{{#Wiki_filter:OA- 8' Cornirftrd to Nuclear E POlfiBERCi
{{#Wiki_filter:OA-8 '
* UIR2I Point Beach Nuclear Plant U1R28 OCC Interactive Turnovqgmation                   inthis record was deleted inaccordance with tPe Freedom of Information Meeting Agenda     Act, ex botions4 SaturdayAprll7, 2004 MILX/           m Start Time:         0600                   NSB Cafetetia             BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Cornirftrd to Nuclear E POlfi BERCi
* UIR2I Point Beach Nuclear Plant U1R28 OCC Interactive Turnovqgmation in this record was deleted in accordance with tPe Freedom of Information Meeting Agenda Act, ex botions4 SaturdayAprll7, 2004 MILX /
m Start Time:
0600 NSB Cafetetia BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Maintenance Coordinators (MOC)
Line 25: Line 28:
Shutdown Safety Assessor(SSA)
Shutdown Safety Assessor(SSA)
Site Management (SSM)
Site Management (SSM)
General Supervisors                       .
General Supervisors First Line Supervisors Agenda Safety Issue Discussion (SSC)
First Line Supervisors Agenda Safety Issue Discussion (SSC)                       .
: 2. Radiation Protection (RPM)
: 2. Radiation Protection (RPM)
: 3. Operations Coordinator Turnover (SOC)
: 3. Operations Coordinator Turnover (SOC)
Line 39: Line 41:
: 12. Shift Goals (SOM)
: 12. Shift Goals (SOM)
Items Included in Daily Package:
Items Included in Daily Package:
-    Site Communication
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Work Activity Risk Asignment ACEMAN Worksheet
-    Safety Snippet
-    Outage Alara Report
-    Outage Status Report
-    Shutdown Safety Assessment
-    Outage Schedule
-    Operating Unit Schedule
-    Work Activity Risk Asignment
-    ACEMAN Worksheet


Site Communication Revised 4/12/04 Priorities:
Site Communication Revised 4/12/04 Priorities:
* The Safe Operation of Unit 2
* The Safe Operation of Unit 2
* Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1 'tPriority  Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2 nd Priority   Focused Specialty Activities
* Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1 't Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities
                              - SG Eddy Current and Sludge Lancing
- SG Eddy Current and Sludge Lancing
                              - Main Turbine and Generator Work
-Main Turbine and Generator Work
                              - Rx Vessel Head Inspection
- Rx Vessel Head Inspection
                              - Hx Hydro Lance and Eddy Current 3' Priority     Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
-Hx Hydro Lance and Eddy Current 3' Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
Outage Briefing Schedule - NSB Cafeteria:
Outage Briefing Schedule - NSB Cafeteria:
Day Shift       Night Shift                                 Activity 0600 - 0640     1800 - 1840 OCC Turnover **
Day Shift Night Shift Activity 0600 - 0640 1800 - 1840 OCC Turnover **
0645 - 0725     1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730 - 0800     1930 - 2000 Supervisor Feedback to OCC of Tumover to Work Force
0645 - 0725 1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730 - 0800 1930 - 2000 Supervisor Feedback to OCC of Tumover to Work Force
        ** Outage Briefing Schedule Notes:
** Outage Briefing Schedule Notes:
* The following personnel are required to attend the OCC turnover meeting:
* The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity.
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity.
Line 71: Line 65:
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.


Committed to Nudcar Edcilenc                                             ,      _
Committed to Nudcar Edcilenc s EflU'JBRIIEY DF U
s   EflU'JBRIIEY DF U     TEXCELLEnE POWI BERCH U1REE Point Beach Nuclear Plant U1R28 Refueling Outage
TEXCELLEnE POWI BERCH U1REE Point Beach Nuclear Plant U1R28 Refueling Outage
  ;-:.;:  :7...                   Safety. Topic for week of April 11-17th                     -
:7...
Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?
Safety. Topic for week of April 11-17th Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?
Lotsl A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.
Lotsl A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.
Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April 21, 2001 the Point Beach declared an Unusual Event due to a small fire in the Unit I containment building during a refueling outage. The fire was Ina bag of rags on the manway platform of the Alpha steam generator in Unit
Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April 21, 2001 the Point Beach declared an Unusual Event due to a small fire in the Unit I containment building during a refueling outage. The fire was In a bag of rags on the manway platform of the Alpha steam generator in Unit
: 1. The fire brigade was summoned and put out the fire within about 20 minutes.
: 1. The fire brigade was summoned and put out the fire within about 20 minutes.
Monday "When you clean up hazards, you scrub out accidents" Why is good housekeeping important? Just think about It. A clean workplace has less fire hazards, fewer safety hazards and lust plain looks better. A clean workplace promotes pride in your Job.
Monday "When you clean up hazards, you scrub out accidents" Why is good housekeeping important? Just think about It. A clean workplace has less fire hazards, fewer safety hazards and lust plain looks better. A clean workplace promotes pride in your Job.
Line 85: Line 79:
Saturdav "Clean up and care will speed up repair" It is a good practice to assign one coworker as the 'housekeeping conscious' on each job. This person is responsible not to clean up after you but to remind everybody on the job to dean up after themselves. This helps to minimize the gradual buildup of clutter as the lob progresses.
Saturdav "Clean up and care will speed up repair" It is a good practice to assign one coworker as the 'housekeeping conscious' on each job. This person is responsible not to clean up after you but to remind everybody on the job to dean up after themselves. This helps to minimize the gradual buildup of clutter as the lob progresses.


U                     V Point Beach Nuclear Plant Outage 1R28                                                                                                        Path                      Picture DAY               12                                           Nlzp                           Meets Supporting Operational Excellence Outaae Radiation Performance II-                                                                       c_6U                                            IIVs
U V
* LJU OS I- &
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 12 Path Nlzp Picture Meets Outaae Radiation Performance Rfi__#
Rfi__#
I I-
                                    !    1    '£l-                                                                             AT*
* LJU OS I-c_6U IIVs A
This indicator measures cumulative dose radiation exposure and Day 12 - April 15 Actual = 0.360 total number of personnel-contamination events (PCE's > 5000                                   Cumulative = 24.112 cpm) during refueling outages. The dose indicator is measured in                               Cumulative Forecast = 43.719 Rem and individual PCE events.
1 T*
Meets:                   <=75 Rem                   Actual Cum.
'&#xa3; l-This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Exceeds:                 <=71 Rem                         Dose:             24.112 Rem Meets: <=18             Exceeds: <= 12             Actual PCE's:                   5 Stu Thomas Personnel Contamination Events                                                             Cummulative Dose Exposure 20 18 I                                                                                          ---
Meets:  
                                                                                                                                                      - -        I 16 60
<=75 Rem Actual Cum.
    ? 14                     I                                                                                                                                         +      -Actual
Exceeds:  
                                                                --Actual                                                              I.
<=71 Rem Dose:
e12                                                                                  0)
24.112 Rem Day 12 - April 15 Actual = 0.360 Cumulative = 24.112 Cumulative Forecast = 43.719 Meets: <=18 Exceeds: <= 12 Actual PCE's:
E                    I                                       . . . . .Forecast                                           .
5 Stu Thomas Personnel Contamination Events Cummulative Dose Exposure 20 18 16
0
? 14 e12 E
    ! 10              II                                                                      40      21                                                                        Goal Goal
1 0
    -0 8                                                                                  a a)                               I (a
- 8 0
z  4                                                                                0    20                       044**
z 4
2
2 0
              .64 I  I    I  I  I I        II              -
I I
0 0 2 4 6 8 10121416182022242628303234                                                    0    2          4    6  8  tO   12 14   1ff 18 20 22 24     2ff
I II
.64 I
I I
I I
I I I
- --Actual
.....Forecast Goal 0) 0 a
a)
(a 0
I 60 I.
40 21 I
20 044**
0 2
4 6
8 tO 12 14 1ff 18 20 22 24 2ff
+
-Actual Goal 0 2 4 6 8 10121416182022242628303234


NMC Comumiltaed lo Nucbar Excelletwe Outage Status Report Plant!         Point Beach Unit I                       Day:     Friday                       Today's Date/Time:       4/17/04     0600 Outage Duration: Day               13   of   28 Safety Status Industrial - Within the last 12 hours OSHA Recordables               0           First Aid cases         0         Significant near misses       0 Total for this outage           I Summary:
NMC Comumiltaed lo Nucbar Excelletwe Outage Status Report Plant!
* Pending OSHA Injury- Back Strain Radiological Dose outage to date               24.112                           Projected to date     43.719                     Outage Goal           *75 R Difference                       -19.607                                                                             Number of PCEs           5 Summary:
Point Beach Unit I Day:
Nuclear Significant human performance errors and events in last 24 hours                   0 Summary:
Friday Today's Date/Time:
Plant Status Mode:               Hlot Standby (Mode 3)         D] Hot Shutdown (mode 4) D Cold Shutdown (Mode 5)                 3 Refueling Shutdown   ()-lode 6)
4/17/04 0600 Outage Duration: Day 13 of 28 Safety Status Industrial - Within the last 12 hours OSHA Recordables 0
RCS:             Temperature:         95                         Pressure: Vented to Atmosphere           RV Level:       70%
First Aid cases 0
Time to Boil:             52 Minutes
Significant near misses 0
                                                            . Shutdown Safety Assessment Reactivity:           Green             Core Cooling:         Yellow             Power Availability:           Green Containment:         Green               Inventory:           Yellow             Spent Fuel Pool Cooling:       N/A Shutdown'Safety Assessment ProQ                 Equipment:     . .
Total for this outage I
Major Activities Completed In Last 24 Hours                             Critical Pat and Near Critical Path Activities (Nest 24 Hours)
Summary:
Schedule: Activities Required to Exit Yellow Risk Conditions I) Troubleshoot & Repair Z-13 Polar Crane
* Pending OSHA Injury-Back Strain Radiological Dose outage to date 24.112 Projected to date 43.719 Outage Goal  
*75 R Difference  
-19.607 Number of PCEs 5
Summary:
Nuclear Significant human performance errors and events in last 24 hours 0
Summary:
Plant Status Mode:
H lot Standby (Mode 3)
D] Hot Shutdown (mode 4)
D Cold Shutdown (Mode 5) 3 Refueling Shutdown ()-lode 6)
RCS:
Temperature:
95 Pressure:
Vented to Atmosphere RV Level:
70%
Time to Boil:
52 Minutes
. Shutdown Safety Assessment Reactivity:
Green Core Cooling:
Yellow Power Availability:
Green Containment:
Green Inventory:
Yellow Spent Fuel Pool Cooling:
N/A Shutdown'Safety Assessment ProQ Equipment:
Major Activities Completed In Last 24 Hours Critical Pat and Near Critical Path Activities (Nest 24 Hours)
Schedule:
Activities Required to Exit Yellow Risk Conditions I) Troubleshoot & Repair Z-13 Polar Crane
: 2) Reactor Vessel Head Stud Removal
: 2) Reactor Vessel Head Stud Removal
: 3) B RCP Motor Move
: 3) B RCP Motor Move
: 4) Install Cavity Seal Ring
: 4) Install Cavity Seal Ring
: 5) Reactor Vessel Head Lift Significant Outstanding Issues Date                                                     Issue                                                 Due           Responsibility 4/03/04       Repair Blowdown Tank Leakage                                                                     4120/04           Scott Manthei 4/04104       1P2A Charging Pump Troubleshooting                                                               4123/04             Clay Hill 4/08/04       Incorporate Lessons Learned     from lsr Reduced     Inventory   Orange Path                 420/04             Dave Dyzak 4/13/04       Z-13 Polar Crane Troubleshooting                                                                 4/17/04           Dan Laing 4115/04       Isolation Valves for RCS Flow Transmitters IFT413 & IFT-416 leakby                               4/17104         Larry Peterson 4116/04       Nitrogen Supplied to Nozzle Dams has Potential         to Backfeed   to Breathing Air           4/17/04         Larry Peterson 4117/04       IT-300B on hold until completion of I&C Valve work on ICS-476                                   4/17/04           Dave Dyzak
: 5) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4120/04 Scott Manthei 4/04104 1 P2A Charging Pump Troubleshooting 4123/04 Clay Hill 4/08/04 Incorporate Lessons Learned from lsr Reduced Inventory Orange Path 420/04 Dave Dyzak 4/13/04 Z-13 Polar Crane Troubleshooting 4/17/04 Dan Laing 4115/04 Isolation Valves for RCS Flow Transmitters I FT413 & IFT-416 leakby 4/17104 Larry Peterson 4116/04 Nitrogen Supplied to Nozzle Dams has Potential to Backfeed to Breathing Air 4/17/04 Larry Peterson 4117/04 IT-300B on hold until completion of I&C Valve work on ICS-476 4/17/04 Dave Dyzak
                                                              ..Upcomilng Ma or Milestones               .      :          .
.. Upcomilng Ma or Milestones Sch eduled Actual Scheduled Ac tal Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100
Scheduled                  Actual                                         Scheduled                   Actal Date         Time         Date           Time                               Date         Time       Date         Time Cooldown <2000             4/03/04         2100       4/03/04         2230       Heatup >2000         4/25/04       0900 Head Lift                 4/09/04         0900                                   Initial               4/28/04       1100 Refueled                   4/14/04         0300                                   On-Line               4/30/04       0100


                                              - Pahicaeaclr~ucleut-Plmit -. -        . ...-
- Pahicaeaclr~ucleut-Plmit -.
PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:         1             DATE:         April 17, 2004           TIME:       0200 KEY SAFETY FUNCTIONS:
PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
REACTIVITY:                 GREEN CORE COOLING:               YELLOW POWER AVAILABLE:             GREEN INVENTORY:                   YELLOW CONTAINMENT:                 GREEN SFP COOLING:                 N/A PROTECTED EOUIPMENT:
1 DATE:
r COMMENTS:                                                                                               e .kL Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil Is 52 minutes RCS is at 70 % Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-I 562                                                                                       Rererences: NP 103.6 Revision 2 10/30/02                                     Page 5 of 9                                          NP 10.2.1
April 17, 2004 TIME:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EOUIPMENT:
r COMMENTS:
e Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil Is 52 minutes RCS is at 70 % Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway
.kL PBF-I 562 Revision 2 10/30/02 Rererences: NP 103.6 NP 10.2.1 Page 5 of 9


ACEMAN INDIVIDUAL EXCELLENCE WORKSHEET Qualified Workers Accident Job Planning & Preparations Procedures & Work Instructions B
ACEMAN INDIVIDUAL EXCELLENCE WORKSHEET P
P                          I  Free Verification & Validation Supervisor Oversight A
I L
I                        N            Worker Practices R
L A
L    Organizational      D                                            R Excellence                        Qualified Workers L                          I            Job Planning & Preparations     I Control    Procedures & Work Instructions A                          V  Dose Verification & Validation Supervisor Oversight E
R S
R                          I            Worker Practices               R S                          D                                            .S Qualified Workers U            Job Planning & Preparations Procedures & Work Instructions 0      Operational        A            Verification & Validation       F Excellence                        Supervisor Oversight F                          L            Worker Practices               0 4-R.
0 F
E                         E             Qualified Workers Job Planning & Preparations Procedures & Work Instructions X        Training X            Verification & Validation       E Supervisor Oversight C      Excellence          C            Worker Practices               X E                          E                                            C L                          L            Qualified Workers Job Planning & Preparations E
E X
                          'L  Attend Training Procedures & Work Instructions Verification & Validation L
C E
E                          E            Supervisor Oversight Worker Practices               L N                          N                                            E C                          C            Qualified Workers Job Planning & Preparations N
L E
E                          E    No      Procedures & Work Instructions Verification & Validation C
N C
Rework Supervisor Oversight Worker Practices E
E Organizational Excellence Operational Excellence I
Date:                   Time:
N D
I V
I D
U A
L E
X C
E L
'L E
N C
E Accident Free Control Dose Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices B
A R
R I
E R
.S F
0 R.
E X
C E
L L
E N
C E
4-Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Training Excellence Attend Training No Rework Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Date:
Time:


