SOTEAIMGENERTO WIP 09/219/2002 04/01/2004 05/07/2004 03/23/2004 05/25/2004 08/07/2004.
1281C P81 76 03008396 ICP-04.026 IC 1HZ P81 HIVPAST RPANGATRIX 109/17/2002 04/01/2004 05/218/2004 04/18/2004 05/25/2004 09/02/2004.
1281C P81 76 02104106 IC-04206 MMV ZM2 P-R1 REOVESHAND  
/REPLACE 11/142/199 04/01/2004 04/08/2004 04/19/2004 09/10/2004 05/29/2005.
128MC P81 77 0215886 OICP-040293A 0P6 PH I IC-43A9, RHRPUM AN 09/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.
1280P P81 77 0215887 -ITP-04009 IPC 1HZ POT IC-4329-LOW HEA R 10/11/2002 04/01/2004 03/29/2004 04/12/2004 05/25/2004 08/21/2004.
1281C P81 77 0215888 -ICP-040293C0P 1HZ POTRO INSERT IGH HEAD 10/07/2002 04/01/2004 05/21/2004 04/08/2004 05/25/2004 08/23/2004.
1281C P81-77 -0215890 ----
T-0005B 0P6 1H IT-O--- CONT--
SPRAY 10/07/2002-04/01/2004--05/07/2004-04/08/2004 05/25/2004 08/23/2004.05/01/2004----280P P81 77 0215893 -ICP-040034I 0P61 H I IOT-ZOINIET 1YDPOR 09/30/2002 04/01/2004 04/22/2004 04/01/2004 05/25/2004 08/16/2004.
1281C P81 77 0215898 OITP-04270 IPC I2 PHT STEAM GENERATOR WI 09/26/2002 04/01/2004 04/29/2004 03/28/2004 05/25/2004 08/07/2004.
1281C PR1 77 0218589 OIT-30207 P IC Z
GOT GT-280A DISE MSSTRU 09/18/2002 04/01/2004 05/07/2004 032/20 05/25/2004 08/04/2004.0620204 8OIA P81 77 02150089  
-ICP-10150 IPC 1HZ PO1 S
AT-1 AFP DATISC 10/12/2002 04/01/2004 05/10/2004 04/13/2004 05/25/2004 08/028/2004.
1281C P81 70 0215901 S
O-T0206 MMV HZM MOT RT-2908,IP-Z9LAFP 10/14/2002 04/01/2004 05/14/2004 04/15/2004 05/25/2004 08/30/2004.
128MM P81 70 021598502 -IT-0200C 0P6 1HZ OT IT-CIAC, COMPLHETE 10/107/2002 04/01/2004 05/22/2004 04/08/2004 05/25/2004 08/23/2004.050/041280P


P 0 IN T         B E A C H     N U C L E A R   P L A N T                 05:44 Friday, April 23. 2004     3 12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/P80071 .OPS.PROGRAMS(TSPECSUI)
P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23. 2004 3
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP                             DESCRIPTION             LAST         DUED       SKED       TSDUE     &#xb6;0%       25%         DEFER     ACT B170250 0-T-0300 0P 114 OTI-                                         ,UIT       1 MAI10/07/ *2*02   040/040/22**004*04/051200* 5/5204082/20.o2N P81 77 0215908 C-T02                     P   12C                     T30       C-7       N1/120         40/040/920             40/040/520           81/004.               1280P PB 70199CI-30                   P   120OIT-3                   0A RC SA             09/1/2002 04/01/2004 04/24/200 0/92 405/25/2004 08/23/20412P 77-0215910-------030
12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/P80071.OPS.PROGRAMS(TSPECSUI)
                              ----- 061               TI------------------------- UNIT.1.CN.10/042002.0401/2004.5/07/204.04/052004.05/5/2004.8/20/204......
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE  
PBI 70 0215912 a IT-O300B 0P6 IM2 CT                               IT-5100, UNI SI TES 10/06/2002 04/01/2004 05/04/2004 04/07/2004 05/25/2004 08/22/2004.                   1280p Pal 77 0215913 a IT-0320B 0P6 1142 CT                               IT-520B. IC-3716AN 10/01/2002 04/01/2004 05/08/2004 04/02/2004 05/25/2004 08/17/2004.                   1280P P8177 0215916
&#xb6;0%
            ..       C-     .............. 1 2    .. ...........        C....RPM .PR.G.09/30/2002     04/01/2004
25%
                                                                                                              ..      05/03/2004..04/01/2004..05/25/2004..08/16/2004........
DEFER ACT B17 0250 0-T-0300 0P 114 OTI-  
P81 77 0215919 0-IT 05320 0P6 1142 OT                              IT-5320A UlCPN SUA 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/103/2004.,                  1280p P91 77 0215920 C-                               2--T-----------R
,UIT 1 MAI10/07/ *2*02 040/040/22**004*04/051200* 5/5204082/20.o2N P81 77 0215908 C-T02 P
                                    -------------------                                  PR-G-10/07/2002
12C T30 C-7 N1/120 40/040/920 40/040/520 81/004.
                                                                                          ----              04/01/2004-05/20/2004--04/08/2004--05/25/2004-08/23/2004.-------
1280P PB 70199CI-30 P
PBI 77 0215922 O-IT-0380 0P6 1142 OT                               IT-330, UNIT 1 COS 109/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.                   1280P P81 77 02159125 OIT-05109 CP6 1142 OT                               IT 740B, UNI      1iTA  10/08/2002 04/01/2004 05/03/2004 04/09/2004 05/25/2004 08/24/2004.             1280P Pal 77 0215926 O-IT 05208 CP6 1142 OT                              IT 5209,U      IH  HE6A10/01/2002 04/01/2004 04/21/2004 04/02/2004 05/25/2 00 08/17/2004.             1280P
120 OIT-3 0A RC SA 09/1/2002 04/01/2004 04/24/200 0/92 405/25/2004 08/23/20412P 77-0215910-------030 061 TI------------------------- UNIT.1.CN.10/042002.0401/2004.5/07/204.04/052004.05/5/2004.8/20/204......
__ P81 77 0215927 C-IT-0770C 0P6 1142 CT                              IT-30C,ULRPSPRAY        109/307/2002 04/01/2004 05/05/2004 04/08/2004 05/25/2004 08/23/2004.           1280P F----77-0216004 O                              2--T----------C
PBI 70 0215912 a IT-O300B 0P6 IM2 CT IT-5100, UNI SI TES 10/06/2002 04/01/2004 05/04/2004 04/07/2004 05/25/2004 08/22/2004.
                                    -------------------                              PER -- N-10/12/2002
1280p Pal 77 0215913 a IT-0320B 0P6 1142 CT IT-520B. IC-3716AN 10/01/2002 04/01/2004 05/08/2004 04/02/2004 05/25/2004 08/17/2004.
                                                                                                ---          04/01/2004-05/12/2004--04/13/2004--05/25/2004-08/28/2004.-------
1280P P81 77..
P91 77 02169700      I-TS-03O 0P6 1142 CT                           TS-30D,       PHIGH/OU 109/130/2002 04/01/2004 05/11/2004 04/014/2004 05/25/2004 08/29/2004.           1280P PB1 70 0216006        I-T-0530E 0P6 1142 CT                        ITS-30, UNI    MTE1CST 10/12/2002 04/01/2004 05/12/2004 04/13/2004 05/25/2004 08/28/2004.               1280P Pa1 77 021601908 -T-0531              0P6 1142 OT                  ITS-3, TES COF ESE 09/29/2002 04/01/2004 04/27/2004 03/31/2004 05/25/2004 08/15/2004.                   1280P P91760305079 PT-RC-                  EP...................        RC...PRESSURE..TEST.01/22/2003..04/01/2004 05/16/2004
0215916 C-1 2
                                                                                                                          ..      07/24/2004..05/25/2004..12/08/2004........
C....RPM
PB1 40 0214138 RCIT00540-L MP MV12 MOR                              ISTORY9 LREVEM AND 10/08/2002 04/01/2004 05/202/2004 04/09/2004 05/25/2004 08/24/2004.                  128NS P9176 0214139
.PR.G.09/30/2002..
            --       RC-00 3 -- ----    M V -- --------
04/01/2004 05/03/2004..04/01/2004..05/25/2004..08/16/2004........
R          -HISTORY..REVIE...ANDi02/05/2002 04/01/2004--        05/02/2004
P81 77 0215919 0-IT 05320 0P6 1142 OT IT-5320A UlCPN SUA 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/103/2004.,
                                                                                                                          --            -08/08/2003--05/25/2004--12/23/2003.--12814  --
1280p P91 77 0215920 C-2--T-----------R PR-G-10/07/2002 04/01/2004-05/20/2004--04/08/2004--05/25/2004-08/23/2004.-------
P81 77 03018782 REIT0012              HP6 142 RMSCALAPR.UNI IR-2/RE                     1 0AS9/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.             1280P P91 77 0213863 RES 3.10 PRE 1142 RE                                 PIMARY0 SYSTEACTES 10/16/2002 04/01/2004 05/26/2004 04/17/2004 05/25/2004 09/01/2004.                   1280P P91 77 0213864 RES 04.1                PRE 1142 RE                 INTIAL0 CRITICMALIT 10/16/2002 04/01/2004 05/17/2004 04/17/2004 05/25/2004 09/01/2004.                   1280P P91 77 02138265 RESP 5.                 PRE 1142 RE                 RETESTS DURINGH HES10/29/2002 04/01/2004 05/218/2004 04/302/2004 05/25/2004 09/14/2004.                 '1280P P91 77 0213512    RES    6.20        PRE 1142 RE                VEIFY0 RC SPFURAY        102/11/2003 04/01/2004 05/22/2004 08/13/2004 05/25/2004 12/28/2004.            1280P PS1 76 030190140T  RH          0      EP6IM32R  OTVTS-1 P2                ASMlC     PERC 104/120/2001 04/01/2004 04/30/2004 04/19/2004 07/19/2004 01/17/2005.               1280P PBI 76 0301900451                     EPS 3A2 SI PT-2TVTS 30ASM                  HIGPEROW 05/03/2001 04/01/2004 05/07/2004 05/02/2004 07/19/2004 01/30/2005.               1280P P91 76 03019056       TSI05.           EP6I32 OI1T         -         TS-3 ASME XI PERO 105/08/2001 04/01/2004 05/.16/2004 05/07/2004 07/19/2004 082/0/2005.                 1280P P91 76 030196 SNUBERS                 E3 PT 1142 OT               TS3VISUA SNUBBE INMSI10/05/2002 04/01/2004 04/08/2004 04/06/2004 05/25/2004 08/21/2004.                 1280P
PBI 77 0215922 O-IT-0380 0P6 1142 OT IT-330, UNIT 1 COS 109/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.
1280P P81 77 02159125 OIT-05109 CP6 1142 OT IT 740B, UNI 1i TA 10/08/2002 04/01/2004 05/03/2004 04/09/2004 05/25/2004 08/24/2004.
1280P Pal 77 0215926 O-IT 05208 CP6 1142 OT IT 5209, U IH HE6A 10/01/2002 04/01/2004 04/21/2004 04/02/2004 05/25/2 00 08/17/2004.
1280P P81 77 0215927 C-IT-0770C 0P6 1142 CT IT-30C, ULRPSPRAY 109/307/2002 04/01/2004 05/05/2004 04/08/2004 05/25/2004 08/23/2004.
1280P F----77-0216004 O 2--T----------C PER N-10/12/2002 04/01/2004-05/12/2004--04/13/2004--05/25/2004-08/28/2004.-------
P91 77 02169700 I-TS-03O 0P6 1142 CT TS-30D, PHIGH/OU 109/130/2002 04/01/2004 05/11/2004 04/014/2004 05/25/2004 08/29/2004.
1280P PB1 70 0216006 I-T-0530E 0P6 1142 CT ITS-30, UNI MTE1CST 10/12/2002 04/01/2004 05/12/2004 04/13/2004 05/25/2004 08/28/2004.
1280P Pa1 77 021601908
-T-0531 0P6 1142 OT ITS-3, TES COF ESE 09/29/2002 04/01/2004 04/27/2004 03/31/2004 05/25/2004 08/15/2004.
1280P P91 760305079 PT-RC-EP...................
RC...PRESSURE..TEST.01/22/2003..04/01/2004 05/16/2004 07/24/2004..05/25/2004..12/08/2004........
PB1 40 0214138 RCIT00540-L P M MV 12 MOR ISTORY9 LREVEM AND 10/08/2002 04/01/2004 05/202/2004 04/09/2004 05/25/2004 08/24/2004.
128NS P91 76 --
0214139 RC-00 3
M V
R
-HISTORY..REVIE...ANDi02/05/2002 04/01/2004 05/02/2004  
-08/08/2003--05/25/2004--12/23/2003.--12814 P81 77 03018782 REIT0012 HP6 142 RMSCALAPR.UNI IR-2/RE 1 0AS 9/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.
1280P P91 77 0213863 RES 3.10 PRE 1142 RE PIMARY0 SYSTEACTES 10/16/2002 04/01/2004 05/26/2004 04/17/2004 05/25/2004 09/01/2004.
1280P P91 77 0213864 RES 04.1 PRE 1142 RE INTIAL0 CRITICMALIT 10/16/2002 04/01/2004 05/17/2004 04/17/2004 05/25/2004 09/01/2004.
1280P P91 77 02138265 RESP 5.
PRE 1142 RE RETESTS DURINGH HES 10/29/2002 04/01/2004 05/218/2004 04/302/2004 05/25/2004 09/14/2004.  
'1280P P91 77 0213512 RES 6.20 PRE 1142 RE VEIFY0 RC SPFURAY 102/11/2003 04/01/2004 05/22/2004 08/13/2004 05/25/2004 12/28/2004.
1280P PS1 76 030190140T RH 0
E P6IM32R P2 OTVTS-1 ASMlC PERC 104/120/2001 04/01/2004 04/30/2004 04/19/2004 07/19/2004 01/17/2005.
1280P PBI 76 0301900451 EPS 3A2 SI PT-2TVTS 30 ASM HIGPEROW 05/03/2001 04/01/2004 05/07/2004 05/02/2004 07/19/2004 01/30/2005.
1280P P91 76 03019056 TSI 05.
EP6I32 OI1T -
TS-3 ASME XI PERO 105/08/2001 04/01/2004 05/.16/2004 05/07/2004 07/19/2004 082/0/2005.
1280P P91 76 030196 SNUBERS E3 PT 1142 OT TS3VISUA SNUBBE INMSI 10/05/2002 04/01/2004 04/08/2004 04/06/2004 05/25/2004 08/21/2004.
1280P


P 0 1 N T       8 E A C H N U C L.E A R           P LA N T                   05:44 Friday, April 23, 2004 4 12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071 .OPS.PROGRAMS(TSPECSUI)
P 0 1 N T 8 E A C H N U C L. E A R P L A N T 05:44 Friday, April 23, 2004 4
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID         GRP FRO CALLUP       DESCRIPTION             LAST           DUED       SKED       TSDUE     lox       25X         DEFER     ACT Pal 76 0214145 SNUBBERS         MN 1M2 M-R-3       INSPECT STEAM GENE 10/13/2002 04/01/2004 05/16/2004 04/14/2004 05/25/2004 08/29/2004.                       128MM Pet   60 0301907 Ut-CONTAIN EPI 1HZ CG-COREINS VISUAL/ULTRASONIC 10/02/2002 04/01/2004 04/18/2004 04/03/2004 05/25/2004 08/18/2004.                               128NS Pal   60 0301908 Ul-CONTAIN EPI 1HZ CG-KEYINSP VISUAL INSPECTION 09/20/2002 04/01/2004 04/04/2004 03/22/2004 05/25/2004 08/06/2004.                             128NS Pet   77..0301909.ut-CONTAIN EPI .. .1HCG...T.GA..    .CONT .INSPECTI.ONW.10/04/2002
12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUI)
                                                                                ..          04/01/2004..04/22/2004.04/05/2004..05/25/2004.08/20/2004........
SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE lox 25X DEFER ACT Pal 76 0214145 SNUBBERS MN 1M2 M-R-3 INSPECT STEAM GENE 10/13/2002 04/01/2004 05/16/2004 04/14/2004 05/25/2004 08/29/2004.
PBI   77 03019109 Ul-CONTAIN EPI 1M2 G-AT3           INSPECTINPCTONAIWHE 10/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.                       128EN Pet   76 0306921;----C --------IC -------------   R POWER
128MM Pet 60 0301907 Ut-CONTAIN EPI 1HZ CG-COREINS VISUAL/ULTRASONIC 10/02/2002 04/01/2004 04/18/2004 04/03/2004 05/25/2004 08/18/2004.
                                                    ---       -RAN E-N-S-TE
128NS Pal 60 0301908 Ul-CONTAIN EPI 1HZ CG-KEYINSP VISUAL INSPECTION 09/20/2002 04/01/2004 04/04/2004 03/22/2004 05/25/2004 08/06/2004.
                                                                      --          -07/17/2003 04/01/2004--05/01/2004-01/16/2005--05/25/2004-05/22/200--.------
128NS Pet 77..0301909.ut-CONTAIN EPI  
PBI 76 0300961 U1ICP-04.0 EIC 1M2 Pet               ISTEAM GENERATREN 109/24/2002 04/01/2004 04/28/2004 03/26/2004 05/25/2004 08/10/2004.                       128EN PBi 76..0300962 t.. ......... IC     ......Pet   . CHARGING..FLO...TRAN.09/22/2002 04/01/2004
.1H...
                                                                                              ..        04/23/2004..03/24/2004..05/25/2004..08/08/2004........
CG T.GA  
Pet 76 0300971 IICP-02.02 IC 1HZPISTRU PtOEEWTER                   FLOGHI TRA 09/15/2002 04/01/2004 04/24/2004 03/17/2004 05/25/2004 08/01/2004.                 1281C Pet 76 0300972 11CP-04 01 IC H2 Pe1                 FIRS SAGEPZRRELIEU 09/27/2002 04/01/2004 04/23/2004 03/29/2004 05/25/2004 08/13/2004.                       1281C PSI 7     0300973 I1CP-04.00 IC 12 PBt               RTEAC   ENRTOR VES     LEV 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/10/2004.                   1281C PB1 76 0300974 11CP-04.00 IC 1M2 PBt                 AWCHARGING FLOW           1RN09/07/2002 04/01/2004 04/26/2004 04/08/2004 05/25/2004 08/23/2004.             1281C PeI 76 030097 11CP-04.03 IC 1HZ Pet                 CANT HIGHRANGE RHO09/27/2002 04/01/2004 04/28/2004 03/29/2004 05/25/2004 08/13/2004.                         1281C Pet 76 0300976 IICP-04.03 IC 1HZ Pet                 TUBIEW EVALVE CAl 109/06/2002 04/01/2004 05/024/2004 04/07/2004 05/25/2004 08/22/2004.                       1281C Pet 76 0215924     162P-A4     IC EM    M2 E-R         FIRST20STAND PRESS 09/25/2002 04/01/2004 05/05/2004 03/27/2004 05/25/2004 08/11/2004.                       1281C PeI 76 021524 52/BY             EM02I 1M2 P-R-         BYACTORIP-FREEL LNEV 109/024/2002 04/01/2004 04/21/2004 04/03/2004 05/25/2004 08/18/2004.                   1281C Pet76-0215243
.CONT.INSPECTI.ON W.10/04/2002 04/01/2004..04/22/2004.04/05/2004..05/25/2004.08/20/2004........
      --        52-BY EH ----------------- TRIP-FREE---NTE-10/02/2002 04/01/2004   --        04/21/2004
PBI 77 03019109 Ul-CONTAIN EPI 1M2 G-AT3 INSPECT INPCTONAIWHE 10/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.
                                                                                                            --      04/03/2004--05/25/2004--08/-8/2004--------
128EN Pet 76 0306921;----C --------IC -------------
Pet 76 0215244 11CPRTA     03EM 1HZ PBR-           RAFWTHRGIP     GFR ONT 10/04/2002 04/01/2004 04/01/2004 04/05/2004 05/25/2004 08/20/2004.                   1281C Pet 76 0215245     I   0 03/RB IE 1HZ P-R-         RTB TRIP-FREEANTE       1M09/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.               1281C Pet 76 0215246 62/A-0.03EM         1H     E-R       CALBIBRAE VANDE TEST 10/03/2002 04/01/2004 04/027/2004 04/04/2004 05/25/2004 08/19/2004.                     1281C Pet 76 0301678 162-Al           EM TM2 E-R7         lSEVENTH YARD U - 092U20 04/01/2004 040/27                 0403/27/   200 152/3/2004 02/14/2006.           128EM Pet 71 0215247 52/BA0           EM 1HZ E-R1         CLBRATRI-REA NDTES 10/01/2002 04/01/2004 05/07/2004 04/02/2004 05/25/2004 08/17/2004.                       128EM 2BY Pet 77 0215811 TE-CONT-00ORt       1HZYS           C   TRIP0-FVALE     AN 103/12/2004 04/012/2004 04/23/2004 04/12/2004 04/15/2004 04/18/2004.               128EM Pet 77 02158452/R-TS-A         EPN I     OT-       RT-A, UNIT-RE 1TUR 103/204/2004 04/017/2004 05/018/2004 04/205/2004 04/20/2004 04/24/2004.                   128EM P507 -- 0300195
R POWER  
            --    CHEM-SA L ---        -H-----BA-T-BORON BAST BORON TSR 3.5 04/16/2004-   -      04/19/2004 04/19/2004--04/23/2004 04/19/2004--04/24/2004.--O-A1 PB2 77 03002481 CHE/RATB       CH WI     ERCSBOO   RCS BORON-SREE 39 T 1004/1/2004 04/019/2004 04/22/2004 04/22/2004 04/19/2004 04/23/2004.                     128EN PB2 77 0300249   CHE2-AMOI     C Mt          RCSC   C CALRTTSR 3.4.5.       104/16/2004 04/019/2004 04/18/2004 04/23/2004 04/19/2004 04/24/2004.               128Et Pet 77 03007     C6EM-AM1     CH TM2t RCSD       RSEVDOT TSAR 3.45.       041/20         04/019/2004 04/18/2004 042/20     04/19/2004 04/25/2004.           B28El PS2 77 03005117 C6E2-AM2P       E CM t         RC D   RCSLIDOTTSR 345   TES 104/16/2004 04/019/2004 04/18/2004 04/023/2004 04/19/2004 04/24/2004.                 128EM
-RAN --
E-N-S-TE  
-07/17/2003 --
04/01/2004--05/01/2004-01/16/2005--05/25/2004-05/22/200--.------
PBI 76 0300961 U1ICP-04.0 EIC 1M2 Pet ISTEAM GENERATREN 109/24/2002 04/01/2004 04/28/2004 03/26/2004 05/25/2004 08/10/2004.
128EN PBi 76..0300962 t
IC  
......Pet CHARGING..FLO...TRAN.09/22/2002..
04/01/2004 04/23/2004..03/24/2004..05/25/2004..08/08/2004........
Pet 76 0300971 IICP-02.02 IC 1HZPISTRU PtOEEWTER FLOGHI TRA 09/15/2002 04/01/2004 04/24/2004 03/17/2004 05/25/2004 08/01/2004.
1281C Pet 76 0300972 11CP-04 01 IC H2 Pe1 FIRS SAGE PZRRELIEU 09/27/2002 04/01/2004 04/23/2004 03/29/2004 05/25/2004 08/13/2004.
1281C PSI 7 0300973 I1CP-04.00 IC 12 PBt RTEAC ENRTOR VES LEV 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/10/2004.
1281C PB1 76 0300974 11CP-04.00 IC 1M2 PBt AWCHARGING FLOW 1RN09/07/2002 04/01/2004 04/26/2004 04/08/2004 05/25/2004 08/23/2004.
1281C PeI 76 030097 11CP-04.03 IC 1HZ Pet CANT HIGHRANGE RHO 09/27/2002 04/01/2004 04/28/2004 03/29/2004 05/25/2004 08/13/2004.
1281C Pet 76 0300976 IICP-04.03 IC 1HZ Pet TUBIEW E VALVE CAl 109/06/2002 04/01/2004 05/024/2004 04/07/2004 05/25/2004 08/22/2004.
1281C Pet 76 0215924 162P-A4 EM IC M2 E-R FIRST20STAND PRESS 09/25/2002 04/01/2004 05/05/2004 03/27/2004 05/25/2004 08/11/2004.
1281C PeI 76 021524 52/BY EM02I 1M2 P-R-BYACTORIP-FREEL LNEV 109/024/2002 04/01/2004 04/21/2004 04/03/2004 05/25/2004 08/18/2004.
1281C Pet --
76-0215243 52-BY EH  
----------------- TRIP-FREE---NTE-10/02/2002 --
04/01/2004 04/21/2004 04/03/2004--05/25/2004--08/-8/2004--------
Pet 76 0215244 11CPRTA 03EM 1HZ PBR-RAFWTHRGIP GFR ONT 10/04/2002 04/01/2004 04/01/2004 04/05/2004 05/25/2004 08/20/2004.
1281C Pet 76 0215245 I
0 03/RB IE 1HZ P-R-RTB TRIP-FREEANTE 1M09/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.
1281C Pet 76 0215246 62/A-0.03EM 1H E-R CALBIBRAE VANDE TEST 10/03/2002 04/01/2004 04/027/2004 04/04/2004 05/25/2004 08/19/2004.
1281C Pet 76 0301678 162-Al EM TM2 E-R7 lSEVENTH YARD U -
092U20 04/01/2004 040/27 0403/27/
200 152/3/2004 02/14/2006.
128EM Pet 71 0215247 52/BA0 EM 1HZ E-R1 CLBRATRI-RE A ND TES 10/01/2002 04/01/2004 05/07/2004 04/02/2004 05/25/2004 08/17/2004.
128EM Pet 77 0215811 2BY TE-CONT-00ORt 1HZYS C TRIP0-FVALE AN 103/12/2004 04/012/2004 04/23/2004 04/12/2004 04/15/2004 04/18/2004.
128EM Pet 77 02158452/R-TS-A EPN I OT-RT-A, UNIT-RE 1TUR 103/204/2004 04/017/2004 05/018/2004 04/205/2004 04/20/2004 04/24/2004.
128EM P50 --
7 0300195 CHEM-SA L  
-H-----BA-T-BORON BAST BORON TSR 3.5 04/16/2004- 04/19/2004 04/19/2004--04/23/2004 04/19/2004--04/24/2004.--O-A1 PB2 77 03002481 CHE/RATB CH WI ERCSBOO RCS BORON-SREE T
39 1004/1/2004 04/019/2004 04/22/2004 04/22/2004 04/19/2004 04/23/2004.
128EN PB2 77 0300249 CHE2-AMOI C M t RCSC C CALRT TSR 3.4.5.
104/16/2004 04/019/2004 04/18/2004 04/23/2004 04/19/2004 04/24/2004.
128Et Pet 77 03007 C6EM-AM1 CH TM2t RCSD RSEVDOT TSAR 3.45. 041/20 04/019/2004 04/18/2004 042/20 04/19/2004 04/25/2004.
B28El PS2 77 03005117 C6E2-AM2P E CM t RC D RCSLIDOT TSR TES 345 104/16/2004 04/019/2004 04/18/2004 04/023/2004 04/19/2004 04/24/2004.
128EM