I U         ID after16APR0412:00 RES       WO     WO             EQID I            U1R28 WORKING SCHEDULE DESCRIPTION         RD       ES         EF   16                                                               17R after 16APR04 12:00 t8 I.
after16APR0412:00 I
            .. I        pi__III_   __  _                                                _  _                    0112.14,16_18_._                 I0          .41           8.221_0_.2.4.6,8_                       .2114;16!
U1R28 WORKING SCHEDULE I
1 MM993T787     MMV         76   9937787     FD-02543A                 1FD-2543A -
after 16APR04 12:00 U
ID RES WO WO EQID DESCRIPTION RD ES EF 16 17R t8 I
pi__III_
0112.14,16_18_._
0
.41 I
8.221_0_.2.4.6,8_  
.2114;16!
I.
1 MM993T787 MMV 76 9937787 FD-02543A 1 FD-2543A -
REBUILD/STICKS &
REBUILD/STICKS &
4 05APR04 06:00A 16APR04 pA-9n7i 15:59 FD-2543A - REBUILDI 0 'KS & PACK LEA?
PACK LEAK 4
i191LP FWH 36 DRAI Tc HX-17B CONTRC L9437787 PACK LEAK
05APR04 06:00A 16APR04 15:59 pA-9n7i FD-2543A - REBUILDI 0 i191LP FWH 36 DRAI Tc
-    -        i.-+-*                       I               4                           -I               I 1 NG26TFC2ND NOE             77   0301897       IST-SISI       NOE FOR FAC PROG - 20 05APR04                17APR04 N YE                          FOR FAC PRt .                JRB HALL 26 FTC EN AREA TUR8 HALL 26 FT GEN               07:OOA       11:59                                                       -1 _ 11SECONDAi1 Y NSERVICE INSPECTI( WN6301897 AREA                                        _                _
-
-               .f--+-                       4               +                           4-4             4 1 MM0214026     MMV         76   0214026     CS-00141A         CS-141A, INSPECT         20 06APR04      20APR04 IV ho2140MCC S-i 1A, INSPECT CHI .C VALVE INTERNA S. RMP 9326 CHECK VALVE                  10:OOA       10:59     -
i.-+-*
I -4.
I 4  
                                                                                                                                                                              - mu                 I '.I                         - I INTERNALS. RMP 9326                                                                                                                                        ,
-I I
1 NG08TFC2ND NOE             77   0301897       IST-SISI       NDE FOR FAC PROG-           5 07APR04       16APR04                     ,NI E FOR FAC PROG E. JRB HALL 8 FTGI 'N kREA I
N YE FOR FAC PRt.
1MN
'KS & PACK LEA?
_TURB HALL . FT GEN                 08:OOA       16:59                     )CN NDARY INSERVIC Eli 4SPECTION030181
HX-17B CONTRC JRB HALL 26 FTC EN L9437787 1
_  _    _    _                  ~AREA_                                _
NG26TFC2ND NOE 77 0301897 IST-SISI NOE FOR FAC PROG -
1 NG08TFC1ND NDE             77   0301897 1 IST-SISI           NDE FOR FAC PROG -         60 08APR04      19APR04    ;08TFCIN                E FOR FAC PROG -17JRB HALL 8 FT O'                      HEAD TURB HALL 8 FT OVERHEAD 00:OOA       11:59     I..o   -          -1I      I .I ,_
TUR8 HALL 26 FT GEN AREA 20 05APR04 07:OOA 17APR04 11:59 AREA NSERVICE INSPECTI(
                                                                                                                                                                              -   -     _            ;            _        I
RMP 9326
                                                                                                                                                                                                                              -MMW~01       -
-1 _ 11SECONDAi1 Y WN6301897 ho2140MCCS-i 1A, INSPECT CHI.C VALVE INTERNA
MM0214027     MMV       76   0214027       CS-00476       CS476.INSPECT AND 5           08APR04       16APR04                     S.; 6. INSPECT AND MP NTAIN VALVE. RF IP i 138-4 1CS-0476 1
-
MAINTAIN       VALVE, RMP _
.f--+-
9138-4                  1:00A       16:59                     Ix. B SG FEEDWATE                     !GULATOR CONT           .0214027 1 NG26TFCtND NDE             77   0301897       IST-SISI       NOE FOR FAC PROG -         30 08APR04      17APR04
4  
                                                                                                                          ;26TFC1N        Itic  E FOR FAC PROG                  IRB HALL 26 FT C IVE HD TURB HALL 26 FT               21:OOA       23:59                   I-       ___          __    __      - 3     _                ii           SECONDARY ISLRVICE INSPE OVERHD
+
-4 1  MM0214038
4-4 4
                  .-----4 MMV       76   0214038 4-FD-00157A FD-157A. INSPECTANC 16 09APR04 MAINTAIN CHECK VALVE 4                                                                                                    07:OOA
1 MM0214026 MMV 76 0214026 CS-00141A CS-141A, INSPECT CHECK VALVE INTERNALS. RMP 9326 20 06APR04 10:OOA 20APR04 10:59 IV S.
                                                                                                            +
-
19APR04 13:59 12&L4238f
I -4.
                                                                                                                                              -1 .
mu I '.I  
i7A, INSPECT AN D A AIJNTAIN CHECK
- I 1 NG08TFC2ND NOE 77 0301897 IST-SISI NDE FOR FAC PROG-5 07APR04 16APR04
__        - -  ____ T AL
_TURB HALL. FT GEN 08:OOA 16:59
__     -               :i   I I  MM0214143      MM2        76  0214143          SC-1B        HYDROLANCE SC-i B          13 09APR04      17APR04    4-02143     1         ZOLANCE SC-1B 4.Ol DENSER (BOTH (Al ERBOXES)
~AREA_
CONDENSER (BOTH                 11:00A       15:59                       11_I                                               CCMOSD NSER (DEAERATINGt024`143 WATERBOXES) 1 MM0303383     MMV       76   0303383     SC-00966B           SC-966B - VALVE         20 09APR04      20APR04    80303383!              6B . VALVE LEA IN 'BY. REPAIR LEAKING BY. REPAIR               I 1:00A     10:59               _    .    .I
I 1MN
                                                                                                                                                .                         I, - I..     _              III 1 TG9949102N ITGG            76  9949102      TG-01-Ti              LP1- REPLACE        58 13APR04      23APR04 T 9949102?, .Pi .REPLACE EXTR C1 ON BELLOWS (N                                       -S)
;08TFCIN
EXTRACTION BELLOWES               00:OOA       00:59                         _                          I   I                   I I                     ,,  I (NIGHTS)
,NI
-4               4-4-4.                       4               4.                         4-4
)CN E FOR FAC PROG NDARY INSERVIC E FOR FAC PROG E.
* 1  CE-1600-20     CE8       76   0213472           R-1         ENERGIZE AND CAL           26 13APR04       19APR04    A600.20EI        IEFGtZE AND CAL U? DErHEAD INSPECTIN                            =QIPMENT UNDERHEAD                02:OOA       14:59                   I - I I
Eli
Il In                           -
-17 JRB HALL 8 FTGI 4SPECTION030181 JRB HALL 8 FT O'
INSPECTION EQUIPMENT 1    TG-30470    TGG        76  0302153      TG-01-T        PERFORM HP SPINDLE          36 13APR04 120APR04 T* :t 4 7 0 PEI tFc RM HP SPINDLE I 01 DR BORE INSPEC                                     4l-T1 ROTOR BORE INSPECTION-PT2 09:OOA 1 11:59           .0 .
'N kREA HEAD 1
h   I I                         I I         _     ~       I                         I I _
NG08TFC1ND NDE 77 0301897 1 IST-SISI NDE FOR FAC PROG -
_________                                A                .1.                       -A                                                                                                                 ______________
TURB HALL 8 FT OVERHEAD 60 08APR04 00:OOA 19APR04 11:59 I..o I
Run Date                                         16APR04 15:38l                           LT-51 PRIORITY PUBLICATION-ES                                                       l                             Sheet I of II Primavera Systems, Inc                           Il                  FL-50 Priority Working Publication                                                   l
I
.I,_
-1
-1 I
MMW~01 I
MM0214027 MMV 76 0214027 CS-00476 CS476.INSPECT AND 5
08APR04 16APR04 MAINTAIN VALVE, RMP _
1:00A 16:59 1CS-0476 1
9138-4
;26TFC1N S.;
Ix.
Itic
: 6. INSPECT AND B SG FEEDWATE E FOR FAC PROG MP NTAIN VALVE. RF
!GULATOR CONT IRB HALL 26 FT C IP i IVE 138-4
.0214027 HD 1
NG26TFCtND NDE 77 0301897 IST-SISI NOE FOR FAC PROG -
TURB HALL 26 FT OVERHD 30 08APR04 21:OOA 17APR04 23:59 I -
- 3 ii SECONDARY ISLRVICE INSPE
-4  
-4-.-----4 4-4
+
12&L4238f -1 i7A, INSPECT AND A AIJNTAIN CHECK AL 1
MM0214038 MMV 76 0214038 FD-00157A FD-157A. INSPECTANC MAINTAIN CHECK VALVE 16 09APR04 07:OOA 19APR04 13:59
____ T  
__ -
:i I
4-02143 1 ZOLANCE SC-1B 4.Ol DENSER (BOTH (Al ERBOXES)
I MM0214143 MM2 76 0214143 SC-1B HYDROLANCE SC-i B CONDENSER (BOTH WATERBOXES) 13 09APR04 11:00A 17APR04 15:59 11_I CCMOSD NSER (DEAERATINGt024`143 80303383!
6B. VALVE LEA
'BY. REPAIR 1
MM0303383 MMV 76 0303383 SC-00966B SC-966B - VALVE LEAKING BY. REPAIR 20 09APR04 I 1:00A 20APR04 10:59 IN
.I I..
I I,
II T 9949102?,.Pi.REPLACE EXTR C1 ON BELLOWS (N 1
TG9949102N ITGG 76 9949102 TG-01-Ti LP1-REPLACE EXTRACTION BELLOWES (NIGHTS) 58 13APR04 00:OOA 23APR04 00:59
-S)
I I
I I
I A600.20EI IEFGtZE AND CAL U?
=QIPMENT
-4 4-4-4.
4
: 4.
4-4 1
CE-1600-20 CE8 76 0213472 R-1 ENERGIZE AND CAL UNDERHEAD INSPECTION EQUIPMENT 26 13APR04 02:OOA 19APR04 14:59 DErHEAD INSPECTIN I
I Il I
In T* :t 4 7 0 PEI tFc RM HP SPINDLE I 01 DR BORE INSPEC 4l-T1 1
TG-30470 TGG 76 0302153 TG-01-T PERFORM HP SPINDLE ROTOR BORE INSPECTION-PT2 36 13APR04 120APR04 09:OOA 1
11:59
.0.
h I
I I
I I _
I
~
I A
.1.  
-A Run Date 16APR04 15:38l LT-51 PRIORITY PUBLICATION-ES l
Sheet I of II I
Primavera Systems, Inc l
FL-50 Priority Working Publication l


after 16APR04 12:00                           I         U1R28 WORKING SCHEDULE                                                                       I                       after 16APR04 12:00 U                     RESP WO       WO         EQID       I       DESCRIPTION   1 RD1           ES           EF                                                                   1A7PR
after 16APR04 12:00 I
___ST                                                           __._                                                                    . 1S 80.2210
U1R28 WORKING SCHEDULE I
___      .2.4-1-61&sect;8 .10012.1 .16.18,20.22 0 .2. 4                 .6. 8 tO121Ot4.16l 1   TG9949102D     TGG     76 9949102     TG-01-T1           LPI- REPLACE         57 13APR04           23APR04 4&99441n2rdPi                   REPLACE EXTRACTION BELLOWS (DAYSI47r2 EXTRACTION BELLOW,                09:OOA          08:59        1-5df=A~~
after 16APR04 12:00 U
I 9_,II.I                                                   _~                       ,+
RESP WO WO EQID I
(DAYS)-PT2                                              z 4              4
DESCRIPTION 1 RD1 ES EF 1A7PR
* 1    TGSUPPORT TGG                            TG-01-T          PROVIDE CRANE.      267 13APR04            01MAY04 T. SUPPOR1                   )VIDE CRANE, RlI GE R.AND TOOLRO(                       ,UPPORT(PT2)
___ST  
RIGGER. AND                 09:00A         18:59                   __.                              . ,,          ---                  ._ : _
. 1S 80.2210  
TOOLROOM
.2.4-1-61&sect; 8.10012.1.16.18,20.22 0.2. 4  
___            4 SUPPORT(PT2)            _ _        _  .
.6. 8 tO121O t4.16l 1
1     TG0302133     TGG     76 0302133     MS-02026       MS-2026 - OVERHAUL       15 13APR04           17APR04                         *-226 - OVERHAUL I H! TOP VALVE-PT2 LH STOP VALVE-PT2               12:00A          16:59      r                    IA.                    TY =           _    r   ";
TG9949102D TGG 76 9949102 TG-01-T1 LPI-REPLACE EXTRACTION BELLOW, (DAYS)-PT2 57 13APR04 09:OOA 23APR04 08:59 1-4&99441n2rdPi REPLACE EXTRACTION BELLOWS (DAYSI47r2 5 df=A~~
b      .RBINE LEFT HAND S ro, 0302133 1    TG0302134     TGG     76 0302134     MS-02027       MS-2027 - OVERHAUL       15    13APR04      17APR04                        5.2127 - OVERHAUL I              ;TOP VALVE-PT2 I
I.I
RH STOP VALVE-PT2               12:OOA         16:59             -     Ipz-              -          *1 i                   -        'T JRBINE RIGHT HAND         P0302134
_~  
_              _        _ -I             I I     MM0213779     MMV     76 0213779                       1FDA145 BODY TO      22      13APR04      20APR04 FD-00145                                                                     A02137791 :D. 145 BODY TO BO9 NE r LEAK BONNET LEAK                 20:OOA         21:59                   .        I                     I I             _!                g                           _
,+
I               I                     .LL                    I 1     EP0301956     EPT     76 0301956     HX-001A       EDDY CURRENT TEST 1B5 14APR04                  25APR04 E '0 1 E1                      CURRENT TEST              AM GENERATOR STEAM GENERATOR A                 00:OOA         16:59         30 956
9_,
                                                                                                                                      -                                I-             -          I-       I         Li                 -
I I T.
I 4              4                     4-1                   1 I     EP0301957     EPT     76 0301957     HX-001B       EDDY CURRENT TEST 185 14APR04                  25APR04 E '0301957E                    CURRENT TEST              lAM GENERATOR STEAM GENERATOR B                 00:WOA         16:59         ___--_I                         -
z SUPPOR1
I    TG0215004     TGG     76 0215004     HX-054B       HX-54B - INSTALL NEW 4           14APR04       16APR04                               B - INSTALL NEV Et COOLER
)VIDE CRANE, RlI GE R. AND TOOLRO(
_                                                                  EH COOLER         _      09:OOA         15:59                       CT iO-HYDRAULIC P Ull COOLER021500d 1     IC0400553A       IC1   76 0400553     SERVICE           SERVICE MAINT       42      14APR04      23APR04              E53U ER' FICE MAINT SUPF                    -EQ VERIFYING SUPPORT-EQ                  09:WOA         13:59                       . .                                                    . _      I VERIFYING
,UPPORT(PT2) 4 4
                                                                                                                              -appmvec tec 1 spec ST- Restar CL not reqd
1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.
-                                         I               I                                             4 I     EM0407780       EM     76 0407780       Z-013           Z-013 PERFORM         8     14APR04       16APR04          10407T802            PERFORM TROU SLU SHOOTING AND I EF TROUBLESHOOTING                  13:OOA         21:59                             _                  iWTAIfMI'Cl dAM49InARf77Y AND REPAIR
RIGGER. AND TOOLROOM SUPPORT(PT2) 267 13APR04 09:00A 01MAY04 18:59 4
-r                                         t               i                                             F 0     EM0304877       EM     76 0304877   A52-DHVR.1               BREAKER           8    14APR04      17APR04        I0304877Q            LKER MAINTENA              1200.14 MAINTENANCE 1200-14               19:W0A         22:59                     -        .          .          I     .
1 TG0302133 TGG 76 0302133 MS-02026 MS-2026 - OVERHAUL LH STOP VALVE-PT2 15 13APR04 12:00A 17APR04 16:59 r
W4.16 KVI1200 AiPN ACUUM BREA (I
I
-r                   t-i--t               4               1                                             F 1         IC5.5       IC2   76 0300848   ICP-05.006       TURBINE LUBE OIL       8      14APR04      18APR04 IC5 6 TURBI?                  JBE OIL SYSTEM IC '5;6)
*-226 - OVERHAUL I H! TOP VALVE-PT2 I.A b
SYSTEM (ICP 5.6)               22:OOA         04:59                                                                                         _TU+  i               LUBF OILSY OIn=S~lQ i     i                     i  i                     I       (             u         odINdLUBE 1     IC0302376       1C2   76 0302376     TS-02134       TS.2134 RELOCATE       137 14APR04 I 06MAY04                 )302376T'      .2? 4 RELOCATE SVY TCI SWITCH                  22:OOA         21:59         -__            _                                                  I I       J.                 _ _ _ _ _ I     _ _ _ _  I     I.                             __ _ _ __ _I__ _      i                       I..
5.2127 - OVERHAUL I
RunDate                                       16APR               l               LT-51 PRIORITY PUBLICATION-ES u Da                 PmaveratSes           16msAnc.                           FL-50 Priority Working Publication                                                       ll
;TOP VALVE-PT2 TY  
=
r 1
TG0302134 TGG 76 0302134 MS-02027 MS-2027 - OVERHAUL RH STOP VALVE-PT2 15 13APR04 12:OOA 17APR04 16:59 I
pz-  
*1 i
A02137791 :D. 145 BODY TO BO9 NE
'T
.RBINE LEFT HAND S JRBINE RIGHT HAND ro, 0302133 P0302134
-I I
r LEAK I
MM0213779 MMV 76 0213779 FD-00145 1FDA145 BODY TO BONNET LEAK 22 13APR04 20:OOA 20APR04 21:59 I
I I g
E '0301956E1 CURRENT TEST AM GENERATOR I
I  
.LL I
1 EP0301956 EPT 76 0301956 HX-001A EDDY CURRENT TEST STEAM GENERATOR A 1B5 14APR04 00:OOA 25APR04 16:59 I -
I -
I Li 4
4 4-1 1
E '0301957E CURRENT TEST lAM GENERATOR I I
EP0301957 EPT 76 0301957 HX-001B EDDY CURRENT TEST STEAM GENERATOR B 185 14APR04 00:WOA 25APR04 16:59
___--_I I
TG0215004 TGG 76 0215004 HX-054B HX-54B - INSTALL NEW 4
14APR04 16APR04 EH COOLER 09:OOA 15:59 E53U CT ER' B - INSTALL NEV iO-HYDRAULIC P FICE MAINT SUPF Et Ull COOLER COOLER021500d
-EQ VERIFYING 1
IC0400553A IC1 76 0400553 SERVICE SERVICE MAINT SUPPORT-EQ VERIFYING 42 14APR04 09:WOA 23APR04 13:59 I
-appmvec 10407T802 tec 1 spec ST-Restar PERFORM TROU CL SLU not reqd SHOOTING AND I
-
I I
4 I
EM0407780 EM 76 0407780 Z-013 Z-013 PERFORM TROUBLESHOOTING AND REPAIR 8
14APR04 13:OOA 16APR04 21:59 EF iWTAIfMI'Cl dAM49InARf77Y I0304877Q LKER MAINTENA 1200.14
-r t
i F
0 EM0304877 EM 76 0304877 A52-DHVR.1 BREAKER MAINTENANCE 1200-14 8
14APR04 19:W0A 17APR04 22:59 I
W4.16 KVI1200 AiPN IC56TURBI?
JBE OIL SYSTEM IC '5;6)
-r t-i--t 4
1 F
ACUUM BREA LUBF OIn= S~lQ (I
1 IC5.5 IC2 76 0300848 ICP-05.006 TURBINE LUBE OIL SYSTEM (ICP 5.6) 8 14APR04 22:OOA 18APR04 04:59 i
i i
i I
( _TU+
i u
odINdLUBE OILSY
)302376T'.2? 4 RELOCATE SVY TCI 1
IC0302376 1C2 76 0302376 TS-02134 TS.2134 RELOCATE SWITCH 137 14APR04 I 06MAY04 22:OOA 21:59 I
I J.
I
_ _ _ _ _ I I.
I..
__ _ _ __ _I__
i RunDate 16APR l
LT-51 PRIORITY PUBLICATION-ES u Da PmaveratSes 16msAnc.
FL-50 Priority Working Publication ll