P 0 IN T                                     B E A C H                               N U C L E A R                                       P LA N T                                                                                                 05:44 Friday, April 23, 2004                                                                                       5 12 WEEK SURVEILLANCES - MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSU1)
P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23, 2004 5
SCHEDULED DUE DATE IS LESS THAN OR EQUAL TO04/23/2004 UNITST URK ORD EQUIP ID                                                                             GRP FRQ CALLUP                                                     DESCRIPTION                                                             LAST                                 DUED                             SKED                                     TSDUE                                     10X                                       25X                                       DEFER                                     ACT PB2 77 0300550 CHEM-SAMPL CH                                                                                       1U1 RE-229                                         RE-229 ISOTOPIC                                                         04/15/2004 04/19/2004 04/19/2004 04/22/2004 04/19/2004 04/23/2004.                                                                                                                                                                                                                     BO5A1 PB2 77 0300524 CHEM-SAHPL CH                                                                                       1U1 SGBDF0                                         SGBDFO GAMMA SCAN                                                       04/16/2004 04/19/2004 04/19/2004 04/23/2004 04/19/2004 04/24/2004.                                                                                                                                                                                                                     805AI PB1 77 0215802 O-TS-033                                                                           OPI 4U1 OT                                                         TS-33, U1C ACCIDEN 03/23/2004 04/20/2004 04/22/2004 04/23/2004 04/23/2004 04/27/2004.                                                                                                                                                                                                                                                                           1280P PB1 76 0300396 CHEM-SAMPL CH                                                                                                     ACCUM.UNIT UNIT 1 SI ACCUHULA                                                                                                                     04/22/2004 04/22/2004                                                                                         . 04/25/2004 04/29/2004.                                                                                                             B05A1 P61-77-030460-C.E-SAMPL.CH.1.1.RUST.BORON.R.ST.BORON.SR.3.05 04/15/2004 04/22/2004 04/22/2004-04/22/2004 04/22/2004-04/23/2004.                                                                                                                                                                                                                                                                                                                                                                                   _                      -- _
12 WEEK SURVEILLANCES -
P81 77 0300460 CHEM-SAMPL CH 1U1 RUST BORON RUST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.                                                                                                                                                                                                                                                                                                                                                                                                     B05A1 PB0 77 0300589 CHEM-SAMPL CH                                                                                       1U1 RFST BORON RSST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.                                                                                                                                                                                                                                                                                                               B05A1 PB0 77 0300231 CHEM-SAHPL CH                                                                                       1U1 SFP BOROOROSTEWATEN SR 3.7.1 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.                                                                                                                                                                                                                                                                                                               805A1 PB0 77 0300244 CHEH-SAHPL CH                                                                                       1U1 UU EFF COH WASTEWATER EFFLUEN 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.                                                                                                                                                                                                                                                                                                               B05A1 PB1 40 9950079 ICP-02.003 IC                                                                                       8U1 PB1-1                                         RP LOGIC TEST - TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.                                                                                                                                                                                                                                                                           128NS
MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSU1)
....            z.......                     i-               -;        ...........                              ;.......................      ----------------------------------------------------------------------------------------------------------------.................                                                                                                                                                                                                                                                                                          _ _........
SCHEDULED DUE DATE IS LESS THAN OR EQUAL TO04/23/2004 UNITST URK ORD EQUIP ID GRP FRQ CALLUP DESCRIPTION LAST DUED SKED TSDUE 10X 25X DEFER ACT PB2 77 0300550 CHEM-SAMPL CH 1U1 RE-229 RE-229 ISOTOPIC 04/15/2004 04/19/2004 04/19/2004 04/22/2004 04/19/2004 04/23/2004.
PB1 40 0300735 ICP-02.005 IC 841 PB1-1                                                                                                                                 SG LOGIC TEST - TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.                                                                                                                                                                                                                                                                           128NS 770215479 -TP                                                                                                                                                                                                                                                                                                                                                                                                                                                                     P0 PBO 77 0215479 0-IT-0011 OPZ CWI OT                                                                                                                                     IT-11, P-1TA/B SPE 01/30/2004 04/23/2004 04/29/2004 04/30/2004 05/02/2004 05/14/2004.                                                                                                                                                                                                                                                                         B05A1 PRO 77 0215406 0-IT-0016                                                                           OP1 CU1 OT                                                         IT-16, QTRLY FAIL- 01/30/2004 04/23/2004 04/23/2004 04/30/2004 05/02/2004 05/14/2004.                                                                                                                                                                                                                                                                         805A1 PR0 77 0407626 0-PC-026.8 OP3                                                                                                     OT                                   WEEKLY CSD PRIMARY                                                                                           04/23/2004 04/03/2004                                                                                         . 04/23/2004 04/24/2004.                                                                                                             1280P P60 77 0215586 O-PC-083.6 OP3 441 OT                                                                                                                                   VERIFY ANY INOPERA 03/26/2004 04/23/2004 04/23/2004 04/26/2004 04/25/2004 04/30/2004.                                                                                                                                                                                                                                                                           B05A1 770215755                                       T-                     A                           141TT                                                               AUCAIRL04/16/200404/23/200404/23/200404/23/200404                                             P PB1 77 0215755 0-TS-010AB OP1 141 OT                                                                                                                                   TS-10A, U1C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.                                                                                                                                                                                                                                                                               MRS PBZ 77 OZ16032 O-TS-010AB OP1 1U1 OT                                                                                                                                   TS-10A, U2C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.                                                                                                                                                                                                                                                                           B05A1
BO5A1 PB2 77 0300524 CHEM-SAHPL CH 1U1 SGBDF0 SGBDFO GAMMA SCAN 04/16/2004 04/19/2004 04/19/2004 04/23/2004 04/19/2004 04/24/2004.
805AI PB1 77 0215802 O-TS-033 OPI 4U1 OT TS-33, U1C ACCIDEN 03/23/2004 04/20/2004 04/22/2004 04/23/2004 04/23/2004 04/27/2004.
1280P PB1 76 0300396 CHEM-SAMPL CH ACCUM.UNIT UNIT 1 SI ACCUHULA 04/22/2004 04/22/2004 04/25/2004 04/29/2004.
B05A1 P61-77-030460-C.E-SAMPL.CH.1.1.RUST.BORON.R.ST.BORON.SR.3.05 04/15/2004 04/22/2004 04/22/2004-04/22/2004 04/22/2004-04/23/2004.
P81 77 0300460 CHEM-SAMPL CH 1U1 RUST BORON RUST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.
B05A1 PB0 77 0300589 CHEM-SAMPL CH 1U1 RFST BORON RSST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.
B05A1 PB0 77 0300231 CHEM-SAHPL CH 1U1 SFP BOROOROSTEWATEN SR 3.7.1 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.
805A1 PB0 77 0300244 CHEH-SAHPL CH 1U1 UU EFF COH WASTEWATER EFFLUEN 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.
B05A1 PB1 40 9950079 ICP-02.003 IC 8U1 PB1-1 RP LOGIC TEST -
TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.
128NS z.......
i-PB1 40 0300735 ICP-02.005 IC 841 PB1-1 SG LOGIC TEST -
TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.
128NS P0 770215479 -TP PBO 77 0215479 0-IT-0011 OPZ CWI OT IT-11, P-1TA/B SPE 01/30/2004 04/23/2004 04/29/2004 04/30/2004 05/02/2004 05/14/2004.
B05A1 PRO 77 0215406 0-IT-0016 OP1 CU1 OT IT-16, QTRLY FAIL- 01/30/2004 04/23/2004 04/23/2004 04/30/2004 05/02/2004 05/14/2004.
805A1 PR0 77 0407626 0-PC-026.8 OP3 OT WEEKLY CSD PRIMARY 04/23/2004 04/03/2004 04/23/2004 04/24/2004.
1280P P60 77 0215586 O-PC-083.6 OP3 441 OT VERIFY ANY INOPERA 03/26/2004 04/23/2004 04/23/2004 04/26/2004 04/25/2004 04/30/2004.
B05A1 P
770215755 T-A 141TT AUCAIRL04/16/200404/23/200404/23/200404/23/200404 PB1 77 0215755 0-TS-010AB OP1 141 OT TS-10A, U1C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.
MRS PBZ 77 OZ16032 O-TS-010AB OP1 1U1 OT TS-10A, U2C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.
B05A1


Run Date                                     22APR04 13:38l               Work Activity Risk Assignment                                                                                 Sheet1 oti U         ACT   IWO   GRP       HPE       EQUIPMENT               Actvity         Cal DUR     START   FINISH   -A.R                                               2
Run Date 22APR04 13:38l Work Activity Risk Assignment Sheet1 oti U
_D     ST           RISK                             DeseftI
ACT IWO GRP HPE EQUIPMENT Actvity Cal DUR START FINISH  
_2n         ID                    .                                                               8,16 . 18.i61 I     EM-BMFP-01 176   EM     DR-Y ML-Y I P-028B-M     IP288 REMOVE OIL UNES AND     8   6     24APR04 24APR04                             OJSTEAM GENERATOR FEED PUMP MOTOR ORT3-NR-M lMOTORCOVERS                                           j   1000     1559                             0312035- 128EM 2       IC0407898 76   IC     DR-Y ML-Y     LT-00935   LT-934/935 LEVEL DEVIATION   1   4     20APR04 22APR04           ]T-348 Si ACCUMULATOR LEVEL TRANSMITrER ORT3-Y RM                                                           21:00A   15:59 1407898 - 1281C 1I     MM-8480M   76 MM11 DR-Y ML-Y I           R-1     CLEAN REACTOR HEAD           U 1 45 124APR04 26APR04                                           REACTO R       VESSELANDASSEMBLY
-A.R 2
                    . I        ORT3-YR-H l                 STUDS                                   10:00'   14:59                             0214134 - 128MM 0   I MM0201361   75 IMM2I DR-YML-Y       I   W-030A     W-30A, LUBRICATE AND       IU1   4 i23APR04i23APRO4                       F-23F.29 PAS EXHAUST FILTER FAN lORT3-NR-H 0                          MAINTAIN FAN                         l05:00       10:59                 0201361 - 128EM 1 i   MM-8485C   76   MM31   DR-Y ML-Y       P-0O1B     P-1B. REMOVEPUMP             U   14   22APRO4 i23APR04                 REACTOR COOLANT PUMP ORT3-Y R-M                 COUPLING RMP 9002-5                     1200     03:59           214119 - 128MM 1   MM-485D   76 IMM31 DR-Y ML-Y           P-401B     REMOVE SEAL P-1B RMP         U   10   23APR04 23APR04                 C=1REACTOR COOLANT PUMP lORT3-NR-M         .      002-5                                     04:00   15:59                 0214119- 128MM 2 1 OP0216032     177 lOPI I DR-YML-Y   I O-TS4-10AB.1 TS-10A,U2CAIRLOCKDOOR i 4 i 2         I23APR04123APR04                 11U2CONTAIRLOCK DOOR SEALTEST ORT3-N R-M [SEALTEST                                                         0159 -00:00         0216032 - BOSAI E1~U           MCIWELT-81                                                           HUMAN ERROR RISK BARCHART C Primavera Sytems, Inc.                                     PBNP U1 Refueling 28 Outage                                                         FL81 HUMANERRORPOTENTIAL
_D ST RISK DeseftI ID
_2n 18.i61 8,16.
I EM-BMFP-01 176 EM DR-Y ML-Y I P-028B-M I P288 REMOVE OIL UNES AND 8
6 24APR04 24APR04 OJSTEAM GENERATOR FEED PUMP MOTOR ORT3-NR-M lMOTORCOVERS j 1000 1559 0312035-128EM 2
IC0407898 76 IC DR-Y ML-Y LT-00935 LT-934/935 LEVEL DEVIATION 1
4 20APR04 22APR04  
]T-348 Si ACCUMULATOR LEVEL TRANSMITrER ORT3-Y RM 21:00A 15:59 1407898 - 1281C 1I MM-8480M 76 MM11 DR-Y ML-Y I R-1 CLEAN REACTOR HEAD U 1 45 124APR04 26APR04 REACTO R VESSELANDASSEMBLY I
ORT3-YR-H l STUDS 10:00' 14:59 0214134 - 128MM 0 I MM0201361 75 IMM2I DR-YML-Y I W-030A W-30A, LUBRICATE AND IU1 4 i23APR04i23APRO4 F-23F.29 PAS EXHAUST FILTER FAN 0
lORT3-NR-H MAINTAIN FAN l05:00 10:59 0201361 - 128EM 1 i MM-8485C 76 MM31 DR-Y ML-Y P-0O1B P-1B. REMOVEPUMP U
14 22APRO4 i23APR04 REACTOR COOLANT PUMP ORT3-Y R-M COUPLING RMP 9002-5 1200 03:59 214119 - 128MM 1
MM-485D 76 IMM31 DR-Y ML-Y P-401B REMOVE SEAL P-1B RMP U
10 23APR04 23APR04 C=1REACTOR COOLANT PUMP lORT3-NR-M 002-5 04:00 15:59 0214119-128MM 2 1 OP0216032 177 lOPI I DR-YML-Y I O-TS4-10AB.1 TS-10A,U2CAIRLOCKDOOR i 4 i 2 I23APR04123APR04 11U2 CONTAIRLOCK DOOR SEALTEST ORT3-N R-M [SEALTEST  
-00:00 0159 0216032 - BOSAI E1~U MCIWELT-81 HUMAN ERROR RISK BARCHART C Primavera Sytems, Inc.
PBNP U1 Refueling 28 Outage FL81 HUMANERRORPOTENTIAL


'. . ~~ ?3 C* *1*,e Regulatory Impact April 23, 2004 NRC Meetings and Inspections rn+
~  
~  
?3 C* *1*,e rn+
Regulatory Impact April 23, 2004 NRC Meetings and Inspections
* Submittals Due in the Next 60 Days NRC Commitments
* Submittals Due in the Next 60 Days NRC Commitments
* INPO Open Items Status
* INPO Open Items Status
* NRC Performance Indicator Summary Page 1
* NRC Performance Indicator Summary Page 1


NRC Meetings, Inspections, Entrances and Exits And Other Events of Interest April 5-23   Rx Vessel head & Nozzle Penetrations and ISI for         Holmberg     G Sherwood x7630 C. Krause x6809 U1R28 (IP-7111108, TI-150/152)                       3-member team   GSewo 73           .Kas 60 April 12-23   RP Outage ALARA Planning & Access Control,             Alexander     S. Thomas x6198   C. Krause x6809 IP-7112101, IP-7112102_________
NRC Meetings, Inspections, Entrances and Exits And Other Events of Interest April 5-23 Rx Vessel head & Nozzle Penetrations and ISI for Holmberg G Sherwood x7630 C. Krause x6809 U1R28 (IP-7111108, TI-150/152) 3-member team GSewo 73  
April 26-30   License Renewal/aging management programs             Curt Cousins   R. Newton x6522   J. Knorr x6863 (consistency review)                                   Mark Lentz June 1- July 31 Onsite Fab & Construction of ISFSI, IP-60853                           J Becka x7500     K. Locke x6420 June 7-11     License Renewal/AMR Audit #1                                           R. Newton x6522   J. Knorr x6863 June 14-18     Biennial Heat Sink Inspection, IP-7111107B               D Schrum     L Hawki x6208     K. Locke x6420 June 15     License Renewal/Environmental Public Scoping Meeting     Bill Dam     R. Newton x6522   J. Knorr x6863 June 16-17     License Renewal/Environmental Audit                     Bill Dam     R. Newton x6522   J. Knorr x6863 June 21-25     License Renewal/Scoping and Screening Audit           Steve Dennis   R. Newton x6522   J. Knorr x6863 June 28 - July 16 Safety System Design Inspection (SSDI) IP-7111121     8-member team   T Petrowsky x7405 F. Flentje 6221 July 12-16   License Renewal/Follow-up Audit with Public Exit                       R. Newton x6522   J. Knorrx6863 July 26 - 30   RP Liq/Gas Effluents Inspection, IP-71151, IP-7112201                                   K. Locke x6420 August 1 - 31   Preop Testing ISFSI, IP-60854                                         J Becka x7500     K. Locke x6420 August 2     License Renewal/Optional GALL Consistency Audit with                   R. Newton x6522   J. Knorr x6863 Public Exit August 16 - 20   Steam Generator Baseline Inspection, IP-7113001,     2-member team                     C. Krause x6809 IP-7113002, IP-7113008, IP-71151________
.Kas 60 April 12-23 RP Outage ALARA Planning & Access Control, Alexander S. Thomas x6198 C. Krause x6809 IP-7112101, IP-7112102_________
Aug 30 - Sep 17   Problem ID & Resolution (PI&R) IP-71152B             6-member team   P Russell         C. Krause x6809 September 01 - 30 Operation of ISFSI, IP-60855                                           J Becka x7500     K. Locke x6420 Page 2
April 26-30 License Renewal/aging management programs Curt Cousins R. Newton x6522 J. Knorr x6863 (consistency review)
Mark Lentz June 1 - July 31 Onsite Fab & Construction of ISFSI, IP-60853 J Becka x7500 K. Locke x6420 June 7-11 License Renewal/AMR Audit #1 R. Newton x6522 J. Knorr x6863 June 14-18 Biennial Heat Sink Inspection, IP-7111107B D Schrum L Hawki x6208 K. Locke x6420 June 15 License Renewal/Environmental Public Scoping Meeting Bill Dam R. Newton x6522 J. Knorr x6863 June 16-17 License Renewal/Environmental Audit Bill Dam R. Newton x6522 J. Knorr x6863 June 21-25 License Renewal/Scoping and Screening Audit Steve Dennis R. Newton x6522 J. Knorr x6863 June 28 - July 16 Safety System Design Inspection (SSDI) IP-7111121 8-member team T Petrowsky x7405 F. Flentje 6221 July 12-16 License Renewal/Follow-up Audit with Public Exit R. Newton x6522 J. Knorrx6863 July 26 - 30 RP Liq/Gas Effluents Inspection, IP-71151, IP-7112201 K. Locke x6420 August 1 - 31 Preop Testing ISFSI, IP-60854 J Becka x7500 K. Locke x6420 August 2 License Renewal/Optional GALL Consistency Audit with R. Newton x6522 J. Knorr x6863 Public Exit August 16 - 20 Steam Generator Baseline Inspection, IP-7113001, 2-member team C. Krause x6809 IP-7113002, IP-7113008, IP-71151________
Aug 30 - Sep 17 Problem ID & Resolution (PI&R) IP-71152B 6-member team P Russell C. Krause x6809 September 01 - 30 Operation of ISFSI, IP-60855 J Becka x7500 K. Locke x6420 Page 2


A     g'
A g'
          -- D rl tes
rl 1
                            ;A       ~       O e   .ln.oJYt.t               516w;          wReg. 1 Affesrs October Noctober1rInspection License Renewal/Aging Management Program                           Laura Kozak     R.Newton   x6522   J. Knorr x6863 L3 ra Kzak   l   NSerwtoo x7630   J.K.Loc x64 November 1- 19           Triennial Fire Protection, IP-7111105T                           3-member team     G Sherwood x7630     K. Locke x6420 Regulatory Affairs Submittals Due in the Next 60 Days (through 0612512004) it                                                                 -            ,"gE . 1W 04/29/2004             Security Order         Revised Security, Contingency & T&Q Plans                           M. Fencl       F. Flentje 04/30/2004             510 CFR               Changes to ECCS Evaluation Model - Annual Report                     J Olvera       J Gadzala 04/30/2004             20.2206(b)             1)Annual Report of Individual Monitoring - 2003                     E KiI         L Schofield 04/30/2004TS25.26.1)                     2) Occupational Radiation Exposure ReportEKriLScoel Supplement to Bulletin 2003-01 (Containment Sump) due 30             J McNamara     A Hazelhoff 04/30/2004             BL 2003-01             days after issuance of WCAP 16204 - Implementation                   J Marean       (Palisades) schedule for revising IPEOPs                                         B Wartenburg   L Schofield 04/30/2004             50.36a(a)(2)           Annual Monitoring Report                                             K Johansen     L Schofield May 2004               10 CFR 50.55a           Request for Alternative Test Frequency for Manual Valves           A Guenther     L Schofield 06/11/2004             NEIL Response           60 Day Response to the NEIL Evaluation                               D Duenkel     K Locke
;A  
___________________ ____ ___ ___ ___ ___ ___ ___ G Casadonte      _   _ _ _ _ _
~
06/30/2004             10 CFR 50.59           Changes, Tests, and Experiments - Annual Report                     D Black       K Locke 06/30/2004             (e)(4)
O
C   50.71         Updated Facility Safety Analysis Report (FSAR)                       D Black       K Locke 06/30/2004             10 CFR 50.59           Commitment Change Evaluation                                         K Locke       K Locke Page 3
-- D tes e
516w;
.ln.oJYt.t wReg.
Affesrs October License Renewal/Aging Management Program Laura Kozak R. Newton x6522 J. Knorr x6863 Noctober 1rInspection L3 ra Kzak l
NSerwtoo x7630 J. K.Loc x64 November 1 - 19 Triennial Fire Protection, IP-7111105T 3-member team G Sherwood x7630 K. Locke x6420 Regulatory Affairs Submittals Due in the Next 60 Days (through 0612512004) it  
,"gE. 1W 04/29/2004 Security Order Revised Security, Contingency & T&Q Plans M. Fencl F. Flentje 04/30/2004 510 CFR Changes to ECCS Evaluation Model - Annual Report J Olvera J Gadzala 04/30/2004 20.2206(b)
: 1) Annual Report of Individual Monitoring - 2003 E KiI L Schofield 04/30/2004TS25.26.1)
: 2) Occupational Radiation Exposure ReportEKriLScoel Supplement to Bulletin 2003-01 (Containment Sump) due 30 J McNamara A Hazelhoff 04/30/2004 BL 2003-01 days after issuance of WCAP 16204 - Implementation J Marean (Palisades) schedule for revising IPEOPs B Wartenburg L Schofield 04/30/2004 50.36a(a)(2)
Annual Monitoring Report K Johansen L Schofield May 2004 10 CFR 50.55a Request for Alternative Test Frequency for Manual Valves A Guenther L Schofield 06/11/2004 NEIL Response 60 Day Response to the NEIL Evaluation D Duenkel K Locke
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ G C a s a d o n te 06/30/2004 10 CFR 50.59 Changes, Tests, and Experiments - Annual Report D Black K Locke 06/30/2004 (e)(4)
C 50.71 Updated Facility Safety Analysis Report (FSAR)
D Black K Locke 06/30/2004 10 CFR 50.59 Commitment Change Evaluation K Locke K Locke Page 3


NRC Commitments (w/Firm Due Dates) 1     I     "I         &#xa2;       I                A                     '
NRC Commitments (w/Firm Due Dates) 1 I  
IR 2001-017/04                                                                                               NRC commit date CA LAR 046558       EPN     J Masterlark   1210112004     Complete PRA update project.                       CAP 045972 NRC Commitments (w/Admin Due Dates)
"I  
&#xa2; A
I I R 2001-017/04 NRC commit date CA LAR 046558 EPN J Masterlark 1210112004 Complete PRA update project.
CAP 045972 NRC Commitments (w/Admin Due Dates)
Should extended operation be considered, NMC will test the supplemental capsule at a fluence corresponding to EOLE to confirm the toughness condition for the PBNP Unit 2 RPV weld at about 38 EFPY, which is well before EOLE is reached.
Should extended operation be considered, NMC will test the supplemental capsule at a fluence corresponding to EOLE to confirm the toughness condition for the PBNP Unit 2 RPV weld at about 38 EFPY, which is well before EOLE is reached.
INPO AFIs Extended from 9/30/2001: Work on the fire PRA has been 045208)       EPN     Masterlark   07/30/04     PSA Deficiencies: Effectiveness review following fire PRA   delayed due to resource resolution of SDP issue.
INPO AFIs Extended from 9/30/2001: Work on the fire PRA has been 045208)
_    _CAP   _                                                                                            045179 Page 4
EPN Masterlark 07/30/04 PSA Deficiencies: Effectiveness review following fire PRA delayed due to resource resolution of SDP issue.
_CAP 045179 Page 4


2004 Event Response and EP Training Team Schedule JANUARY                                           FEBRUARY                                                      MARCH S I M I TlWI Tl Fl S                               S M T W T F S                                            S    M IT IW I T I F I S T      I     I F1 12 13                       1 2 3 4 5 6 7                                                   1 2        3      4    5 6 415          6  7    8 9 10                      8 9 10 11 12 13 14                                       7      8    9 10 112 13 11 12        13  14  15 16 17                    15 16 17 18 19 20 21                                     14    15 16 17 18 19120
2004 Event Response and EP Training Team Schedule JANUARY S I M I TlWI Tl Fl S T
[2 18 19 26 20 27 21 28 22 23 24 29 30 31 22 23 24 25 26 27 28 29                _
I I F1 12 13 4
21 28 22 23 24 25 26 27 29 30 31 APRIL                                               MAY                                                      JUNE S I M         TIl T IWT     Fl S                 Sl Ml TlWI T IF                    S                          Ml T        w    T      F SM               T     1T3 FS 41                                                                                                       _7      18 19        1101 1112
15 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
_ 12l13l145 16 17l                                   10 1112 13 14 15 18 2I JULY                                           AUGUST                                            I      SEPTEMBER S     M IT     Wl Tl F         S                     I M   T           T 1 F1 p 4 5 6 28     29I
[2 26 27 28 29 30 31 APRIL S I M TIl T IWT Fl S SM T
_            1282      31 3 5ttt 1sor I             OCTOBER                 I           I           NUJVMUtKn~                   I              I              UttMOMMUK                I S     M     TIWI TI FI S                         SlMTW                   T     FS I SI M                    TIFIs
FS 1T3 41
                                                                                                                  ~                    16    1718
_ 12l13l145 16 17l 18 JULY S
_ 2223     24::. -:           270
M IT Wl Tl F S
_25    2627 28 29 30                        28                    1    7                                                 I     I     I 1                  1    1 1 This schedule does not contain swaps. Rescheduling is allowed however, it is up to each individual to arrange for a replacement.
FEBRUARY MARCH S M T W T
F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 MAY Sl Ml TlWI T IF S 10 1112 13 14 15 AUGUST I M T T
F 1
1 2I p 4 5 6 1sor S M IT IW I T I F I S 1 2 3
4 5 6 7
8 9 10 112 13 14 15 16 17 18 19120 21 22 23 24 25 26 27 28 29 30 31 JUNE Ml T w T
F
_7 18 19 1101 1112 I
SEPTEMBER 128 2
31 3 5ttt 28 29I I
OCTOBER I
I NUJVMUtKn~
I S
M TIWI TI FI S
_25 2627 28 29 30 1
1 1
1 SlMTW T
FS
_ 2223 24::. -:
270 2 8 1
7 I
UttMOMMUK I
I SI M TIFIs
~
16 1718 I
I I
This schedule does not contain swaps.
Rescheduling is allowed however, it is up to each individual to arrange for a replacement.
The period is Monday 08:00 AM to Monday 08:00 AM. Except-when a holiday falls on Monday, duty continues until Tuesday.
The period is Monday 08:00 AM to Monday 08:00 AM. Except-when a holiday falls on Monday, duty continues until Tuesday.
J:\ShareData\Common\Duty Roster\Event Response Teams.xls
J:\\ShareData\\Common\\Duty Roster\\Event Response Teams.xls