after 16APR04 12:00                                                                                                                                                                                           after 16APR04 12:00 I                U1R28 WORKING SCHEDULE                                                                                  I U I       ID           RESP             WO         WO         EQID                 DESCRIPTION               RD       ES                   EF                                                                         APR
after 16APR04 12:00 I
_____                _ST                 _____            _ ___              ______                                                      ._____
U1R28 WORKING SCHEDULE I
1    IC5.52-1            IC2            76    0300872    ICP-05.052 I
after 16APR04 12:00 U I ID RESP WO WO EQID DESCRIPTION RD ES EF APR
ICP 5.52 SECONDARY
_ST 2__
_102 I137    14APR04        01MAY04 OL1 2__                8 jjD       4.16.1     Bl~.Di20221     0
8
* 2.4.6 zA.ii4QI+/-Id'8 1_0_12_14_16_1 s.52.ilCP $.52LSECONDARY TE4PEIATURE INST TEMPERATURE INST                         23:OOA           21:59         r
_102 0
_      .       _ _ _ _ = _  .        _    _  _  _ .      _    . _ _  _
* 2.4.6 8 1_0_12_14_16_1 I
MM0301145 76 MMI                      0301145     HX-01585         HX-15B5. CFC COIL               10     15APR04         17APR04           I0301145                iB5. CFC COIL IN EF NAL INSPICLEANI NG INTERNAL                        0200A            20:59           I                                     --                                      ECONTAINMENT ACIDl1NT RECIRC Ht
I OL1 jjD 4.16.1 Bl~.Di20221 zA.ii4QI+/-Id' 1
                                                                                . INSPICLEANING 1
IC5.52-1 IC2 76 0300872 ICP-05.052 ICP 5.52 SECONDARY TEMPERATURE INST 137 14APR04 23:OOA 01MAY04 21:59 s.52.ilCP $.52LSECONDARY TE4PEIATURE INST r
_-                                                           4             4                                   4-4                   4.
I0301145 iB5. CFC COIL IN EF NAL INSPICLEANI NG
1   MM0301146           MMI               76     0301146                       HX-01586- CFC COIL               10     15APR04         17APR04            q0301140              ISB6 - CFC COIL I Im1 RNAL INSPICLEA qIh                xI HX.01586                  INTERNAL                        02:WOA           20:59                       -i -                                  I-         -        l4     CONTAINMENT ACdID4NT RECIRC H INSPICLEANING II4                                                                              l MM0301148          MM1               76     0301148     HX-015B8         HX-1568. CFC COIL               10     15APR04         17APR04           903011i4 1X4iB8, CFC COIL INtEIJNAL INSPICLEANI NGL 1                                                                                      INTERNAL                        02:OOA            20:59                                                              i ___  __        _ I      __    lrr~ _  _I =   AltnrtKrr INSPICLEANING                                                                                                                                                                                                ,HH4 l   T                       l                                _ _ __                _    _  . _ _  _;
_ _ =
1   MM0214171           MM1               75     0214171     W-u01B1         W-1B1. INSPECTAND                 30     15APR04         19APR04            10214171' r-1I 1, INSPECT AND LU RICATE FAN BEJ                                IGS LUBRICATE FAN                        02:00A           22:59                             .,                              I                     I BEARINGS 1   IC9948487           ICV             76     9948487     FD-02513B             I FD-2513B POST               2     15APR04         16APR04                                   139 POST REPAI              AGNOSTIC
1 MM0301145 MMI 76 0301145 HX-01585 HX-15B5. CFC COIL INTERNAL INSPICLEANING 10 15APR04 0200A 17APR04 20:59 I
                                                                          .      REPAIR DIAGNOSTIC                       03:OOA           21:59
ECONTAINMENT ACIDl1NT RECIRC Ht q0301140 ISB6 - CFC COIL I Im1 RNAL INSPICLEA qIh 4
                                                                                                                                                                                    *HX-211 HP FM                B DUMP TO CONE EN 3ER CONTROL99484I r 1   MM0214064           MM1               76     0214064     HX-0158             HX-15B, MOTOR               10     15APR04         16APR04           ~W21064#      X:1 iB. MOTOR COO! IN, COIL INTERNAL                            PECTION COOLING COIL                        10:OOA            23:59                                  i!W-1B1 AC( :IDI NT RECIRC FAN I INTERNAL INSPECTION                                                            _11                                                                          OR COOLING COIL0 140 1     TG-30510           TGG               76     0302153     TG-01-T             CLEAN IINSPECT               3     15APR04         16APR04                                   IINSPECT INNEI ST EAM GLAND CASI N!I                SG INNER STEAM GLAND                                                             MD1 0 Cu I11:OOA           14:59           ;MHIG- PF ESSURE TURBINE 031 2153 1CASINGS 1 EP0301963             EPT             76     0301963     HX-021A             HX-021A - EDDY               27     15APR04         17APR04           0101 9a6Hi c-c:-
4 4-4 4.
IA - EDDY CURRI              INSPECT SA LP FL._ I EATER                              I CURRENT INSPECT SA                        18:OOA            18:59                                                      ...
1 MM0301146 MMI 76 0301146 HX.01586 HX-01586-CFC COIL INTERNAL INSPICLEANING 10 15APR04 02:WOA 17APR04 20:59 xI i
LP FW HEATER
I-l4 CONTAINMENT ACdID4NT RECIRC H I I4 1
__                    I,                     it                           HP FEEDWATER HEAT R A0301963
MM0301148 l
_-              _4           -        _-
MM1 76 0301148 HX-015B8 HX-1568. CFC COIL INTERNAL INSPICLEANING 10 15APR04 02:OOA 17APR04 20:59 903011i4 1X4iB8, CFC COIL INtEIJNAL INSPICLEANI NGL i
I     IC4.1C             IC2             76     0300824     ICP-04.001       ICP4.ICDELTATSPI                 39     15APR04         22APR04 C4.1CjCP 4. IC ELTA TSPI CAL CALIB                      21:00A           03:59               -        I -ML. .         ml    _~~~I B.
lrr~  
I   TG-9040           TGG               76     0302150       TG-01             INSPECTTURBINE THRUST BEARING 4      16APR04 08:OOA 16APR04 15:59 sNSI EC              rTURBINE LTU BII JE GENERATOR ((
=
THRU              EARING ERIC; SEE COMP( INENTS)0302150 I  NG-SCIASRV           EPT             75     0301978       SC-1A                 SC-tA - EDDY               5     16APR04         16APR04                                     A - EDDY CURR                REVIEW I RERUN '(1 %S)
I AltnrtKrr
CURRENT REVIEW I                         08:OOA           16:59                         ON
* __ __
                                                                                                                                                                                  )ENSER (DEAERA flN .)0301978 RERUN (1AS)
H4 10214171' r-1I 1, INSPECT AND LU RICATE FAN BEJ IGS
_I        __________..                                                                                                                                      IfZBFA 1 TGHX22BRP I TOG                       76     0302109     HX-022B           MSR B INTERNALS                 5    16APR04 116APR04
_I
_h          DlAS
,H l
                                                                                                                                                                                  ~B INTERNALS RI rP IRS (SHELL SIDE)
l T
IREPAIRS (SHELL SIDE)                      08:WOA           16:59                                 TURE SEPARATO                  =HEATER0302109
1 MM0214171 MM1 75 0214171 W-u01B1 W-1B1. INSPECTAND LUBRICATE FAN BEARINGS 30 15APR04 02:00A 19APR04 22:59 I
_                                                                        .                                                                  ,                                                            I_                                  I Run   Date C tPmavera            Systems, Inc.
I 1
16APRo415:381 I
IC9948487 ICV 76 9948487 FD-02513B I FD-2513B POST 2
LT-51 PRIORITY PUBLICATION-ES FL-50 Priority Working Publication                                                   T       l                              Sheet 3 of 11
15APR04 16APR04 REPAIR DIAGNOSTIC 03:OOA 21:59
~W21064# X:1 1
MM0214064 MM1 76 0214064 HX-0158 HX-15B, MOTOR COOLING COIL INTERNAL INSPECTION 10 15APR04 10:OOA 16APR04 23:59
_11 139 POST REPAI
*HX-211 HP FM iB. MOTOR COO!
i!W-1B1 AC(
IINSPECT INNEI ESSURE TURBINE IA - EDDY CURRI IN,
:IDI ST 031 AGNOSTIC B DUMP TO CONE COIL INTERNAL NT RECIRC FAN I EAM GLAND CASI 2153 INSPECT SA LP F 1
TG-30510 TGG 76 0302153 TG-01-T CLEAN IINSPECT 3
15APR04 16APR04 INNER STEAM GLAND I11:OOA 14:59 1CASINGS MD1 0 Cu
;MHIG-0101 9a6H PF c-c:
EN SG N!I 3ER CONTROL99484I PECTION OR COOLING COIL0 EATER r
140 1
EP0301963 EPT 76 0301963 HX-021A HX-021A - EDDY CURRENT INSPECT SA LP FW HEATER 27 15APR04 18:OOA 17APR04 18:59 i -
L._ I I
I, it HP FEEDWATER HEAT R A0301963
_4 C4.1CjCP 4. IC ELTA TSPI CAL B.
I IC4.1C IC2 76 0300824 ICP-04.001 ICP4.ICDELTATSPI CALIB 39 15APR04 21:00A 22APR04 03:59 I -ML..
m l I
_~~~
I TG-9040 TGG 76 0302150 TG-01 INSPECTTURBINE 4
16APR04 16APR04 THRUST BEARING 08:OOA 15:59 I
NG-SCIASRV EPT 75 0301978 SC-1A SC-tA - EDDY 5
16APR04 16APR04 CURRENT REVIEW I 08:OOA 16:59 RERUN (1AS)
_I sNSI EC LTU BII ON IfZBFA
_h DlAS rTURBINE THRU JE GENERATOR ((
A - EDDY CURR
)ENSER (DEAERA
~ B INTERNALS RI TURE SEPARATO flN rP EARING ERIC; SEE COMP(
REVIEW I RERUN
.)0301978 IRS (SHELL SIDE)
=HEATER0302109 INE
'(1 NTS)0302150
%S) 1 TGHX22BRP I TOG 76 0302109 HX-022B MSR B INTERNALS I REPAIRS (SHELL SIDE) 5 16APR04 116APR04 08:WOA 16:59 I
I Run Date 16APRo415:381 LT-51 PRIORITY PUBLICATION-ES l
Sheet 3 of 11 C tPmavera Systems, Inc.
I FL-50 Priority Working Publication T


I                                                                                                     I after 16APR04 12:00 after 16APR04 12:00 I                U1R28 WORKING SCHEDULE U           ID       RESP WO       WO         EQID   I         DESCRIPTION                 IRDI     ES       EF                                                               APR
I I
_______      _        ST    __  __  _._      _  __                                    .                        .                                                                            . -..                i i 1                                                 _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _I I   CEDIVSURCH       CEI   76   0.400396 JI-FOREBAY         INSPECT & CLEAN                     17   16APFR04 1UAPMU4     mrVSURCfl N~PECT & CLEAN 5UK~jE CHAMULB                     I 54AL[VVYLL SURGE CHAMBER I                            09:00A    08:59            _      r
after 16APR04 12:00 I
__ _ i-        i                     -m  -
U1R28 WORKING SCHEDULE after 16APR04 12:00 U
SEAL WELL                                                                                                                !-     1+-
ID RESP WO WO EQID I
1     TG03021358     TGG   76   0302135   MS-02033-O     MS-2033 -REINSTALL                     5   16APR04   16APR04                           2033 - REINSTA    UI- GOv VALVE OPE IN OR LH GOV VALVE                           10:OOA     16:59               _    I        IRBINE LOWER  7F1 HAND GOVERNO 1t# OPERATOR0302135 OPERATOR 1     CAMP-113A       CH                     HX-001A     CAMP-113 SAMPLE A                     3   16APR04   16APR04     MP-113 S              ILE A STEAM GE        kTOR (NO SPARC STEAM GENERATOR                             11:00A     14:59 (NO SPARGE) w-              1t 1       T-8447-H     WCC         0018447     TG-01-T     1 TU TG-01-T REV6.03-1                 2   16APR04   16APR04                           .01 -T REV6.03-1 12:00     13:59         1TU T(            -T REV6.03-1 001 1        T-8451-H     WCC         0018451       T-36     1 LO T-36 EPT REV.1-                   2   16APR04   16APR04   1W441 L(              16 EPT REV1-1 12:00     13:59         1 LOT.            PT REV1-100184!
DESCRIPTION IRDI ES EF APR S T i
I        T-8453-H     WCC         0018453       T-36       I LO T-36 MM REV1-1                   2   16APR04   16APR04         3441 L(          16 MM REVI-1 12:00     13:59         1WI  LOT-        AM REVI-1 001845 1        T-9689-R     WCC         0009689       T-36       1 LO T.36 MM REVO-1                   2   16APR04   16APRo4   6_9-R 1 L(            16 MM REV0.1 12:00     13:59     _1 LOT-            AM REV0-1 000968 1        T-9697-R     WCC     -    009697     HX-001B     1 MS HX-1B WLU MMV                     2   16APR04   16APR04         7-1 M            (-it13 WLU MMV RE      I REVO-1                           12:00     13:59   i    1MS H          3 WLU MMV REVO          09697 1     TGHX22ARP       TGG   76   0302108     HX-022A       MSR A INTERNALS                       5   16APR04   16APR04                         1A INTERNALS RI        IRS (SHELL SIDE)      rra REPAIRS (SHELL                           12:00     16:59                         TURE SEPARATOl          =HEATER0302108 SIDE)PT2 1       IT300ABR     OPS                     HX-001B       PRE JOB BRIEF FOR                     I   16APR04   16APR04   300ABRPR                B BRIEF FOR IT-:    3 IT-300B                           13:00     13:59   U 1     lT-300BSMP     CH                   O-IT-0300A       SAMPLE S/G HX-18                     3   16APR04   16APR04 T 00BSMP                  PLE SIG HX-1B Pi          VL300S        1 PER IT-300B                           14:00-   16:59         _A              MAIN FEED LINE        CK VALVES (COLI )S fUTDOWN) 1         01124-10   OPS                     HX-001A             DRAIN A SIG                   12   16APR04   17APR0     24-IODRJ                SIG COMPLETEI COMPLETELY                             15:00     04:59                 Li 1       TG-9050     TGG   76   0302150       TG-01       VISUALLY INSPECT                         16APR04 I 16APR04     .00 5 0 V15 JA LY INSPECT THRI                BEARING COMPONEINTS THRUST BEARING                      1    16:00     16:59 I 0215cIT          RI INE GENERATOR            NERIC: SEE COMI'OliENTS)
i 1
COMPONENTS
_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _I I
_                                                    I __                                       I                     I .......      .                          .                      .                        .,.
CEDIVSURCH CEI 76 0.400396 JI-FOREBAY INSPECT & CLEAN SURGE CHAMBER I SEAL WELL 17 16APFR04 09:00A 1UAPMU4 08:59 mrVSURCfl N~PECT & CLEAN 5UK~jE CHAMULB I 54AL[VVYLL r
Run Date                                       16APR04 15:38                 l                 LT-51 PRIORITY PUBLICATION-ES                                                                           Sheet 4 of II Primavera SIstemsInc                       l                             FL-50 Priority Working Publication
i i-  
-m 1+-
1 TG03021358 TGG 76 0302135 MS-02033-O MS-2033 -REINSTALL 5
16APR04 16APR04 LH GOV VALVE 10:OOA 16:59 OPERATOR 1
CAMP-113A CH HX-001A CAMP-113 SAMPLE A 3
16APR04 16APR04 STEAM GENERATOR 11:00A 14:59 (NO SPARGE) 1 T-8447-H WCC 0018447 TG-01-T 1 TU TG-01-T REV6.03-1 2
16APR04 16APR04 12:00 13:59 1
T-8451-H WCC 0018451 T-36 1 LO T-36 EPT REV.1-2 16APR04 16APR04 12:00 13:59 I
T-8453-H WCC 0018453 T-36 I LO T-36 MM REV1-1 2
16APR04 16APR04 12:00 13:59 1
T-9689-R WCC 0009689 T-36 1 LO T.36 MM REVO-1 2
16APR04 16APRo4 12:00 13:59 1
T-9697-R WCC 009697 HX-001B 1 MS HX-1B WLU MMV 2
16APR04 16APR04 REVO-1 12:00 13:59 1
TGHX22ARP TGG 76 0302108 HX-022A MSR A INTERNALS 5
16APR04 16APR04 REPAIRS (SHELL 12:00 16:59 SIDE)PT2 1
IT300ABR OPS HX-001B PRE JOB BRIEF FOR I
16APR04 16APR04 IT-300B 13:00 13:59 1
lT-300BSMP CH O-IT-0300A SAMPLE S/G HX-18 3
16APR04 16APR04 T PER IT-300B 14:00-16:59 1
01124-10 OPS HX-001A DRAIN A SIG 12 16APR04 17APR0 COMPLETELY 15:00 04:59 I
MP-113 S w-1t 1 TU T(
1W441 L(
1 LOT.
3441 L(
1WI LOT-6_9-R 1 L(
_1 LOT-7-1 M i 1MS H 300ABRPR U
00BSMP
_A 24-IODRJ
.00 5 0V15 0215cIT 2033 - REINSTA IRBINE LOWER ILE A STEAM GE
.01 -T REV6.03-1
-T REV6.03-1 001 16 EPT REV1-1 PT REV1-100184!
16 MM REVI-1 AM REVI-1 001845 16 MM REV0.1 AM REV0-1 000968
(-it13 WLU MMV RE 3 WLU MMV REVO 1 A INTERNALS RI TURE SEPARATOl B BRIEF FOR IT-:
PLE SIG HX-1B Pi MAIN FEED LINE SIG COMPLETEI LY INSPECT THRI INE GENERATOR UI-7F1 GOv VALVE OPE HAND GOVERNO kTOR (NO SPARC I
09697 IRS (SHELL SIDE)
=HEATER0302108 3
VL300S 1
CK VALVES (COLI IN 1t#
OR OPERATOR0302135 rra
)S fUTDOWN)
Li
JA RI 1
TG-9050 TGG 76 0302150 TG-01 VISUALLY INSPECT THRUST BEARING COMPONENTS 1
16APR04 I 16APR04 16:00 16:59 I BEARING COMPONEINTS NERIC: SEE COMI'OliENTS)
I __
I I.......
Run Date 16APR04 15:38 l
LT-51 PRIORITY PUBLICATION-ES Sheet 4 of II Primavera SIstemsInc l
FL-50 Priority Working Publication


after 16APRO4 12.00                                                                                                                               after 16APRO4 12.,00 I          U1R28 WORKING SCHEDULE                                                    I Ul       'ID       EI wI      W           EQID   I     DESCRIPTION       IRE) IE       I   EF   I                                                     APR ST11                                                                                                                             17                                         18
after 16APRO4 12.00 I
. TG-9070   TGG   76   0302150       TG-01         CLEAN THRUST         4   16APR04  16APR04                     NTHRUST BEARI IG OMPONENTS BEARING                17:00     20:59   030215Ci1         ITURBINE GENE A OR (GENERIC: SE                OMPONENTS)
U1R28 WORKING SCHEDULE I
COMPONENTS 1      IT-300B OPS   77   0215905     O-IT-0300B     FILL B S/G TO MSIV     6   16APR04   17APR04     IT.300%F L I SIG TO MSIV AN FRESSURIZE TO I                    SIG AND PRESSURIZE TO             17:00     00:59   n'4xnO    I .-            ~8 SG MA N EED LINE CHECK            YVES (COLD SHUTDOI 100 PSIG 1   TGRF-230   TGG   76   0215878     O-RF.230           EH FILTER         8   16APR04   17APR04   GRF.230E I F .TER CHANGEOU            r    0DMAGNETIC CHANGEOUT AND               17:00     00:59   02158T7i                    EH FILTE R HANGEOUT AND            2'NETIC PLUG INSPEC  JNN MAGNETIC 1   PM-BRIEFI   ADM                       ADMIN       OCC INTERACTIVE       2   16APR04   16APR04   'M4BRIEF'            INTERACTIVE Ti IR OVER and FOLLC            P TURNOVER and             18:00     19:59 FOLLOWUP                                               IC 1   TG-30511   TGG   76   0302153     TG-01-T   -LEAN/INSPECTIREPAIF       10 16APR04   17APR04       TG-305        .EANIINSPECTIRE PA R OUTER STEAM                U41DCASINGS OUTER STEAM GLAND CASINGS 19:00-     08:59       03021  .        -ia  _        - 1HIGH PRESSUR            JRBINE 1   CE300869SI CE4   76   0300869     ICP-05.049   BUILD SCAFFOLDING       8   16APR04   17APR04     CE3008          1UILD SCAFFOLr IN ICP 5.49 SEC CO              oL VALVES ICP 5A9 SEC CONTROL           20:00*     03:59         030o86 _                S    E I Ot: DARY PLANT CO?        OL VALVES VALVES I     TG-9100   TGG   76   0302150       TG-01       ASSEMBLE TURBINE       20   16APR04   19APR04           TC        1OASSEMBLE TUF BI E THRUST BEARI THRUST BEARING               21:00     20:59           I03p21                _
after 16APRO4 12.,00 Ul  
1    IC5.18-1   IC2   76   0300856     ICP-05.018   RSC CNTL SYS CAL       28   16APR04   21APR04           IC      .jRSC    CNTL SYS l:Az 21:00-     00:59           DI 08          _                                            lf      fM 1   T-8436-R WCC         0018436       Z-013     1 Z Z-13 TBL REV2-1     1 16APR04   16APR04             7          "I Z Z-13 TBL F 1 EZMRCP-K1     EM   76   0215205     P-00IB-M   JIT INFO SHARING FOR 2 22:00 16APR04 22:59 16APR04 t2 t3d1 Z Z-13 TBL          REV2-1
'ID EI I
                                                                                                                          .KIJIT INFO SHAF Imi FOR P.1B MOTO P- B MOTOR LIFT             22:00     23:59 EZM 2OREACTOR cO LANT PUMP MOI orL FT RWP: RCP Sea IM intenance 1 MM-8480C3   MM1   76   0214134         R-1       REMOVE REMAINING         4 16APR04   17APR04         MM. VI148 10 3REMOVE REM UNING STUDS I CLO                3TUD HOLES STUDS / CLOSE STUD             22:00     01:59               21113REACT                DRVESSEL AND ASS          ILY HOLES       I I EZMRCP-K2     EM   76   0215205     P-001B-M     P-1B PRE-JOB BRIEF     2   17APR04   17APR04               ZMClCP4C2P B PRE, 10! BRIEF FOR MOT(                MOVE FOR MOTOR MOVE               00:00     01:59                     21520!0REACT DRCOOLANT PUMP I                  OR RWP: RCP       I Maintenance
w W
                                                                                                                                              'A 1   IC0212599   lCV 76   0212599     CC-00761A- I ICC-761A-O   AIR LEAK   4   17APR04 117APRo4                   iCl 21 25 9 91CC-761A. IR LEAK ON DIAPI        ,GM ON DIAPHRAGM              00:00-     03:59                     2125991P- IA ICP THERMAL BA ZRI ..R COOLING RETURI                      ERATO Run Date                                 1APR0415:38I                       LT-51 PRIORlIY PUBLICATION-ES                                                                 Sheot5of11 O Primavera Systems, Inc.                                     FL-50 Priority Working Publication                                 I
EQID I
DESCRIPTION I RE) IE I
EF I
APR ST11 17 18 TG-9070 TGG 76 0302150 TG-01 CLEAN THRUST BEARING COMPONENTS 4
16APR04 17:00 16APR04 20:59 030215Ci1 IT.300%F L 1
IT-300B OPS 77 0215905 O-IT-0300B FILL B S/G TO MSIV 6
16APR04 17APR04 AND PRESSURIZE TO 17:00 00:59 100 PSIG 1
TGRF-230 TGG 76 0215878 O-RF.230 EH FILTER 8
16APR04 17APR04 CHANGEOUT AND 17:00 00:59 MAGNETIC 1
PM-BRIEFI ADM ADMIN OCC INTERACTIVE 2
16APR04 16APR04 TURNOVER and 18:00 19:59 FOLLOWUP 1
TG-30511 TGG 76 0302153 TG-01-T  
-LEAN/INSPECTIREPAIF 10 16APR04 17APR04 OUTER STEAM GLAND 19:00-08:59 CASINGS 1
CE300869SI CE4 76 0300869 ICP-05.049 BUILD SCAFFOLDING 8
16APR04 17APR04 ICP 5A9 SEC CONTROL 20:00*
03:59 VALVES I
TG-9100 TGG 76 0302150 TG-01 ASSEMBLE TURBINE 20 16APR04 19APR04 THRUST BEARING 21:00 20:59 1
IC5.18-1 IC2 76 0300856 ICP-05.018 RSC CNTL SYS CAL 28 16APR04 21APR04 21:00-00:59 1
T-8436-R WCC 0018436 Z-013 1 Z Z-13 TBL REV2-1 1
16APR04 16APR04 22:00 22:59 1
EZMRCP-K1 EM 76 0215205 P-00IB-M JIT INFO SHARING FOR 2 16APR04 16APR04 P-B MOTOR LIFT 22:00 23:59 1
MM-8480C3 MM1 76 0214134 R-1 REMOVE REMAINING 4
16APR04 17APR04 STUDS / CLOSE STUD 22:00 01:59 HOLES I
I EZMRCP-K2 EM 76 0215205 P-001B-M P-1B PRE-JOB BRIEF 2
17APR04 17APR04 FOR MOTOR MOVE 00:00 01:59 n'4xnO I
GRF.230E 02158T7i
'M4BRIEF' TG-305 03021 CE3008 I F IC N THRUST BEARI ITURBINE GENE I SIG TO MSIV AN
~8 SG MA
.TER CHANGEOU EH FILTE INTERACTIVE Ti
.EANIINSPECTIRE IG OMPONENTS A OR (GENERIC: SE F RESSURIZE TO I N EED LINE CHECK r
0D MAGNETIC R HANGEOUT AND IR OVER and FOLLC PA R OUTER STEAM 1HIGH PRESSUR IN ICP 5.49 SEC CO Ot: DARY PLANT CO?
BI E THRUST BEARI OMPONENTS)
SIG YVES (COLD SHUTDOI 2'NETIC PLUG INSPEC P
U41D CASINGS JRBINE oL VALVES OL VALVES JNN
-ia 1UILD SCAFFOLr 030o86 _
S E I TC 1OASSEMBLE TUF I03p21 IC
.jRSC CNTL SYS l:Az DI 08 lf fM 7
EZM MM.
t2 148 211 VI ZMC iCl "I Z Z-13 TBL F t3d1 Z Z-13 TBL
.KIJIT INFO SHAF 2OREACTOR RWP: RCP Sea 10 3REMOVE REM 13REACT lCP4C2P B PRE, 21520!0REACT RWP: RCP 2125991CC-761A.
2125991P-Imi cO IM UN DR 10!
DR
'A IA REV2-1 FOR P.1B MOTO LANT PUMP MOI intenance ING STUDS I CLO VESSEL AND ASS BRIEF FOR MOT(
COOLANT PUMP I I Maintenance IR LEAK ON DIAPI ICP THERMAL BA orL ZRI FT 3TUD HOLES ILY MOVE OR
,GM
..R COOLING RETURI 1
IC0212599 lCV 76 0212599 CC-00761A-I ICC-761A-O AIR LEAK ON DIAPHRAGM 4
17APR04 117APRo4 00:00-03:59 ERATO Run Date 1APR0415:38I LT-51 PRIORlIY PUBLICATION-ES Sheot5of11 O Primavera Systems, Inc.
FL-50 Priority Working Publication I