POD Bullet List for PdM group 4/23/04
POD Bullet List for PdM group 4/23/04
Line 302: Line 721:
20
20


I PDM TECHNOLOGIES MONTHLY EQUIPMENT CONDITION REPORT 4AMPS ID ISUPPORT DOC.                 PROBLEM DESCRIPTION                 ISTATUS 9/30/03 Motor vibration levels in excess of 3.0 in/sec after 8 months of stand-by service. WO
I PDM TECHNOLOGIES MONTHLY EQUIPMENT CONDITION REPORT 4AMPS ID ISUPPORT DOC.
                  !W-040A                                                                         Tag initiated to repair damaged motor and Aain Turbine LO CAP 050552                 Motor vibration levels at point of   existing WO to balance fan.
PROBLEM DESCRIPTION ISTATUS 9/30/03 Motor vibration levels in excess of 3.0 in/sec after 8 months of stand-by service. WO
fapor Extractor WO 0209028                 imminent failure. Fan declared       2/11/04 Work postponed due to parts an               WO 0309381               OOS.                                 availablity. No reschedule date.
!W-040A Tag initiated to repair damaged motor and Aain Turbine LO CAP 050552 Motor vibration levels at point of existing WO to balance fan.
fapor Extractor WO 0209028 imminent failure. Fan declared 2/11/04 Work postponed due to parts an WO 0309381 OOS.
availablity. No reschedule date.
5/8/03 Motor axial vibration increase of 25%
5/8/03 Motor axial vibration increase of 25%
noted. Coupling misalignment/degradation present. WO to inspect and realign scheduled for 7/28/03/.
noted. Coupling misalignment/degradation present. WO to inspect and realign scheduled for 7/28/03/.
Line 312: Line 733:
2/18/04 Declared OOS due to apparent wipe in inboard motor bearing.
2/18/04 Declared OOS due to apparent wipe in inboard motor bearing.
2/25/04 59 gm-in of residual unbalance found on coupling end of motor. Balancing reduced the residual unbalance to approximately 2 gm-in. Uncoupled run of motor SAT following balancing. Awaiting return to service and final PMT.
2/25/04 59 gm-in of residual unbalance found on coupling end of motor. Balancing reduced the residual unbalance to approximately 2 gm-in. Uncoupled run of motor SAT following balancing. Awaiting return to service and final PMT.
DP-503            CAP 0327071                                                    3/6/04 - PMT SAT following replacement of Gas Turbine FO 034456/053947                Vibration identified coupling defect  coupling and addition of coupling spacers.
3/6/04 - PMT SAT following replacement of coupling and addition of coupling spacers.
WO 0304979/ 0306786     and excessive 1x vibration.          Remove from list next month.
Remove from list next month.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATE D                             YELLOW - PROBLEM OR TREND IDENTIFIED. CR AND WO INITIATED Page 1 of 5
DP-503 Gas Turbine FO CAP 0327071 034456/053947 WO 0304979/ 0306786 Vibration identified coupling defect and excessive 1x vibration.
2004 MARCH STATUS REPORT.XLS D
YELLOW - PROBLEM OR TREND IDENTIFIED. CR AND WO INITIATED RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATE Page 1 of 5


lCHAMPS ID 4SUPPORT DOC.                     PROBLEM DESCRIPTION                   STATUS ICHAMPS ID SUPPORT 1W-040A                        DOC.       PROBLEM DESCRIPTION                   STATUS 4.
lCHAMPS ID SUPPORT DOC.
Main Turbine LO                             Motor vibration levels at point of     2/18/04 - Fan declared OOS for defective motor Vapor Extractor CAP 053950                  imminent failure. Fan declared        bearings Fan              4 WO 0405914                OOS.                                  3/31/04 - Currently WO is status 10.
PROBLEM DESCRIPTION STATUS ICHAMPS ID SUPPORT DOC.
1                                     4.
PROBLEM DESCRIPTION STATUS 4
3/31/03 - Oil analysis results received on 10/8/02 indicate serious degradation is possibly present on three of the six gearboxes on the unit I polar crane(1Z-013). The analysis results indicate that there may have been a compatibility Issue with the synthetic Mobil SHC 220 and the previous mineral 1Z-013            CAP 029789              Oil analysis identifies possible cross oil. System engineer has scheduled vendor review.
4.
YELLOW            Polar Crane       WO 0306551               contamination.
1W-040A Main Turbine LO Vapor Extractor Fan CAP 053950 WO 0405914 Motor vibration levels at point of imminent failure. Fan declared OOS.
I                                           I 3/31/03 - Oil indicates high level of iron possibly due to operation with low oil level. WO in place to resample oil.
2/18/04 - Fan declared OOS for defective motor bearings 3/31/04 - Currently WO is status 10.
4 1
4.3/31/03 - Oil analysis results received on 10/8/02 indicate serious degradation is possibly present on three of the six gearboxes on the unit I polar crane(1Z-013). The analysis results indicate that there may have been a compatibility Issue with the synthetic Mobil SHC 220 and the previous mineral oil. System engineer has scheduled vendor review.
1Z-013 Polar Crane CAP 029789 WO 0306551 Oil analysis identifies possible cross contamination.
YELLOW I
I 3/31/03 - Oil indicates high level of iron possibly due to operation with low oil level. WO in place to resample oil.
8/28/03 WO completed 8/21/03. Awaiting results.
8/28/03 WO completed 8/21/03. Awaiting results.
11/6/03 Oil samples were in fact collected on 6/12/03. Those samples indicate that the problem is with contamination not machine degradation. Pump will be resampled in Z08 work week.
11/6/03 Oil samples were in fact collected on 6/12/03. Those samples indicate that the problem is with contamination not machine degradation. Pump will be resampled in Z08 work week.
02/23/04 Oil sample analysis shows that the outboard bearing is normal for this kind of service, but the high iron content of the inboard bearing is starting to show degradation.
02/23/04 Oil sample analysis shows that the outboard bearing is normal for this kind of service, but the high iron content of the inboard bearing is starting to show degradation.
Vibrations trending upward on inboard bearing, but not at alert levels yet. Submitted new work 2P-011B            CAP 054114              Oil analysis indicates high levels of order and CAP to track the inboard bearing.
Vibrations trending upward on inboard bearing, but not at alert levels yet. Submitted new work order and CAP to track the inboard bearing.
YELLOW            CCW Pumo           WO 0406032               iron from inboard bearina.            The outboard may be removed from the list.
The outboard may be removed from the list.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED. CR AND WO INITIATED                             YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 2 of 5
2P-011B CCW Pumo CAP 054114 WO 0406032 Oil analysis indicates high levels of iron from inboard bearina.
YELLOW 2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED. CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 2 of 5


CONDITION       CHAMPS ID SUPPORT DOC.                     PROBLEM DESCRIPTION                   STATUS 4110/03 - PMT for WO 0303760 identified lower motor bearing defect in newly refurbished motor. PMT failed.
CONDITION CHAMPS ID SUPPORT DOC.
OP-501-M                                                                           2/27/04 Update - Defect is still present in motor Gas Turbine LO CAP 032134                   Vibration identified lower motor       bearing but does not appear to be degrading YELLOW           Pump               WO 0303760               bearing defect                         further. Vibration levels are constant.
PROBLEM DESCRIPTION STATUS 4110/03 - PMT for WO 0303760 identified lower motor bearing defect in newly refurbished motor. PMT failed.
OP-501-M 2/27/04 Update - Defect is still present in motor Gas Turbine LO CAP 032134 Vibration identified lower motor bearing but does not appear to be degrading YELLOW Pump WO 0303760 bearing defect further. Vibration levels are constant.
5/19/03 Oil analysis indicates an increase in wear debris in the oil samples. WO initiated to change oil in the gearboxes scheduled 9/22/03.
5/19/03 Oil analysis indicates an increase in wear debris in the oil samples. WO initiated to change oil in the gearboxes scheduled 9/22/03.
0Z-015             CAP 032963/033609                                               7/29/03 Added main hoist to scope due to high YELLOW           PAB Crane         WO 0305393/0305976       Degradation noted in oil analysis. water content.
0Z-015 CAP 032963/033609 7/29/03 Added main hoist to scope due to high YELLOW PAB Crane WO 0305393/0305976 Degradation noted in oil analysis.
6/17/03 Vibration indicates large increase in the rotor bar pass frequency with associated OW-068                                                                             increase in 1x frequency amplitude. Increased CONTAINENT                                                                         testing frequency to weekly.
water content.
SPRAY PUMP                                                                         9/29/03 Bearings and sheave replaced. PMT AREA COOLING CAP 033598                     Vibration identified rotor problems in was UNSAT with vib levels >.6 in/sec. Identified YELLOW           FAN               WO 0305967               the motor                             as eccentric pulley or bent motor shaft.
6/17/03 Vibration indicates large increase in the rotor bar pass frequency with associated OW-068 increase in 1x frequency amplitude. Increased CONTAINENT testing frequency to weekly.
6/17/2003 Oil analysis show jump in main hoist oil sample moisture content from 100 ppm to 200 ppm. Not an immediate concern, since acid number is still low. Source of water is probably absorbtion from atmosphere, since there are no OZ-015             CAP 033609               High moisture content in oil analysis water or steam lines local to the main hoist.
SPRAY PUMP 9/29/03 Bearings and sheave replaced. PMT AREA COOLING CAP 033598 Vibration identified rotor problems in was UNSAT with vib levels >.6 in/sec. Identified YELLOW FAN WO 0305967 the motor as eccentric pulley or bent motor shaft.
YELLOW           PAB Crane         WO 0305976               sample.                               WO initiated to change oil.
6/17/2003 Oil analysis show jump in main hoist oil sample moisture content from 100 ppm to 200 ppm. Not an immediate concern, since acid number is still low. Source of water is probably absorbtion from atmosphere, since there are no OZ-015 CAP 033609 High moisture content in oil analysis water or steam lines local to the main hoist.
7/31/03 - Vibration and oil indicate early degradation of pump bearings with an elevated 1P-010B           CAP 029611               Early indication of bearing           vane pass frequency. WO to change rotating YELLOW           RHR Pump           WO 0305857               degradation from vibration and oil assemble during U1R28.
YELLOW PAB Crane WO 0305976 sample.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED                             YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 3 of 5
WO initiated to change oil.
7/31/03 - Vibration and oil indicate early degradation of pump bearings with an elevated 1P-010B CAP 029611 Early indication of bearing vane pass frequency. WO to change rotating YELLOW RHR Pump WO 0305857 degradation from vibration and oil assemble during U1R28.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 3 of 5


CONDITION       CHAMPS ID         SUPPORT DOC.             PROBLEM DESCRIPTION                   STATUS 7/29/03 High particle counts due to wear particles as well as advanced additive depletion. Recommended drain, flush, and change of oil to mitigate degradation until 0-K-004D                                                                         rebuild is completed. 10/29/03 Oil change and G-04 Diesel Air                                                                   resample complete. Oil condition moved up Start             CAP 034113/ 034461       Oil analysis indicates high particle from critical, and will last until the rebuild WO is YELLOW           Compressor       WO 0306503/ 0360779       counts.                             performed.
CONDITION CHAMPS ID SUPPORT DOC.
1RDC-LOGIC                                 Thermography found dead             9/1/03 Thermography identified cold R1 resistor Power Cabinet     CAP 049786               suppression circuit in the one       in A37 supression circuit. Work order is to YELLOW           1BD              WO 0307357               thyristor phases.                   repair condition at next outage.
PROBLEM DESCRIPTION STATUS 7/29/03 High particle counts due to wear particles as well as advanced additive depletion. Recommended drain, flush, and change of oil to mitigate degradation until 0-K-004D rebuild is completed. 10/29/03 Oil change and G-04 Diesel Air resample complete. Oil condition moved up Start CAP 034113/ 034461 Oil analysis indicates high particle from critical, and will last until the rebuild WO is YELLOW Compressor WO 0306503/ 0360779 counts.
Oil analysis results show that 0-K-004A                                   compressor has high particle G-01 Diesel Air                             counts, high dissolved iron content, .
performed.
Start             CAP 051807               corrosive wear, and black and red     11/14/03 - Oil changes scheduled until overhaul YELLOW           Compressor         WO 0310212               oxides.                               can be performed.
1RDC-LOGIC Thermography found dead 9/1/03 Thermography identified cold R1 resistor Power Cabinet CAP 049786 suppression circuit in the one in A37 supression circuit. Work order is to YELLOW 1 BD WO 0307357 thyristor phases.
OK-004C                                                                         9/30/03 Oil sampled for the first time in almost Diesel Starting   CAP 050532               Extreme high particle counts and     2 years and badly in need of replacement.
repair condition at next outage.
YELLOW           Air Compressor     Tag 202177               iron content.                         Overhaul also to be scheduled.
Oil analysis results show that 0-K-004A compressor has high particle G-01 Diesel Air counts, high dissolved iron content,.
Oil analysis results show that 0-K-005A                                   compressor has high particle G-01 Diesel Air                             counts, high dissolved iron content, Start             CAP 051807               corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul YELLOW           Compressor .      WO 0310211               oxides.                               can be performed.
Start CAP 051807 corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul YELLOW Compressor WO 0310212 oxides.
OK-005C                                                                           9/30/03 Oil sampled for the first time in almost Diesel Starting   CAP 050532               Extreme high particle counts and     2 years and badly in need of replacement.
can be performed.
YELLOW           Air Compressor     Tag 202179               iron content.                         Overhaul also to be scheduled.
OK-004C 9/30/03 Oil sampled for the first time in almost Diesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.
01/19/2004 - Workorder submitted for oil sample and filter dissection. Recommended OP-035B-E                                   Oil analysis shows high particles,   overhaul.
YELLOW Air Compressor Tag 202177 iron content.
Diesel Fire       CAP 052967               iron, molybdenum, copper,             03/02/2004 Oil sample taken and filter changed YELLOW           Pump               Tag 203303               manganese.                           out for dissection.
Overhaul also to be scheduled.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED                             YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 4 of 5
Oil analysis results show that 0-K-005A compressor has high particle G-01 Diesel Air counts, high dissolved iron content, Start CAP 051807 corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul YELLOW Compressor WO 0310211 oxides.
can be performed.
OK-005C 9/30/03 Oil sampled for the first time in almost Diesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.
YELLOW Air Compressor Tag 202179 iron content.
Overhaul also to be scheduled.
01/19/2004 - Workorder submitted for oil sample and filter dissection. Recommended OP-035B-E Oil analysis shows high particles, overhaul.
Diesel Fire CAP 052967 iron, molybdenum, copper, 03/02/2004 Oil sample taken and filter changed YELLOW Pump Tag 203303 manganese.
out for dissection.
2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 4 of 5


CONDITION       CHAMPS ID         SUPPORT DOC.             PROBLEM DESCRIPTION                 STATUS 02/23104 - Item identified via CAP and identifies G-01                                                                             need for MR 01-127 installation to correct Emergency         CAP 054116               Vibration analysis shows binding in problem.
CONDITION CHAMPS ID SUPPORT DOC.
YELLOW           Diesel Generator WO 9947398                 gen. bearing fit.
PROBLEM DESCRIPTION STATUS 02/23104 - Item identified via CAP and identifies G-01 need for MR 01-127 installation to correct Emergency CAP 054116 Vibration analysis shows binding in problem.
3/6/04 - Axial movement in vani-drive noted by OPS. Vibration data indicates low level axial 1P-002C           CAP 054558               Visible axial movement of vari-drive impact related to movement. WO submitted to YELLOW           Charging Pump WO 0406232                   output shaft and gearbox input shaft correct issue per 12 week process.
YELLOW Diesel Generator WO 9947398 gen. bearing fit.
OP-217B                                                                         3/8/04 - Routine vibration data indicated a step G-02 LO Circ       CAP 054576               Coupling defect/distress noted in   increase in coupling related vibration. WO YELLOW           Pump               WO 0406273               vibration signature                 issued to repair/replace coupling and align.
3/6/04 - Axial movement in vani-drive noted by OPS. Vibration data indicates low level axial 1 P-002C CAP 054558 Visible axial movement of vari-drive impact related to movement. WO submitted to YELLOW Charging Pump WO 0406232 output shaft and gearbox input shaft correct issue per 12 week process.
OP-217B 3/8/04 - Routine vibration data indicated a step G-02 LO Circ CAP 054576 Coupling defect/distress noted in increase in coupling related vibration. WO YELLOW Pump WO 0406273 vibration signature issued to repair/replace coupling and align.
3/15/04 - OPS reported motor as being noisy.
3/15/04 - OPS reported motor as being noisy.
OW-029                                                                           Vibration data collected indicated that the SSB Air           CAP 054787                                                   problem was belt related and not an issue with YELLOW           Conditioner Fan WO 0406899                 Motor reported as noisy by OPS       the motor. WO initiated to correct belt problem.
OW-029 Vibration data collected indicated that the SSB Air CAP 054787 problem was belt related and not an issue with YELLOW Conditioner Fan WO 0406899 Motor reported as noisy by OPS the motor. WO initiated to correct belt problem.
3/26/04 - routine vibration data collection noted a step increase in gear related vibration on the speed increaser. WO was initiated to do visual inspection during U1R28 and add sheet has 1P-028A                                                                         been routed. Additional inspections will occur SGFP Speed         CAP 055137               Increased gear related vibration     on 1P-028B during U1R28 and both unit 2 YELLOW           Increaser         WO 0407389               levels noted                         gearboxes will be inspected during U2R27 2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED                             YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 5 of 5
3/26/04 - routine vibration data collection noted a step increase in gear related vibration on the speed increaser. WO was initiated to do visual inspection during U1R28 and add sheet has 1 P-028A been routed. Additional inspections will occur SGFP Speed CAP 055137 Increased gear related vibration on 1P-028B during U1R28 and both unit 2 YELLOW Increaser WO 0407389 levels noted gearboxes will be inspected during U2R27 2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 5 of 5


Run Date                                                               22APRO4 11:451                                                                                                                                                                                       Sheet 3 of 5 WO STATUS <75 ACT                   Risk lW WO GRP tnin                 EQUIPMENT                         Activity               WWSC           START         FINISH                             MA                                                               JUN______
Run Date 22APRO4 11:451 WO STATUS <75 Sheet 3 of 5 ACT Risk lW WO GRP tnin EQUIPMENT Activity WWSC START FINISH MA JUN______
ID                         TST                                                           Description                                                                                           S13 APR".~;                         ~         .    ~       '~""
ID TST Description S13 APR".~; ~  
AP0215111                   H       P 71     APR 0                   H52-21         AUTO TRANSFER                         B10B1       24MAY04         24MAY04                                             HIGH RiSk       kdTIVTY: Iss E MANAGER AVt GARCi.
~  
FEATURES. VOLTAGE CHKS                               09:00           10:59                                             SCHEDULE DOfrIMAALLV                        .    . ,            i COUE:2604/0I2/05 NEED 2600ItS)24 LATEr2004I 1104 AP0215112                   H       P 71     APR 0                   H52-31           AUTO TRANSFER                         81081         24MAY04       24MAY04                                                 i RlSKATiVIT4 iSS                   MAlAGER AVE(<ARtIA FEATURES, VOLTAGE CHKS                               11:00         12:59                                               9HULED:DOPfIMALLY l DUEi2do4ld2iol5 NEED:20405124 LATE: 004h1104 AP0305892                           P 71     APS 1                   X401-A           COOLING SYSTEM                       610B1l       24MAY04       24MAY04                                               SCHEDUL D:OPTIM)AlJY.
'~""
INSPECTION/CLEANING                                 07:00     l 14:59           .DUE                                           26000 524q4EEq:24 0)29dLTE: 004108!123 AP0305893                           P 71     APS 1                   X-01-B         COOLING SYSTEM                         10B1I       25MAY04       25MAY04     .                                            SCHEDU ED:OPTIMALLY                             l INSPECTIONICLEANING                                 07:00-         14 59   .                                              DUE 20O 105124 NEEO 20204/089 LATE:2004108:23 AP0305894                           P 71     APS 1                   X01-C           COOLING SYSTEM                     lB1OB1         26MAY04       26MAY04                                                     SCHECULED OPTIMALLY INSPECTIONICLEANING                                 07:00'         14 59                         . . . . .        . .      DUE2dC04105124 NEEI 006129 LAWE:20041083 CE;                                                                             i               -                              _  _                                        .-..          .      . :          ;;:    :        ;;.;;
AP0215111 H
CE0212184                 l         J71 I CE 1&deg;         I         T-119A J
P 71 APR 0 H52-21 AUTO TRANSFER B10B1 24MAY04 24MAY04 HIGH RiSk kdTIVTY: Iss E MANAGER AVt GARCi.
IT-119A. REMOVETM02437lB101l 24MAY04
FEATURES. VOLTAGE CHKS 09:00 10:59 SCHEDULE D OfrIMAALLV i
____      ____    ____      __   I07:00   I                   24MAY04 14:59
COUE:2604/0I2/05 NEED 2600ItS)24 LATEr2004I 1104 AP0215112 H
: j. 3INSTALLATIONl UPON COMPLETION OF0i12330 WTMICROFILTERA S .. .. -...;TON : ..:::::::n   ::::::
P 71 APR 0 H52-31 AUTO TRANSFER 81081 24MAY04 24MAY04 i
IMN EM Lr',,''       : - '';                     ~1.k; .',          ",''S :, ,-4
RlSKATiVIT4 iSS MAlAGER AVE(<ARtIA FEATURES, VOLTAGE CHKS 11:00 12:59 9HULED:DOPfIMALLY l DUEi2do4ld2iol5 NEED:20405124 LATE: 004h 1104 AP0305892 P 71 APS 1 X401-A COOLING SYSTEM 610B1l 24MAY04 24MAY04 SCHEDUL D:OPTIM)AlJY.
                                                              ,,~-,"             ' r - ?--
INSPECTION/CLEANING 07:00 l
I :**;w:s.
14:59  
                                                                                                , -,:   ~,-         ,-.;        ." '      - ,~       ,    ." , ~:. ',
.DUE 26000 524q4EEq:24 0)29d LTE: 004108!123 AP0305893 P 71 APS 1 X-01-B COOLING SYSTEM 10B1I 25MAY04 25MAY04 SCHEDU ED:OPTIMALLY l
11111 cj 'V-L V E[M0G7                                                               ros 02Iiin             PO1iS   bIMaITS1MTHi           I           lIAALfAvn2LMAaVn I
INSPECTIONICLEANING 07:00-14 59 DUE 20O 105124 NEEO 20204/089 LATE:2004108:23 AP0305894 P 71 APS 1 X01-C COOLING SYSTEM lB1OB1 26MAY04 26MAY04 SCHECULED OPTIMALLY INSPECTIONICLEANING 07:00' 14 59 DUE2dC04105124 NEEI 006129 LAWE:20041083 CE; i
STICKS                                               07:00         14:59   Al                M/R Xfi
CE0212184 l
::::::                    SCn        UE EM0406368                 l       P 71     EM                       D-06         INSPECT CELLS FOR                     B10B31       24MAY04 24MAY04                         ::::::
J71 I CE 1&deg; I
1                          ELECTROLYTE                                         07:00     I 07:59                       ::::::
T-119A IT-119A. REMOVETM02437lB101l 24MAY04 24MAY04 UPON COMPLETION OF0i12330 WTMICROFILTERA IMN J
DUE:2004/05i24NEED:200kO5I26 LATE:2                        4105131 EM0406398                 I         P 71     EM 1                   D-205           INSPECT CELLS FOR                     B10B1         24MAY04 24MAY04                               . .  .  .
__ I07:00 I
ELECTROLYTE                                         07:00     I 07:59                       ::::::
14:59
b~:03114N21:32052                              LATE:2 EM0406452                           P 71     EM 1                 P-025A-M         E-MAX ANALYZE MOTOR                   B10B1         24MAY04 24MAY04                         ::::::                                                                          K041110106 (1A52-07/1A-01)                                     07:00     l 08:59                             . .  .  .
: j.
E:20010R24NFED12Q07117 I.ATE~,2 SCHEDIJLC          OP111MALLYI EM0302175                 I         P 71     EM 1                   G-07-M           MCE ANALYZE MOTOR                     B10B1         24MAY04 24MAY04                               .
3INSTALLATIONl S.... -... ; TON :..:::::::n EM Lr',,'' : - '';  
                                                                                                                                                                                                      .            SCHEDULED:EARLY.EiILUATE:
,,~-,"  
(1B52-7AI18.02)                                     08:00     I 12:59                       ::::::                      DUE20041(16i0l14NEED-2          20            LATE:
,-4 '
tI7          .0410106 SCHEDULE            OPTIMALLY EM0406453                 I       P 71     EM 1                 P-025B-M         E-MAX ANALYZE MOTOR                   B1081         24MAY04       24MAY04                   ::::::
I :**;w:s.  
(1A52.111A-02)                                       09:00         10:59                   ::::::
~1.k
                                                                                                                                                                                              . .  .  .  .        1:::1::::1:::NEED 2004107117 LATEM DUE:2604IO1624 D              5UJ204hi1NEtEJ:2b      toi25 LklrE:;
", ''S :, cj
EM0406457                           P i71     EM 1 I               P-028A-M         E-MAX ANALYZE MOTOR                   B10B1         24MAY04       24MAY04                   ::::::
, -,: ~,-  
I                          (I1A52-05/1A-01)                                     11:00         12:59                   ::::::
' V-r
DUE:2004M$/24 NEED:2004107)17 LATE'                     04110)06 A A_          __
-,~  
i[_l_.l_l.l_ _ _.._ _ ...    -.        _ _    .      - _,__
?
P-028B-M                                                                                                                                  , D;E,20;04105124 NEED 2004/0TJ1r' LATE; EM0406458                           P 71     EM 1                                   E-MAX ANALYZE MOTOR                   B10B1        24MAY04        24MAY04                                            :I: :h:DULED:OtPIMALLY                II, (1A52-1 3/1A-02)                                                                             ::::::                              : : :1 13:00         14:59                   ::::::                                                                            0o64l!b64 I     I     I.                                                             I                                                 . . .  .  . .  ..              ..                            .
.", ~:.
VAt:               L),eI-/eJ AV,                             Aad /           F-'s FC5-                                   tZ         '                                                                  _            _        _        _              _      _        _        _
V E [M0G7 ros 02Iiin PO1iS bIMaITS1MTHi I
                                                                                  -mPw9
IA l ALfAvn I
                                                                                      '        l                                          N NMCI/WE      W                                                                                           LT-87 <75 At Risk BARCHART
2LMAaVn STICKS 07:00 14:59 EM0406368 l
                                  -   Primavera Systems, Inc.                                                 PBNP Unit I Cycle 29/Unit 2 Cycle 27                                                                                                               FL-87 <75WaStatus
P 71 EM D-06 INSPECT CELLS FOR B10B31 24MAY04 24MAY04 1
ELECTROLYTE 07:00 I
07:59 EM0406398 I
P 71 EM 1 D-205 INSPECT CELLS FOR B10B1 24MAY04 24MAY04 ELECTROLYTE 07:00 I
07:59 EM0406452 P 71 EM 1 P-025A-M E-MAX ANALYZE MOTOR B10B1 24MAY04 24MAY04 (1A52-07/1A-01) 07:00 l
08:59 EM0302175 I
P 71 EM 1 G-07-M MCE ANALYZE MOTOR B10B1 24MAY04 24MAY04 (1B52-7AI18.02) 08:00 I
12:59 EM0406453 I
P 71 EM 1 P-025B-M E-MAX ANALYZE MOTOR B1081 24MAY04 24MAY04 (1A52.111A-02) 09:00 10:59 EM0406457 P i71 EM 1 I P-028A-M E-MAX ANALYZE MOTOR B10B1 24MAY04 24MAY04 I
(I1A52-05/1A-01) 11:00 12:59 A
A _
i[_l_.l_l.l_
Al