after 16APR04 12:00                                   U1R28 WORKING SCHEDULE                                           I                 after 16APR04 12:00 UI        ID   RES   WO IWO         IED                 DESCRIPTION   IRDI   ES         EF   11                                                                                   1 a
after 16APR04 12:00 U1R28 WORKING SCHEDULE I
__ST                                                                    _                       l21.1f,20,2210 . 2. 4.4 6 . 8 .10112,14,1861970.22 0. .2. 4. 6 , 8,10112,14,16l1 1   IC10.10B   IC   76   0300885     ICP.10.010     B SIG INSTRUMENT     5 17APR04   17APR04            IC10.1066 SI/G IN TS MENT BLOWDO BLOWDOWN              01:00     05:59             030088        !    SG TRANSMITTERS    -      IWDOWN, FILUNG At      ENTING 1   EZMRCP-K     EM   76   0215205     P-OOIB-M     P1 B MOVE MOTOR       6 17APR04   17APR04             EZMRCP4-KMI VE MOTOR FROM PI IMFTO STAND FROM PUMP TO STAND           02:00       09:59               021520                EREACTOR CC            NT PUMP MOTOR RWP: F    r1p Seal Maintenance 1   AM-BRIEF2   ADM                                     OCC INTERACTIVE       2 17APR04   17APR04                   AM-BRIEP      X, INTERACTIVE F      R.I OVER and FOLLOWU p.
after 16APR04 12:00 U I ID RES WO IWO IED DESCRIPTION IRDI ES EF 11 1 a
TURNOVER and           06:00-     07:59                                 VA FOLLOWUP I TGHX22CVIS   TGG   76   0302110     HX-022C       MSR C INTERNALS     10 17APR04   17APR04                   TGHX22CN t        SR C INTERNALS IN.! DECTION (SHELL SID INSPECTION (SHELL         07:00     16:59                       03021 1                      WAO l'It rURE SEPARATOR R -Hi ATER SIDE) 1   MM-8480RA   MMI   76   0214134         R-1       JIT INFO SHARING. 1 17APR04   17APR04                       MM-848 Rl JIT INFO SHARINI            AVITY SEAL RING & rol HAT CAVITY SEAL RING &         08:00       08:59                         021i 134 EREACTOR VES' EL WND ASSEMBLY TOP HAT                                                                                     0'1 1    IT-30081 OPS   77   0215905     O-IT-0300B     RAISE B SrG TO 500   2 17APR04   17APR04                                     RAISE B SIG TO I        SIG IAW IT-3001B IT-3C PSIG IAW IT-300B         08:00     09:59                         021! 05 WB SG MAIN FE ED INE CHECK VALVES rCC LD SHTDOVt4 1   TG0302151   TGG   76   0302151       TG-01   AUTOSTOP OIL RELIEF 20     17APR04   19APR04                       TG030 154 WUTOSTOP OIL R EU F VALVES OVERHAL L VALVES OVERHAUL           08:00'     07:59                         030i 51                      _ 2_
_ _ST l21.1f,20,2210. 2. 4.4 6. 8.10112,14,1861970.22 0..2. 4. 6, 8,10112,14,16l1 1
MM-8480RB   MMI   76   0214134         R-1     IPTE BRIEF. INSTALL     I 17APR04   17APRo4                       MM8 80 BlPTE BRIEF, IN TA CAVITY SEAL RIN                & rOP HAT CAVITY SEAL RING &         09:00     09:59                           02 41 WREACTOR VE S AND ASSEMBLY TOP HAT 1   TG-30580   TGG   76   0302153       TG-01-T   MEASURE HP OUTER       2 17APR04   17APR04 TG- 05 d0MEASURE HP 0              R STM GLD CLEARA C S
IC10.10B IC 76 0300885 ICP.10.010 B SIG INSTRUMENT BLOWDOWN 5
_TM GLD CLEARANCES           09:00     10:59                           03 21 QHIGH PRES UF TURBINE 1   TG0302155   TGG   76   0302155     TG-01-T2         LP2 TURBINE     40 17APR04   20APR04                         TG03 21 sLP2 TURBINE C          L-THROUGH INSPEcntN CRAWL-THROUGH           09:00-     08:59                           03 21      _____ _    ,
17APR04 01:00 17APR04 05:59 1
INSPECTION 1     IT-300B2 OPS   77   0215905     0-IT0300B CS-476M & CS-476-BB       3 17APR04   17APR04 M -3' DEBS~6AIA & CS4 '6-B8 SEAT LEAKAGI VEIST SEAT LEAKAGE TEST           10:00     12:59                                     906=      SG MW EED LINE CHECK VAI VE (COLDSHUI MM 1   MM-8480R1   MMI   76   0214134         R-1     INSTALL CAVnIY SEAL     4 17APR04   17APR04                                 341 DRIINSTAL~L CAV TY EAL RING RING             10:00     13:59                                 21 13~iREACII 6R JESSEL AND ASSEMI ILt 1   RPID-005   OPS                     O-RP-001D       ESTABLISH RP ID     4 17APR04 I 17APR04                                 P1 3-005ESTABLISH qP 0 INITIAL CONDITIOI IS.
EZMRCP-K EM 76 0215205 P-OOIB-M P1 B MOVE MOTOR 6
INmAL CONDmONS            11:00     14:59
17APR04 17APR04 FROM PUMP TO STAND 02:00 09:59 1
                    .U                                                     . &                    AIA.A                         I                                                  I Run Date                                 16APR0415:381                   LT-51 PRIORITY PUBLICATION-ES                                                         Sheet6of11 O Prlmavera Systems, Inc.                   I               FL.50   Priority Working Publication                       I
AM-BRIEF2 ADM OCC INTERACTIVE 2
17APR04 17APR04 TURNOVER and 06:00-07:59 FOLLOWUP I
TGHX22CVIS TGG 76 0302110 HX-022C MSR C INTERNALS 10 17APR04 17APR04 INSPECTION (SHELL 07:00 16:59 SIDE) 1 MM-8480RA MMI 76 0214134 R-1 JIT INFO SHARING.
1 17APR04 17APR04 CAVITY SEAL RING &
08:00 08:59 TOP HAT 1
IT-30081 OPS 77 0215905 O-IT-0300B RAISE B SrG TO 500 2
17APR04 17APR04 PSIG IAW IT-300B 08:00 09:59 1
TG0302151 TGG 76 0302151 TG-01 AUTOSTOP OIL RELIEF 20 17APR04 19APR04 VALVES OVERHAUL 08:00' 07:59 1
MM-8480RB MMI 76 0214134 R-1 IPTE BRIEF. INSTALL I
17APR04 17APRo4 CAVITY SEAL RING &
09:00 09:59 TOP HAT 1
TG-30580 TGG 76 0302153 TG-01-T MEASURE HP OUTER 2
17APR04 17APR04
_TM GLD CLEARANCES 09:00 10:59 1
TG0302155 TGG 76 0302155 TG-01-T2 LP2 TURBINE 40 17APR04 20APR04 CRAWL-THROUGH 09:00-08:59 INSPECTION 1
IT-300B2 OPS 77 0215905 0-IT0300B CS-476M & CS-476-BB 3
17APR04 17APR04 SEAT LEAKAGE TEST 10:00 12:59 1
MM-8480R1 MMI 76 0214134 R-1 INSTALL CAVnIY SEAL 4
17APR04 17APR04 RING 10:00 13:59 IC10.1066 SI/G IN 030088 EZMRCP4-KMI 021520 RWP: F AM-BRIEP TGHX22CN 03021 MM-848 021i IT-3C 021!
TG030 TS SG VE r1p X,
VA t
MENT BLOWDO TRANSMITTERS -
MOTOR FROM PI EREACTOR CC Seal Maintenance INTERACTIVE F SR C INTERNALS IMF R.I IN.!
IWDOWN, FILUNG At TO STAND NT PUMP MOTOR OVER and FOLLOWU DECTION (SHELL SID rURE SEPARATOR R p.
ENTING 1
WAO l'It Rl 134 05 154 JIT INFO SHARINI EREACTOR VES' RAISE B SIG TO I WB SG MAIN FE WUTOSTOP OIL R 0'1 EL ED EU
-Hi rol ATER HAT AVITY SEAL RING &
WND ASSEMBLY SIG IAW IT-3001B INE CHECK VALVES F VALVES OVERHAL rCC L
LD SHTDOVt4 030i 51
_ 2 _
MM8 80 BlPTE BRIEF, IN TA CAVITY SEAL RIN
& rOP HAT 02 41 WREACTOR VE S AND ASSEMBLY TG- 05 d0MEASURE HP 0 R STM GLD CLEARA C S 03 21 QHIGH PRES UF TURBINE TG03 21 sLP2 TURBINE C L-THROUGH INSPEcntN 03 21 M
MM
-3' 341 21 P1 DEBS~6AIA & C 906=
SG MW DRIINSTAL~L CAV 13~iREACII 3-005ESTABLISH S4 TY 6R qP
'6-B8 SEAT LEAKAGI EED LINE CHECK VAI EAL RING JESSEL AND ASSEMI 0 INITIAL CONDITIOI VE IST VE (COLD SHUI ILt IS.
1 RPID-005 OPS O-RP-001D ESTABLISH RP ID INmAL CONDmONS 4
17APR04 I 17APR04 11:00 14:59
.U I
AIA.A I
Run Date 16APR0415:381 LT-51 PRIORITY PUBLICATION-ES Sheet6of11 O Prlmavera Systems, Inc.
I FL.50 Priority Working Publication I


after 16APRO4 12:00                                                                                                                               after 16APR04 12:00 I          U1R28 WORKING SCHEDULE U       ID                 f lPESPl WOtoWRESEaID                       DESCRIPTION     RD       ES       EF   11       lIn                   A               f17~ An                              A
after 16APRO4 12:00 I
                                                                                                                                                                                          ~           is lA
U1R28 WORKING SCHEDULE after 16APR04 12:00 U
-                    _              I          I......               I   I-       I         fu L 1,l   .       'Z   .Z   fI0101a]III               lIA  1   &#xa3;ZUiZZL "I    Z Iff4, L U 1lIllleJJ.1JIP'4 1  MM0214052 MM1   76     0214052     HX-001A       HX-1A, OPEN SG         17APR04  17APR04 HANDHOLES 10 11:00*     22:59 MI C )2I40        5
ID lPESPl f
                                                                                                                                                          )PEY S xHANDHOLES INSTEAM GENERJ Is    ,-1I 1  CAMP-113B   CH                       HX-001B   CAMP-113 SAMPLE B     3   17APR04   17APR04                                   :A? P-I13BCAMP. 113 SA PLE r STEAM GENEI AT pR (NO SPARC E STEAM GENERATOR             13:00     15:59 (NO SPARGE) r-muCI_F 1   TG-30695 TGG   76     0302153     TG01-T     CLEAN GOVERNOR       20   17APR04   19APR04                                                           WN          RNOR PEDESTAL B ZE -PT2 PEDESTAL BASE-PT2           13:00     12:59           .L.-J.        .__ - .- RIZZI                                                      =1 I ril-Ir LICNrNUECT  TUK iNr;U3U15                                              .- S a        I    -
An A
MM-8480R2 MM1   76     0214134       R-1     CHECK SANDBOX &       I   17APR04   17APR04                                       AM-8480R2CHI ECI St NDBOX & TOP HATC )VI :R BOLT TORC TOP HAT COVER BOLT           14:00     14:59                                             0214134R EA T RVESSELANDASSE 'B' Y TORQUE 1   MM-8480D3 MM1   76     0214134       R-1       JIT INFO SHARING   2   17APR04   17APR04                                         MM-8480D3JI ITI FO SHARING PRIOR TO IE.8D UFT PRIOR TO HEAD LIFT           15:00     16:59                                               02141341OR AGTOR VESSEL AND A' SE ABLY 1   RPID-010 OPS                     O-RP-OOID   FILL LOWER CAVITY     5   17APR04   17APR04                                             RPI D-001 OFI ILL .0IER CAVITY PER RP- D PER RP-1D             15:00     21:59                                                             M1_-        FILL LOWER CAV          t VERIFY DRA 1   01124-20 OPS                       HX-001B         DRAIN B SIG     12 17APR04     18APR04                                               01124-2( VD            StG COMPLETELY COMPLETELY              16:00     05:59 I   MM-8480D MM1   76     0214134       R1     IPTE BRIEF FOR HEAD   2   17APR04   17APR04                                               MM-845( lod          BRIEF FOR HEAD LIF LIFT               17:00     20:59                                                   02141:
WOtoWRESEaID DESCRIPTION RD ES EF 11 lIn A
r iRREACTOR VESSEL kNt 'ASSEMBLY 1    0123A-10 OPS                       01-23A   INSTALL PORTABLE     3   17APR04   17APR04                                           0123A.1 aNS TA L            RTABLE CAVTY FIL            UNIT (TRI.NUIl CAVITY FILTER UNIT           17:00     21:59             IN! ;TALUCONNECT CAV 1Y FILTER UN (TRI-NUKE)                                                                                                                       ~E I 1   0123A-15   EM                       01-23A     PHASE CHECK AND     3   17APR04   17APR04                                         )123A-15sPAS E C 'E K AND START TRI NU                    ILTRATION U1 START TRI NUKE           17:00     21:59             IN! TAWPCONNECT      AV TY FILTER UN FILTRATION UNIT 1   PM-BRIEF2 ADM                                   OCC INTERACTIVE     2   17APR04   17APR04                                               PM-BRIE F2C CC NTERACTIVE TURNO                      and FOLLOWI TURNOVER and             18:00-     19:59 FOLLOWUP                                                                                                                         09EI 1   T-0711-H WCC           0010711     Z-024A   1 RC Z-24A RMP-9096   1   17APR04   17APR04                                                                                                   MM REV0-1 1 07 1t IRC Z-24A RMP-4 MM REVO-1              22:00    22:59                                                                  01 71131 RC Z-24A RMF -90' 6MMREVO-1 I   RPIA-052 OPS                     O-RP-001A I SET CLOSURE FOR       3   17APR04 I 18APR04                                                           tP1v '0! 2SET CLOSURE FOR F EA, .TOR HEAD Ul REACTOR HEAD LIFT            22:00     00:59                               PRI PA IATION FOR FREFI IEl NG_
f17~
Run Date C Primavera Systems, Inc.
is
16APR04 15:38l                 LT.51 PRIORITY PUBLICATION-ES FL-50 Priority Working Publication                         T                                   Sheet 7 of II
~
lA I
I......
I I-I fu L 1,l.
'Z  
.Z fI0101a]III 1
MM0214052 MM1 76 0214052 HX-001A HX-1A, OPEN SG HANDHOLES 10 17APR04 11:00*
17APR04 22:59 MI C)2I 40 5 1
CAMP-113B CH HX-001B CAMP-113 SAMPLE B 3
17APR04 17APR04 STEAM GENERATOR 13:00 15:59 (NO SPARGE) 1 TG-30695 TGG 76 0302153 TG01-T CLEAN GOVERNOR 20 17APR04 19APR04 PEDESTAL BASE-PT2 13:00 12:59 1
MM-8480R2 MM1 76 0214134 R-1 CHECK SANDBOX &
I 17APR04 17APR04 TOP HAT COVER BOLT 14:00 14:59 TORQUE 1
MM-8480D3 MM1 76 0214134 R-1 JIT INFO SHARING 2
17APR04 17APR04 PRIOR TO HEAD LIFT 15:00 16:59 1
RPID-010 OPS O-RP-OOID FILL LOWER CAVITY 5
17APR04 17APR04 PER RP-1D 15:00 21:59 1
01124-20 OPS HX-001B DRAIN B SIG 12 17APR04 18APR04 COMPLETELY 16:00 05:59 I
MM-8480D MM1 76 0214134 R1 IPTE BRIEF FOR HEAD 2
17APR04 17APR04 LIFT 17:00 20:59 1
0123A-10 OPS 01-23A INSTALL PORTABLE 3
17APR04 17APR04 CAVITY FILTER UNIT 17:00 21:59 (TRI-NUKE) 1 0123A-15 EM 01-23A PHASE CHECK AND 3
17APR04 17APR04 START TRI NUKE 17:00 21:59 FILTRATION UNIT 1
PM-BRIEF2 ADM OCC INTERACTIVE 2
17APR04 17APR04 TURNOVER and 18:00-19:59 FOLLOWUP 1
T-0711-H WCC 0010711 Z-024A 1 RC Z-24A RMP-9096 1
17APR04 17APR04 MM REVO-1 22:00 22:59
:A? P-I13BCAMP.
r-muCI_F
.L.-J.
.__ -.- RIZZI ril-Ir LICNrNUECT TUK
;TALUCONNECT C TAWPCONNECT PRI iNr;U3U15 AM-8480R2CHI 0214134R MM-8480D3JI 02141341 RPI D-001 OFI 01124-2(
MM-845(
02141:
0123A.1 aNS 1Y FILTER UN
)123A-15sPAS TY FILTER UN PM-BRIE IATION FOR F lIA 1  
&#xa3;ZUiZZL "I
Z Iff 4,
)PEY S xHANDHOLES INSTEAM GENERJ 113 SA PLE r STEAM GENEI WN RNOR PEDESTAL B ECI St NDBOX & TOP HATC EA T RVESSELANDASSE IT I FO SHARING PRIOR TO OR AGTOR VESSEL AND A' ILL.0IER CAVITY PER RP-M1_ -
FILL LOWER CAV VD StG COMPLETELY lod BRIEF FOR HEAD LIF iRREACTOR VESSEL TA L RTABLE CAVTY FIL E C 'E K AND START TRI NU F2C CC NTERACTIVE TURNO 1 07 1t I RC Z-24A RMP-4 01 71131 RC Z-24A RMF tP1v '0! 2SET CLOSURE FOR F REFI IEl NG_
Is AT ZE I
=1 I S
pR (NO SPARC
-PT2 E
L U 1 lIllleJJ.1JIP'4 a
)VI
'B' IE.8 SE D
I
:R BOLT TORC Y
D UFT ABLY t VERIFY DRA
,-1 IN!
IN!
AV AV rkNt
~E I 09EI
-90' EA,
'ASSEMBLY UNIT (TRI.NUIl ILTRATION U1 and FOLLOWI MM REV0-1 6MMREVO-1
.TOR HEAD Ul I
RPIA-052 OPS O-RP-001A I SET CLOSURE FOR REACTOR HEAD LIFT 3
17APR04 I 18APR04 22:00 00:59 PA Run Date 16APR04 15:38l LT.51 PRIORITY PUBLICATION-ES Sheet 7 of II C Primavera Systems, Inc.
FL-50 Priority Working Publication T