M/R Xfi SCn UE 11111 DUE:2004/05i24NEED:200kO5I26 LATE:2 b~:03114N21:32052 LATE:2 E:20010R24NFED12Q07117 I.ATE~,2 SCHEDULED:EARLY.EiILUATE:
DUE20041(16i0l14NEED-2 20 tI7 LATE:
SCHEDIJLC OP111MALLYI DUE:2604IO1624 NEED 2004107117 LATEM SCHEDULE OPTIMALLY DUE:2004M$/24 NEED:2004107)17 LATE' 1:::1::::1:::
D 5UJ204hi1NEtEJ:2b toi25 LklrE:;
h:DULED:OtPIMALLY I,
, D;E,20;04105124 NEED 2004/0TJ1r' LATE;
:I: : : :
: 1 I
L 4105131 K041110106
.0410106 04110)06 0o64l!b64 EM0406458 P 71 EM 1 P-028B-M E-MAX ANALYZE MOTOR (1A52-1 3/1A-02)
B10B1 24MAY04 13:00 24MAY04 14:59 I
I I.
I VAt: L),eI-/eJ AV, Aad /
F-'s FC5-tZ l
N W
LT-87 <75 At Risk BARCHART mPw9 NMCI/WE
- Primavera Systems, Inc.
PBNP Unit I Cycle 29/Unit 2 Cycle 27 FL-87 <75WaStatus


Run Date                                 22APRO4 11:451 WO STATUS <75                                                                                               Sheet 4 of 5 AC       Risk 1WJ WO IGRP Unit     EQUIPMENT         I               Activity       WWSCj   START         FINISH                         MA EM0310314   M       71   M.02./-02                     271-02LOWR                   808126MY0426MY04PR                                 .              3 OPERATOR             . .U. .. .W .0~-0.I.5.D.
Run Date 22APRO4 11:451 WO STATUS <75 Sheet 4 of 5 AC Risk 1WJ WO IGRP Unit EQUIPMENT I
EM3131M        71   EM 0         27/D-01           27/0-01 LOWER UV             01081   26MAY04     26MAY04                                 PR         FERATOR 13URbEN'- OWA~ =~03R-00 6!125V C SEPITIn                                                             MEDIUI HUMAN' PE - ER Oft PQTENTAIl EM03103165 M     rZ71   EM 0         2710-01           27/10-03 LOWER UV             B310BI 27MAY04     27MAY04.                                 P!RI 3. OIERATbR BURbEN.-OWA -~',310615[i SETPOINT                                 10           145                                   In!MEDIU AHiMANI PRt-. ER~ROR PQ         NTIAL III:
Activity WWSCj START FINISH MA EM0310314 M
7       -_:/yEM:RESCURCES:                                                                                               I....
71 M.02./-02 271-02LOWR 808126MY0426MY04PR 3 OPERATOR  
EM0310316         S271DEM3                 -1050STATONWATEYER U                   R CEBlOB1   28MAY04       01JUN04                                 PRI X fERATEOR Bj1bN!   4ALLY340:15 A -. u.                                                                                                        . . . .
..U...  
STESIT                               07:00*       2359.DI.04051                                                     Q2040/7LAT:O fi0/
.W.0~-0  
EM03061031       P 71   EM 0         27-048-             7-MAX ANLYZER MOTOR         01081 28MAY04     28MAY04                                 :CIEDL6PTALY:
.I.5.D.
ANDMANTEANE   0:0NEE9.DUEV20410N1                                                   CHNEED RO Bf 204109/EU12
EM3131 M 71 EM 0 27/D-01 27/0-01 LOWER UV 01081 26MAY04 26MAY04 PR FERATOR 13URbEN'- OWA~ =~03R-00 6!125V C SEPITIn MEDIUI HUMAN' PE - ER Oft PQTENTAIl EM03103165 M
                            -MM0302Z54..
rZ71 EM 0 2710-01 27/10-03 LOWER UV B310BI 27MAY04 27MAY04.
                                -..                                                                                          -.      .....            MR4ESC JRCES~'e-TEPIST                                  07:00,       1459         .Au.200   or                                   N     :20M710 L[E:204/01I EM0406510   -        1   M           P2038B-M           E-MA ANABPFLYZERMOTOR         B4OB1   28MAY04-     28MAY04                                 4PJMLL  :SCE[LE REPAIRS12B04                             07:00       014.59           ZeI I   *yI-                               I !S::OMM7LA:E:&)].
P!RI 3. OIERATbR BURbEN.- OWA -~',310615[i SETPOINT 10 145 In! MEDIU A HiMANI PRt-. ER~ROR PQ NTIAL III:
                                                    -  2. MM.                             4.04. .24.UX....26.Y                                                         .. . . .i  . . . . . .  ..            .
7 -_:/yEM:RESCURCES:
                                      .JUDJA92..  -              i.2     A.II             94.4 -4.             4JA.4       -                                          . .1W.            .0162.9    .T    I-MM0202029             207 Mm 2         CZ-0312           AIR DRY238ERT VALVECTO     BY   1081   24MAY04     24MAY04   CS-HDU                                     D.ERL           LUAT4.       .A'..     .*
I....
5I27200 (SPTEARCE)                       07:00       14:59                 34  J2pqfL/0  02 btk:./654       Nt/4
EM0310316 S271DEM3  
-&AU40302548L   -                         -XV9               NPCADAITIA                   48   _4-M.0 "M~4 26&44                                                    SHDLDP3AL UNIT                     ~~~~~07:00   10 59                                     DE20152           ED20/70         A20/82 MM40302376-       C           1 A1M        MS-0027           4r4I13P-270 BLOVR/DWN         81081   6MY0       26MAY094                           a...
-1050STATONWATEYER R
OUTAGES                                 07:00       18 590 NMCWE                                                               L-87.c5 A Rik ARCAR a_   . :10,             LI             PBNPsUnit11 Cycle         29Ai           yl       7FL8                                                           7 oSau C     Prmavea                 S   tems     Inc
U CEBlOB1 28MAY04 01JUN04 PRI X
fERATEOR Bj1bN!
4ALLY340:15 A -.
: u.
STESIT 07:00*
2359.DI.04051 Q2040/7LAT:O fi0/
EM03061031 P 71 EM 0 27-048-7-MAX ANLYZER MOTOR 01081 28MAY04 28MAY04
:CIEDL6PTALY:
ANDMANTEANE 0:0NEE9.DUEV20410N1 CHNEED RO Bf 204109/EU12
-MM0302Z54..
M R4ESC JRCES~'e-T EPIST 07:00, 1459  
.Au.200 or N
:20M710 L[E:204/01I EM0406510 1
M P2038B-M E-MA ANABPFLYZERMOTOR B4OB1 28MAY04-28MAY04
:SCE[LE 4PJMLL REPAIRS12B04 07:00 014.59 ZeI I *yI-I !S::OMM7LA:E:&)].
: 2. MM.  
..i 4.04..24.UX....26.Y  
.JUDJA92..  
..1W.  
.0162.9 i.2 A.II  
.T 94.4 -4.
I-4JA.4 MM0202029 207 Mm 2 CZ-0312 AIR DRY238ERT VALVECTO BY 1081 24MAY04 24MAY04 CS-HDU D.ERL LUAT4.  
.A'..
5I27200 (SPTEARCE) 07:00 14:59 btk:./654 Nt/4 3 4 J2pqfL/0 02
-&AU40302548L
_4-M.0
-XV9 NPCADAITIA 48 26&44 "M~4 SHDLDP3AL UNIT  
~~~~~07:00 10 59 DE20152 ED20/70 A20/82 MM40302376-C A1M 1
MS-0027 4r4I13P-270 BLOVR/DWN 81081 6MY0 26MAY094 a...
OUTAGES 07:00 18 590 NMCWE L-87.c5 A Rik ARCAR a_  
. :10, LI PBNPs Unit11 Cycle 29Ai yl 7FL8 7
oSau C
Prmavea S
tems Inc


Sheet S of 5 Irun uate                                                   ZZAPR04 11:451 WO STATUS <75 ACT           lRisk lW WO GRP zUnit                   EQUIPMENT                                   Activity                                 WWsCl               START           FINISH                                   I                 JUN ID I       ITlISTI                                                I             DescrIptIon                                     I                               I               [tm r tuM! !           11111 MM                                                                                                           '   ....    :',~
I run uate ZZAPR04 11:451 WO STATUS <75 Sheet S of 5 ACT lRisk lW WO GRP zUnit EQUIPMENT Activity WWsCl START FINISH I
                                                                                                                            ..-.    .'.I      !      -    ~     :I.:s, MM0310412       I       IC 71   1MM          [         CS-03100               CS.3100 TCV NOT                                               [101B1             26MAY04     I 26MAY04                   .....      ......
JUN ID I
_ _                    _  ____                      _  CONTROLLING                                                                         07:00         16:59                                                               ::          :::
ITlI STI I
MM0310576                 C 21       MM II               RD-05975               1RD-5975 RUPTURE DISC                                           B1081           26MAY04        26MAY04                                                               ::::::
DescrIptIon I
CHANGE OUT                                                                          07:00         14:59                   REQjUIRE] TO CLEAR OP O00099                ......
I
DO NOT MOVE -WIThOUT :lRST-DiS60S SING WITH '
[tm t ! !
TO0M`KEND~ALL (DJSI):                     1 .
r uM 11111 MM  
PAT !TURdNtR CON0FIRMEE '4 EACH RUP' IURE DISCH!
.'.I
btEE ORDEREDl.                               ::::::            I
:',~  
::::::             I
- ~ :I.:s, MM0310412 I IC 71 1 MM [
::::::            I
CS-03100 CS.3100 TCV NOT
::::::            I pRI 4,       ......                          ::::::            I 1MS-319 VALVE LEAKS BY                                         B10811 26MAY04                 26MAY04                         DEEN ODEREDI      NEE D                  ::::::            I
[101B1 26MAY04 I 26MAY04
                                                                                                                                                  . _ _ _. 07:00                       16:59                                                               ::::::
_ CONTROLLING 07:00 16:59 MM0310576 C 21 MM II RD-05975 1RD-5975 RUPTURE DISC CHANGE OUT B1081 26MAY04 07:00 26MAY04 14:59 REQjUIRE] TO CLEAR OP DO NOT MOVE -WIThOUT TO0M`KEND~ALL (DJSI):
:0::::                                  ......
PAT !TURdNtR CON0FIRMEE btEE ORDEREDl.
                                                                                                                                                                                                                                                            . , , , , . I CHANGE OIL, FLUSH                                               B10811 26MAY04                  26MAY04                      :SCUE ULED:O::A: .;y:                      ::::::            I BEARINGS AND CLEAN                                                                   09:00         14:59 .                                         :2004)06111 L irE:200,4t07,/09 LI
:SCUE ULED:O::A:
                                    ' '5
pRI 4, DEEN ODEREDI NEE D
                                      - -,;,        I------ -                      -  --
:0::::
1.,
O00099
I,..1`"--I -'-''IL'r--
:lRST-DiS60S
                                                                                                                                  -- '':t.
'4 EACH RUP'
                                                                                                                          ' " .4. -",- " :'.               "     rx   e ".. . '   ,        r'-
.;y:
                              "t .
:2004)06111 L SING WITH '
                                                      ;5.1 7'     -
1.
11    .     . .
I URE DISCH!
                                                                                                                                              .I..     : .,. -.:I
I I
                                                                                                                                                                        .": ' e     V       r' ,                                         I......
I I
FIRE PUMP CAPACITY TEST l10B1l 26MAY04 I 26MAY04                                                                                 SCHEIULEQ EARLY I EVALUATE:
I I
13:00        20:59                        DUE:200410G2 NEEO:2004)7T28 L .TE:2004711114
.,,,,. I I
:. . I . . . . . .      . I . . . I::::::
i rE:200,4t07,/09 1MS-319 VALVE LEAKS BY B10811 26MAY04 26MAY04 07:00 16:59 CHANGE OIL, FLUSH BEARINGS AND CLEAN B10811 26MAY04 09:00 26MAY04 14:59.
__-                        ---                        -__      IM                                                                             M C I WE                                                         LT-87 <75 At   Risk BARCHART O Prlmavera_________Inc                       _     _  0                                     P N                                                                                                                         FL-87 <75 Wo Status 0 PlaverdSAs.msPBNP                                                                                                 Unit I Cycle 29IUnit 2 Cycle 27
I - - - - --
LI
'5 1.,  
, ` I - '' ' ".4. -",- " :'.  
"
rx e ".. . '
r'-
' -,;, 
I-
.1
"t  
;5.1  
, '. ''
". -  11
  7'  
. " ' IL 'r-- '.",': '':t..I..
:.,. -.:I  
.": ' e V
r',
I......
FIRE PUMP CAPACITY TEST l10B1l 26MAY04 I 26MAY04 13:00 20:59 SCHEIULEQ EARLY I EVALUATE:
DUE:200410G2 NEEO:2004)7T28 L I
. I.
.TE:2004711114 I::::::
M IM C I WE LT-87 <75 At Risk BARCHART O Prlmavera_________Inc
_ 0 P N FL-87 <75 Wo Status 0 P laverdSAs.msPBNP Unit I Cycle 29IUnit 2 Cycle 27


External Performance Indicators-PBU1 March 2004 REACTOR SAFETY                                                       I   RADIATION SAFETY                       SAFEGUARDS t           t         .        "                                          t             1" Occupafional t
External Performance Indicators-PBU1 March 2004 REACTOR SAFETY I
hniating   Mtiating           Barrier                 Energency                       Radiation             Radiation             Physical
RADIATION SAFETY SAFEGUARDS t
          .iC t   Eents     Systems           Integrity           Preparedness                         Safety                                     Protection PERFORMANCE INDICATORS Indicator Summary NRC Indicator -
t t
Site Indicator   -
1" t
I                                            INSPECTION FINDINGS Nofindingsthis I 1Q/2004                                                                                                                                       I      qulaner    I I      Quantert 4Q/2003     [d         l 7~ndngsthij lNofndgsthT]l
Occupafional hniating Mtiating Barrier Energency Radiation Radiation Physical
[
.iC t
Fl I Noindgsths I I No fisdingsthisquatrt:
Eents Systems Integrity Preparedness Safety Protection Indicator Summary PERFORMANCE INDICATORS NRC Indicator -
No find.     iS MEN lNofindigs his        I    No findiogsthis I l l
Site Indicator I
N fi~ig stbts quarter l
INSPECTION FINDINGS 1 Q/2004 4Q/2003 3Q/2003 2Q/2003 1 Q/2003
3Q/2003                                                                                                                    No Fordangsomisj    jNo PsodingoThasj Q.....      vIA...
[d l 7~ndngsthij
                                                                                          .i?<i, 2Q/2003                                                                                            I  Quanter            I    Quarter l NoindigsThis 1 Q/2003                      _
[ lNofndgsthT]l Fl No fisdingsthisquatrt:
F o ing l L 2 rtLr rs mhs                        -              ljd~ningsmjs l     Quarter       l  l NoFundingsThis 1 Quarter Co2Z
I Noindgsths I
I No find.
MEN iS Q.....  
.i?<i, vIA...
F o ing rs mhs l L 2 rtLr lNofindigs his I
I Quantert I Quanter ljd~ningsmjs l
Quarter l
No findiogsthis I No Fordangsomisj I
Quarter NoFundingsThis 1 l
Quarter Nofindingsthis I
I qulaner I
l N fi~ig stbts l l
quarter jNo PsodingoThas j l Noindigs This Co2Z


External Performance Indicators-PBU2 March 2004 NRC                                                 PERFORMANCE INDICATORS Performance     - _ _-                                                      -_
External Performance Indicators-PBU2 March 2004 NRC Performance Indicator Summary 1 Q/2004 4Q/2003 30/2003 2Q/2003 1 Q/2003 PERFORMANCE INDICATORS NRC di.a8 Site Indca or INSPECTION FINDINGS i
Indicator Summary                           --
NRC     di.a8         _
Site Indca or -
INSPECTION FINDINGS                                               i 1Q/2004                                                                                                  I    q......
_~~
_~~
_NI                                           _              dig,_
_NI dig,_
4Q/2003 l oandngThi-30/2003                                                                                                  l    aa -r.r l Nom Fidnggal                          lN                            TdnIhi
                                    -Q--
Na.d[g~~
Na.d[g~~
2Q/2003 I    Q--r lNa Finda a Thll_l             NoaFmadagThls:l               Na Findiags Thai   oFndnsri 1 Q/2003      Qnart a                     Qaaaaa,l                       Qaaloa
Nom Fidnggal lN TdnIhi
-Q--
lNa Finda a Thll_l NoaFmadagThls:l Na Findiags Thai oFndnsri Qnart a Qaaaaa,l Qaalo a I
q......
l oandngThi-l aa.r
-r l
I Q--r


External Performance Indicators-PBNP March 2004 Preliminary Data. Debrlefs/Exits (Violations, Non-Cited Vlolatlons, aSnd URls)
External Performance Indicators-PBNP March 2004 Preliminary Data. Debrlefs/Exits (Violations, Non-Cited Vlolatlons, aSnd URls)
NRC                                   First Ouarter 2004 Reported Findings (Violations, Non-Cited Violations. and URls)
NRC Inspection Report Summary First Ouarter 2004 Reported Findings (Violations, Non-Cited Violations. and URls)
Inspection    The following findings were identified in NRC Integrated Inspection Report 05000266/2003009; 05000301/2003009 dated January 30, 2004.
The following findings were identified in NRC Integrated Inspection Report 05000266/2003009; 05000301/2003009 dated January 30, 2004.
: 1. Non-Cited Violation (NCV) of License Condition which invokes the Fire Protection Evaluation Report concerning the licensee's failure to take Report      effective corrective actions to address the control of transient combustibles. (GREEN)
: 1. Non-Cited Violation (NCV) of License Condition which invokes the Fire Protection Evaluation Report concerning the licensee's failure to take effective corrective actions to address the control of transient combustibles. (GREEN)
: 2. Inspector identified finding concerning an inadequate risk assessment associated with the Unit 2 refueling 26 outage. The finding was not a violation of regulatory requirement. (GREEN)
: 2. Inspector identified finding concerning an inadequate risk assessment associated with the Unit 2 refueling 26 outage. The finding was not a violation of regulatory requirement. (GREEN)
Summary  3. 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings." Self-revealing NCV for inadequate procedure use, which resulted in starting a Unit 2 RHR pump with the suction valve shut. (GREEN)
: 3.
10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings." Self-revealing NCV for inadequate procedure use, which resulted in starting a Unit 2 RHR pump with the suction valve shut. (GREEN)
: 4. Inspector identified finding concerning the licensee's failure to use the correct procedure revision to a safety related EPIP during training.
: 4. Inspector identified finding concerning the licensee's failure to use the correct procedure revision to a safety related EPIP during training.
(GREEN)
(GREEN)
: 5. 10 CFR 20.1602, self-revealing NCV concerning the licensee's failure to adequately maintain positive control of a key for the lock to a very high radiation area. (GREEN)
: 5.
: 6. 10 CFR 20.1501 and 10 CFR 20.1802, selfrevealing NCV concerning the licensee's failure to provided an adequate survey ofa valve prior to release off site to a vendor. (GREEN)
10 CFR 20.1602, self-revealing NCV concerning the licensee's failure to adequately maintain positive control of a key for the lock to a very high radiation area. (GREEN)
: 7. 10 CFR Part 50, Appendix B, Licensee-Identified NCV; Licensee had not verified that adequate emergency and abnormal operating procedures were in place such that IA system restoration and maintenance of the purge supply and exhaust valve boot seals was assured prior to the loss of containment integrity function.
: 6.
10 CFR 20.1501 and 10 CFR 20.1802, selfrevealing NCV concerning the licensee's failure to provided an adequate survey ofa valve prior to release off site to a vendor. (GREEN)
: 7.
10 CFR Part 50, Appendix B, Licensee-Identified NCV; Licensee had not verified that adequate emergency and abnormal operating procedures were in place such that IA system restoration and maintenance of the purge supply and exhaust valve boot seals was assured prior to the loss of containment integrity function.
: 8. URI concerning Framatome non-conformance Report 6028873-Lack of ultrasonic testing coverage during Unit I refueling outage U I R27 Reactor Pressure Vessel Inspection
: 8. URI concerning Framatome non-conformance Report 6028873-Lack of ultrasonic testing coverage during Unit I refueling outage U I R27 Reactor Pressure Vessel Inspection
: 9. URI concerning the installation ofa non-safety related worm gear in the IAF-4000, ZIP-29 AFW Pump Discharge to 'B' Steam Generator,"
: 9. URI concerning the installation ofa non-safety related worm gear in the IAF-4000, ZIP-29 AFW Pump Discharge to 'B' Steam Generator,"
Line 485: Line 1,031:


External Performance Indicators-PBNP March 2004 The following findings were identified in the NRC 95003 Supplement Inspection Report 05000266/2003007; 05000301/2003007 dated February 4, 2004.
External Performance Indicators-PBNP March 2004 The following findings were identified in the NRC 95003 Supplement Inspection Report 05000266/2003007; 05000301/2003007 dated February 4, 2004.
NRC      I.       Inspectors identified a NCV of emergency planning standard 0 CFR 50.47(b)(2) because the licensee failed to assign on-shift responsibilities for reading facility seismic monitors thus affecting the ability to timely classify certain seismic events. (GREEN)
I.
Insp ection 2.       Inspectors identified a Severity Level IV NCV of 10 CFR 50.9 for failure to provided complete and accurate information forthe ERO performance indicator for tracking on-shift communicators. Corrected data was subsequently submitted. This issue was evaluated with the traditional enforcement process.
Inspectors identified a NCV of emergency planning standard 0 CFR 50.47(b)(2) because the licensee failed to assign on-shift responsibilities for N R C reading facility seismic monitors thus affecting the ability to timely classify certain seismic events. (GREEN)
Repo rt   3.       Inpectors identified a NCV of emergency planning standard 10 CFR 50.47(b)(16) for failure to develop and implement an emergency planning Sum mary  4.       Inspectors identified a NVC of emergency planning standard 10 CFR 50.47(b)(4) for failure to properly calibrate the facility seismic monitors to ensure they were capable of supporting implementation of an Unusual Event EAL. (GREEN)
Insp ection 2.
: 5.       Inspectors identified a NCV of 10 CFR Part 50 Appendix B, Criterion 111, "Design Control," due to a non-conservative Technical Specification Surveillance Requirement for testing the safety-related battery chargers. (GREEN)
Inspectors identified a Severity Level IV NCV of 10 CFR 50.9 for failure to provided complete and accurate information forthe ERO performance indicator for tracking on-shift communicators. Corrected data was subsequently submitted. This issue was evaluated with the traditional enforcement process.
: 6.       Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion III, "Design Control, 'because the licensee failed to maintain the 125 VDC voltage drop calculations accurate and up to date. (GREEN)
R epo rt
: 7.       Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action, " in that the licensee failed to implement timely corrective actions for safety-related electrical equipment in the PAB that was not environmentally qualified. (GREEN)
: 3.
: 8.       Inspectors identified a NCV of 10 CFR Part 50.49(f) in that equipment in the PAB that would be susceptible to a harsh environment during a HELB was not environmental qualified. (GREEN)
Inpectors identified a NCV of emergency planning standard 10 CFR 50.47(b)(16) for failure to develop and implement an emergency planning Sum m ary 4.
: 9.       Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings," because the licensee failed to include appropriate setpoint values for the minimum low head SI system "A" train flow in plant emergency operating procedures. (GREEN)
Inspectors identified a NVC of emergency planning standard 10 CFR 50.47(b)(4) for failure to properly calibrate the facility seismic monitors to ensure they were capable of supporting implementation of an Unusual Event EAL. (GREEN)
: 10.     Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion X, "Test Control, 'because the licensee failed to include in the inservice testing program certain CCW valves that were required to perform a safety function. (GREEN)
: 5.
: 11.     Inspectors identified aNCV of 10 CFR Part 50, Appendix RSection III.L.I.c. Specificallythe licensee failed to ensure adequate control air to the speed controllers for the charging pumps during a postulated Appendix R fire, without the need for "hot standby repairs." (GREEN)
Inspectors identified a NCV of 10 CFR Part 50 Appendix B, Criterion 111, "Design Control," due to a non-conservative Technical Specification Surveillance Requirement for testing the safety-related battery chargers. (GREEN)
: 12.     Licensee-ldentified a NCV of 10 CFR Part 50.54(q), Failure to Declare An NOUE In a Timely Manner. Appendix Estates, in part, that a licensee shall have the capability to notify responsible State and local governmental authorities within 15 minutes after declaration of an emergency. On March 4, 2002, the licensee took approximately 31 minutes to notify responsible State and local governmental authorities of a liquefied propane gas leak.
: 6.
: 13.     Unresolved Item (URI) A Range of Protective Action Recommendations was not established for State and Local Governmental Authorities.
Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion III, "Design Control, 'because the licensee failed to maintain the 125 VDC voltage drop calculations accurate and up to date. (GREEN)
: 14.       Apparent Violation for Failure to Maintain a Standard Scheme of Emergency Action Levels (EALs).
: 7.
Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action, " in that the licensee failed to implement timely corrective actions for safety-related electrical equipment in the PAB that was not environmentally qualified. (GREEN)
: 8.
Inspectors identified a NCV of 10 CFR Part 50.49(f) in that equipment in the PAB that would be susceptible to a harsh environment during a HELB was not environmental qualified. (GREEN)
: 9.
Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings," because the licensee failed to include appropriate setpoint values for the minimum low head SI system "A" train flow in plant emergency operating procedures. (GREEN)
: 10.
Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion X, "Test Control, 'because the licensee failed to include in the inservice testing program certain CCW valves that were required to perform a safety function. (GREEN)
: 11.
Inspectors identified aNCV of 10 CFR Part 50, Appendix RSection III.L.I.c. Specificallythe licensee failed to ensure adequate control air to the speed controllers for the charging pumps during a postulated Appendix R fire, without the need for "hot standby repairs." (GREEN)
: 12.
Licensee-ldentified a NCV of 10 CFR Part 50.54(q), Failure to Declare An NOUE In a Timely Manner. Appendix Estates, in part, that a licensee shall have the capability to notify responsible State and local governmental authorities within 15 minutes after declaration of an emergency. On March 4, 2002, the licensee took approximately 31 minutes to notify responsible State and local governmental authorities of a liquefied propane gas leak.
: 13.
Unresolved Item (URI) A Range of Protective Action Recommendations was not established for State and Local Governmental Authorities.
: 14.
Apparent Violation for Failure to Maintain a Standard Scheme of Emergency Action Levels (EALs).


External Performance Indicators-PBNP March 2004 Fourth Quarter 2003 Reported Findings (Violations, Non-Cited Violations, and URIs)
External Performance Indicators-PBNP March 2004 Fourth Quarter 2003 Reported Findings (Violations, Non-Cited Violations, and URIs)
Integrated Inspection Report (IR 2003-009) has not been received at this time, is expected mid February Inspection   12/19/2003:   NRC Evaluation of Changes, Experiments, or Tests and Permanent Plant Modifications Inspection (IR 2003-010)
Integrated Inspection Report (IR 2003-009) has not been received at this time, is expected mid February Inspection 12/19/2003:
Report                    Level IV Non-Cited Violation. Failure to perform an adequate safety evaluation review.
NRC Evaluation of Changes, Experiments, or Tests and Permanent Plant Modifications Inspection (IR 2003-010)
Sum m ary   10/29/2003:   Integrated Inspection Report (IR 2003-004)
R eport Level IV Non-Cited Violation. Failure to perform an adequate safety evaluation review.
Sum m ary 10/29/2003:
Integrated Inspection Report (IR 2003-004)
Finding: Green: Initiating Events and Mitigating Systems, Unit 0, Grading disagreement between the facility licensee and the NRC inspectors during the licensed operator requalification annual operating test.
Finding: Green: Initiating Events and Mitigating Systems, Unit 0, Grading disagreement between the facility licensee and the NRC inspectors during the licensed operator requalification annual operating test.
Non-Cited Violation: Green: Initiating Events and Mitigating Systems, Unit 0, Failure to meet the performance requirements in maintaining simulator fidelity throughout the life of the simulation facility.
Non-Cited Violation: Green: Initiating Events and Mitigating Systems, Unit 0, Failure to meet the performance requirements in maintaining simulator fidelity throughout the life of the simulation facility.
Line 511: Line 1,074:
Unit 1: Red Finding, Feb. 28, 2003, AFW due to inadequate procedural guidance Unit 2: Red Finding, March 24, 2003, Installation of orifices to the AFW recirculation lines
Unit 1: Red Finding, Feb. 28, 2003, AFW due to inadequate procedural guidance Unit 2: Red Finding, March 24, 2003, Installation of orifices to the AFW recirculation lines


All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack   Steo Owner   Start Date   Due Date Assesrment.-
All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Steo Owner Start Date Due Date Assesrment.-
OP-10011                   Improve Effectiveness of Self Assessments OP-10-011.3.D               Perform an effectiveness review of site   CA028467   Purcell, J. 2/1512004 5115/2004     Commitment leadership observation programs.
OP-10011 Improve Effectiveness of Self Assessments OP-10-011.3.D Perform an effectiveness review of site CA028467 Purcell, J.
OP-10-011 .4.C             Perform benchmarking effectiveness review. CA028465   Purcell, J. 4/15/2003 5/15/2004     Commitment OP-10-011.5.F              Develop a process for site leadership      CA030635  Purcell. J. 1/12/2004 5/15/2004     Commitment review of completed self-assessments.
2/1512004 5115/2004 Commitment OP-10-011.4.C OP-10-011.5.F leadership observation programs.
Total Nof Items for Assessment                                                                                                       :3 Business Procedures .                      .
Perform benchmarking effectiveness review. CA028465 Develop a process for site leadership CA030635 review of completed self-assessments.
OR-01-004                 Individual Behavioral Excellence OR-01-004.19               Begin review of department indicators at   CA054880   Breene, T. 4/1312004   5/7/2004     Commitment Management Review Meetings.
Purcell, J.
Total #of Mtems for Busineess Procedures                                                                                            :1 Emergency Planning OP-09-004                 Upgrade EmergencyActlon Levels (EALs)
Purcell. J.
OP-09-004.8                 PORC approval of EAL upgrade changes.     CA052689  Schwartz, P. 4/15/2004  5/21/2004    Commitment OP-09-004.9                Submit site approved EAL upgrade changes CA052690    Schwartz, P. 5/2112004  5/28/2004    Commitment to state and counties for approval.
4/15/2003 5/15/2004 1/12/2004 5/15/2004 Commitment Commitment Total Nof Items for Assessment Business Procedures.
OP-09-004. 10              Obtain state and county approval of EAL   CA052691  Schwartz, P. 5/28/2004  6/18/2004    Commitment upgrades and incorporate comments.
OR-01-004 Individual Behavioral Excellence OR-01-004.19 Begin review of department indicators at Management Review Meetings.
OP-09-005                  Control I Maintenance of EP Required Equipment OP-09-005.4                Document the licensing basis of required   CA052409  Schwartz, P. 2/20/2004  61112004    Commitment EP equipment contained in the matrix.
: 3 CA054880 Breene, T.
OP-09-005.5                Evaluate whether each piece of EP         CA052413  Schwartz, P. 2/23/2004  617/2004    Commitment Equipment in the matrix meets its associated EP functional requirements.
4/1312004 5/7/2004 Commitment Total # of Mtems for Busine Emergency Planning OP-09-004 OP-09-004.8 OP-09-004.9 OP-09-004. 10 OP-09-005 OP-09-005.4 OP-09-005.5 OP-09-005.6 OP-09-005.7 ess Procedures Upgrade EmergencyActlon Levels (EALs)