I after 16APR04 12:00                                                                                                                             after 16APR04 12:00 I          U1R28 WORKING SCHEDULE U     EPW           O           Et           DESCRIPTION       RD     ES   IEF                                                         APR
I after 16APR04 12:00 I
__ST                                           I         _                                    1002,14,16,18.2n.221   0 2, *4 6     8 j10j2.l.s1q.6           2n-221   0 .2. 4. 6     l8    10112ilA16.-1 1   EM-84800     EM   78   0214134         R-1     DISCONNECT PATCH        I  18APR04  18APR04                                        EM.848ODDISCOt            CT PATCH CABLES FC      .. 1    v_,^.__
U1R28 WORKING SCHEDULE after 16APR04 12:00 U
DIC-IIATED I
EPW O
                                                                                                                                                                                                                  .. F CABLES FOR            00:00     00:59                     REACTOR VE       'EL AND ASSEME            121413.4 DEDICATED TICS 1   NRC-CALL-7   ADM                     MILESTONE     O.D. CALL NRC TO     I 18APR04   18APR04                                       NRC-CALL-70.D.            1L NRC TO WITNESS F                TOR HEAD Li WITNESS REACTOR           00:00     00:59 HEAD UFT I
Et DESCRIPTION RD ES IEF APR
2 I  MM-8480D1     MMI   76   0214134         R-1       MOVE REACTOR         4 18APR04 18APR04                                                   MM-848        AOVE REACTOR VESS                  4EAD TO R VESSEL HEAD TO             01:00   04:59                       REACTOF        SSEL AND ASSEN            (021413                l RHLDA RWP: Reacto            ad ULft 1   HEADLIFT     PPG                     MILESTONE     REACTOR VESSEL       0 18APR04                                                                             HEADUFT REACTOF                SSEL HEAD U HEAD LIFT             03:00                     A1 ?rY MONITOR PU        OPERATING STAl              ILESTONE+
__ST I
MM-848581     MM3   76   0214119       P-00tB       PLACE BACKSEAT       I 18APR04 18APR04                                                                   EAT COLLECTION SI                bSERVICE (S Fl 84 1 5 5 1PLACE  BA COLLECTION SYS IN           04:00   04:59                                     REACTOR COOL/              PUMP0214119 SERVICE (8 FT.)
1002,14,16,18.2n.221 0
1 CAVFILUIT     OPS   77   0215926     o-ITr0760 JIT INFO SHARING FOR     I 18APR04 18APR04                                                                   INFO SHARING FOR                      FIL & IT-7 CAVFILLJ CAVITY FILL & IT-760       05:00   05:59             INI 1 HIGH HEAD SI    HI:CK VALVES FLOI              ST (RF)0215924l I   T-3426-H   WCC         0013428       P-001B         1 RC P-1B RMP       2 18APR04 18APR04                                                                     26- RC P-1 B RMP              ..8 l9 MM REJ 900248/19 MM REVO-1         05:00   08:59                             IR      lB RMP 900248/19            REV0-1 001342EU 1  AM-BRIEF3     ADM                                   OCC INTERACTIVE       2 18APR04 18APR04                                               AM-BRIEFX          NTERACTIVE TURNO                  and FOLLOW1 TURNOVER and             06:00'   07:59                                                                                       U FOLLOWUP 1   rT760-BRF   OPS   77   0215926     O-rT-0T60   BRIEF PRIOR TO HH SI   1 18APR04 18APR04                                     60-ORFORIEF PRI                  lHH SI CHECK FUL              OW TEST PRI CHECK FULL FLOW           08:00     08:59                 UNIT 1 HIGH HE D I CHECK VALVES                  W TEST (RF)021592E TEST PREPS I   CESH81-SI     CE4                 PACKAGE 81 BUILD SCAFFOLDING           6 18APR04 18APR04                                     ;H81-SIUILD SCW              ILDING FOR SHIELDIIN              pHLDA SHADC FOR SHIELDING -           08:00'   13:59 RHLDA SHADOW                                                             CE 1   CESH82-SI     CE4                   PACKAGE 82 BUILD SCAFFOLDING         8 18APR04 18APRo4                                     ;H82-SIBUILD SC)              LDING FOR SHIELDI                  HILDA SHADC FOR SHIELDING -           08:00     13:59 RHLDA SHADOW 1   CE-1600-05   CE4 76     0213472         R-1     BUILD SCAFFOLDING     12 18APR04 18APR04                                     CE4600.05BUILD              FFOLDING TO SUPPO                  00oINSPECnC TO SUPPORT 1600           08:00   21:59                                                           -.1-ii ZEACTOR VESSEI-11A_. .NFR                    n1    : ii       -
2,
INSPECTION I   RP4A-030   I EM                     O-RP-004A   CLEAR WALKWAY FOR       2 18APR04   18APR04                                                         RI 4A 030CLEAR WALKWA' RC IMANIPULAT, )I MANIPULATOR              09:00    10:59 I
* 4 6 8 j10j2.l.s1q.6 2n-221 0.2.
Run Date                                   1SAPR041S:38s                     LT-51 PRIORITY PUBLICATION-ES                                                             Sheet8of11 C Primavera Systems, Inc.                 I                 FL-50 Priority Working Publication                       I
: 4. 6 l 8 10112ilA16.-1 1
EM-84800 EM 78 0214134 R-1 DISCONNECT PATCH CABLES FOR DEDICATED TICS I
18APR04 00:00 18APR04 00:59 REACTOR VE 1
NRC-CALL-7 ADM MILESTONE O.D. CALL NRC TO I
18APR04 18APR04 WITNESS REACTOR 00:00 00:59 HEAD UFT I
MM-8480D1 MMI 76 0214134 R-1 MOVE REACTOR 4
18APR04 18APR04 VESSEL HEAD TO 01:00 04:59 RHLDA 1
HEADLIFT PPG MILESTONE REACTOR VESSEL 0
18APR04 HEAD LIFT 03:00 I
MM-848581 MM3 76 0214119 P-00tB PLACE BACKSEAT I
18APR04 18APR04 COLLECTION SYS IN 04:00 04:59 SERVICE (8 FT.)
1 CAVFILUIT OPS 77 0215926 o-ITr0760 JIT INFO SHARING FOR I
18APR04 18APR04 CAVITY FILL & IT-760 05:00 05:59 I
T-3426-H WCC 0013428 P-001B 1 RC P-1B RMP 2
18APR04 18APR04 900248/19 MM REVO-1 05:00 08:59 1
AM-BRIEF3 ADM OCC INTERACTIVE 2
18APR04 18APR04 TURNOVER and 06:00' 07:59 FOLLOWUP 1
rT760-BRF OPS 77 0215926 O-rT-0T60 BRIEF PRIOR TO HH SI 1
18APR04 18APR04 CHECK FULL FLOW 08:00 08:59 TEST PREPS I
CESH81-SI CE4 PACKAGE 81 BUILD SCAFFOLDING 6
18APR04 18APR04 FOR SHIELDING -
08:00' 13:59 RHLDA SHADOW 1
CESH82-SI CE4 PACKAGE 82 BUILD SCAFFOLDING 8
18APR04 18APRo4 FOR SHIELDING -
08:00 13:59 RHLDA SHADOW 1
CE-1600-05 CE4 76 0213472 R-1 BUILD SCAFFOLDING 12 18APR04 18APR04 TO SUPPORT 1600 08:00 21:59 INSPECTION A1 INI REACTOF
?rY MONITOR PU 1 HIGH HEAD SI IR UNIT 1 HIGH HE 2
HI EM.848ODDISCOt
'EL AND ASSEME NRC-CALL-70.D.
MM-848 SSEL AND ASSEN OPERATING STAl 84155 1PLACE BA REACTOR COOL/
CAVFILLJ
:CK VALVES FLOI lB RMP 900248/19 AM-BRIEFX 60-ORFORIEF PRI I CHECK VALVES
;H81-SIUILD SCW
;H82-SIBUILD SC)
CE4600.05BUILD ZEACTOR VESSEI RI CT PATCH CABLES FC 121413.4 1L NRC TO WITNESS F I
AOVE REACTOR VESS (021413 l
RWP: Reacto HEADUFT REACTOF ILESTONE+
EAT COLLECTION SI PUMP0214119 INFO SHARING FOR ST (RF)0215924l 26-RC P-1 B RMP REV0-1 001342EU NTERACTIVE TURNO U
lHH SI CHECK FUL W TEST (RF)021592E ILDING FOR SHIELDIIN LDING FOR SHIELDI FFOLDING TO SUPPO DIC-IIATED I TOR HEAD Li 4EAD TO R ad ULft SSEL HEAD U bSERVICE (S Fl FIL & IT-7
..8 l9 MM REJ and FOLLOW1 OW TEST PRI pHLDA SHADC HILDA SHADC 00o INSPECnC
..1 v_,^.__
F D
CE
-.1-ii
: ii -
-11 A_..NFR n1 I
RP4A-030 I EM O-RP-004A CLEAR WALKWAY FOR MANIPULATOR 2
18APR04 09:00 18APR04 10:59 4A 030CLEAR WALKWA' RC IMANIPULAT, I
)I Run Date 1SAPR041S:38s LT-51 PRIORITY PUBLICATION-ES Sheet8of11 C Primavera Systems, Inc.
I FL-50 Priority Working Publication I


after 16APR04 12:00                             l           U1R28 WORKING SCHEDULE                                           I                     after 16APR04 12:00 U     I           RESI WOI       WO     I     EQID     I       DESCRIPTION     1 RD     ES   I   EF                                         -    APR
after 16APR04 12:00 l
_              ST                                                              _      __      __    0202210,         2 .4 161 8 1001               r.16820.2210 . 2. ._ 6 8 110112.d14,1 1                 OPS                                      FlLL CAVITY FOR ROD      3    18APR04    18APR04                                                            1P1A-060ILL CA          F0 ROD UNLATI RP1A-060                               O-RP-001A               UNLATCH                 09:00     11:59                   FILL UI PE ZCAVITY FOR UN                .lHING RODS (RP-1       ?-
U1R28 WORKING SCHEDULE I
1      IT-760-A OPS   77   0215926       O-IT-0760       HIGH HEAD SI CHECK       6   18APR04   18APR04                                                             HEAD SI CHECK FU                  PREI 1 TEbWnST FULL FLOW TEST               09:00     14:59 mT760o-A"                                  I UNIT I HIGH H        SI CHECK VAL              .OW TEST (RF) 02159 PREPS IV 1   MM-8485K     MM3   76   0214119       P-001B           P-1B. ALIGN SEAL       1   18APR04   18APR04                                   M-8485KP- 11. A          SEAL COLLECTION T CIVrIY RMP900I COLLECTION TO               12:00     12:59                                                   R        OR COOLANT PUMPI 21 119 CAVITY RMP9002-8 1     0123A-20   OPS                         01-23A           INMATE CAVITY         11   8APR04   18APR04                                                               0123A-2UNmATE C vr Y PURIFiCATI PURIFICATION               12:00     12:59                                                             IATE CAVITY PURIFIC AT ONN 1     T-6594-R   WCC         0016594         T-36         1 LO T-36 EPT REVO-1     I   18APR04   18APR04                                                                       T-6594-R 1 LO T-36 EPT REVI 12:00     12:59                                                             LO T-36 EPT REVO-1 CD1594 1 EM0302132A       EM   76   0302132       LO-00291         P-059B - DE-TERM       2   18APR04   18APR04                           I      302132AP-059B .          ERM AIRSIDE SEAL 0 LB `U PUMP MOTOF AIRSIDE SEAL OIL BtU           12:00-     13:59                             'MC        TURBINE Oil        tESSURE REDUCINGC 30 132 PUMP MOTOR I   MM0214099     MM2   76   0214099       HX-056A         HX-056A - OPEN SGFP     2   18APR04   18APR04                                                                           - OPE? I SFP OIL COOUS 214099HX-056A OIL COOLER               12:00     13:59                                                     F    %SGFP OIL COOLERC 21' 099E I   RPSHo78-1   RPI                     PACKAGE 78 INSTALL SHIELDING O             3   18APR04   18APR04                                           RPSHOI          STALL SHIELDING ON RE EN FOR CV-2 REGEN FOR CV-296               12:00-     14:59 I   IC425N36-1     IC5   76   0300838     ICP-04.025     ICP 4.25 NI IR N-36 CAL 4     18APR04   18APR04                                                                   IC425N36-11CI CS NI IR NJ38 C 12:00     15:59           NUCLEARINSTFM          INTATION SYSTE            ITERMEDIATE RANGC 30(83E 1   O-RT-035A   OPS   77   0215973       O-RT-035         PRE O-RT.035, HOT       4   18APR04   18APR04                                                 O.R      ISAPRE O-RT-035. HO ri!G SAMPLE        ELI LEG SAMPLE LINE               12.00     15:59                                             HOT Li        AMPLE LINE (P-28A)C 21! 973 1   IC5.73A-1     ICI   76   0300878     ICP-05.073           ICP-5.73 T-34A       5   18APR04   18APR04                                               73 I :5.73A.11CP-.      T-      ACCUMULATOR LEVI                RESTA WIMTRS ACCUMULATOR LEVEL                 12:00-     16:59                                   ACCUMULATOF            V/EL TRANSMITTERSC 306C    8711l XMTR'S RESTART VP: Containment Gene 2al ea Maintenan 1 EM0216164Z     EM   76   0216164     ISOL PHASE         REMOVE BUS LINKS       8   18APR04   18APR04                         El 02 6 16 42REMOVE SI            JNKS "ALL BUT I PEPI P &SE-(RESTA I
after 16APR04 12:00 U
                                                          'ALL BUT I PER PHASE             12:00     21:59                                                               ISOL PHASE DUCT(
I RESI WOI WO I
(RESTART)
EQID I
I EM0215183A IEMV       76   0215183 I SI-00860A-             SI-86OA-0 MOV       10I 18APR04   I 18APR04                                   EM02151083ASI46 A MOV ACTUATOR CHI ,C .OUT(RESTAr ACTUATOR                12:00     23:59             P-14A CONT. PF AY PUMP DISCH EEUNDANT ISOL OPERC 21                          1 CHECK-OUT (RESTART,
DESCRIPTION 1 RD ES I
                                                      .          _                I_                        .L   .,                    _                            .                      ..
EF APR ST
Run Date O Primavera Systems, Inc.
: 0202210, 2.4 161 8 1001 r.16820.2210. 2.._ 6 8 110112.d14,1 1
16APR04     15:38l I
RP1A-060 OPS O-RP-001A FlLL CAVITY FOR ROD UNLATCH 3
LT-51 PRIORITY PUBLICATION-ES FL-50 Priority Working PublIcation                 T     l                              Sheet 9 of 11
18APR04 09:00 18APR04 11:59 FILL UI UNIT I HIGH H 1
IT-760-A OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 6
18APR04 18APR04 FULL FLOW TEST 09:00 14:59 PREPS 1
MM-8485K MM3 76 0214119 P-001B P-1B. ALIGN SEAL 1
18APR04 18APR04 COLLECTION TO 12:00 12:59 CAVITY RMP9002-8 1
0123A-20 OPS 01-23A INMATE CAVITY 11 8APR04 18APR04 PURIFICATION 12:00 12:59 1
T-6594-R WCC 0016594 T-36 1 LO T-36 EPT REVO-1 I
18APR04 18APR04 12:00 12:59 1 EM0302132A EM 76 0302132 LO-00291 P-059B - DE-TERM 2
18APR04 18APR04 AIRSIDE SEAL OIL BtU 12:00-13:59 PUMP MOTOR I
MM0214099 MM2 76 0214099 HX-056A HX-056A - OPEN SGFP 2
18APR04 18APR04 OIL COOLER 12:00 13:59 I
RPSHo78-1 RPI PACKAGE 78 INSTALL SHIELDING O 3
18APR04 18APR04 REGEN FOR CV-296 12:00-14:59 I
IC425N36-1 IC5 76 0300838 ICP-04.025 ICP 4.25 NI IR N-36 CAL 4 18APR04 18APR04 12:00 15:59 1
O-RT-035A OPS 77 0215973 O-RT-035 PRE O-RT.035, HOT 4
18APR04 18APR04 LEG SAMPLE LINE 12.00 15:59 1
IC5.73A-1 ICI 76 0300878 ICP-05.073 ICP-5.73 T-34A 5
18APR04 18APR04 ACCUMULATOR LEVEL 12:00-16:59 XMTR'S RESTART 1
EM0216164Z EM 76 0216164 ISOL PHASE REMOVE BUS LINKS 8
18APR04 18APR04
'ALL BUT I PER PHASE 12:00 21:59 (RESTART)
PE IV I 'MC Z CAVITY FOR UN mT760o-A" SI CHECK VAL M-8485KP-11. A R
302132AP-059B.
TURBINE Oil F
RPSHOI INTATION SYSTE O.R HOT Li
:5.73A.11CP-. 7 3 T-ACCUMULATOF 61642REMOVE SI 1P1A-060ILL CA
.lHING RODS (RP-1 HEAD SI CHECK FU
.OW TEST (RF) 02159 SEAL COLLECTION T OR COOLANT PUMPI 0123A-2UNmATE C IATE CAVITY PURIFIC T-6594-R1 LO T-36 EPT REVO-1 C ERM AIRSIDE SEAL 0 tESSURE REDUCINGC 214099HX-056A - OPE?
% SGFP OIL COOLERC STALL SHIELDING ON IC425N36-11CI ITERMEDIATE RANGC ISAPRE O-RT-035. HO AMPLE LINE (P-28A)C ACCUMULATOR LEVI V/EL TRANSMITTERSC VP: Containment Gene JNKS "ALL BUT I PEPI ISOL PHASE DUCT(
MOV ACTUATOR CHI UNDANT ISOL OPERC F0 ROD UNLATI
?-
I TEbWnST PREI 1 CIVrIY RMP900I 21 119 vr Y PURIFiCATI AT ONN LO T-36 EPT REVI D1 594 LB `U PUMP MOTOF 30 132 I SFP OIL COOUS 21' 099E RE EN FOR CV-2 CS NI IR NJ38 C 30(83E ri!G SAMPLE ELI 21! 973 WIMTRS RESTA 306C 8711l 2al ea Maintenan P &SE- (RESTA I
,C.OUT(RESTAr 21 1
NUCLEARINSTFM El P-14A CONT.
I 02 PF I
EM0215183A IEMV 76 0215183 I SI-00860A-SI-86OA-0 MOV ACTUATOR CHECK-OUT (RESTART, 10I 18APR04 I 18APR04 12:00 23:59 EM02151083ASI46 A
AY PUMP DISCH EE I
.L Run Date 16APR04 15:38l LT-51 PRIORITY PUBLICATION-ES l
Sheet 9 of 11 O Primavera Systems, Inc.
I FL-50 Priority Working PublIcation T


afterl6APRO412.00 after 16APRO4 12:00                           1 U1R28 WORKING SCHEDULE                               I U IID__RESF__         WO   I   WO     I     EQID           DESCRIPTION     IRDI   ES       EF   I 6                                        APR
after 16APRO4 12:00 1
_S                 S                             I_                        _                      120.22         0.2 .4 1 6_ 8 ._1_ 12_14.16 1820.22t 0 ._2.4A. 6 18 0112,14.161:
U1R28 WORKING SCHEDULE I
1 IC0407776       IC   71   0407776       N-431       iN-31 NOISE SPIKES     10 18APR04   18APR04                                                                IC0407776  1 NOISE SPIK 12:00     23:59                                             NI SO JR1.E RANGE CHANNEL(    776le 1   MM0214054   MM1   76   0214054       HX-001B         HX-1 B. OPEN SG   10 18APR04   1sAPRw4                                                       MM0214054HX11B OF    SSG HANDHOLE HANDHOLES             12:00     23:59                                                       3TEAM GENERATORC 0   EM0301792   EM   76   0301792     A52-DHVR-3           BREAKER       24 18APR04   19APR04                                           EMW030    BREAKER MAINTENAI    3W00-01 (A524 MAINTENANCE 3000-01           12:00     15:59                                   4.16 KV/3000, TM VACUUM BREAKERC        T7920 (A52-01) 1       1C4.iJ   ICI   76   0300831     ICP-04.001     PZR LVIL AND FIRST   16 18APR04   20APR04                                                   C4 1JPZR LVIL AND FIRSI AGE PRESS C, STAGE PRESS CAL           12:00     09:59             RP/SAFEGUAR )S NNALOG RACKS F            LVL/1ST STG PRESSC  4831w4 1     IC5.19-1   ICI   76   0300857     ICP-05.019   COND STEAM DUMP       32 18APR04   23APR04                                           IC5.194    tD STEAM DUMP CNTI    S CAL RESTAI CNTL SYS CAL         12:00'     11:59                                                       AM DUMP CONTROLC RESTART 1   MM0306054   MM2   76   0306054       P-028A       P-028A -CONTINUE   90 18APR04  28APRo4                                 MM03060s4P-&deg; 8A
afterl6APRO412.00 U IID__RESF__
* CONTINUE OVERHAI        lAIN FEED PUI OVERHAUL MAIN FEED           12:00     11:59                                         STEAM G :_NlRATOR FEED PUMPC PUMP I     1C5.54-1   IC5   76   0300874     ICP-05.054   ICP 5.54 SECONDARY     71 18APR04   29APR04                             -5. 5 4 .11CP 5.54 SE co YDARY LOW RANGE F    ;SURE RESTAI LOW RANGE             12:00     10:59             SECONDARYPI AN r LOW RANGE PR              URE INSTRUMENTS C    5874q PRESSURE RESTART 1   IC9944161   ICS   76   9944161     DPS-05933       IDPS-5933 INSTALL   71 18APR04   29APR04                                                       1C99441611DPS-5933 1  ALL SNUBBEI SNUBBERS             12:00     10:59                             9-1t2 DRN BOTTL          GH DPS INTERLOCKS    l181 1     IC5.7-1   IC5   76   0300849     ICP-05.007   ICP 5.7 EH CNTL CAL   112 18APR04 04MAY04                                         IC5.7.11CP I .*EH CNTL CAL THRU ST    .49.11 RESTAI THRU STEP 4.49.11         12:00     11:59                         ~LICTRO-HYDRAULI(            IVERNOR (OUTAGE)C RESTART t   lC5.49DAY1   ICV   76   0300869     ICP-05.049 ICP 5.49 SEC CONTROL 160 18APR04     06MAY04                                                       :5.49AY1lCP 5.49 SE( )NTROL VALVI VALVES             12:00     09:59                               SECONDARY Pi ANT CONTROL VALVESC            186_
WO I WO I
1    IC5.47-1   ICI   76   0300867     ICP-05.047     SECONDARY LEVEL     178 18APR04   08MAY04                                         ICSA7-1 8 EC, )NDARY LEVEL CONT    LERS AND SV CONTROLLERS AND           12:00     09:59                   SECON    ZY LEVEL CONTRI ILL TRS AND SWITCHES C          867_
EQID DESCRIPTION IRDI ES 6
SWIr 1   RPSH08141 RP1                     PACKAGE 81       INSTALL SHADOW     3 18APR04   18APR04                                     RPSH0814N! 0TALL SHADOW SHIELDI?        FROM RX HEA SHIELDING (FROM RX           14:00     16:59 HEAD) 1   RPSH0824  RPI                      PACKAGE 82      INSTALL SHIELDING    3  18APR04 I 18APR04                                  RPSH0824NS AL L SHIELDING FOR D0-       FROM RX HEA FOR D-FAN (FROM RX           14:00     16:59 HEAD)                                                                                                                _M Sheet 10 of 11 Run Date O Primavera Systems, Inc.
EF I
16APR04 15:381 I
APR
LT-51 PRIORITY PUBLICATION-ES FL-50 Priority Working Publication             T
_S I_
S 120.22 0.2.4 1 6_ 8._1_ 12_14.16 1820.22t 0._2.4A. 6 18 0112,14.161:
1 IC0407776 IC 71 0407776 N-431 iN-31 NOISE SPIKES 10 18APR04 12:00 18APR04 23:59 1
MM0214054 MM1 76 0214054 HX-001B HX-1 B. OPEN SG 10 18APR04 1sAPRw4 HANDHOLES 12:00 23:59 0
EM0301792 EM 76 0301792 A52-DHVR-3 BREAKER 24 18APR04 19APR04 MAINTENANCE 3000-01 12:00 15:59 (A52-01) 1 1C4.iJ ICI 76 0300831 ICP-04.001 PZR LVIL AND FIRST 16 18APR04 20APR04 STAGE PRESS CAL 12:00 09:59 1
IC5.19-1 ICI 76 0300857 ICP-05.019 COND STEAM DUMP 32 18APR04 23APR04 CNTL SYS CAL 12:00' 11:59 RESTART 1
MM0306054 MM2 76 0306054 P-028A P-028A -CONTINUE 90 1 8APR04 28APRo4 OVERHAUL MAIN FEED 12:00 11:59 PUMP I
1C5.54-1 IC5 76 0300874 ICP-05.054 ICP 5.54 SECONDARY 71 18APR04 29APR04 LOW RANGE 12:00 10:59 PRESSURE RESTART 1
IC9944161 ICS 76 9944161 DPS-05933 IDPS-5933 INSTALL 71 18APR04 29APR04 SNUBBERS 12:00 10:59 1
IC5.7-1 IC5 76 0300849 ICP-05.007 ICP 5.7 EH CNTL CAL 112 18APR04 04MAY04 THRU STEP 4.49.11 12:00 11:59 RESTART t
lC5.49DAY1 ICV 76 0300869 ICP-05.049 ICP 5.49 SEC CONTROL 160 18APR04 06MAY04 VALVES 12:00 09:59 1
IC5.47-1 ICI 76 0300867 ICP-05.047 SECONDARY LEVEL 178 18APR04 08MAY04 CONTROLLERS AND 12:00 09:59 SWIr 1
RPSH08141 RP1 PACKAGE 81 INSTALL SHADOW 3
18APR04 18APR04 SHIELDING (FROM RX 14:00 16:59 HEAD)
RP/SAFEGUAR SECONDARYPI SECON NI SO EMW030 4.16 KV/3000, JR1 TM
)S AN NNALOG RACKS F IC5.194 MM03060s4P-&deg; STEAM G
-5. 54.11CP 5.54 SE r LOW RANGE PR 9-1t2 DRN BOTTL IC5.7.11CP I CTRO-HYDRAULI(
SECONDARY Pi ICSA7-1 8 ZY LEVEL CONTRI RPSH0814N!
RPSH0824NS C4 8A
:_Nl co IC0407776
.E RANGE CHANNEL(
MM0214054HX11B OF 3TEAM GENERATORC BREAKER MAINTENAI VACUUM BREAKERC 1JPZR LVIL AND FIRSI LVL/1ST STG PRESSC tD STEAM DUMP CNTI AM DUMP CONTROLC
* CONTINUE OVERHAI RATOR FEED PUMPC YDARY LOW RANGE F URE INSTRUMENTS C 1C99441611DPS-5933 1 GH DPS INTERLOCKS H CNTL CAL THRU ST IVERNOR (OUTAGE)C
:5.49AY1lCP 5.49 SE(
T CONTROL VALVESC
)NDARY LEVEL CONT TRS AND SWITCHES C LL SHADOW SHIELDI?
L SHIELDING FOR D0-1 NOISE SPIK 776le SSG HANDHOLE 3W00-01 (A524 T7920 AGE PRESS C, 4831w4 S CAL RESTAI lAIN FEED PUI
;SURE RESTAI 5874q ALL SNUBBEI l181
.49.11 RESTAI
)NTROL VALVI 186_
LERS AND SV 867_
FROM RX HEA FROM RX HEA M
~LI
.* E AN EC, ILL 0TA 1
RPSH0824 RPI PACKAGE 82 INSTALL SHIELDING FOR D-FAN (FROM RX HEAD) 3 18APR04 I 18APR04 14:00 16:59 AL Run Date 16APR04 15:381 LT-51 PRIORITY PUBLICATION-ES Sheet 10 of 11 O Primavera Systems, Inc.
I FL-50 Priority Working Publication T


after 16APR04 12:00                               U1R28 WORKING SCHEDULE                               j               after 16APR04 12:00 U       ID     RESP WO     WO           EOID       DESCRIPTION     RD     ES     EF   16                                 7 APR                                   8
after 16APR04 12:00 U1R28 WORKING SCHEDULE j after 16APR04 12:00 U
_ST I                                               .12_14                 16   ?0.2210.
ID RESP WO WO EOID DESCRIPTION RD ES EF 16 7 APR 8
2        2 .4 . 8 ,1012.14. m   20.2210 .2. 4. 6 8 1Ol1Zzi4iM 1   0156-020   OPS                       01-56 FILL TRANSFER CANAL 16 18APR04   19APR04                                                             0156-020FIT1 NSE   A 14:00   09:59                                               UE L TRANSFER SYSTE N CANAL IT -760-B OPS   77 0215926     0-IT-0760 HIGH HEAD SI CHECK   4   18APR04 18APR04                                           IT 76' 48 HGH HEAD Si CHE K   WLLFLOWTE FULL FLOW TEST           15:00   20:59                     UNI- 1 iGH HEAD SI CH C VALVES FLOWTEST             021592 1   IC4.26N41   ICI   76 0300839     ICP-04.026     ICP 4.26 NIS PR 19   18APR04 22APR04                                                     IC4.26N41ICP 4.26 IS R CAUBRATI(
_ST I  
CALIBRATION           16:00   10:59                       NU U AR INSTRUMENT     TI   N SYSTEM POWER F jN E 0300839 1   TG0306774   TGG   76 0306774     LO-00254         I LO-254 -     6   18APR04 1IAPR04                                 TG0306741 0.5 - REPACK/GLAND 'OL.OWER COCKIt REPACKIGLAND           17:00'   22:59                       P 59. AIR SIDE SEAL CIL UMP DISCHARGE HE D R IS030677 FOLLOWER COCKED 1   01100-40   OPS                     T-034A         DRAIN SI     12   18APR04 19APR04                                                   Oi100-0DRAIN StA C MULATORT ACCUMULATOR T-34A           17:00   08:59 31       EPT   76 0301963       HX-021A     HX-021A-EDDY     24   18APR04 19APR4                                     EP03019 3       -021A3-EDDY C       RMVEW/RER CURRENT             17:00'   16:59                                                   HP FEEDWATER HS TE I A030196 REVIEWIRERUN Run Date                               16APR04 15:38                 LT-51 PRIORITY PUBLICATION-ES                                           Sheet 11 of 11 OPdmavera Systems, Inc.                               FL-50 Priority Working Publication
.12_14 16 2
?0.2210. 2. 4 8 1012.14.
m 20.2210.2. 4. 6 8 1Ol1Zzi4iM 1
0156-020 OPS 01-56 FILL TRANSFER CANAL 16 18APR04 19APR04 0156-020FIT1 NSE A
14:00 09:59 UE L TRANSFER SYSTE N CANAL IT -760-B OPS 77 0215926 0-IT-0760 HIGH HEAD SI CHECK 4
18APR04 18APR04 IT 76' 48 HGH HEAD Si CHE K WLLFLOWTE FULL FLOW TEST 15:00 20:59 UNI-1 iGH HEAD SI CH C VALVES FLOWTEST 021592 1
IC4.26N41 ICI 76 0300839 ICP-04.026 ICP 4.26 NIS PR 19 18APR04 22APR04 IC4.26N41ICP 4.26 IS R CAUBRATI(
CALIBRATION 16:00 10:59 NU U AR INSTRUMENT TI N SYSTEM POWER F jN E 0300839 1
TG0306774 TGG 76 0306774 LO-00254 I LO-254 -
6 18APR04 1IAPR04 TG0306741 0.5 - REPACK/GLAND  
'OL.OWER COCKIt REPACKIGLAND 17:00' 22:59 P 59. AIR SIDE SEAL C IL UMP DISCHARGE HE D R IS030677 FOLLOWER COCKED 1
01100-40 OPS T-034A DRAIN SI 12 18APR04 19APR04 Oi100-0DRAIN StA C MULATORT ACCUMULATOR T-34A 17:00 08:59 31 EPT 76 0301963 HX-021A HX-021A-EDDY 24 18APR04 19APR4 EP03019 3  
-021A3  
-EDDY C RMVEW/RER CURRENT 17:00' 16:59 HP FEEDWATER HS TE I A030196 REVIEWIRERUN Run Date 16APR04 15:38 LT-51 PRIORITY PUBLICATION-ES Sheet 11 of 11 O Pdmavera Systems, Inc.
FL-50 Priority Working Publication


after 16APR04 12:00                       lWORKWEEK                           SCHEDULE                                                   thru 18APR04 1700 RESP S WO       EQID         DESCRIPTION     RD       ES       EF         RISK   Resrce MSM MF     TIES                                               APR Y' ST                                                                             ID                     .6   .9 112615618211 Q .             .6.9 18815.812110         3 .6.     9 -12,15 CE6 M   77     SEC       SEC SUPPORT MR     123 05APR04     07MAY04     DR-N ML-N 926   3     60 05APR04 CE02109 rSECSUPPORTMR9' 1-11PB 99-1PB                07:OOA   14:59   ORT3-N R-L                 07:OOA                                                                               -
after 16APR04 12:00 lWORKWEEK SCHEDULE thru 18APR04 1700 RESP S WO EQID DESCRIPTION RD ES EF RISK Resrce MSM MF TIES APR Y'
                                                                                                              .re-ap z te spec ST - Rest irt CL not reqd CEO M   76     SEC       SEC. INSTALL NEW   123 05APR04. 07MAY04       DR-N ML-N 926   3     60 05APR04   E02109     SEC,:INSTALL NEW IQUIP MR 99.011 'E EQUIP MR 99 E           07:00A   14:59   ORT3-N R-L                 07:00A
ST ST ID  
_re-app       tedh spec ST - Rest rt CL not reqd CH P   77   HEM-SAMPI   RCS DO TSR 3.4.5.1   9   11APR04 17APR04     DR-N ML-N       3   287 11APR04 rHO307   nRCS I         TSR 3.4.5.1                 ,
.6.9 112615618211 Q.
05:OOA   11:59   ORT3-N R-L                 05:00A                                         h_   =MISC CHEMISTRY SA PLING 03005107
.6.9 18815.812110 3.6.
_re-apprr tedtehspec ST - Rest irt CL not reqd CH IP   77 CHEM-SAMPI     RCS CL TSR 3.4.5.2   9   11APR04 17APR0-4   DR-N ML-N       3   287 11APR04 CHo3nn4 7RCS CL TSR 3A.5.2l 07:00A   11:59   ORT3-N R-L                 07:OOA       _C                 M       I       S     C   HEMISTRY SA PLING0300497
9 -12,15 CE6 M 77 SEC SEC SUPPORT MR 123 05APR04 07MAY04 DR-N ML-N 926 3
_                _                                              _              re-apprc led tech spec ST - Rest ir CL not req'd CH P   77   HEM-SAMPI   RCS CL TSR 3.4.5.2   9   12APR04 17APR04     DR-N ML-N       3   287 12APR04 CHo3003       CS bCL   TSR 3A.5.2 05:OOA   11:59   ORT3-N R-L                 05:OOA       _-2MISC                                       CHEMISTRY S   PLING 0300357
60 05APR04 CE02109 rSECSUPPORTMR9' 1-11PB 99-1 PB 07:OOA 14:59 ORT3-N R-L 07:OOA  
_re-apprc red tech spec ST- Rest 3rt CL not reqd CH P     n   EM-SAMPI   RCS DO TSR 3.4.5.1   9   12APR04 17APR04     DR-N ML-N       3   287 12APR04   H0       oRCS bo TSR 3.9.5.1 05:WOA   11:59   ORT3-N R-L                 05:OOA       _        _                            _M ISC &#xa2;HEMISTRY SA PLING 03003700
.re-ap z
_re-apprc red Imp spec ST - Rest rt CL rnot reqd CH P   77 :HEM-SAMPI RCS BORON SR 3.9.1.1     9   12APRW4 17APR04     DR-N ML-N       3   287 12APR&deg;4 nHwn         RSBRON SR 3.9.'.1 05:OOA   11:59   ORT3-N R-L                 05:00A                       _M             I --  S     IC CHEMISTRY SAt PLING0300400 Pre-apprc _ed te_ _spec ST - RestIrt CL not req'd CH P   77   HEM-SAMPL   RCS CL TSR 3.4.5.2   58   18APR04 24APR04     DR-Y ML-Y       3   224 19APR04                     I                                         CH030 3 58RCS CL TSFq 08:00-   11:59   ORT3-N R-L                 OT:00'                     I               MISC CHEMISTRY, SAMPLING 030 35 Pre-approved CH IP   77 ,HEM-SAMP     RCS DO TSR 3.4.5.1   58   18APR04 24APR04     DR-Y ML-Y       3   224 19APR04                     ICH030                                         3 7 1 RCS DO TSR 08.00. 11:59   ORT3-N R-L                 07:00'                                     M SC CHEMISTRY, SAMPLING 030 371 Pre-approveo CH P   77   HEM-SAMPI RCS BORON SR 3.9.1.1 58       18APR04 24APR04     DR-Y ML-Y       3   224 19APR04                                                                       0RCS BORO ICH030 08:00'   11:59   ORT3-N R-L                   07:001                                   M SC CHEMISTRY SAMPLING0301 401_
te spec ST - Rest irt CL not reqd CEO M 76 SEC SEC. INSTALL NEW 123 05APR04. 07MAY04 DR-N ML-N 926 3
_Pe-approved CH P   77 :HEM-SAMPL   RCS CL TSR 3.4.52   58   18APR04 24APR04     DR-Y ML-Y       3   224 19APR04                   .                                '        CH030     BRCS CL TSN:
60 05APR04 E02109 SEC,:INSTALL NEW IQUIP MR 99.011 'E EQUIP MR 99 E 07:00A 14:59 ORT3-N R-L 07:00A
08:00-   11:59   ORT3-N R-L                   07:00-                                   M SC CHEMISTRY, SAMPLING030 49
_re-app ted h spec ST - Rest rt CL not reqd CH P
_                  *              '                    Pre-approvesl CH P   77   HEM-SAMPI   RCSDOTSR3.4.5.1     58   18APR04 24APR04     DR-Y ML-Y       3   224 19APR04                                       l                       CH030 5 11 RCSDOTSR 08:00-   11:59   ORT3-N R-L                   07:00-                                   M SC CHEMISTR' SAMPLING030 511 Pre-approve4 Run Date                                 16APR04   15:351         LT-52 WORKWEEK ACTIVITIES DURING Ul R28                           l                         Sheet 1 of 4 C Primavera Systems. Inc.                 I           FL-52 Workweek Activities during Ul R28
77 HEM-SAMPI RCS DO TSR 3.4.5.1 9
11APR04 17APR04 DR-N ML-N 3
287 11APR04 rHO307 nRCS I TSR 3.4.5.1 05:OOA 11:59 ORT3-N R-L 05:00A h_ =MISC CHEMISTRY SA PLING 03005107
_re-apprr ted tehspec ST - Rest irt CL not reqd CH IP 77 CHEM-SAMPI RCS CL TSR 3.4.5.2 9
11APR04 17APR0-4 DR-N ML-N 3
287 11APR04 CHo3nn4 7RCS CL TSR 3A.5.2l 07:00A 11:59 ORT3-N R-L 07:OOA
_C M
I S
C HEMISTRY SA PLING0300497 re-apprc led tech spec ST - Rest ir CL not req'd CH P 77 HEM-SAMPI RCS CL TSR 3.4.5.2 9
12APR04 17APR04 DR-N ML-N 3
287 12APR04 CHo3003 CS bCL TSR 3A.5.2 05:OOA 11:59 ORT3-N R-L 05:OOA
_-2MISC CHEMISTRY S PLING 0300357
_re-apprc red tech spec ST-Rest 3rt CL not reqd CH P n
EM-SAMPI RCS DO TSR 3.4.5.1 9
12APR04 17APR04 DR-N ML-N 3
287 12APR04 H0 oRCS bo TSR 3.9.5.1 05:WOA 11:59 ORT3-N R-L 05:OOA
_M ISC &#xa2;HEMISTRY SA PLING 03003700
_re-apprc red Imp spec ST - Rest rt CL rnot reqd CH P 77
:HEM-SAMPI RCS BORON SR 3.9.1.1 9
12APRW4 17APR04 DR-N ML-N 3
287 12APR&deg;4 nHwn RSBRON SR 3.9.'.1 05:OOA 11:59 ORT3-N R-L 05:00A
_M I
S IC CHEMISTRY SAt PLING0300400 Pre-apprc _ed te_ _ spec ST - RestIrt CL not req'd CH P 77 HEM-SAMPL RCS CL TSR 3.4.5.2 58 18APR04 24APR04 DR-Y ML-Y 3
224 19APR04 I
CH030 3 58RCS CL TSFq 08:00-11:59 ORT3-N R-L OT:00' I
MISC CHEMISTRY, SAMPLING 030 35 Pre-approved CH IP 77  
,HEM-SAMP RCS DO TSR 3.4.5.1 58 18APR04 24APR04 DR-Y ML-Y 3
224 19APR04 ICH030 371RCS DO TSR 08.00.
11:59 ORT3-N R-L 07:00' M SC CHEMISTRY, SAMPLING 030 371 Pre-approveo CH P 77 HEM-SAMPI RCS BORON SR 3.9.1.1 58 18APR04 24APR04 DR-Y ML-Y 3
224 19APR04 ICH030 0RCS BORO 08:00' 11:59 ORT3-N R-L 07:001 M SC CHEMISTRY SAMPLING0301 401_
_Pe-approved CH P 77
:HEM-SAMPL RCS CL TSR 3.4.52 58 18APR04 24APR04 DR-Y ML-Y 3
224 19APR04 CH030 BRCS CL TSN:
08:00-11:59 ORT3-N R-L 07:00-M SC CHEMISTRY, SAMPLING030 49 Pre-approvesl CH P 77 HEM-SAMPI RCSDOTSR3.4.5.1 58 18APR04 24APR04 DR-Y ML-Y 3
224 19APR04 l
CH030 5 11RCSDOTSR 08:00-11:59 ORT3-N R-L 07:00-M SC CHEMISTR' SAMPLING030 511 Pre-approve4 Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING Ul R28 l
Sheet 1 of 4 C Primavera Systems. Inc.
I FL-52 Workweek Activities during Ul R28