OP-09-005.6                Perform an assessment of the equipment in CA052414  Schwartz, P. 2/23/2004  6/7/2004    Commitment the matrix for reliability/maintainability/
PORC approval of EAL upgrade changes.
Submit site approved EAL upgrade changes to state and counties for approval.
Obtain state and county approval of EAL upgrades and incorporate comments.
Control I Maintenance of EP Required Equipment Document the licensing basis of required EP equipment contained in the matrix.
Evaluate whether each piece of EP Equipment in the matrix meets its associated EP functional requirements.
Perform an assessment of the equipment in the matrix for reliability/maintainability/
obsolescence.
obsolescence.
OP-09-005.7                Evaluate the adequacy ofpreventative        CA052415  Schwartz, P. 2/23/2004   6/7/2004     Commitment Maintenance (PM) performed on EP equipment contained in the matrix.
Evaluate the adequacy of preventative Maintenance (PM) performed on EP equipment contained in the matrix.
Tolal Nof hems for Emerg lency Planning                                                                                              : 7 Engineering Design OP.144001                 Improve the Configuration Management Program OP-14-001.11               Implement fleet standards for modification CA030747  Marean, J.            5120/2004    Commitment closeout (Objective 2).
CA052689 CA052690 CA052691 CA052409 Schwartz, P.
OP-14-O01.12              Interim Effectiveness Review (EFR).         EFR030748   Holt, K.             5/2012004     Commitment Printed:               4/22/2004 2:39:29 PM                                                                           Page 1 of 3 34
Schwartz, P.
4/15/2004 5/2112004 5/21/2004 5/28/2004 Schwartz, P.
5/28/2004 6/18/2004 Schwartz, P.
2/20/2004 61112004
:1 Commitment Commitment Commitment Commitment CA052413 Schwartz, P.
2/23/2004 617/2004 Commitment CA052414 Schwartz, P.
2/23/2004 6/7/2004 Commitment CA052415 Schwartz, P.
2/23/2004 6/7/2004 Commitment Tolal N of hems for Emerg Engineering Design OP.144001 OP-14-001.11 lency Planning Improve the Configuration Management Program Implement fleet standards for modification closeout (Objective 2).
Interim Effectiveness Review (EFR).
: 7 CA030747 EFR030748 Marean, J.
Holt, K.
5120/2004 Commitment 5/2012004 Commitment OP-14-O01.12 Printed:
4/22/2004 2:39:29 PM Page 1 of 3 34


All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack   Steo Owner   Start Date   Due Date Total # of items for Engineering Design                                                                                                 : 2 Engineering Design ClvilUStructural - PB EQ-15-012                   Manhole and Cable Vault Flooding EQ-15-012.8                 Complete installation of modification to     CA031053   Corbin, T. 3129/2004   5/28U2004   Commitment dewater Manholes I end 2.
All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Steo Owner Start Date Due Date Total # of items for Engineering Design Engineering Design ClvilUStructural - PB EQ-15-012 Manhole and Cable Vault Flooding EQ-15-012.8 Complete installation of modification to dewater Manholes I end 2.
Total 1 of Items for Engineering Design CNilUStructural - PB                                                                             :1 Engineering Design Configuration Management (and Q-Llst Items)
: 2 CA031053 Corbin, T.
OP-44-007                   Updated Vendor Technical Information Program (VTIP)
3129/2004 5/28U2004 Commitment Total 1 of Items for Engineering Design CNilUStructural - PB Engineering Design Configuration Management (and Q-Llst Items)
OP-14-007.8                 Review and eddress issues identified in the   CA055685     Holt, K. 4115/2004  512012004    Commitment VTIP self-assessment and in CA 000248, CA001634, end CA002968.
OP-44-007 Updated Vendor Technical Information Program (VTIP)
Total # of tems for Engineering Design Conflguration Management (and Q-Ust iems)                                                         :1 Engineering Equipment Systems Electrical EQ-15016                   Determine Condition of Underground Electrical Cables Which Have Been Submerged EQ-15-016.4                 Establish call-ups for future cable condition CA031639   Soulia, H. 4/2912003   611612004   Commitment monitoring.
OP-14-007.8 Review and eddress issues identified in the CA055685 VTIP self-assessment and in CA 000248, CA001634, end CA002968.
Total # of Items for Engineering Equipment Systems Electrical                                                                           :1 Engineering Processes OR-05-008                   AFW Root Cause Evaluation IRCE)
Total # of tems for Engineering Design Conflguration Management (and Q-Ust iems)
Corrective Actions OR-05-008.2                 Develop an effectiveness review plan and     CA055859 Peterson, L. 4/15/2004  511112004    Commitment schedule.
Engineering Equipment Systems Electrical EQ-15016 Determine Condition of Underground Electrical Cables Which Have Been Submerged EQ-15-016.4 Establish call-ups for future cable condition CA031639 monitoring.
OR-05-008.3                 Establish ecross functional team to perform CA055860   Peterson, L. 5115/2004   61712004     Commitment the effectiveness review.
:1 Holt, K.
Total # of Items for Engineering Processes                                                                                             :2 Performance Assessment OP-10-004                   CAP Resolutions Effectively Addresses Problems OP-10-004. 16               Expand CARB membership.                       CA055913   Hettick, D.           6117/2004     Commitment OR-01-004                   Individual Behavioral Excellence OR-01-004.18               Begin Monthly group/department/site rollups CA054879   Hennessy, F. 4/112004 412912004   Commitment with month of March.
4115/2004 512012004 Commitment
OR-01-004.26                Revise CAP Trend reports to bin vs.           CA0#4894   Hettick, D. 3/1/2004 5/2812004   Commitment barriers, results and attributes.
:1 Soulia, H.
OR-01-004.34                Revise Human Performance trend reports to CA055029     Hennessy, F. 31112004  5128/2004    Commitment bin vs. barriers, results, and attributes.
4/2912003 611612004 Commitment Total # of Items for Engineering Equipment Systems Electrical Engineering Processes OR-05-008 AFW Root Cause Evaluation IRCE)
Total # of Items for Performance Assessment                                                                                             :4 Production Planning OR-01-004                   Individual Behavioral Excellence Printed:                 4/22)2004 2:39:29 PM                                                                             Page 2 of 3 35
Corrective Actions OR-05-008.2 Develop an effectiveness review plan and CA055859 schedule.
OR-05-008.3 Establish ecross functional team to perform CA055860 the effectiveness review.
:1 Peterson, L.
4/15/2004 511112004 Peterson, L.
5115/2004 61712004 Commitment Commitment
: 2 Total # of Items for Engineering Processes Performance Assessment OP-10-004 CAP Resolutions Effectively Addresses Problems OP-10-004. 16 Expand CARB membership.
CA055913 Hettick, D.
6117/2004 Commitment OR-01-004 OR-01-004.18 Individual Behavioral Excellence Begin Monthly group/department/site rollups CA054879 with month of March.
Hennessy, F.
4/112004 412912004 Commitment OR-01-004.26 OR-01-004.34 Revise CAP Trend reports to bin vs.
barriers, results and attributes.
CA0#4894 Hettick, D.
3/1/2004 5/2812004 Commitment Revise Human Performance trend reports to CA055029 bin vs. barriers, results, and attributes.
Hennessy, F.
31112004 5128/2004 Commitment Total # of Items for Performance Assessment Production Planning OR-01-004 Individual Behavioral Excellence
: 4 Printed:
4/22)2004 2:39:29 PM Page 2 of 3 35


All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack   Stop Owner   Start Date Due Date OR-t1-004.17                Build additional accountability Into work CA054878 Strharsky, J. 5/10/2004 6/11/2004 Commitment week process via review of work week performance at POD.
All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Stop Owner Start Date Due Date CA054878 Strharsky, J.
Total # of Items for Production Planning                                                                                         :1 Site Projects EQ-1 5-001                 AFW Appendix R Firewall Project EQ-15-OO1. 13               Modification Closeout                     CA030842 Morse, M. 12119/2003 5/30/2004 Commitment Total # of Items for Site Projects                                                                                               :I Printed:               412212004 2:39:29 PM                                                                         Page3of 3 36
5/10/2004 6/11/2004 OR-t1-004.17 Build additional accountability Into work week process via review of work week performance at POD.
Commitment Total # of Items for Production Planning Site Projects
:1 EQ-1 5-001 EQ-15-OO1. 13 AFW Appendix R Firewall Project Modification Closeout CA030842 Morse, M.
12119/2003 5/30/2004 Commitment Total # of Items for Site Projects
: I Printed:
412212004 2:39:29 PM Page3of 3 36


-i Point Beach CAP Activities Delay of Game Clock Friday, 04/23/ 2004 21 Days since-last fumbled item 1 Day since last Unassigned item (Last reset: NQP-PBNP QC -)
-i Point Beach CAP Activities Delay of Game Clock Friday, 04/23/ 2004 21 Days since-last fumbled item 1 Day since last Unassigned (Last reset: NQP-PBNP QC -)
40- ,YI   A
item w..
                                  =F   d     ,1         ~ &#xa2;,        ,
iMn.; me O---
,YI  
=F 40-A d  
,1  
~  
&#xa2;,
t~~
t~~
t   X   -s     J     .      F-r-                             Q     as w..                iMn.; me                    O---
t X  
    ;;S' i-ja:',           i,     ;    rta     F,,tr.       . .,g     2,i   ,
-s J
37
F-r-Q as
;;S' i-ja:',
i, rta F,,tr.  
.,g 2,i 37


Plan of the Day Meeting
/
                              /    z  -                                                                    8:15 - 8:45 am Front Office Conference Room Committed to Nuclear        N Excellence I  ..  .  . .
z Committed to Nuclear N
                                                                "Do thejob rightthe first time."
Excellence I
Plan of the Day Meeting 8:15 - 8:45 am Front Office Conference Room "Do the job right the first time. "
Plan of the Day Meeting Action Register Short Term Actions (<7 days)
Plan of the Day Meeting Action Register Short Term Actions (<7 days)
Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday, and Friday.
Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday, and Friday.
Entry Date                         Action Description                     Due Date             Owner 4/20/04         Notify Pat Russell of the following:                     4/23/04         All Managers
Entry Date Action Description Due Date Owner 4/20/04 Notify Pat Russell of the following:
4/23/04 All Managers
: 1. date of last human performance team meeting;
: 1. date of last human performance team meeting;
: 2. date of next department human performance team meeting 4/21/04         Develop recovery plans for PPG identified work-wveek     4/23/04       Affected Managers items and deliver to Plant Manager.                    .
: 2. date of next department human performance team meeting 4/21/04 Develop recovery plans for PPG identified work-wveek 4/23/04 Affected Managers items and deliver to Plant Manager.  
                        +                                                       4-             4 4-                                                       4-             4 I               4-4                                                       4             4-Long Term Actions (>7 days)
+
4-4 4-4-
4 I
4-4 4
4-Long Term Actions (>7 days)
Responsible Department Manager will provide weekly updates at POD Meeting on Friday.
Responsible Department Manager will provide weekly updates at POD Meeting on Friday.
Entry Date                           Action Description                     Due Date           Owner
Entry Date Action Description Due Date Owner
          =                                                                         ==i 1                                                       4             4-4                                                       4             4-38}}
=  
 
==i 1
4 4-4 4
4-38}}

Latest revision as of 21:07, 15 January 2025

POD H.O., with Handwritten Notations - Point Beach Nuclear Plant U1R28: Day 20
ML050870118
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/23/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
0815-0845, B05A1, FOIA/PA-2004-0282, U1R28
Download: ML050870118 (38)


Text

-a I

N-Point Beach Nuclear Plant

.O Safety + Innovation + Teamwork "I

A N

93 910 I

mg=

'N EP Team On Call:

Plan-of-the-Day Meeting UD R21: Day 20 Team:081 50845Days to U2R27: 344 Team:

0815-0845 Front Office Conference Room Days to U1R29: 519 Days Since Last HP Work Week: B05A1 Safety Event:

Clock Reset:

Date: Friday, April 23, 2004 I-75; 1

Plan of1theDay Agenda I

Purpose:

Understand unit status + Ensure ownership and support + Recognize performance

+ Improve communications and teamwork Daily:

Plant Status - Units I and 2:

A.

[IHS] - Safety B.

[Ops] - Plant Conditions (Units 1&2)

C.

[Ops] - Immediate attention (Pri 2)

D.

[Ops] - Operations' Dept concerns, activil and priorities E.

[Ops] - Status control events (last event)

F.

[Ops] - Regulatory notification / near miss G.

[Ops] - TSACs (active & potential)

H.

[Ops] - Nuisance alarms

1.

[Ops] - Operations' Housekeeping Reporl J.

[PA] - Operating Experience K.

[PIt Mgr] - Communications Surveillance Schedule Review:

A.

[PPG Mgr] week rolling schedule B.

[PPG Mgr] - Equipment / system outages Chemistry / RADCON Review. Units 1 and 2:

Integrated Schedule / System Outages:

A.

[Ops] - Operations' work week issues Unit Outage (if applicable):

Administrative:

A. [PPG Mgr] - Plant impact issues Action Items:

Round Table:

Pagers:

AOM.................................................

Chemistry Shift Supervisor...............

Industrial Safety...............................

Maintenance.....................................

Outage Manager..............................

Radiation Protection.........................

Shift Manager...................................

System Engineering.........................

Work Week Manager...................

Jies,
es
  • Monday:

A. [EP] - Event Response duty list B. [Ops/Eng] - Fire Protection summary C. [Safety] - Industrial safety action item list & safety performance D. [Site Engineering] - Maintenance Rule 'Al' system review E. [Project Mgmt] - Major project status F. [Business Mgr] - Budget overview G. Excellence Plan review

  • Tuesday:

A. [RP] - Annual dose summary B. [Security] - Security system status & compensatory measures C. [PPG] - Forced outage schedule D. [Site Eng] - Thermal cycle efficiency E. [VP/Director] - INPO follow up & readiness F. [EP] - EP issues G. Human Performance H. Excellence Plan review

  • Wednesday:

A. [Training] - Training B. [PPG] - Management Risk Observations C. [Ops] - Operator Workarounds D. [Ops] - Leakage list; oil & water E. [EP] - EP Drill Schedule F. [Engr] - Section Xl equipment in double frequency G. [Maint] - Housekeeping issues H. Excellence Plan review

  • Thursday:

A. [EP] - EP Pager Test Results (as applicable)

B. [Engr] - Temporary Modifications C. [Ops] - Control Room Panel Deficiency Analysis D. [Ops] - Disabled alarms (Units 1 &2)

E. [Ops] - Instruments Out-of-Service (Units 1 &2)

F. [PA] - CAP backlogs G. [Ops] - Out-of-Spec routine readings H. Excellence Plan review

  • Friday:

A. [Reg Affairs] - Upcoming Licensing/fA Reviews B. [QA] - Quality Assurance update C. [Maint] - WR Backlog D. Weekend coverage list (Units 1&2)

E. [EP] - Event response "draft" for next week F. [Engr] - Predictive Monitoring G. [PPG Mgr] - Next week's work week summary and highlights H. [Reg Affairs] - NRC/INPO Perf Indicators I. Excellence Plan review 2

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 18 Path sN Picture Meets Outage Radiation Performance Doesn't Meet Exceeds

_eay

_.'.. __.g-*__-i_

This indicator measures cumulative dose radiation exnosure and Day 18 - April21 I

total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Actual = 1.011 Cumulative = 26.886 Cumulative Forecast = 61.429 Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

26.886 Rem Meets: <= 18 Exceeds: <=12 Actual PCE's:

5

_3BM, Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure 20 18 16

> 14

= 12 E 10 o0 8 8, 6 z4 2

0 80

.IM

.I I,.'

0*.0 I

,._4 I

fI

-*-Actual Forecast Goal E

00:

0 0

Q so To

.9 60 40 20 I

A,.......I Actual 4

Goal 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 0

2 4

8 8

10 12 14 16 18 20 22 24 26

NUCLEAR POWER BUSINESS UNIT PBNP DAILY CHEMISTRY STATUS REPORT Date: 04/23/04 Time: 5:00 PARAMETER UNIT I UNIT 2 ACTION LEVEL(S)

REACTOR COOLANT Boron, ppm 2989 1265 N/A Lithium, ppm

<0.05 2.47 out of range Chloride, ppb

<5

<5

> 50 Fluoride. ppb

<5

<5

> 50 Sulfate, ppb

<5

<5

> 50 Silica, ppb 860 414

> 1 000 at power Dissolved H2. cc/kg N/A 34.4

< 25, > 50 Specific Activity. uCi/cc N/A 1.43E+0

>100 / E-Bar 100/E-Bar, uCVcc N/A 164.4 1-131 DE. uCi/cc N/A 2.19E-4

> 0.8 RWST Boron, ppm 2994 3063 SiO2, ppb 4140 5375 BDEB (last done dates) 4114/04 6:00 4/11/04 2:17

% Solids 4.2 1.13

% Boric Acid 4.4 2.8 BAST A

% Acid - Date & Time 3.69 4/20/04 10:14 B

% Acid - Date & Time 3.71 4/20/04 14:54 C

% Acid - Date & Time 3.81 4/21/04 10:00 STEAM GENERATORS A

I B

A r1 B Action Level I INPO CPI Chemistry Performance Index N/A 1.00

> 1.1 above 30% power (2)

(C PI)_

P/S Leak Rate, gpd N/A 0.0

> 30 or> 60 gpd / hr Cation Cond(1). uS/cm N/A N/A 0.0567 0.0563

> 0.8 Sodium. ppb N/A N/A 0.2 0.2

> 5

> 0.8 Chloride, ppb N/A N/A 0.2

<0.1

>10

> 1.6 Sulfate. ppb N/A N/A 0.3 0.3

> 10

> 1.7 pH N/A N/A 9.77 9.77

< 8.5 FEEDWATER UNIT I UNIT 2 ActIon Level INPO CPI Iron, ppb N/A 2.483

>3

>5 Copper, ppb N/A 0.030

> 0.1

> 0.2 Dissolved 02, ppb N/A

<5

>5 pH N/A 9.68 CONDENSATE Action Level Dissolved 02, ppb N/A 3.4

>10 SAE Flow (scfm)

N/A 2.9 NOTE: Bolded items require action by Chemistry (2) Best allowable CPI is 1.0 EMERGENT PROBLEMS I SIGNIFICANT ACTIVITIES / OTHER INFORMATION Priority Chemistry equipment currently OOS 4

Weekly Core Damage Risk Profile (Safety Monitor)

IBO5AVIE.O I 411812004 I

Unit 2 Risk Mgmt. Engr Tom Staskal (x6259)

Work Week Coord: 0CC Projected Risk Level Compared to Average:

154%

Highest Projiected Risk Level YELLOW Actual Risk Level Compared to Average:

0%

Highest Actual Risk LvelI Notes: (1) Schedule analyzed using Safety Monitor 3.0 and PRA model Rev. 3.11. (2) This Risk Profile was generated based on schedule Jinformation received on 04116/2004, manually modified 04119104I. Any schedule changes after that date should be re-assessed by either the I STA. PPG. or PRA in order to ensure the risk profile correctly reflects risk for upcomingp lant activities.,

Scheduled Activities Unit 1 In Mode 5 or 6 _

11-13029 O-SW-00146 TS 1

j1__

19 41 15

-RED4 13W-015 12 117

-RED 12 -

7 6

5 4

3 2

4

~

- I -

~

i inZ I

_ _ _ _ _ _t C

.0 E

-J

- I i. z .:- -.

,  ,

".   I I

I 1

7...:

,. I -,

r, I ' ' ; _ "

   : j _7 ' I

.- . -- ,,

I : ;, -. :,, --  '.  -

.  I " 1: I  -

 I.. I I

_, I :

4 1

t...

 :, 1

. I I..: i"

- ". ,  i "  ,'  ;:

I,

I.:

U I

I I

o Sunday I

Monday 2

Tuesday 4/1812004 4/19/2004 4/20/2004 3

Wednesday 4

Thursday 5

412112004 412212004 Friday 4123/2004 6

Saturday 412412004 7

5 Printed on 411912004

Committed to Nuclear Excettence A

JC' f

f t4 P/o Pa 7

P lan Stus Rp

'Xx)4?

A-5AC AC4b' Plant Status Report 5-,a gx gig Plant: Point Beach Nuclear Plant Date: Friday, April 23, 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit I is in refueling shutdown (Mode 6). Reactor vessel head removed and cavity flooded to rod unlatch height.

Unit 2 is at 100% power.

Days Without LTA: 580 Homeland Security Condition: Yellow

-UnitI Unit2-i PWR PNVR MWE MWE PWR PWR MWE MWE Mode Level (Gross)

(Net)

Mode Level (Gross)

(Net) 6 0%

0 0

1 100%

542.9 520.9 Days On Line: 0 Days Since Last Reactor Trip: 281 Days On Line: 155 Days Since Last Reactor Trip: 287 m

v..:

Technical SpeciricationActionConditions -.

Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)

Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2

Out of 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosscau 8/27/04 U2C RMW service.

.: -. ; ;i.

Maor Equipment Out of ServiceorDegraded.

Item Unit Condition Date Time W

Work Order Number Due Date Responsibility NONE Operational Problems'/-Concerns Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2

Valve comes off shut seat Provide decision tree to Engineering 4/23/04 K. Krause Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2

Inadequate excess letdown flow.

Open and inspect, 2CV-285.

517/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2

Elevated indication, temperature 4 step action plan is developed.

5/14104 B. Carberry Ejector Gas Monitor related.

Scheduled completion is 5/14/04.

2P-2A, Charging 2

Excessive seal leakage/prevents WO 0400329, Priority 3.

4/29/04 R. Brittingham Pump continuous use of pump.

"B" Safety Injection 2

4% difference between LT-934 and IC continue troubleshooting to 4/23104 J. Helbing Accumulator Level LT-935.

determine cause of deviation.

Transmitter Deviation Evaluation due today.

.~~~

'i.

-:i.

PAggregate Review of Issues
.

-^;

Item Unit Condition Actions Planned Due Date Responsibility NON EII I

~

r i.,

,-a;.

p,Repo table Events

a.

I ON I

~NONEI Page 1 of 2 6

NMta Committed to Nuclear E~cellencej r

Plant Status Report OutstandingOperabilityDeterminations..--!,

NONE i.-.-

^.

Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump / P-38A Aux Feedwater Motor-Driven Pump /

P-32A,B,C,D,E,F Service Water Pumps I K-2A/B Instrument Air Compressors I K-3A/B Service Air Compressors I G-Ol/G-02/G-03/G-04 Emergency Diesel Generators I Unit 1 Nozzle Dam Panels and Associated Equipment

- L--oad Changes (Planned or Unplanned),

NONE

.Reactor Coolant System Leakage-.

Unit 1 Unit 2 Unidentified (gpm) 0 0.04 (No leak rate determined due to draindown)

Identified (gpm) 0 0.04 Major Tests and Evolutions Scheduled in Next 24 Hours Secure PAB ventilation for W-30A/B, F-23/F-29 PAB exhaust filter fan work.

Align G-02 to IA-05 and 2A-05 for IB-42 outage. -

A A

F I

/

((

/741, De-energize IB42.

'q A IL #,U,. -V 0 idt _0 -- T----7 Alt(IA. -

, J ffl-t

I---

G=

r,-= 7- --- -

Page 2 of 2 7

Committed to Nuclear Excelnc Outage Status Report Plant:

Point Beach Unit I Day:

Friday Today's Date / Time:

4/23104 0400 Outage Duration: Day 20 Of A 28 Day Scheduled Refueling Outage

"-1

~!~

t I...

-~

4

Safetv Sta tu -s.
1.

I Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases I

Significant near misses 0

Total for this outage 1

Summary: Individual bumped head on valve (was wearing a hard hat), reported a sore neck and back, no medical attention Irequired.

Radiological Dose outage to date 26.886 Projected to date 61.429 Outage Goal

  • 75 R Difference

-34.543 Number of PCEs 5

Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary: 4121/04 - Incore T/C Column Protective Sleeve Installation Under Evaluation i-

,i :t d

'S

'-i Mode:

0 Hot Standby (Mode 3) a Hot Shutdown (AMode 4) E Cold Shutdown (AMode 5) 3 Refueling Shutdown (Mode 6)

RCS:

Temperature:

95 Pressure:

Vented to Atmosphere RV Level:

Rod Latch Height Time to Boil:

19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br />

,ht Reactivity:

Yellow Core Cooling:

Green Power Availability:

Green Containment:

Yellow Inventory:

Green Spent Fuel Pool Cooling:

N/A i

Shutdown Safety-Ass'esmnetProtectedEquipment-e Unit I A and B Steam Generator Nozzle Dams and Associated Equipment Major ctivities Completed in Lst 24 Hours,,

Critical Path'nd Near Critical Path Activities'(Neit 24 Hoursl

  • Incore T/C Column Protective Sleeve Installation
  • Rod Unlatch
  • Cavity Flooded to Rod Unlatch Height
  • Remove Upper Internals 1B S/G Sludge Lancing i-.-:

.:R.

Signiricant Outtndn Issue

-i Date l

Issue

'Due Responsibility 4103/04 Repair Blowdown Tank Leakage 4/30/04 Scott Manthei 4/04/04 IP2A Charging Pump Troubleshooting 4/30/04 Clay Hill 4/08/04 Incorporate Lessons Learned from IST Reduced Inventory Orange Path 4/25/04 Dave Dyzak 4/22/04 Procedure Changes to Allow Hoses thru Hatch during Fuel Motion 4/23/04 Clay Hill 4/22/04 IP-IOB RHR Pump Return to Service Plan 4/24/04 Steve Bach 4/22/04 RP-1 C SFP Pump Operability Requirements 4/23/04 Ken Sokol

.o.r.es.

K > U com ing 6o~

le t ii is

.~

Scheduled Actual Scheduled A'

-Actual Date '

Time ' 2 Date'

'Time -.

'Date:

Time 45Date4 0 0Time Cooldown <200_

4/03/04 2100 4/03/04 2230

.eatup

>200t 4/25m04 0900 Head Lift 4/09/04 0900 4/21/04 1550 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 8

P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23, 2004 12 WEEK SURVEILLANCES -

MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUl)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE 10%

25%

DEFER ACT P81 40 0306530 CC-00779 MM SWl M-RELVLV REPLACE RELIEF VAL 05/07/2003 05/22/2004.

09/30/2003 05/06/2004.05/15/2004 128NS PB-O-74 0308970--------------M------M--RE------REPLACE--RELIEF--VAL--02/13/2004--06/14/2004------1/27/2004---02/02/2006.--------

PR0 74 0308971 DA-030558 MM 8A1 M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 11/27/2004 02/02/2006.

COW~

PRO 74 0308972 DA-03055D MM BAl M-RELVLV REPLACE RELIEF VAL 02/13/2004 06/14/2004 11/27/2004 02/02/2006.

COIAI P81 40,0214362 ICP-02.001 IC CW1 P81-1 RP AND SG ANALOG T 12129/2003 03/22/2004 03/29/2004 03/31/2004 04/12/2004.05/03/2004 NO-PX PS1 40 0214363 ICP-02.007 IC CWl PSI POWER RANGE NIS TE 12/30/2003 03/23/2004 03/30/2004 04/01/2004 04/13/2004.05/03/2004 NO-PX P81 40 0214364-----P-........IC

.C....P8 --

2 ---

P-AND-S--ANALOG--T-01/05/2004 03/24/2004 04/05/2004--

04/02/2004--0-/19/2004.05/03/2004------P P51 40 0214371 ICP-02.001 IC CWI PB1-2 RP AND SG ANALOG T 01/07/2004 03/29/2004 04/07/2004 04/07/2004 04/219/2004.05/03/2004 NO-PX P-8 --

40

-9950082 I

-C--0-.00 ---

IC W

P-LOGIC TEST -

-R-02/03/2004 03/30/2004-04/03/2004 04/05/2004---04/13/2004.05/03/2004 NO--P-X PBI 40 0214375 ICP-02.001 IC CWI P81-4 RP AND SG ANALOG T 01/07/2004 03/31/2004 04/07/2004 04/09/2004 04/21/2004.05/03/2004 NO-PX P81..

76

.0215117 ------

APR------A-R----

CALIBRATE---A-----E--10/01/2002 04/01/2004 04/30/2004--04/02/2004--05/25/2004--08/17/2004.-------

PB1 76 02151182 I-02.

APR IC 8M2PI

-RP CLOIBRATESTA-TR 102/01/020/200 2

3/

00 053/2004 04/03/2004 05/25/2004 08/17/2004.05/3200 8EMP P81..76..0214022..A.........MMV..3......R3.RE.OVE..VALVE..FROM..04/01/2004..04/22/2004.....07/19/2004...12/30/2004....128.M P81 76 0215122 ICP-020 APRI CM2 A8-R UPNDERSRGQUNCYO RE 010/07/2002 04/01/2004 042/0404/08/2004 05/25/2004 08/23/2004.0513200 8EMP P81--76

-0215123 --

A-2-1-4 APR M --

A-R UNDERFREQ--ENCY-REL 10/07/2002---04/01/2004 05/08/2004- 04/08/2004 05/25/2004- 08/23/2004.

128EM--

P81 76 0215120 8-03 APR 1M2 A-R-1 CALIBRATE 18-03 TE 109/018/2002 04/01/2004 05/303/2004 03/020/2004 05/25/2004 08/04/2004.

128EM P81 76 02151218 8-04 APR 1M2 A-R-I CALIBRATE 1A-04 TE 10/06/2002 04/01/2004 04/23/2004 04/07/2004 05/25/2004 08/22/2004.

128EM P81 76 0310189 AFV 01 EPIM 3A2 CV-1T-RMVT-SE VALV PEROM 0/820 04/01/2004 05/16/2004 050/20 07/19/2004 02/304/2005.

128MM P81 76 03019512 A52-049 EPT M2 AS-O0 UNST-CHECKUVALV CL 109/207/2002 04/01/2004 04/23/2004 03/22/2004 05/25/2004 08/06/2004.

128EM P-81 -7 0301953 CV- 04A -EPT 1M-2

-S -------ST-CHECK VALVE CL 09/22/2002

-04/01/2004 04/23/2004 03/24/2004 05/25/2004 08/08/2004.

128-E-N--

P81 77 03019542 C52-1048 EPT M2 AS-R~

1ST-CHRECKUVALV CL 109/26/2002 04/01/2004 04/29/2004 03/28/2004 05/25/2004 08/123/2004.

128EM P81 77 03019552 8-0033 EPT M2 AS-RO1 1ST-CHECK VALVE CL 09/25/2002 04/01/2004 04/25/2004'03/27/2004 05/25/2004 08/11/2004.

128EN PB0 76 02010963 G-0 EMI G3 EA2 C lP 1

VT2 YARM ELECTRICA 06/15/2002 04/01/2004 05/15/0405/07/

200 06/05/2004 09/104/2004.

C2lEN P8O 76 020195148 0-029 EMT M2 E-R 0 MOITO C EMERGENCY 09/17/2002 04/01/2004 04/0/2004~ 03/19/2004 05/25/2004 08/03/2004.

128EM P80 76 020195149 0-02 4A EMT M2 ES-R 0

MOISTORE EM LERGECY 09/17/2002 04/01/2004 04/05/2004 03/19/2004 05/25/2004 08/03/2004.

128EM P81 76 0300803 IC-----------IC P

-- N---AXIAL-O--SE ---

CA

-11/08/2002 --

04/01/2004--05/-9/2004-05/10/2004--05/25/2004--09/24/2004.-------

PS1 76 0300804 CP-020304B EP IC M2 PS NISTPOWER RANGLVE CL01021/2002 04/01/2004 05/20/2004 04/22/2004 05/25/2004 09/06/2004.

128EC PB1 76 0300805 ICV-020383 E IC M2 PS8 01-INT-CERMDIT RANGE 1L09/10/2002 04/01/2004 05/05/2004 04/11/2004 05/25/2004 08/26/2004.

128EN P81..

76

.0300806.............. IC..M P..-..SOURCE RANGE N.TR.10/11/2002..04/01/2004..05/05/2004..04/12/2004..05/25/2004...08/27/2004.

2C PB1 76 0300807 FICE-BARR15 IC M2 P1-i RNSEACTOR N PROECION 10/06/2002 04/01/2004 05/02/2004 04/07/2004 05/25/2004 08/22/2004.

128EM PR1 76 0300096 GC-01.

ENI G1M P8-A 2VEARPRESLUEC MTRIGA 09/29/2002 04/01/2004 04/27/2004 033/20 05/25/2004 08/15/2004.

C28AC PR1 76 03001810 CP02.01 M IC M2 P8-R RPOSYTOREMETRIPELOG 109/14/2002 04/01/2004 05/15/2004 04/15/2004 05/25/2004 08/030/2004.

128EM PR1 76 03001514 GC-02.017 IC M2 P8-1 RPOSYTOREMEAUTEMAT 109/06/2002 04/01/2004 05/05/2004 04/07/2004 05/25/2004 08/22/2004.

128EM

P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, Aprit 23, 2004 2

12 WEEK SURVEILLANCES -

MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUI)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST CUED SKED TSDUE 1OX 25%

DEFER ACT P81 76 0300812 ICP-02.018 IC IM2 PBI-1 RX TRIP BKR AND TU 10/05/2002 04/01/2004 05/07/2004 04/06/2004 05/25/2004 08/21/2004.

1281C P81 76 0300813 ICP-02.019 IC 1HZ PBI-STARTU SAFEGUARDS LOGIC T 10/05/2002 04/01/2004 05/03/2004 04/06/2004 05/25/2004 08/2112004.

1281C P81 76 0300814 ICP-..........IC

........... L RP

.AND.....

ANALOG

.T..

09/29.2..0..04/01/2004..05/07/2004..03/31/2004..05/25/2004..08/15/2004..18C P81 76 0300815 ICP 02.020 IC 1M2 P81-RD.

RP AND SG ANALOG T 09/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.

1281C P81 76 0300816...............IC R

AND G.ANALOG

.T..

09..9.200...04/01/2004..05/07/2004..03/31/2004..05/25/..004.08/15..2004.

2C Pa1l7 0300817 ICP-02.020 IC lM2 PB1-RL RP AND SG ANALOG T 09/29/2002 04/01/2004 05/08/2004 03/31/2004 05/25/2004 08/15/2004.

1281C P81--76 0300818 -

IC 0

C IM P

RP AND-SG A-ALOG T 10/14/2002 04/01/2004 05/16/2004 04/15/2004---05/25/2004--08/30/2004.

2 C

P81 76 0300819 ICP-02.020 IC IM2 PBI-2H RP AND SG ANALOG T 109/14/2002 04/01/2004 05/16/2004 04/315/2004 05/25/2004 08/30/2004.

1281C P81 76- 0300834 CP-0 0

IC 1H P81 BORIC-ACID CONTROL--09/24/2002 04/01/2004 04/23/2004 03/26/2004 05/25/2004- 08/10/2004. ---

C P81 76 0300836 ICP-02.022 IC 1HZ PSIY CONTAINDME NTASOM L 09/19/2002 04/01/2004 05/07/2004 03/21/2004 05/25/2004 08/05/2004.

1281C P81 76 0300839 ICP............IC......81..NI

.PO.ER..

RA.GE C.A.09/27/2002..04/01/2004...04/21/2004..03/29/2004..05/25/2004..08/..3/2004.

81 P8I 76 0300840 ICP-02.020 IC 1HZ P811 OPS AND CRNAOSSOVE 10/04/2002 04/01/2004 04/28/2004 04/05/2004 05/25/2004 08/20/2004.

1281C P81 76 0300841.....P.........

IC P.1 C..4.29..1.RP..INS..09/22/200 04/01/2004 04/26.200...03/24/2004..05/25/2004..08/08/2004........

pal 7 0300842 ICP-02.020 IC 1M2 P81-1 ICP 4.29S2 ORAL-3 R 10/15/2002 04/01/2004 05/16/2004 04/16/2004 05/25/2004 08/31/2004.

1281C P81--76 0300843 I-P-9-IC P8

--- ROD-INSERTION LIM-I-10/08/2002 04/01/2004 04/29/2004--04/09/2004--05/25/2004 08/24/2004.

1-----C P81 76 0300844 ICP-04.034 IC 1H2 P81 BRCON ACINME ONTHYROG 09/29/2002 04/01/2004 04/28/2004 03/31/2004 05/25/2004 08/15/2004.

1281C P81 76 0300847 ICP-04.022 IC 1H2 PS1 SOTEAIMGENERTO WIP 09/219/2002 04/01/2004 05/07/2004 03/23/2004 05/25/2004 08/07/2004.

1281C P81 76 03008396 ICP-04.026 IC 1HZ P81 HIVPAST RPANGATRIX 109/17/2002 04/01/2004 05/218/2004 04/18/2004 05/25/2004 09/02/2004.