after 16APR04 12:00                                           WORKWEEK SCHEDULE                                                                 thru 18APR04 1700
after 16APR04 12:00 WORKWEEK SCHEDULE
                                                                                                                                        -I IYST RESP Tl WO       EQID
-I thru 18APR04 1700 RESP Tl WO EQID DESCRIPTION RD ES EF RISK ResrCe MSM MF TI ES APR
                        ~YS~ID DESCRIPTION       RD         ES       EF         RISK ID ResrCe MSM   MF     TI ES
~YS~ID J21p1 I2 I17 i 0318 IY ST ID
                                                                                                                          .6*9 J21p11121,8,O     I2 APR I17
.6*9 1121,8,O
* 3.6.*9i12..18.211 0318    i  0.3 *6.9112.15 FG1 l   76   DOOR-065     REPLACE MORTISE       4     16APR04 .16APR04       DR-YML-Y     451   3         16APR04 G030       EPUACE MORTISE .OCKSET LOCKSET                 09:OOA     10:59A   ORT3-V R-L                       0900         a   FE SHUTDOWN ARE S FIREISEC/HELB/BULLET RESI TAN0307324
* 3.6.*9i12..18.211 0.3 *6.
                                                              -        -                                          -          P    pproved tech spec ST Restart CL not red FG3 p   77   SERVICE   FLAMMABLE STORAGE       3     14APR04   16APR04     DR-Y ML-Y     453   3   293   14APR04 F3                 MABLE STORA GE CABINET IN;PECT1ON 0             IDE PA CABINET INSPECTION             12:00A     14:59   ORT3-Y R-L.                       12:OOA             MISC EQUIPMENT REPAIRISERVICE0309950 OU.SI_                                             PAre-app                                       d tech spec ST - Rest rt CL not reqd ICt     76   ICP-06.028   LEFM ELECTRONICS       1     16APR04   16APR04     DR-Y ML-Y     330   3   230 16APR04     0C302   LEFM ELECTRONICS REBOOT                                                   _
9112.15 FG1 l 76 DOOR-065 REPLACE MORTISE 4
REBOOT                 09:00A     12:59   ORT3-Y R-L                       09:00             LEFM ELECTRONICS REBOOT0302523
16APR04.16APR04 DR-YML-Y 451 3
                                                                                                                              . Prepproved te spec ST Restart CL not req6d GUE F-MIM-A-milml 1111:01               Ull             ki 11,!-
16APR04 G030 EPUACE MORTISE.OCKSET LOCKSET 09:OOA 10:59A ORT3-V R-L 0900 a
l Li1                                                 ;
FE SHUTDOWN ARE S FIREISEC/HELB/BULLET RESI TAN0307324 P
MM2 M   75   YS-03587     2YS-3587 REPLACE     24     16APR04   17APR04                   441, 3                                           87 REPLACE TRAINER STRAINER                 12:00     15:59         I       30,91                       030486 MM2 h   75   YS-03589     2YS-3589 REPLACE     24     17APR04   18APR04                   410, 3         0                             '                    MM0304862YS-3589 REPLA E STRAINER STRAINER                 16:00     21:59               430.913 MM2     76     Z-014     Z-014 -WIRE ROPE       6     18APR04 18APR04       DR-NML-N 09660 3           0   18WR04                                                               MMO2 1238 Z-014-WIqE INSPECTION                 09:00I 14:59       ORT3-N R-LI 441                   09:00I                                                                   02P123       1_
pproved tech spec ST Restart CL not red FG3 p 77 SERVICE FLAMMABLE STORAGE 3 14APR04 16APR04 DR-Y ML-Y 453 3
MiSL OP1     77 i
293 14APR04 F3 MABLE STORA GE CABINET IN;PECT1ON 0 IDE PA CABINET INSPECTION 12:00A 14:59 ORT3-Y R-L.
TS-RE-004 1
12:OOA MISC EQUIPMENT REPAIRISERVICE0309950 OU.SI_
AXIAL FLUX       2 17APR04
PAre-app d tech spec ST - Rest rt CL not reqd ICt 76 ICP-06.028 LEFM ELECTRONICS 1
                                                                                            *S        EU-iE 17APR04     DR-N ML-N           3   229 17APR04                   C0021607oAXIAL FLUX DIFFEREICE AND QUAD OWER DIFFERENCE AND               00:00I     01:59   ORT3-N R-L                       00:00*                 1 021607ltAXI L FLUX DIFFERENCE AND QUAD POWER TILT R II QUADPOWER    I                                                                                                   P-p     roved tech sPeC ST - Restart CL tot req'd OPt     77   O-PC023.5     CHARGING PUMP         3     17APR04 17APR04       DR-N ML-N           3   228   17APR04                 dpO2&#xb6;6 0 49 CHAR ING PUMP ROtATION PM ROTATION PM               00:00I 02:59         ORT3-N R-LI                       00:00*                     0216049WC ARGING PUMP POTATIONPR1ENTIVE MAINTT Pre-nap     t   speCST - Restart CL at   reqd OPI       l7O-PC-MIDS     OPERATIONS MID       49     17APR04 23APR04       DR-Y ML-Y           3   182 16APR04                 Qp02&#xb6;5354&deg;PE       TIONS MIDSHIFTWEEKLYRO             NE SHIFTWEEKLY                 00:00I 06:59 1 ORT3-N R-L I             I   I     I00M00                     ,02153N IPre-ap                                                                                   )roved tech speCST - Restart CL sot reqd OP1 P   77   O-PC-049.7 WEEKLYVERIFICATION         I   18APR04   18APR04     DR-N ML-N           3   223   18APR04                                                   CIPO21539&NEEK Y VERIFICATIOl OF FACADE FREEZE               00:00       00:59   ORT3-N R-LI                       00:00*                                   I021539aiFAC                       DE FREEZE PR9 IIIPr   ovapved tech spec'<
16APR04 16APR04 DR-Y ML-Y 330 3
Run Date                                   16APR04   15:351           LT-52 WORKWEEK ACTIVITIES DURING U1 R28                                                       Sheet 2 of 4 OPrimavera  Systems. Inc                     l               FL-52 Workweek Activities during U1 R28                         I
230 16APR04 0C302 LEFM ELECTRONICS REBOOT REBOOT 09:00A 12:59 ORT3-Y R-L 09:00 LEFM ELECTRONICS REBOOT0302523
. Pre pproved te spec ST Restart CL not req6d GUE F-MIM-A-milml 1111:01 Ull ki l 11,!-
Li1 MM2 M 75 YS-03587 2YS-3587 REPLACE 24 16APR04 17APR04
: 441, 3
87 REPLACE TRAINER STRAINER 12:00 15:59 I
30,91 030486 MM2 h 75 YS-03589 2YS-3589 REPLACE 24 17APR04 18APR04
: 410, 3
0 MM030486 2YS-3589 REPLA E STRAINER STRAINER 16:00 21:59 430.913 MM2 76 Z-014 Z-014 -WIRE ROPE 6
18APR04 18APR04 DR-NML-N 09660 3 0
18WR04 MMO2 1238Z-014-WIqE INSPECTION 09:00I 14:59 ORT3-N R-LI 441 09:00I 02P123 1_
MiSL i
1
*S EU-iE OP1 77 TS-RE-004 AXIAL FLUX 2
17APR04 17APR04 DR-N ML-N 3
229 17APR04 C0021607oAXIAL FLUX DIFFEREICE AND QUAD OWER DIFFERENCE AND 00:00I 01:59 ORT3-N R-L 00:00*
1 021607ltAXI L FLUX DIFFERENCE AND QUAD POWER TILT R II QUAD POWER I
P-p roved tech sPeC ST - Restart CL tot req'd OPt 77 O-PC023.5 CHARGING PUMP 3
17APR04 17APR04 DR-N ML-N 3
228 17APR04 dpO2&#xb6;6049CHAR ING PUMP ROtATION PM ROTATION PM 00:00I 02:59 ORT3-N R-LI 00:00*
0216049WC ARGING PUMP POTATIONPR1ENTIVE MAINTT Pre-nap t
speCST - Restart CL at reqd OPI l7 O-PC-MIDS OPERATIONS MID 49 17APR04 23APR04 DR-Y ML-Y 3
182 16APR04 Qp02&#xb6;5354&deg;PE TIONS MIDSHIFTWEEKLYRO NE SHIFTWEEKLY 00:00I 06:59 1 ORT3-N R-L I I
I I00M00  
,02153N IPre-ap  
)roved tech speCST - Restart CL sot reqd OP1 P 77 O-PC-049.7 WEEKLYVERIFICATION I
18APR04 18APR04 DR-N ML-N 3
223 18APR04 CIPO21539&NEEK Y VERIFICATIOl OF FACADE FREEZE 00:00 00:59 ORT3-N R-LI 00:00*
I021539aiFAC DE FREEZE PR9 IIIPr ovapved tech spec'<
Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 Sheet 2 of 4 O Primavera Systems. Inc l
FL-52 Workweek Activities during U1 R28 I


after 16APR04 12:00                                     WORKWEEK SCHEDULE                                                             thru 18APR04 1700 RESPET WO l           EID         DESCRIPTION       RD       ES     EF         RISK   Resrre MSM MF     TI ES             16                             17                               18 E:_
after 16APR04 12:00 WORKWEEK SCHEDULE thru 18APR04 1700 RESPET WO l EID DESCRIPTION RD ES EF RISK Resrre MSM MF TI ES 16 17 18 Yg ST
Yg ST
_ID 1.6,9 I 12.15.18.211 0, 3 6
__-                  _ID 1.6 ,9 I 12.15.18.211 0 , 3       6 9 112,15.18, 211 0       3   6 .9 i 12, 1 OP2 _     76     0-PC-DAYS     OPERATIONS DAY     24   13APR04 19APR04    DR-N ML-N       3   206 13APR04 OPERATIONS DAY S 4IFT WEEKLY ROUnNE SHIFT WEEKLY             08:OOA   14:59   ORT3-N R-L                   08:00A     PO=
9 112,15.18, 211 0 3
ROUTINE                                                                         re-appn d IedI spec ST - Rest rt CL not req d OP2 P     77     TS-ECCS-00 SAFEGUARD SYSTEMS VALVE AND LOCK I   17APR04 08:00 17APR04 08:59 DR-N ML-N ORT3-N R-L 3   226 17APR04 08:00:
6.9 i 12, 1 E:_
:        0P021 l21SAFEGUARt SYSTEMS VA VE AND LOCK:
OP2 _
76 0-PC-DAYS OPERATIONS DAY 24 13APR04 1 9APR04 DR-N ML-N 3
206 13APR04 OPERATIONS DAY S 4IFT WEEKLY ROUnNE SHIFT WEEKLY 08:OOA 14:59 ORT3-N R-L 08:00A PO=
ROUTINE re-appn d Ied I
spec ST - Rest rt CL not req d OP2 P 77 TS-ECCS-00 SAFEGUARD SYSTEMS I
17APR04 17APR04 DR-N ML-N 3
226 17APR04 0P021 l21SAFEGUARt SYSTEMS VA VE AND LOCK:
VALVE AND LOCK 08:00 08:59 ORT3-N R-L 08:00:
021 121ISAFEGUA8D SYSTEMS V LVE AND LOCK.
021 121ISAFEGUA8D SYSTEMS V LVE AND LOCK.
Pre-approved tech spec ST - estart CL not re4l OP2       77     OPC043.1           CLEAN AIR       2   17APR04 17APR04     DR-N ML-N       3   225 17APR04                             OP021 5 27CLEAN AIR EREATHERSIOI STRAINER ON, BREATHERS/OIL           08:00-   09:59   ORT3-N R-L                   08:00                   ,            021 527MAIR BREATHER CLEANIN STRAINER ON Pre-approveo tech spec ST - estart CL not re4 OP2 ,p   70       G-01-GOV     OBTAIN G-1 EDG       1   18APR04 18APR04     DR-N ML-N       3   622 18APR04                                                     ,        OOBTAIN               G-0 GOVERNOR OIL             08E00   08:59   ORT3-N R-L                   08:00'                                                               021 441lG41 EDG
Pre-approved tech spec ST -
_SAMPLE         _                                                                                                                                    Pre-approved OP2       77       O-PC-012.1 G-01 EDGVIBRATION     I   18APR04 18APR04     DR-N ML-N       3   622 18APR04                                                                       4G-01 EDOVl IP021 (QUARTERLY)             08:00   08:59   ORT3-N R-L                   08:00-                                                               021 4G4-1 EMED Pre-approvesl OP2       77     O-PC-012.3       G-01 COOLANT       I   18APR04 18APR04     DR-N ML-N       3   622 18APR04                                                     ,      .P021       gO-1 COOLA SAMPLING               08:00-   08:59   ORT3-N R-L                   08:00-                                                               021   91a"i EMEI
estart CL not re4l OP2 77 OPC043.1 CLEAN AIR 2
_ _                              l                    Pre-approver OP2       77       O-TS-081       TS-81. G-01       6   18APR04 18APR04     DR-N MI-N CCE   3     0 18APR04                                                                       53 TS81 ,-G-01IP021 EMERGENCY DIESEL             08 00-   13:59   ORT3-N R-M                   08:00                                                                 021 4Spi Pre-approved
17APR04 17APR04 DR-N ML-N 3
                    &            --a__                                                         EUA_ -
225 17APR04 OP021 527CLEAN AIR EREATHERSIOI STRAINER ON, BREATHERS/OIL 08:00-09:59 ORT3-N R-L 08:00 021 527MAIR BREATHER CLEANIN STRAINER ON Pre-approveo tech spec ST -
OP3 P     77   O-PC-SWING     OPS SWING SHIFT     35   14APR04 20APR04     DR-N ML-N       3   196 14APR04 OP0215       SOPS     NO SHIFTV EEKLY ROUTINt WEEKLY ROUTINE           16:00A   22:59   ORT3-N R-L                   16:00A Pre-appc ted tedi spec ST - Res rt CLnotremqd OP3                 TG-01         DRAIN U2 MAIN     1   16APR04 16APR04               524   3     0 17APR04           U2C NDR002DRAIN U2 MAI ELECTRICAL GENERATOR PE RPC 21.3 ELECTRICAL               18:00   18:59                                 04:00                     n.
estart CL not re4 OP2,p 70 G-01-GOV OBTAIN G-1 EDG 1
21.3                                                                                         PrePapproved t ch spec ST - Re~tart CL not reqd OP3       77     O-PC-078.3   MONTHLY NORTH       I   17APR04 17APR04     DR-N ML-N       3   223 17APR04                                         OP021561 OONY NORTI SERvICE BUIL?
18APR04 18APR04 DR-N ML-N 3
SERVICE BUILDING           16:00-   16:59   ORT3-N R-L                   16:00-                 .021                       5 6 1 MONTHLY NOR H SERVICE BLID Pre-approved tect spec ST - Restart OP3 P     77     TS-CCW-001     CC SYSTEM VALVE     I   18APR04 18APR04     DR-N ML-N       3   216 18APR04                   .                                .                    OP0216154 POSITION CHECKS           16:00-   16:59   ORT3-N R-L                   16:00-                                                                           0216159*
622 18APR04 OOBTAIN G-0 GOVERNOR OIL 08E00 08:59 ORT3-N R-L 08:00' 021 441lG41 EDG
      .__________                                  _                                    __ _            __  __  _                                                                                  P, OP3 IP 77         O-IT-0014. IT-14. FO TRANSFER   3   18APR04 18APR04     DR-N ML-N K04. 3   214 18APR04                                                                         0P021561 SYSTEM PUMPS/             16:00   18:59   ORT3-N R-M 530               16:005                 .                                                        021561 Run Date                                       16APR04 15:351         LT-52 WORKWEEK ACTIVITIES DURING U1 R28                         l                       Sheet 3 of 4 O Primavera Systems. Inc.                             FL-52 Workweek Activities during Ul R28                     I
_SAMPLE Pre-approved OP2 77 O-PC-012.1 G-01 EDGVIBRATION I
18APR04 18APR04 DR-N ML-N 3
622 18APR04 IP021 4G-01 EDOVl (QUARTERLY) 08:00 08:59 ORT3-N R-L 08:00-021 4G4-1 EMED Pre-approvesl OP2 77 O-PC-012.3 G-01 COOLANT I
18APR04 18APR04 DR-N ML-N 3
622 18APR04  
.P021 gO-1 COOLA SAMPLING 08:00-08:59 ORT3-N R-L 08:00-021 91a"i EMEI l
Pre-approver OP2 77 O-TS-081 TS-81. G-01 6
18APR04 18APR04 DR-N MI-N CCE 3
0 18APR04 IP021 53TS81,-G-01 EMERGENCY DIESEL 08 00-13:59 ORT3-N R-M 08:00 021 4Spi Pre-approved EUA_ -
a__
OP3 P 77 O-PC-SWING OPS SWING SHIFT 35 14APR04 20APR04 DR-N ML-N 3
196 14APR04 OP0215 SOPS NO SHIFTV EEKLY ROUTINt WEEKLY ROUTINE 16:00A 22:59 ORT3-N R-L 16:00A Pre-appc ted tedi spec ST - Res rt CLnot remqd OP3 TG-01 DRAIN U2 MAIN 1
16APR04 16APR04 524 3
0 17APR04 U2C NDR002DRAIN U2 MAI ELECTRICAL GENERATOR PE R PC 21.3 ELECTRICAL 18:00 18:59 04:00 n.
21.3 PrePapproved t ch spec ST - Re~tart CL not reqd OP3 77 O-PC-078.3 MONTHLY NORTH I
17APR04 17APR04 DR-N ML-N 3
223 17APR04 OP021561 OONY NORTI SERvICE BUIL?
SERVICE BUILDING 16:00-16:59 ORT3-N R-L 16:00-  
.021 561 MONTHLY NOR H SERVICE BLID Pre-approved tect spec ST - Restart OP3 P 77 TS-CCW-001 CC SYSTEM VALVE I
18APR04 18APR04 DR-N ML-N 3
216 18APR04 OP0216154 POSITION CHECKS 16:00-16:59 ORT3-N R-L 16:00-0216159*
P, OP3 IP 77 O-IT-0014.
IT-14. FO TRANSFER 3
18APR04 18APR04 DR-N ML-N K04.
3 214 18APR04 0P021561 SYSTEM PUMPS/
16:00 18:59 ORT3-N R-M 530 16:005 021561 Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 l
Sheet 3 of 4 O Primavera Systems. Inc.
FL-52 Workweek Activities during Ul R28 I