1281C P81 76 02104106 IC-04206 MMV ZM2 P-R1 REOVESHAND

/REPLACE 11/142/199 04/01/2004 04/08/2004 04/19/2004 09/10/2004 05/29/2005.

128MC P81 77 0215886 OICP-040293A 0P6 PH I IC-43A9, RHRPUM AN 09/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.

1280P P81 77 0215887 -ITP-04009 IPC 1HZ POT IC-4329-LOW HEA R 10/11/2002 04/01/2004 03/29/2004 04/12/2004 05/25/2004 08/21/2004.

1281C P81 77 0215888 -ICP-040293C0P 1HZ POTRO INSERT IGH HEAD 10/07/2002 04/01/2004 05/21/2004 04/08/2004 05/25/2004 08/23/2004.

1281C P81-77 -0215890 ----

T-0005B 0P6 1H IT-O--- CONT--

SPRAY 10/07/2002-04/01/2004--05/07/2004-04/08/2004 05/25/2004 08/23/2004.05/01/2004----280P P81 77 0215893 -ICP-040034I 0P61 H I IOT-ZOINIET 1YDPOR 09/30/2002 04/01/2004 04/22/2004 04/01/2004 05/25/2004 08/16/2004.

1281C P81 77 0215898 OITP-04270 IPC I2 PHT STEAM GENERATOR WI 09/26/2002 04/01/2004 04/29/2004 03/28/2004 05/25/2004 08/07/2004.

1281C PR1 77 0218589 OIT-30207 P IC Z

GOT GT-280A DISE MSSTRU 09/18/2002 04/01/2004 05/07/2004 032/20 05/25/2004 08/04/2004.0620204 8OIA P81 77 02150089

-ICP-10150 IPC 1HZ PO1 S

AT-1 AFP DATISC 10/12/2002 04/01/2004 05/10/2004 04/13/2004 05/25/2004 08/028/2004.

1281C P81 70 0215901 S

O-T0206 MMV HZM MOT RT-2908,IP-Z9LAFP 10/14/2002 04/01/2004 05/14/2004 04/15/2004 05/25/2004 08/30/2004.

128MM P81 70 021598502 -IT-0200C 0P6 1HZ OT IT-CIAC, COMPLHETE 10/107/2002 04/01/2004 05/22/2004 04/08/2004 05/25/2004 08/23/2004.050/041280P

P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23. 2004 3

12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/P80071.OPS.PROGRAMS(TSPECSUI)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE

¶0%

25%

DEFER ACT B17 0250 0-T-0300 0P 114 OTI-

,UIT 1 MAI10/07/ *2*02 040/040/22**004*04/051200* 5/5204082/20.o2N P81 77 0215908 C-T02 P

12C T30 C-7 N1/120 40/040/920 40/040/520 81/004.

1280P PB 70199CI-30 P

120 OIT-3 0A RC SA 09/1/2002 04/01/2004 04/24/200 0/92 405/25/2004 08/23/20412P 77-0215910-------030 061 TI------------------------- UNIT.1.CN.10/042002.0401/2004.5/07/204.04/052004.05/5/2004.8/20/204......

PBI 70 0215912 a IT-O300B 0P6 IM2 CT IT-5100, UNI SI TES 10/06/2002 04/01/2004 05/04/2004 04/07/2004 05/25/2004 08/22/2004.

1280p Pal 77 0215913 a IT-0320B 0P6 1142 CT IT-520B. IC-3716AN 10/01/2002 04/01/2004 05/08/2004 04/02/2004 05/25/2004 08/17/2004.

1280P P81 77..

0215916 C-1 2

C....RPM

.PR.G.09/30/2002..

04/01/2004 05/03/2004..04/01/2004..05/25/2004..08/16/2004........

P81 77 0215919 0-IT 05320 0P6 1142 OT IT-5320A UlCPN SUA 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/103/2004.,

1280p P91 77 0215920 C-2--T-----------R PR-G-10/07/2002 04/01/2004-05/20/2004--04/08/2004--05/25/2004-08/23/2004.-------

PBI 77 0215922 O-IT-0380 0P6 1142 OT IT-330, UNIT 1 COS 109/29/2002 04/01/2004 05/07/2004 03/31/2004 05/25/2004 08/15/2004.

1280P P81 77 02159125 OIT-05109 CP6 1142 OT IT 740B, UNI 1i TA 10/08/2002 04/01/2004 05/03/2004 04/09/2004 05/25/2004 08/24/2004.

1280P Pal 77 0215926 O-IT 05208 CP6 1142 OT IT 5209, U IH HE6A 10/01/2002 04/01/2004 04/21/2004 04/02/2004 05/25/2 00 08/17/2004.

1280P P81 77 0215927 C-IT-0770C 0P6 1142 CT IT-30C, ULRPSPRAY 109/307/2002 04/01/2004 05/05/2004 04/08/2004 05/25/2004 08/23/2004.

1280P F----77-0216004 O 2--T----------C PER N-10/12/2002 04/01/2004-05/12/2004--04/13/2004--05/25/2004-08/28/2004.-------

P91 77 02169700 I-TS-03O 0P6 1142 CT TS-30D, PHIGH/OU 109/130/2002 04/01/2004 05/11/2004 04/014/2004 05/25/2004 08/29/2004.

1280P PB1 70 0216006 I-T-0530E 0P6 1142 CT ITS-30, UNI MTE1CST 10/12/2002 04/01/2004 05/12/2004 04/13/2004 05/25/2004 08/28/2004.

1280P Pa1 77 021601908

-T-0531 0P6 1142 OT ITS-3, TES COF ESE 09/29/2002 04/01/2004 04/27/2004 03/31/2004 05/25/2004 08/15/2004.

1280P P91 760305079 PT-RC-EP...................

RC...PRESSURE..TEST.01/22/2003..04/01/2004 05/16/2004 07/24/2004..05/25/2004..12/08/2004........

PB1 40 0214138 RCIT00540-L P M MV 12 MOR ISTORY9 LREVEM AND 10/08/2002 04/01/2004 05/202/2004 04/09/2004 05/25/2004 08/24/2004.

128NS P91 76 --

0214139 RC-00 3

M V

R

-HISTORY..REVIE...ANDi02/05/2002 04/01/2004 05/02/2004

-08/08/2003--05/25/2004--12/23/2003.--12814 P81 77 03018782 REIT0012 HP6 142 RMSCALAPR.UNI IR-2/RE 1 0AS 9/28/2002 04/01/2004 04/29/2004 03/30/2004 05/25/2004 08/14/2004.

1280P P91 77 0213863 RES 3.10 PRE 1142 RE PIMARY0 SYSTEACTES 10/16/2002 04/01/2004 05/26/2004 04/17/2004 05/25/2004 09/01/2004.

1280P P91 77 0213864 RES 04.1 PRE 1142 RE INTIAL0 CRITICMALIT 10/16/2002 04/01/2004 05/17/2004 04/17/2004 05/25/2004 09/01/2004.

1280P P91 77 02138265 RESP 5.

PRE 1142 RE RETESTS DURINGH HES 10/29/2002 04/01/2004 05/218/2004 04/302/2004 05/25/2004 09/14/2004.

'1280P P91 77 0213512 RES 6.20 PRE 1142 RE VEIFY0 RC SPFURAY 102/11/2003 04/01/2004 05/22/2004 08/13/2004 05/25/2004 12/28/2004.

1280P PS1 76 030190140T RH 0

E P6IM32R P2 OTVTS-1 ASMlC PERC 104/120/2001 04/01/2004 04/30/2004 04/19/2004 07/19/2004 01/17/2005.

1280P PBI 76 0301900451 EPS 3A2 SI PT-2TVTS 30 ASM HIGPEROW 05/03/2001 04/01/2004 05/07/2004 05/02/2004 07/19/2004 01/30/2005.

1280P P91 76 03019056 TSI 05.

EP6I32 OI1T -

TS-3 ASME XI PERO 105/08/2001 04/01/2004 05/.16/2004 05/07/2004 07/19/2004 082/0/2005.

1280P P91 76 030196 SNUBERS E3 PT 1142 OT TS3VISUA SNUBBE INMSI 10/05/2002 04/01/2004 04/08/2004 04/06/2004 05/25/2004 08/21/2004.

1280P

P 0 1 N T 8 E A C H N U C L. E A R P L A N T 05:44 Friday, April 23, 2004 4

12 WEEK SURVEILLANCES -MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSUI)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL T004/23/2004 UNITST WRK ORD EQUIP ID GRP FRO CALLUP DESCRIPTION LAST DUED SKED TSDUE lox 25X DEFER ACT Pal 76 0214145 SNUBBERS MN 1M2 M-R-3 INSPECT STEAM GENE 10/13/2002 04/01/2004 05/16/2004 04/14/2004 05/25/2004 08/29/2004.

128MM Pet 60 0301907 Ut-CONTAIN EPI 1HZ CG-COREINS VISUAL/ULTRASONIC 10/02/2002 04/01/2004 04/18/2004 04/03/2004 05/25/2004 08/18/2004.

128NS Pal 60 0301908 Ul-CONTAIN EPI 1HZ CG-KEYINSP VISUAL INSPECTION 09/20/2002 04/01/2004 04/04/2004 03/22/2004 05/25/2004 08/06/2004.

128NS Pet 77..0301909.ut-CONTAIN EPI

.1H...

CG T.GA

.CONT.INSPECTI.ON W.10/04/2002 04/01/2004..04/22/2004.04/05/2004..05/25/2004.08/20/2004........

PBI 77 03019109 Ul-CONTAIN EPI 1M2 G-AT3 INSPECT INPCTONAIWHE 10/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.

128EN Pet 76 0306921;----C --------IC -------------

R POWER

-RAN --

E-N-S-TE

-07/17/2003 --

04/01/2004--05/01/2004-01/16/2005--05/25/2004-05/22/200--.------

PBI 76 0300961 U1ICP-04.0 EIC 1M2 Pet ISTEAM GENERATREN 109/24/2002 04/01/2004 04/28/2004 03/26/2004 05/25/2004 08/10/2004.

128EN PBi 76..0300962 t

IC

......Pet CHARGING..FLO...TRAN.09/22/2002..

04/01/2004 04/23/2004..03/24/2004..05/25/2004..08/08/2004........

Pet 76 0300971 IICP-02.02 IC 1HZPISTRU PtOEEWTER FLOGHI TRA 09/15/2002 04/01/2004 04/24/2004 03/17/2004 05/25/2004 08/01/2004.

1281C Pet 76 0300972 11CP-04 01 IC H2 Pe1 FIRS SAGE PZRRELIEU 09/27/2002 04/01/2004 04/23/2004 03/29/2004 05/25/2004 08/13/2004.

1281C PSI 7 0300973 I1CP-04.00 IC 12 PBt RTEAC ENRTOR VES LEV 09/24/2002 04/01/2004 04/30/2004 03/26/2004 05/25/2004 08/10/2004.

1281C PB1 76 0300974 11CP-04.00 IC 1M2 PBt AWCHARGING FLOW 1RN09/07/2002 04/01/2004 04/26/2004 04/08/2004 05/25/2004 08/23/2004.

1281C PeI 76 030097 11CP-04.03 IC 1HZ Pet CANT HIGHRANGE RHO 09/27/2002 04/01/2004 04/28/2004 03/29/2004 05/25/2004 08/13/2004.

1281C Pet 76 0300976 IICP-04.03 IC 1HZ Pet TUBIEW E VALVE CAl 109/06/2002 04/01/2004 05/024/2004 04/07/2004 05/25/2004 08/22/2004.

1281C Pet 76 0215924 162P-A4 EM IC M2 E-R FIRST20STAND PRESS 09/25/2002 04/01/2004 05/05/2004 03/27/2004 05/25/2004 08/11/2004.

1281C PeI 76 021524 52/BY EM02I 1M2 P-R-BYACTORIP-FREEL LNEV 109/024/2002 04/01/2004 04/21/2004 04/03/2004 05/25/2004 08/18/2004.

1281C Pet --

76-0215243 52-BY EH


TRIP-FREE---NTE-10/02/2002 --

04/01/2004 04/21/2004 04/03/2004--05/25/2004--08/-8/2004--------

Pet 76 0215244 11CPRTA 03EM 1HZ PBR-RAFWTHRGIP GFR ONT 10/04/2002 04/01/2004 04/01/2004 04/05/2004 05/25/2004 08/20/2004.

1281C Pet 76 0215245 I

0 03/RB IE 1HZ P-R-RTB TRIP-FREEANTE 1M09/04/2002 04/01/2004 04/22/2004 04/05/2004 05/25/2004 08/20/2004.

1281C Pet 76 0215246 62/A-0.03EM 1H E-R CALBIBRAE VANDE TEST 10/03/2002 04/01/2004 04/027/2004 04/04/2004 05/25/2004 08/19/2004.

1281C Pet 76 0301678 162-Al EM TM2 E-R7 lSEVENTH YARD U -

092U20 04/01/2004 040/27 0403/27/

200 152/3/2004 02/14/2006.

128EM Pet 71 0215247 52/BA0 EM 1HZ E-R1 CLBRATRI-RE A ND TES 10/01/2002 04/01/2004 05/07/2004 04/02/2004 05/25/2004 08/17/2004.

128EM Pet 77 0215811 2BY TE-CONT-00ORt 1HZYS C TRIP0-FVALE AN 103/12/2004 04/012/2004 04/23/2004 04/12/2004 04/15/2004 04/18/2004.

128EM Pet 77 02158452/R-TS-A EPN I OT-RT-A, UNIT-RE 1TUR 103/204/2004 04/017/2004 05/018/2004 04/205/2004 04/20/2004 04/24/2004.

128EM P50 --

7 0300195 CHEM-SA L

-H-----BA-T-BORON BAST BORON TSR 3.5 04/16/2004- 04/19/2004 04/19/2004--04/23/2004 04/19/2004--04/24/2004.--O-A1 PB2 77 03002481 CHE/RATB CH WI ERCSBOO RCS BORON-SREE T

39 1004/1/2004 04/019/2004 04/22/2004 04/22/2004 04/19/2004 04/23/2004.

128EN PB2 77 0300249 CHE2-AMOI C M t RCSC C CALRT TSR 3.4.5.

104/16/2004 04/019/2004 04/18/2004 04/23/2004 04/19/2004 04/24/2004.

128Et Pet 77 03007 C6EM-AM1 CH TM2t RCSD RSEVDOT TSAR 3.45. 041/20 04/019/2004 04/18/2004 042/20 04/19/2004 04/25/2004.

B28El PS2 77 03005117 C6E2-AM2P E CM t RC D RCSLIDOT TSR TES 345 104/16/2004 04/019/2004 04/18/2004 04/023/2004 04/19/2004 04/24/2004.

128EM

P 0 I N T B E A C H N U C L E A R P L A N T 05:44 Friday, April 23, 2004 5

12 WEEK SURVEILLANCES -

MANAGEMENT REPORT WITH SCHEDULED DATE AND TECH SPEC DUE DATE SORTED BY SCHEDULED DUE DATE WE4920.PBNP.TRENDING/PB0071.OPS.PROGRAMS(TSPECSU1)

SCHEDULED DUE DATE IS LESS THAN OR EQUAL TO04/23/2004 UNITST URK ORD EQUIP ID GRP FRQ CALLUP DESCRIPTION LAST DUED SKED TSDUE 10X 25X DEFER ACT PB2 77 0300550 CHEM-SAMPL CH 1U1 RE-229 RE-229 ISOTOPIC 04/15/2004 04/19/2004 04/19/2004 04/22/2004 04/19/2004 04/23/2004.

BO5A1 PB2 77 0300524 CHEM-SAHPL CH 1U1 SGBDF0 SGBDFO GAMMA SCAN 04/16/2004 04/19/2004 04/19/2004 04/23/2004 04/19/2004 04/24/2004.

805AI PB1 77 0215802 O-TS-033 OPI 4U1 OT TS-33, U1C ACCIDEN 03/23/2004 04/20/2004 04/22/2004 04/23/2004 04/23/2004 04/27/2004.

1280P PB1 76 0300396 CHEM-SAMPL CH ACCUM.UNIT UNIT 1 SI ACCUHULA 04/22/2004 04/22/2004 04/25/2004 04/29/2004.

B05A1 P61-77-030460-C.E-SAMPL.CH.1.1.RUST.BORON.R.ST.BORON.SR.3.05 04/15/2004 04/22/2004 04/22/2004-04/22/2004 04/22/2004-04/23/2004.

P81 77 0300460 CHEM-SAMPL CH 1U1 RUST BORON RUST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.

B05A1 PB0 77 0300589 CHEM-SAMPL CH 1U1 RFST BORON RSST BORON SR 3.05 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.

B05A1 PB0 77 0300231 CHEM-SAHPL CH 1U1 SFP BOROOROSTEWATEN SR 3.7.1 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.

805A1 PB0 77 0300244 CHEH-SAHPL CH 1U1 UU EFF COH WASTEWATER EFFLUEN 04/15/2004 04/22/2004 04/22/2004 04/22/2004 04/22/2004 04/23/2004.

B05A1 PB1 40 9950079 ICP-02.003 IC 8U1 PB1-1 RP LOGIC TEST -

TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.

128NS z.......

i-PB1 40 0300735 ICP-02.005 IC 841 PB1-1 SG LOGIC TEST -

TR 02/26/2004 04/22/2004 04/22/2004 04/26/2004 04/28/2004 05/06/2004.

128NS P0 770215479 -TP PBO 77 0215479 0-IT-0011 OPZ CWI OT IT-11, P-1TA/B SPE 01/30/2004 04/23/2004 04/29/2004 04/30/2004 05/02/2004 05/14/2004.

B05A1 PRO 77 0215406 0-IT-0016 OP1 CU1 OT IT-16, QTRLY FAIL- 01/30/2004 04/23/2004 04/23/2004 04/30/2004 05/02/2004 05/14/2004.

805A1 PR0 77 0407626 0-PC-026.8 OP3 OT WEEKLY CSD PRIMARY 04/23/2004 04/03/2004 04/23/2004 04/24/2004.

1280P P60 77 0215586 O-PC-083.6 OP3 441 OT VERIFY ANY INOPERA 03/26/2004 04/23/2004 04/23/2004 04/26/2004 04/25/2004 04/30/2004.

B05A1 P

770215755 T-A 141TT AUCAIRL04/16/200404/23/200404/23/200404/23/200404 PB1 77 0215755 0-TS-010AB OP1 141 OT TS-10A, U1C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.

MRS PBZ 77 OZ16032 O-TS-010AB OP1 1U1 OT TS-10A, U2C AIR LO 04/16/2004 04/23/2004 04/23/2004 04/23/2004 04/23/2004 04/24/2004.

B05A1

Run Date 22APR04 13:38l Work Activity Risk Assignment Sheet1 oti U

ACT IWO GRP HPE EQUIPMENT Actvity Cal DUR START FINISH

-A.R 2

_D ST RISK DeseftI ID

_2n 18.i61 8,16.

I EM-BMFP-01 176 EM DR-Y ML-Y I P-028B-M I P288 REMOVE OIL UNES AND 8

6 24APR04 24APR04 OJSTEAM GENERATOR FEED PUMP MOTOR ORT3-NR-M lMOTORCOVERS j 1000 1559 0312035-128EM 2

IC0407898 76 IC DR-Y ML-Y LT-00935 LT-934/935 LEVEL DEVIATION 1

4 20APR04 22APR04

]T-348 Si ACCUMULATOR LEVEL TRANSMITrER ORT3-Y RM 21:00A 15:59 1407898 - 1281C 1I MM-8480M 76 MM11 DR-Y ML-Y I R-1 CLEAN REACTOR HEAD U 1 45 124APR04 26APR04 REACTO R VESSELANDASSEMBLY I

ORT3-YR-H l STUDS 10:00' 14:59 0214134 - 128MM 0 I MM0201361 75 IMM2I DR-YML-Y I W-030A W-30A, LUBRICATE AND IU1 4 i23APR04i23APRO4 F-23F.29 PAS EXHAUST FILTER FAN 0

lORT3-NR-H MAINTAIN FAN l05:00 10:59 0201361 - 128EM 1 i MM-8485C 76 MM31 DR-Y ML-Y P-0O1B P-1B. REMOVEPUMP U

14 22APRO4 i23APR04 REACTOR COOLANT PUMP ORT3-Y R-M COUPLING RMP 9002-5 1200 03:59 214119 - 128MM 1

MM-485D 76 IMM31 DR-Y ML-Y P-401B REMOVE SEAL P-1B RMP U

10 23APR04 23APR04 C=1REACTOR COOLANT PUMP lORT3-NR-M 002-5 04:00 15:59 0214119-128MM 2 1 OP0216032 177 lOPI I DR-YML-Y I O-TS4-10AB.1 TS-10A,U2CAIRLOCKDOOR i 4 i 2 I23APR04123APR04 11U2 CONTAIRLOCK DOOR SEALTEST ORT3-N R-M [SEALTEST

-00:00 0159 0216032 - BOSAI E1~U MCIWELT-81 HUMAN ERROR RISK BARCHART C Primavera Sytems, Inc.

PBNP U1 Refueling 28 Outage FL81 HUMANERRORPOTENTIAL

~

~

?3 C* *1*,e rn+

Regulatory Impact April 23, 2004 NRC Meetings and Inspections

  • Submittals Due in the Next 60 Days NRC Commitments
  • INPO Open Items Status
  • NRC Performance Indicator Summary Page 1

NRC Meetings, Inspections, Entrances and Exits And Other Events of Interest April 5-23 Rx Vessel head & Nozzle Penetrations and ISI for Holmberg G Sherwood x7630 C. Krause x6809 U1R28 (IP-7111108, TI-150/152) 3-member team GSewo 73

.Kas 60 April 12-23 RP Outage ALARA Planning & Access Control, Alexander S. Thomas x6198 C. Krause x6809 IP-7112101, IP-7112102_________

April 26-30 License Renewal/aging management programs Curt Cousins R. Newton x6522 J. Knorr x6863 (consistency review)

Mark Lentz June 1 - July 31 Onsite Fab & Construction of ISFSI, IP-60853 J Becka x7500 K. Locke x6420 June 7-11 License Renewal/AMR Audit #1 R. Newton x6522 J. Knorr x6863 June 14-18 Biennial Heat Sink Inspection, IP-7111107B D Schrum L Hawki x6208 K. Locke x6420 June 15 License Renewal/Environmental Public Scoping Meeting Bill Dam R. Newton x6522 J. Knorr x6863 June 16-17 License Renewal/Environmental Audit Bill Dam R. Newton x6522 J. Knorr x6863 June 21-25 License Renewal/Scoping and Screening Audit Steve Dennis R. Newton x6522 J. Knorr x6863 June 28 - July 16 Safety System Design Inspection (SSDI) IP-7111121 8-member team T Petrowsky x7405 F. Flentje 6221 July 12-16 License Renewal/Follow-up Audit with Public Exit R. Newton x6522 J. Knorrx6863 July 26 - 30 RP Liq/Gas Effluents Inspection, IP-71151, IP-7112201 K. Locke x6420 August 1 - 31 Preop Testing ISFSI, IP-60854 J Becka x7500 K. Locke x6420 August 2 License Renewal/Optional GALL Consistency Audit with R. Newton x6522 J. Knorr x6863 Public Exit August 16 - 20 Steam Generator Baseline Inspection, IP-7113001, 2-member team C. Krause x6809 IP-7113002, IP-7113008, IP-71151________

Aug 30 - Sep 17 Problem ID & Resolution (PI&R) IP-71152B 6-member team P Russell C. Krause x6809 September 01 - 30 Operation of ISFSI, IP-60855 J Becka x7500 K. Locke x6420 Page 2

A g'

rl 1

A

~

O

-- D tes e

516w;

.ln.oJYt.t wReg.

Affesrs October License Renewal/Aging Management Program Laura Kozak R. Newton x6522 J. Knorr x6863 Noctober 1rInspection L3 ra Kzak l

NSerwtoo x7630 J. K.Loc x64 November 1 - 19 Triennial Fire Protection, IP-7111105T 3-member team G Sherwood x7630 K. Locke x6420 Regulatory Affairs Submittals Due in the Next 60 Days (through 0612512004) it

,"gE. 1W 04/29/2004 Security Order Revised Security, Contingency & T&Q Plans M. Fencl F. Flentje 04/30/2004 510 CFR Changes to ECCS Evaluation Model - Annual Report J Olvera J Gadzala 04/30/2004 20.2206(b)

1) Annual Report of Individual Monitoring - 2003 E KiI L Schofield 04/30/2004TS25.26.1)
2) Occupational Radiation Exposure ReportEKriLScoel Supplement to Bulletin 2003-01 (Containment Sump) due 30 J McNamara A Hazelhoff 04/30/2004 BL 2003-01 days after issuance of WCAP 16204 - Implementation J Marean (Palisades) schedule for revising IPEOPs B Wartenburg L Schofield 04/30/2004 50.36a(a)(2)

Annual Monitoring Report K Johansen L Schofield May 2004 10 CFR 50.55a Request for Alternative Test Frequency for Manual Valves A Guenther L Schofield 06/11/2004 NEIL Response 60 Day Response to the NEIL Evaluation D Duenkel K Locke

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ G C a s a d o n te 06/30/2004 10 CFR 50.59 Changes, Tests, and Experiments - Annual Report D Black K Locke 06/30/2004 (e)(4)

C 50.71 Updated Facility Safety Analysis Report (FSAR)

D Black K Locke 06/30/2004 10 CFR 50.59 Commitment Change Evaluation K Locke K Locke Page 3

NRC Commitments (w/Firm Due Dates) 1 I

"I

¢ A

I I R 2001-017/04 NRC commit date CA LAR 046558 EPN J Masterlark 1210112004 Complete PRA update project.

CAP 045972 NRC Commitments (w/Admin Due Dates)

Should extended operation be considered, NMC will test the supplemental capsule at a fluence corresponding to EOLE to confirm the toughness condition for the PBNP Unit 2 RPV weld at about 38 EFPY, which is well before EOLE is reached.

INPO AFIs Extended from 9/30/2001: Work on the fire PRA has been 045208)

EPN Masterlark 07/30/04 PSA Deficiencies: Effectiveness review following fire PRA delayed due to resource resolution of SDP issue.

_CAP 045179 Page 4

2004 Event Response and EP Training Team Schedule JANUARY S I M I TlWI Tl Fl S T

I I F1 12 13 4

15 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

[2 26 27 28 29 30 31 APRIL S I M TIl T IWT Fl S SM T

FS 1T3 41

_ 12l13l145 16 17l 18 JULY S

M IT Wl Tl F S

FEBRUARY MARCH S M T W T

F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 MAY Sl Ml TlWI T IF S 10 1112 13 14 15 AUGUST I M T T

F 1

1 2I p 4 5 6 1sor S M IT IW I T I F I S 1 2 3

4 5 6 7

8 9 10 112 13 14 15 16 17 18 19120 21 22 23 24 25 26 27 28 29 30 31 JUNE Ml T w T

F

_7 18 19 1101 1112 I

SEPTEMBER 128 2

31 3 5ttt 28 29I I

OCTOBER I

I NUJVMUtKn~

I S

M TIWI TI FI S

_25 2627 28 29 30 1

1 1

1 SlMTW T

FS

_ 2223 24::. -:

270 2 8 1

7 I

UttMOMMUK I

I SI M TIFIs

~

16 1718 I

I I

This schedule does not contain swaps.

Rescheduling is allowed however, it is up to each individual to arrange for a replacement.

The period is Monday 08:00 AM to Monday 08:00 AM. Except-when a holiday falls on Monday, duty continues until Tuesday.

J:\\ShareData\\Common\\Duty Roster\\Event Response Teams.xls

POD Bullet List for PdM group 4/23/04

  • lP-028A speed increaser inspection identified abnormal wear.

Gearbox refurbishment will need to be scheduled for U1R29.

  • Lube oil program status turned green following backlog reduction effort.

20

I PDM TECHNOLOGIES MONTHLY EQUIPMENT CONDITION REPORT 4AMPS ID ISUPPORT DOC.

PROBLEM DESCRIPTION ISTATUS 9/30/03 Motor vibration levels in excess of 3.0 in/sec after 8 months of stand-by service. WO

!W-040A Tag initiated to repair damaged motor and Aain Turbine LO CAP 050552 Motor vibration levels at point of existing WO to balance fan.

fapor Extractor WO 0209028 imminent failure. Fan declared 2/11/04 Work postponed due to parts an WO 0309381 OOS.

availablity. No reschedule date.

5/8/03 Motor axial vibration increase of 25%

noted. Coupling misalignment/degradation present. WO to inspect and realign scheduled for 7/28/03/.

7/31/03 - Inspection completed. Coupling installation error induced unbalance that is exciting a resonance. Pump returned to service at previous levels with CAP and WO issued to identify coupling problems.

8/29/03 work scheduled for Z-5 work week (11/05103) 12/16/03 - work currently scheduled for A03 week.

1/21/04 Work not performed as scheduled due to maintenance resources.

2/18/04 Declared OOS due to apparent wipe in inboard motor bearing.

2/25/04 59 gm-in of residual unbalance found on coupling end of motor. Balancing reduced the residual unbalance to approximately 2 gm-in. Uncoupled run of motor SAT following balancing. Awaiting return to service and final PMT.

3/6/04 - PMT SAT following replacement of coupling and addition of coupling spacers.

Remove from list next month.

DP-503 Gas Turbine FO CAP 0327071 034456/053947 WO 0304979/ 0306786 Vibration identified coupling defect and excessive 1x vibration.

2004 MARCH STATUS REPORT.XLS D

YELLOW - PROBLEM OR TREND IDENTIFIED. CR AND WO INITIATED RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATE Page 1 of 5

lCHAMPS ID SUPPORT DOC.

PROBLEM DESCRIPTION STATUS ICHAMPS ID SUPPORT DOC.

PROBLEM DESCRIPTION STATUS 4

4.

1W-040A Main Turbine LO Vapor Extractor Fan CAP 053950 WO 0405914 Motor vibration levels at point of imminent failure. Fan declared OOS.

2/18/04 - Fan declared OOS for defective motor bearings 3/31/04 - Currently WO is status 10.

4 1

4.3/31/03 - Oil analysis results received on 10/8/02 indicate serious degradation is possibly present on three of the six gearboxes on the unit I polar crane(1Z-013). The analysis results indicate that there may have been a compatibility Issue with the synthetic Mobil SHC 220 and the previous mineral oil. System engineer has scheduled vendor review.

1Z-013 Polar Crane CAP 029789 WO 0306551 Oil analysis identifies possible cross contamination.

YELLOW I

I 3/31/03 - Oil indicates high level of iron possibly due to operation with low oil level. WO in place to resample oil.

8/28/03 WO completed 8/21/03. Awaiting results.

11/6/03 Oil samples were in fact collected on 6/12/03. Those samples indicate that the problem is with contamination not machine degradation. Pump will be resampled in Z08 work week.

02/23/04 Oil sample analysis shows that the outboard bearing is normal for this kind of service, but the high iron content of the inboard bearing is starting to show degradation.

Vibrations trending upward on inboard bearing, but not at alert levels yet. Submitted new work order and CAP to track the inboard bearing.

The outboard may be removed from the list.

2P-011B CCW Pumo CAP 054114 WO 0406032 Oil analysis indicates high levels of iron from inboard bearina.

YELLOW 2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED. CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 2 of 5

CONDITION CHAMPS ID SUPPORT DOC.

PROBLEM DESCRIPTION STATUS 4110/03 - PMT for WO 0303760 identified lower motor bearing defect in newly refurbished motor. PMT failed.

OP-501-M 2/27/04 Update - Defect is still present in motor Gas Turbine LO CAP 032134 Vibration identified lower motor bearing but does not appear to be degrading YELLOW Pump WO 0303760 bearing defect further. Vibration levels are constant.

5/19/03 Oil analysis indicates an increase in wear debris in the oil samples. WO initiated to change oil in the gearboxes scheduled 9/22/03.

0Z-015 CAP 032963/033609 7/29/03 Added main hoist to scope due to high YELLOW PAB Crane WO 0305393/0305976 Degradation noted in oil analysis.

water content.

6/17/03 Vibration indicates large increase in the rotor bar pass frequency with associated OW-068 increase in 1x frequency amplitude. Increased CONTAINENT testing frequency to weekly.

SPRAY PUMP 9/29/03 Bearings and sheave replaced. PMT AREA COOLING CAP 033598 Vibration identified rotor problems in was UNSAT with vib levels >.6 in/sec. Identified YELLOW FAN WO 0305967 the motor as eccentric pulley or bent motor shaft.

6/17/2003 Oil analysis show jump in main hoist oil sample moisture content from 100 ppm to 200 ppm. Not an immediate concern, since acid number is still low. Source of water is probably absorbtion from atmosphere, since there are no OZ-015 CAP 033609 High moisture content in oil analysis water or steam lines local to the main hoist.

YELLOW PAB Crane WO 0305976 sample.

WO initiated to change oil.

7/31/03 - Vibration and oil indicate early degradation of pump bearings with an elevated 1P-010B CAP 029611 Early indication of bearing vane pass frequency. WO to change rotating YELLOW RHR Pump WO 0305857 degradation from vibration and oil assemble during U1R28.

2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 3 of 5

CONDITION CHAMPS ID SUPPORT DOC.

PROBLEM DESCRIPTION STATUS 7/29/03 High particle counts due to wear particles as well as advanced additive depletion. Recommended drain, flush, and change of oil to mitigate degradation until 0-K-004D rebuild is completed. 10/29/03 Oil change and G-04 Diesel Air resample complete. Oil condition moved up Start CAP 034113/ 034461 Oil analysis indicates high particle from critical, and will last until the rebuild WO is YELLOW Compressor WO 0306503/ 0360779 counts.

performed.

1RDC-LOGIC Thermography found dead 9/1/03 Thermography identified cold R1 resistor Power Cabinet CAP 049786 suppression circuit in the one in A37 supression circuit. Work order is to YELLOW 1 BD WO 0307357 thyristor phases.

repair condition at next outage.

Oil analysis results show that 0-K-004A compressor has high particle G-01 Diesel Air counts, high dissolved iron content,.

Start CAP 051807 corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul YELLOW Compressor WO 0310212 oxides.

can be performed.

OK-004C 9/30/03 Oil sampled for the first time in almost Diesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.

YELLOW Air Compressor Tag 202177 iron content.

Overhaul also to be scheduled.

Oil analysis results show that 0-K-005A compressor has high particle G-01 Diesel Air counts, high dissolved iron content, Start CAP 051807 corrosive wear, and black and red 11/14/03 - Oil changes scheduled until overhaul YELLOW Compressor WO 0310211 oxides.

can be performed.

OK-005C 9/30/03 Oil sampled for the first time in almost Diesel Starting CAP 050532 Extreme high particle counts and 2 years and badly in need of replacement.

YELLOW Air Compressor Tag 202179 iron content.

Overhaul also to be scheduled.

01/19/2004 - Workorder submitted for oil sample and filter dissection. Recommended OP-035B-E Oil analysis shows high particles, overhaul.

Diesel Fire CAP 052967 iron, molybdenum, copper, 03/02/2004 Oil sample taken and filter changed YELLOW Pump Tag 203303 manganese.

out for dissection.

2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 4 of 5

CONDITION CHAMPS ID SUPPORT DOC.

PROBLEM DESCRIPTION STATUS 02/23104 - Item identified via CAP and identifies G-01 need for MR 01-127 installation to correct Emergency CAP 054116 Vibration analysis shows binding in problem.

YELLOW Diesel Generator WO 9947398 gen. bearing fit.

3/6/04 - Axial movement in vani-drive noted by OPS. Vibration data indicates low level axial 1 P-002C CAP 054558 Visible axial movement of vari-drive impact related to movement. WO submitted to YELLOW Charging Pump WO 0406232 output shaft and gearbox input shaft correct issue per 12 week process.

OP-217B 3/8/04 - Routine vibration data indicated a step G-02 LO Circ CAP 054576 Coupling defect/distress noted in increase in coupling related vibration. WO YELLOW Pump WO 0406273 vibration signature issued to repair/replace coupling and align.

3/15/04 - OPS reported motor as being noisy.

OW-029 Vibration data collected indicated that the SSB Air CAP 054787 problem was belt related and not an issue with YELLOW Conditioner Fan WO 0406899 Motor reported as noisy by OPS the motor. WO initiated to correct belt problem.

3/26/04 - routine vibration data collection noted a step increase in gear related vibration on the speed increaser. WO was initiated to do visual inspection during U1R28 and add sheet has 1 P-028A been routed. Additional inspections will occur SGFP Speed CAP 055137 Increased gear related vibration on 1P-028B during U1R28 and both unit 2 YELLOW Increaser WO 0407389 levels noted gearboxes will be inspected during U2R27 2004 MARCH STATUS REPORT.XLS RED - FAILURE MODE IDENTIFIED, CR AND WO INITIATED YELLOW - PROBLEM OR TREND IDENTIFIED, CR AND WO INITIATED Page 5 of 5

Run Date 22APRO4 11:451 WO STATUS <75 Sheet 3 of 5 ACT Risk lW WO GRP tnin EQUIPMENT Activity WWSC START FINISH MA JUN______

ID TST Description S13 APR".~; ~

~

'~""

AP0215111 H

P 71 APR 0 H52-21 AUTO TRANSFER B10B1 24MAY04 24MAY04 HIGH RiSk kdTIVTY: Iss E MANAGER AVt GARCi.

FEATURES. VOLTAGE CHKS 09:00 10:59 SCHEDULE D OfrIMAALLV i

COUE:2604/0I2/05 NEED 2600ItS)24 LATEr2004I 1104 AP0215112 H

P 71 APR 0 H52-31 AUTO TRANSFER 81081 24MAY04 24MAY04 i

RlSKATiVIT4 iSS MAlAGER AVE(<ARtIA FEATURES, VOLTAGE CHKS 11:00 12:59 9HULED:DOPfIMALLY l DUEi2do4ld2iol5 NEED:20405124 LATE: 004h 1104 AP0305892 P 71 APS 1 X401-A COOLING SYSTEM 610B1l 24MAY04 24MAY04 SCHEDUL D:OPTIM)AlJY.

INSPECTION/CLEANING 07:00 l

14:59

.DUE 26000 524q4EEq:24 0)29d LTE: 004108!123 AP0305893 P 71 APS 1 X-01-B COOLING SYSTEM 10B1I 25MAY04 25MAY04 SCHEDU ED:OPTIMALLY l

INSPECTIONICLEANING 07:00-14 59 DUE 20O 105124 NEEO 20204/089 LATE:2004108:23 AP0305894 P 71 APS 1 X01-C COOLING SYSTEM lB1OB1 26MAY04 26MAY04 SCHECULED OPTIMALLY INSPECTIONICLEANING 07:00' 14 59 DUE2dC04105124 NEEI 006129 LAWE:20041083 CE; i

CE0212184 l

J71 I CE 1° I

T-119A IT-119A. REMOVETM02437lB101l 24MAY04 24MAY04 UPON COMPLETION OF0i12330 WTMICROFILTERA IMN J

__ I07:00 I

14:59

j.

3INSTALLATIONl S.... -... ; TON :..:::::::n EM Lr',, : - ;

,,~-,"

,-4 '

I :**;w:s.

~1.k

", S :, cj

, -,: ~,-

' V-r

-,~

?

.", ~:.

V E [M0G7 ros 02Iiin PO1iS bIMaITS1MTHi I

IA l ALfAvn I

2LMAaVn STICKS 07:00 14:59 EM0406368 l

P 71 EM D-06 INSPECT CELLS FOR B10B31 24MAY04 24MAY04 1

ELECTROLYTE 07:00 I

07:59 EM0406398 I

P 71 EM 1 D-205 INSPECT CELLS FOR B10B1 24MAY04 24MAY04 ELECTROLYTE 07:00 I

07:59 EM0406452 P 71 EM 1 P-025A-M E-MAX ANALYZE MOTOR B10B1 24MAY04 24MAY04 (1A52-07/1A-01) 07:00 l

08:59 EM0302175 I

P 71 EM 1 G-07-M MCE ANALYZE MOTOR B10B1 24MAY04 24MAY04 (1B52-7AI18.02) 08:00 I

12:59 EM0406453 I

P 71 EM 1 P-025B-M E-MAX ANALYZE MOTOR B1081 24MAY04 24MAY04 (1A52.111A-02) 09:00 10:59 EM0406457 P i71 EM 1 I P-028A-M E-MAX ANALYZE MOTOR B10B1 24MAY04 24MAY04 I

(I1A52-05/1A-01) 11:00 12:59 A

A _

i[_l_.l_l.l_

Al



M/R Xfi SCn UE 11111 DUE:2004/05i24NEED:200kO5I26 LATE:2 b~:03114N21:32052 LATE:2 E:20010R24NFED12Q07117 I.ATE~,2 SCHEDULED:EARLY.EiILUATE:

DUE20041(16i0l14NEED-2 20 tI7 LATE:

SCHEDIJLC OP111MALLYI DUE:2604IO1624 NEED 2004107117 LATEM SCHEDULE OPTIMALLY DUE:2004M$/24 NEED:2004107)17 LATE' 1:::1::::1:::

D 5UJ204hi1NEtEJ:2b toi25 LklrE:;

h:DULED:OtPIMALLY I,

, D;E,20;04105124 NEED 2004/0TJ1r' LATE;

I: : : :
1 I

L 4105131 K041110106

.0410106 04110)06 0o64l!b64 EM0406458 P 71 EM 1 P-028B-M E-MAX ANALYZE MOTOR (1A52-1 3/1A-02)

B10B1 24MAY04 13:00 24MAY04 14:59 I

I I.

I VAt: L),eI-/eJ AV, Aad /

F-'s FC5-tZ l

N W

LT-87 <75 At Risk BARCHART mPw9 NMCI/WE

- Primavera Systems, Inc.

PBNP Unit I Cycle 29/Unit 2 Cycle 27 FL-87 <75WaStatus

Run Date 22APRO4 11:451 WO STATUS <75 Sheet 4 of 5 AC Risk 1WJ WO IGRP Unit EQUIPMENT I

Activity WWSCj START FINISH MA EM0310314 M

71 M.02./-02 271-02LOWR 808126MY0426MY04PR 3 OPERATOR

..U...

.W.0~-0

.I.5.D.

EM3131 M 71 EM 0 27/D-01 27/0-01 LOWER UV 01081 26MAY04 26MAY04 PR FERATOR 13URbEN'- OWA~ =~03R-00 6!125V C SEPITIn MEDIUI HUMAN' PE - ER Oft PQTENTAIl EM03103165 M

rZ71 EM 0 2710-01 27/10-03 LOWER UV B310BI 27MAY04 27MAY04.

P!RI 3. OIERATbR BURbEN.- OWA -~',310615[i SETPOINT 10 145 In! MEDIU A HiMANI PRt-. ER~ROR PQ NTIAL III:

7 -_:/yEM:RESCURCES:

I....

EM0310316 S271DEM3

-1050STATONWATEYER R

U CEBlOB1 28MAY04 01JUN04 PRI X

fERATEOR Bj1bN!

4ALLY340:15 A -.

u.

STESIT 07:00*

2359.DI.04051 Q2040/7LAT:O fi0/

EM03061031 P 71 EM 0 27-048-7-MAX ANLYZER MOTOR 01081 28MAY04 28MAY04

CIEDL6PTALY:

ANDMANTEANE 0:0NEE9.DUEV20410N1 CHNEED RO Bf 204109/EU12

-MM0302Z54..

M R4ESC JRCES~'e-T EPIST 07:00, 1459

.Au.200 or N

20M710 L[E:204/01I EM0406510 1

M P2038B-M E-MA ANABPFLYZERMOTOR B4OB1 28MAY04-28MAY04

SCE[LE 4PJMLL REPAIRS12B04 07:00 014.59 ZeI I *yI-I !S::OMM7LA:E:&)].
2. MM.

..i 4.04..24.UX....26.Y

.JUDJA92..

..1W.

.0162.9 i.2 A.II

.T 94.4 -4.

I-4JA.4 MM0202029 207 Mm 2 CZ-0312 AIR DRY238ERT VALVECTO BY 1081 24MAY04 24MAY04 CS-HDU D.ERL LUAT4.

.A'..

5I27200 (SPTEARCE) 07:00 14:59 btk:./654 Nt/4 3 4 J2pqfL/0 02

-&AU40302548L

_4-M.0

-XV9 NPCADAITIA 48 26&44 "M~4 SHDLDP3AL UNIT

~~~~~07:00 10 59 DE20152 ED20/70 A20/82 MM40302376-C A1M 1

MS-0027 4r4I13P-270 BLOVR/DWN 81081 6MY0 26MAY094 a...

OUTAGES 07:00 18 590 NMCWE L-87.c5 A Rik ARCAR a_

. :10, LI PBNPs Unit11 Cycle 29Ai yl 7FL8 7

oSau C

Prmavea S

tems Inc

I run uate ZZAPR04 11:451 WO STATUS <75 Sheet S of 5 ACT lRisk lW WO GRP zUnit EQUIPMENT Activity WWsCl START FINISH I

JUN ID I

ITlI STI I

DescrIptIon I

I

[tm t ! !

r uM 11111 MM

.'.I

',~

- ~ :I.:s, MM0310412 I IC 71 1 MM [

CS-03100 CS.3100 TCV NOT

[101B1 26MAY04 I 26MAY04

_ CONTROLLING 07:00 16:59 MM0310576 C 21 MM II RD-05975 1RD-5975 RUPTURE DISC CHANGE OUT B1081 26MAY04 07:00 26MAY04 14:59 REQjUIRE] TO CLEAR OP DO NOT MOVE -WIThOUT TO0M`KEND~ALL (DJSI):

PAT !TURdNtR CON0FIRMEE btEE ORDEREDl.

SCUE ULED:O::A:

pRI 4, DEEN ODEREDI NEE D

0::::

O00099

lRST-DiS60S

'4 EACH RUP'

.;y:

2004)06111 L SING WITH '

1.

I URE DISCH!

I I

I I

I I

.,,,,. I I

i rE:200,4t07,/09 1MS-319 VALVE LEAKS BY B10811 26MAY04 26MAY04 07:00 16:59 CHANGE OIL, FLUSH BEARINGS AND CLEAN B10811 26MAY04 09:00 26MAY04 14:59.

I - - - - --

LI

'5 1.,

, ` I - '' ' ".4. -",- " :'.

"

rx e ".. . '

r'-

' -,;, 

I-

.1

"t

5.1

, '. ''

". -  11

  7'

. " ' IL 'r-- '.",': :t..I..

.,. -.:I

.": ' e V

r',

I......

FIRE PUMP CAPACITY TEST l10B1l 26MAY04 I 26MAY04 13:00 20:59 SCHEIULEQ EARLY I EVALUATE:

DUE:200410G2 NEEO:2004)7T28 L I

. I.

.TE:2004711114 I::::::

M IM C I WE LT-87 <75 At Risk BARCHART O Prlmavera_________Inc

_ 0 P N FL-87 <75 Wo Status 0 P laverdSAs.msPBNP Unit I Cycle 29IUnit 2 Cycle 27

External Performance Indicators-PBU1 March 2004 REACTOR SAFETY I

RADIATION SAFETY SAFEGUARDS t

t t

1" t

Occupafional hniating Mtiating Barrier Energency Radiation Radiation Physical

.iC t

Eents Systems Integrity Preparedness Safety Protection Indicator Summary PERFORMANCE INDICATORS NRC Indicator -

Site Indicator I

INSPECTION FINDINGS 1 Q/2004 4Q/2003 3Q/2003 2Q/2003 1 Q/2003

[d l 7~ndngsthij

[ lNofndgsthT]l Fl No fisdingsthisquatrt:

I Noindgsths I

I No find.

MEN iS Q.....

.i?<i, vIA...

F o ing rs mhs l L 2 rtLr lNofindigs his I

I Quantert I Quanter ljd~ningsmjs l

Quarter l

No findiogsthis I No Fordangsomisj I

Quarter NoFundingsThis 1 l

Quarter Nofindingsthis I

I qulaner I

l N fi~ig stbts l l

quarter jNo PsodingoThas j l Noindigs This Co2Z

External Performance Indicators-PBU2 March 2004 NRC Performance Indicator Summary 1 Q/2004 4Q/2003 30/2003 2Q/2003 1 Q/2003 PERFORMANCE INDICATORS NRC di.a8 Site Indca or INSPECTION FINDINGS i

_~~

_NI dig,_

Na.d[g~~

Nom Fidnggal lN TdnIhi

-Q--

lNa Finda a Thll_l NoaFmadagThls:l Na Findiags Thai oFndnsri Qnart a Qaaaaa,l Qaalo a I

q......

l oandngThi-l aa.r

-r l

I Q--r

External Performance Indicators-PBNP March 2004 Preliminary Data. Debrlefs/Exits (Violations, Non-Cited Vlolatlons, aSnd URls)

NRC Inspection Report Summary First Ouarter 2004 Reported Findings (Violations, Non-Cited Violations. and URls)

The following findings were identified in NRC Integrated Inspection Report 05000266/2003009; 05000301/2003009 dated January 30, 2004.

1. Non-Cited Violation (NCV) of License Condition which invokes the Fire Protection Evaluation Report concerning the licensee's failure to take effective corrective actions to address the control of transient combustibles. (GREEN)
2. Inspector identified finding concerning an inadequate risk assessment associated with the Unit 2 refueling 26 outage. The finding was not a violation of regulatory requirement. (GREEN)
3.

10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings." Self-revealing NCV for inadequate procedure use, which resulted in starting a Unit 2 RHR pump with the suction valve shut. (GREEN)

4. Inspector identified finding concerning the licensee's failure to use the correct procedure revision to a safety related EPIP during training.

(GREEN)

5.

10 CFR 20.1602, self-revealing NCV concerning the licensee's failure to adequately maintain positive control of a key for the lock to a very high radiation area. (GREEN)

6.

10 CFR 20.1501 and 10 CFR 20.1802, selfrevealing NCV concerning the licensee's failure to provided an adequate survey ofa valve prior to release off site to a vendor. (GREEN)

7.

10 CFR Part 50, Appendix B, Licensee-Identified NCV; Licensee had not verified that adequate emergency and abnormal operating procedures were in place such that IA system restoration and maintenance of the purge supply and exhaust valve boot seals was assured prior to the loss of containment integrity function.

8. URI concerning Framatome non-conformance Report 6028873-Lack of ultrasonic testing coverage during Unit I refueling outage U I R27 Reactor Pressure Vessel Inspection
9. URI concerning the installation ofa non-safety related worm gear in the IAF-4000, ZIP-29 AFW Pump Discharge to 'B' Steam Generator,"

motor-operated valve.

10. URI concerning the licensee's failure to install sprinklers in accordance with the applicable fire protection code in the component cooling water pump area.

External Performance Indicators-PBNP March 2004 The following findings were identified in the NRC 95003 Supplement Inspection Report 05000266/2003007; 05000301/2003007 dated February 4, 2004.

I.

Inspectors identified a NCV of emergency planning standard 0 CFR 50.47(b)(2) because the licensee failed to assign on-shift responsibilities for N R C reading facility seismic monitors thus affecting the ability to timely classify certain seismic events. (GREEN)

Insp ection 2.

Inspectors identified a Severity Level IV NCV of 10 CFR 50.9 for failure to provided complete and accurate information forthe ERO performance indicator for tracking on-shift communicators. Corrected data was subsequently submitted. This issue was evaluated with the traditional enforcement process.

R epo rt

3.

Inpectors identified a NCV of emergency planning standard 10 CFR 50.47(b)(16) for failure to develop and implement an emergency planning Sum m ary 4.

Inspectors identified a NVC of emergency planning standard 10 CFR 50.47(b)(4) for failure to properly calibrate the facility seismic monitors to ensure they were capable of supporting implementation of an Unusual Event EAL. (GREEN)

5.

Inspectors identified a NCV of 10 CFR Part 50 Appendix B, Criterion 111, "Design Control," due to a non-conservative Technical Specification Surveillance Requirement for testing the safety-related battery chargers. (GREEN)

6.

Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion III, "Design Control, 'because the licensee failed to maintain the 125 VDC voltage drop calculations accurate and up to date. (GREEN)

7.

Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action, " in that the licensee failed to implement timely corrective actions for safety-related electrical equipment in the PAB that was not environmentally qualified. (GREEN)

8.

Inspectors identified a NCV of 10 CFR Part 50.49(f) in that equipment in the PAB that would be susceptible to a harsh environment during a HELB was not environmental qualified. (GREEN)

9.

Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures and Drawings," because the licensee failed to include appropriate setpoint values for the minimum low head SI system "A" train flow in plant emergency operating procedures. (GREEN)

10.

Inspectors identified a NCV of 10 CFR Part 50, Appendix B, Criterion X, "Test Control, 'because the licensee failed to include in the inservice testing program certain CCW valves that were required to perform a safety function. (GREEN)

11.

Inspectors identified aNCV of 10 CFR Part 50, Appendix RSection III.L.I.c. Specificallythe licensee failed to ensure adequate control air to the speed controllers for the charging pumps during a postulated Appendix R fire, without the need for "hot standby repairs." (GREEN)

12.

Licensee-ldentified a NCV of 10 CFR Part 50.54(q), Failure to Declare An NOUE In a Timely Manner. Appendix Estates, in part, that a licensee shall have the capability to notify responsible State and local governmental authorities within 15 minutes after declaration of an emergency. On March 4, 2002, the licensee took approximately 31 minutes to notify responsible State and local governmental authorities of a liquefied propane gas leak.

13.

Unresolved Item (URI) A Range of Protective Action Recommendations was not established for State and Local Governmental Authorities.

14.

Apparent Violation for Failure to Maintain a Standard Scheme of Emergency Action Levels (EALs).

External Performance Indicators-PBNP March 2004 Fourth Quarter 2003 Reported Findings (Violations, Non-Cited Violations, and URIs)

Integrated Inspection Report (IR 2003-009) has not been received at this time, is expected mid February Inspection 12/19/2003:

NRC Evaluation of Changes, Experiments, or Tests and Permanent Plant Modifications Inspection (IR 2003-010)

R eport Level IV Non-Cited Violation. Failure to perform an adequate safety evaluation review.

Sum m ary 10/29/2003:

Integrated Inspection Report (IR 2003-004)

Finding: Green: Initiating Events and Mitigating Systems, Unit 0, Grading disagreement between the facility licensee and the NRC inspectors during the licensed operator requalification annual operating test.

Non-Cited Violation: Green: Initiating Events and Mitigating Systems, Unit 0, Failure to meet the performance requirements in maintaining simulator fidelity throughout the life of the simulation facility.

Licensee failed to conduct on particular performance test.

Finding: Green: Initiating Events and Mitigating Systems, Unit 2, Operators failed to identify that the main feedwater regulating valves (MFRVs) were in the automatic mode with a signal to open when the reactor trip breakers were closed during startup.

Non-Cited Violation: Mitigating Systems, Unit 0, Licensee missed SR 3.8.4.7 between 1/24/2003, and 8/21/2003, for the D-06 125-volt station battery and between 7/11/2002, and 7/22/2003, for the D-305 125-volt swing station battery.

Previously Reported Findings Greater than Green Unit 1: Yellow Finding, March 24, 2003, Installation of orifices to the AFW recirculation lines.

Unit 1: Red Finding, Feb. 28, 2003, AFW due to inadequate procedural guidance Unit 2: Red Finding, March 24, 2003, Installation of orifices to the AFW recirculation lines

All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Steo Owner Start Date Due Date Assesrment.-

OP-10011 Improve Effectiveness of Self Assessments OP-10-011.3.D Perform an effectiveness review of site CA028467 Purcell, J.

2/1512004 5115/2004 Commitment OP-10-011.4.C OP-10-011.5.F leadership observation programs.

Perform benchmarking effectiveness review. CA028465 Develop a process for site leadership CA030635 review of completed self-assessments.

Purcell, J.

Purcell. J.

4/15/2003 5/15/2004 1/12/2004 5/15/2004 Commitment Commitment Total Nof Items for Assessment Business Procedures.

OR-01-004 Individual Behavioral Excellence OR-01-004.19 Begin review of department indicators at Management Review Meetings.

3 CA054880 Breene, T.

4/1312004 5/7/2004 Commitment Total # of Mtems for Busine Emergency Planning OP-09-004 OP-09-004.8 OP-09-004.9 OP-09-004. 10 OP-09-005 OP-09-005.4 OP-09-005.5 OP-09-005.6 OP-09-005.7 ess Procedures Upgrade EmergencyActlon Levels (EALs)

PORC approval of EAL upgrade changes.

Submit site approved EAL upgrade changes to state and counties for approval.

Obtain state and county approval of EAL upgrades and incorporate comments.

Control I Maintenance of EP Required Equipment Document the licensing basis of required EP equipment contained in the matrix.

Evaluate whether each piece of EP Equipment in the matrix meets its associated EP functional requirements.

Perform an assessment of the equipment in the matrix for reliability/maintainability/

obsolescence.

Evaluate the adequacy of preventative Maintenance (PM) performed on EP equipment contained in the matrix.

CA052689 CA052690 CA052691 CA052409 Schwartz, P.

Schwartz, P.

4/15/2004 5/2112004 5/21/2004 5/28/2004 Schwartz, P.

5/28/2004 6/18/2004 Schwartz, P.

2/20/2004 61112004

1 Commitment Commitment Commitment Commitment CA052413 Schwartz, P.

2/23/2004 617/2004 Commitment CA052414 Schwartz, P.

2/23/2004 6/7/2004 Commitment CA052415 Schwartz, P.

2/23/2004 6/7/2004 Commitment Tolal N of hems for Emerg Engineering Design OP.144001 OP-14-001.11 lency Planning Improve the Configuration Management Program Implement fleet standards for modification closeout (Objective 2).

Interim Effectiveness Review (EFR).

7 CA030747 EFR030748 Marean, J.

Holt, K.

5120/2004 Commitment 5/2012004 Commitment OP-14-O01.12 Printed:

4/22/2004 2:39:29 PM Page 1 of 3 34

All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Steo Owner Start Date Due Date Total # of items for Engineering Design Engineering Design ClvilUStructural - PB EQ-15-012 Manhole and Cable Vault Flooding EQ-15-012.8 Complete installation of modification to dewater Manholes I end 2.

2 CA031053 Corbin, T.

3129/2004 5/28U2004 Commitment Total 1 of Items for Engineering Design CNilUStructural - PB Engineering Design Configuration Management (and Q-Llst Items)

OP-44-007 Updated Vendor Technical Information Program (VTIP)

OP-14-007.8 Review and eddress issues identified in the CA055685 VTIP self-assessment and in CA 000248, CA001634, end CA002968.

Total # of tems for Engineering Design Conflguration Management (and Q-Ust iems)

Engineering Equipment Systems Electrical EQ-15016 Determine Condition of Underground Electrical Cables Which Have Been Submerged EQ-15-016.4 Establish call-ups for future cable condition CA031639 monitoring.

1 Holt, K.

4115/2004 512012004 Commitment

1 Soulia, H.

4/2912003 611612004 Commitment Total # of Items for Engineering Equipment Systems Electrical Engineering Processes OR-05-008 AFW Root Cause Evaluation IRCE)

Corrective Actions OR-05-008.2 Develop an effectiveness review plan and CA055859 schedule.

OR-05-008.3 Establish ecross functional team to perform CA055860 the effectiveness review.

1 Peterson, L.

4/15/2004 511112004 Peterson, L.

5115/2004 61712004 Commitment Commitment

2 Total # of Items for Engineering Processes Performance Assessment OP-10-004 CAP Resolutions Effectively Addresses Problems OP-10-004. 16 Expand CARB membership.

CA055913 Hettick, D.

6117/2004 Commitment OR-01-004 OR-01-004.18 Individual Behavioral Excellence Begin Monthly group/department/site rollups CA054879 with month of March.

Hennessy, F.

4/112004 412912004 Commitment OR-01-004.26 OR-01-004.34 Revise CAP Trend reports to bin vs.

barriers, results and attributes.

CA0#4894 Hettick, D.

3/1/2004 5/2812004 Commitment Revise Human Performance trend reports to CA055029 bin vs. barriers, results, and attributes.

Hennessy, F.

31112004 5128/2004 Commitment Total # of Items for Performance Assessment Production Planning OR-01-004 Individual Behavioral Excellence

4 Printed:

4/22)2004 2:39:29 PM Page 2 of 3 35

All Excellence Plan Commitment Action Steps Due Within 60 Days tTrack Stop Owner Start Date Due Date CA054878 Strharsky, J.

5/10/2004 6/11/2004 OR-t1-004.17 Build additional accountability Into work week process via review of work week performance at POD.

Commitment Total # of Items for Production Planning Site Projects

1 EQ-1 5-001 EQ-15-OO1. 13 AFW Appendix R Firewall Project Modification Closeout CA030842 Morse, M.

12119/2003 5/30/2004 Commitment Total # of Items for Site Projects

I Printed:

412212004 2:39:29 PM Page3of 3 36

-i Point Beach CAP Activities Delay of Game Clock Friday, 04/23/ 2004 21 Days since-last fumbled item 1 Day since last Unassigned (Last reset: NQP-PBNP QC -)

item w..

iMn.; me O---

,YI

=F 40-A d

,1

~

¢,

t~~

t X

-s J

F-r-Q as

S' i-ja
',

i, rta F,,tr.

.,g 2,i 37

/

z Committed to Nuclear N

Excellence I

Plan of the Day Meeting 8:15 - 8:45 am Front Office Conference Room "Do the job right the first time. "

Plan of the Day Meeting Action Register Short Term Actions (<7 days)

Responsible Department Manager will provide weekly updates at POD Meeting on Monday, Wednesday, and Friday.

Entry Date Action Description Due Date Owner 4/20/04 Notify Pat Russell of the following:

4/23/04 All Managers

1. date of last human performance team meeting;
2. date of next department human performance team meeting 4/21/04 Develop recovery plans for PPG identified work-wveek 4/23/04 Affected Managers items and deliver to Plant Manager.

+

4-4 4-4-

4 I

4-4 4

4-Long Term Actions (>7 days)

Responsible Department Manager will provide weekly updates at POD Meeting on Friday.

Entry Date Action Description Due Date Owner

=

==i 1

4 4-4 4

4-38