after 16APR04 12:00                                         WORKWEEK SCHEDULE                                               thru 18APR04 1700 ESPTl WO       EOID         DESCRIPTION     RD     ES         EF         RISK   Resrce MSM MF   TI ES       16         t           APR                             18 I~ T .                                                 D                     6* 9 i1215.18.211 0, 3 o     9 i 12. 15. 1R 211 O. 3,           1&sect; OP3     77 O-IT-0100. IT-100. SEAL LKG TEST 3 18APR04       18APR04     DR-N ML-N         3 214 18APR04                         .P021                                   5 8 j4fr OF DA-100 AND           16:00'       15:59   ORT3-N R-L   _            16:00'   _                                                          021561 WCC tT 15E az __ - -
after 16APR04 12:00 WORKWEEK SCHEDULE thru 18APR04 1700 ESPTl WO EOID DESCRIPTION RD ES EF RISK Resrce MSM MF TI ES 16 t
Z-14       OZ Z-14 MM REVO-1 I
APR 18 I~
18APR04 0]11 18APR04
T.
                                                                                      *E 1201238 3     0
D 6* 9 i1215.18.211 0, 3 o 9 i 12. 15. 1R 211 O. 3, 1&sect; OP3 77 O-IT-0100.
                                                                                                      - _ *!~~l_
IT-100. SEAL LKG TEST 3 18APR04 18APR04 DR-N ML-N 3
18APR04                                                 T-96 ,04H ZZ-14 MM 08:00'       08:59                 530           08:00j                                                   000! 66Cl0 Z Z-14 Mh Pre-.approved WCC MT         Z-14       OZZ-14MMREVO-1       I 1IAPR04 I1APR04                     D20123 3   615 18APR04 15:00       15:59                                 15:00           -                                                00966oEI; Run Date                                 16APR04 15:35             LT-52 WORKWEEK ACTIVIES DURING U1R28                                       Sheet4of4 o Prlmavera system, Inc.                                 FL-52 Workweek Activities during U1 R28
214 18APR04  
.P021 5 8j4fr OF DA-100 AND 16:00' 15:59 ORT3-N R-L 16:00' 021561 I
0]11 15E az __ -
*E
_ *!~~l_
WCC tT Z-14 O Z Z-14 MM REVO-1 1
18APR04 18APR04 1201238 3 0
18APR04 T-96,04H ZZ-14 MM 08:00' 08:59 530 08:00j 000! 66Cl0 Z Z-14 Mh Pre-.approved WCC MT Z-14 OZZ-14MMREVO-1 I 1IAPR04 I1APR04 D20123 3 615 18APR04 15:00 15:59 15:00 00966oEI; Run Date 16APR04 15:35 LT-52 WORKWEEK ACTIVIES DURING U1R28 Sheet4of4 o Prlmavera system, Inc.
FL-52 Workweek Activities during U1 R28


Run Date                                 16APR04 15:47               Work Activity Risk Assignment                                                                     Shettof 1 U       ACT     WO IGRP         HPE     EQUIPMENT               Activity         Cal DUR START     FINISH                             APR ID       ST             RISK                           Description         ID                       1D210                      214 2t                 1221O 1   EZMRCP-K   76     EM     DR-Y ML-Y   P-DO1D-M     P1B MOVE MOTOR FROM           U 6 17APR04 17APRU4       HREACTOR COOLANT PUMP MOTOR
Run Date 16APR04 15:47 Work Activity Risk Assignment Shettof 1 U
_      rRN R-H                   PUMP TO STAND                       02:00       09:59     0215205 - 128EM I   MM0214052   76   MM1     DR-N ML-N   HX-001A     HX-1A, OPEN SG                 U 10 17APR04 17APR04           WD:0STEAM GENERATOR ORT3-N R-M               HANDHOLES                             11:00-     22:59       0214052 - 128MM 1   MM-848001   76   MM1     DR-N ML-N     R-1       MOVE REACTOR VESSEL           U 4 18APR04 18APR04               IREACTOR VESSEL AND ASSEMBLY I       ORT3-Y R-H               HEAD TO RHLDA                         01:00     04:59             0214134 - 128MM 1   MM0214054   76   MM1     DR-N ML-N   HX-WO1B     HX-1B. OPEN SG                 U 10 18APR04 18APR04                   [X]STEAM GENERATOR I ORT3-N R-M               HANDHOLES                             12:00     23:59                 0214054 - 128MM 1I                     9 :-E-ll .                                                                          -II 1   MM-8485B1   76   MM3 DR-Y ML-Y       P-0018     PLACE BACKSEAT                 U 1 18APR04 18APR04                 IREACTOR COOLANT PUMP ORT3-Y R-M               COLLECTION SYS IN                     04:00     04:59             0214119 - 128MM 1   MM-8485K   76   MM3     DR-N ML-N   P-001B     P-1B. ALIGN SEAL               U   1 18APR04 18APR04                   IREACTOR COOLANT PUMP ORT3-N R-M               COLLECTION TO CAVITY                   12:00     12:59                 0214119 - 128MM 0   OP0215453   77   OP2     DR-N ML-N   0-TS-081     TS-81. G-01 EMERGENCY         U 6 18APR04 18APR04                   OG-01 EMERGENCY DIESEL GENERATOR MONTHLY ORT3-N R-M               DIESEL                               08:00-     13:59               0215453 - B05Al 0   OP0215612   77     OP3   DR-N ML-N   OT--0014.1   IT-14. FO TRANSFER             3 3 18APR04 18APR04                     O-01I EDG FUEL OIL TRANSFER SYSTEM PUMPSIVALV ORT3-N R-M               SYSTEM PUMPS/                         16:00'     18:59                   0215612 - BOSA1 1 1 RPIA-060         OPS     DR-N Mt-N   O-RP-001A   FILL CAVflY FOR ROD           U 13 1APR0 18APR04                     IFILL UPPER CAVITY FOR UNLATCHING RODS     (RP-1A)
ACT WO IGRP HPE EQUIPMENT Activity Cal DUR START FINISH APR ID ST RISK Description ID 1D21 0 21 2t 4
I                         ORT3-N R-M               UNLATCH     .                        09:00 l_11:59                   1280P
1221 O 1
                                              '      _l                                NMC I WE                                           LT-81 HUMAN ERROR RISK BARCHART
EZMRCP-K 76 EM DR-Y ML-Y P-DO1D-M P1B MOVE MOTOR FROM U
                                                                          -rn 1   ,.I             -met                 I                       FL-81 HUMAN ERROR POTENTIAL roi'irf u I rmuluewag AO %julage O5PmAver Svstems In#-                  -I I}}
6 17APR04 17APRU4 HREACTOR COOLANT PUMP MOTOR rRN R-H PUMP TO STAND 02:00 09:59 0215205 - 128EM I
MM0214052 76 MM1 DR-N ML-N HX-001A HX-1A, OPEN SG U
10 17APR04 17APR04 WD:0STEAM GENERATOR ORT3-N R-M HANDHOLES 11:00-22:59 0214052 - 128MM 1
MM-848001 76 MM1 DR-N ML-N R-1 MOVE REACTOR VESSEL U
4 18APR04 18APR04 IREACTOR VESSEL AND ASSEMBLY I
ORT3-Y R-H HEAD TO RHLDA 01:00 04:59 0214134 - 128MM 1
MM0214054 76 MM1 DR-N ML-N HX-WO1B HX-1B. OPEN SG U
10 18APR04 18APR04
[X]STEAM GENERATOR I ORT3-N R-M HANDHOLES 12:00 23:59 0214054 - 128MM 1I 9
:-E-ll  
-II 1
MM-8485B1 76 MM3 DR-Y ML-Y P-0018 PLACE BACKSEAT U
1 18APR04 18APR04 IREACTOR COOLANT PUMP ORT3-Y R-M COLLECTION SYS IN 04:00 04:59 0214119 - 128MM 1
MM-8485K 76 MM3 DR-N ML-N P-001B P-1B. ALIGN SEAL U
1 18APR04 18APR04 IREACTOR COOLANT PUMP ORT3-N R-M COLLECTION TO CAVITY 12:00 12:59 0214119 - 128MM 0
OP0215453 77 OP2 DR-N ML-N 0-TS-081 TS-81. G-01 EMERGENCY U
6 18APR04 18APR04 OG-01 EMERGENCY DIESEL GENERATOR MONTHLY ORT3-N R-M DIESEL 08:00-13:59 0215453 - B05Al 0
OP0215612 77 OP3 DR-N ML-N OT-  
-0014.1 IT-14. FO TRANSFER 3
3 18APR04 18APR04 O-01I EDG FUEL OIL TRANSFER SYSTEM PUMPSIVALV ORT3-N R-M SYSTEM PUMPS/
16:00' 18:59 0215612 - BOSA1 1 1 RPIA-060 OPS DR-N Mt-N O-RP-001A FILL CAVflY FOR ROD U 13 1APR0 18APR04 IFILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A)
I ORT3-N R-M UNLATCH 09:00 l_11:59 1280P
_ l NMC I WE LT-81 HUMAN ERROR RISK BARCHART
-rn 1  
,.I  
-met I
FL-81 HUMAN ERROR POTENTIAL O5 PmAver Svstems In#-
-I roi'irf u I rmuluewag AO %julage I}}

Latest revision as of 17:29, 15 January 2025

U1R28 OCC Interactive Turnover with Handwritten Notes
ML051920072
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/17/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920072 (23)


Text

OA-8 '

Cornirftrd to Nuclear E POlfi BERCi

  • UIR2I Point Beach Nuclear Plant U1R28 OCC Interactive Turnovqgmation in this record was deleted in accordance with tPe Freedom of Information Meeting Agenda Act, ex botions4 SaturdayAprll7, 2004 MILX /

m Start Time:

0600 NSB Cafetetia BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator(SSC)

Shutdown Safety Assessor(SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda Safety Issue Discussion (SSC)

2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Work Activity Risk - Manager Assignment (SOM)
10. Management Expectations (SSM)
11. ACEMAN Assessment Results (SOM)
12. Shift Goals (SOM)

Items Included in Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Work Activity Risk Asignment ACEMAN Worksheet

Site Communication Revised 4/12/04 Priorities:

  • The Safe Operation of Unit 2
  • Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1 't Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities

- SG Eddy Current and Sludge Lancing

-Main Turbine and Generator Work

- Rx Vessel Head Inspection

-Hx Hydro Lance and Eddy Current 3' Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:

Outage Briefing Schedule - NSB Cafeteria:

Day Shift Night Shift Activity 0600 - 0640 1800 - 1840 OCC Turnover **

0645 - 0725 1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730 - 0800 1930 - 2000 Supervisor Feedback to OCC of Tumover to Work Force

    • Outage Briefing Schedule Notes:
  • The following personnel are required to attend the OCC turnover meeting:

Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity.

for outage activities.

  • Attendance will be taken at the OCC turnover meeting.
  • It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
  • Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.

Additional Changes:

  • Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
  • A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.

These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.

Committed to Nudcar Edcilenc s EflU'JBRIIEY DF U

TEXCELLEnE POWI BERCH U1REE Point Beach Nuclear Plant U1R28 Refueling Outage

7...

Safety. Topic for week of April 11-17th Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?

Lotsl A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.

Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April 21, 2001 the Point Beach declared an Unusual Event due to a small fire in the Unit I containment building during a refueling outage. The fire was In a bag of rags on the manway platform of the Alpha steam generator in Unit

1. The fire brigade was summoned and put out the fire within about 20 minutes.

Monday "When you clean up hazards, you scrub out accidents" Why is good housekeeping important? Just think about It. A clean workplace has less fire hazards, fewer safety hazards and lust plain looks better. A clean workplace promotes pride in your Job.

Tuesday "Improper storing can be more than annoying" What are those yellow cabinets for? Remember to properly store all flammable chemicals In fire cabinets. These should be in properly labeled containers and the storage capacity of the cabinet should never be exceeded.

Wednesday "Avoid a fatal scene; Keep your job site clean" A building contractor died when he was trapped In the burning basement of a house under construction. Another worker was using an oxyacetylene cutting torch to cut I-beams over the basement of the house. Stray sparks set fire to some sawdust and scrap wood used as packing material. The worker escaped and sounded the alarm, however the contractor lumped into the basement. In a fatal attempt to put the fire out.

Thursday "Ashes to ashes, dust to dust; A clean workplace is a must" At Pi a couple of years ago during a refueling outage on unit 1, welding sparks Ignited a small fire In some rags In containment. An alert fire watch was able to put out the fire immediately but the fire was preventable with some very basic housekeeping practices.

Friday "Don't be a slob; Clean up after each job" After going through the snippets for this week makes you feel as if you have just gotten a lecture from your mother about keeping your room tidy, that's okay. Mom was right! Housekeeping is everyone's job and working together will not only ensure a clean workspace, It will also help to ensure a safe one.

Saturdav "Clean up and care will speed up repair" It is a good practice to assign one coworker as the 'housekeeping conscious' on each job. This person is responsible not to clean up after you but to remind everybody on the job to dean up after themselves. This helps to minimize the gradual buildup of clutter as the lob progresses.

U V

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 12 Path Nlzp Picture Meets Outaae Radiation Performance Rfi__#

I I-

  • LJU OS I-c_6U IIVs A

1 T*

'£ l-This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

24.112 Rem Day 12 - April 15 Actual = 0.360 Cumulative = 24.112 Cumulative Forecast = 43.719 Meets: <=18 Exceeds: <= 12 Actual PCE's:

5 Stu Thomas Personnel Contamination Events Cummulative Dose Exposure 20 18 16

? 14 e12 E

1 0

- 8 0

z 4

2 0

I I

I II

.64 I

I I

I I

I I I

- --Actual

.....Forecast Goal 0) 0 a

a)

(a 0

I 60 I.

40 21 I

20 044**

0 2

4 6

8 tO 12 14 1ff 18 20 22 24 2ff

+

-Actual Goal 0 2 4 6 8 10121416182022242628303234

NMC Comumiltaed lo Nucbar Excelletwe Outage Status Report Plant!

Point Beach Unit I Day:

Friday Today's Date/Time:

4/17/04 0600 Outage Duration: Day 13 of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage I

Summary:

  • Pending OSHA Injury-Back Strain Radiological Dose outage to date 24.112 Projected to date 43.719 Outage Goal
  • 75 R Difference

-19.607 Number of PCEs 5

Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

H lot Standby (Mode 3)

D] Hot Shutdown (mode 4)

D Cold Shutdown (Mode 5) 3 Refueling Shutdown ()-lode 6)

RCS:

Temperature:

95 Pressure:

Vented to Atmosphere RV Level:

70%

Time to Boil:

52 Minutes

. Shutdown Safety Assessment Reactivity:

Green Core Cooling:

Yellow Power Availability:

Green Containment:

Green Inventory:

Yellow Spent Fuel Pool Cooling:

N/A Shutdown'Safety Assessment ProQ Equipment:

Major Activities Completed In Last 24 Hours Critical Pat and Near Critical Path Activities (Nest 24 Hours)

Schedule:

Activities Required to Exit Yellow Risk Conditions I) Troubleshoot & Repair Z-13 Polar Crane

2) Reactor Vessel Head Stud Removal
3) B RCP Motor Move
4) Install Cavity Seal Ring
5) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4120/04 Scott Manthei 4/04104 1 P2A Charging Pump Troubleshooting 4123/04 Clay Hill 4/08/04 Incorporate Lessons Learned from lsr Reduced Inventory Orange Path 420/04 Dave Dyzak 4/13/04 Z-13 Polar Crane Troubleshooting 4/17/04 Dan Laing 4115/04 Isolation Valves for RCS Flow Transmitters I FT413 & IFT-416 leakby 4/17104 Larry Peterson 4116/04 Nitrogen Supplied to Nozzle Dams has Potential to Backfeed to Breathing Air 4/17/04 Larry Peterson 4117/04 IT-300B on hold until completion of I&C Valve work on ICS-476 4/17/04 Dave Dyzak

.. Upcomilng Ma or Milestones Sch eduled Actual Scheduled Ac tal Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100

- Pahicaeaclr~ucleut-Plmit -.

PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

April 17, 2004 TIME:

0200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EOUIPMENT:

r COMMENTS:

e Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil Is 52 minutes RCS is at 70 % Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway

.kL PBF-I 562 Revision 2 10/30/02 Rererences: NP 103.6 NP 10.2.1 Page 5 of 9

ACEMAN INDIVIDUAL EXCELLENCE WORKSHEET P

I L

L A

R S

0 F

E X

C E

L E

N C

E Organizational Excellence Operational Excellence I

N D

I V

I D

U A

L E

X C

E L

'L E

N C

E Accident Free Control Dose Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices B

A R

R I

E R

.S F

0 R.

E X

C E

L L

E N

C E

4-Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Training Excellence Attend Training No Rework Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Date:

Time:

after16APR0412:00 I

U1R28 WORKING SCHEDULE I

after 16APR04 12:00 U

ID RES WO WO EQID DESCRIPTION RD ES EF 16 17R t8 I

pi__III_

0112.14,16_18_._

0

.41 I

8.221_0_.2.4.6,8_

.2114;16!

I.

1 MM993T787 MMV 76 9937787 FD-02543A 1 FD-2543A -

REBUILD/STICKS &

PACK LEAK 4

05APR04 06:00A 16APR04 15:59 pA-9n7i FD-2543A - REBUILDI 0 i191LP FWH 36 DRAI Tc

-

i.-+-*

I 4

-I I

N YE FOR FAC PRt.

'KS & PACK LEA?

HX-17B CONTRC JRB HALL 26 FTC EN L9437787 1

NG26TFC2ND NOE 77 0301897 IST-SISI NOE FOR FAC PROG -

TUR8 HALL 26 FT GEN AREA 20 05APR04 07:OOA 17APR04 11:59 AREA NSERVICE INSPECTI(

RMP 9326

-1 _ 11SECONDAi1 Y WN6301897 ho2140MCCS-i 1A, INSPECT CHI.C VALVE INTERNA

-

.f--+-

4

+

4-4 4

1 MM0214026 MMV 76 0214026 CS-00141A CS-141A, INSPECT CHECK VALVE INTERNALS. RMP 9326 20 06APR04 10:OOA 20APR04 10:59 IV S.

-

I -4.

mu I '.I

- I 1 NG08TFC2ND NOE 77 0301897 IST-SISI NDE FOR FAC PROG-5 07APR04 16APR04

_TURB HALL. FT GEN 08:OOA 16:59

~AREA_

I 1MN

08TFCIN

,NI

)CN E FOR FAC PROG NDARY INSERVIC E FOR FAC PROG E.

Eli

-17 JRB HALL 8 FTGI 4SPECTION030181 JRB HALL 8 FT O'

'N kREA HEAD 1

NG08TFC1ND NDE 77 0301897 1 IST-SISI NDE FOR FAC PROG -

TURB HALL 8 FT OVERHEAD 60 08APR04 00:OOA 19APR04 11:59 I..o I

I

.I,_

-1

-1 I

MMW~01 I

MM0214027 MMV 76 0214027 CS-00476 CS476.INSPECT AND 5

08APR04 16APR04 MAINTAIN VALVE, RMP _

1:00A 16:59 1CS-0476 1

9138-4

26TFC1N S.;

Ix.

Itic

6. INSPECT AND B SG FEEDWATE E FOR FAC PROG MP NTAIN VALVE. RF

!GULATOR CONT IRB HALL 26 FT C IP i IVE 138-4

.0214027 HD 1

NG26TFCtND NDE 77 0301897 IST-SISI NOE FOR FAC PROG -

TURB HALL 26 FT OVERHD 30 08APR04 21:OOA 17APR04 23:59 I -

- 3 ii SECONDARY ISLRVICE INSPE

-4

-4-.-----4 4-4

+

12&L4238f -1 i7A, INSPECT AND A AIJNTAIN CHECK AL 1

MM0214038 MMV 76 0214038 FD-00157A FD-157A. INSPECTANC MAINTAIN CHECK VALVE 16 09APR04 07:OOA 19APR04 13:59

____ T

__ -

i I

4-02143 1 ZOLANCE SC-1B 4.Ol DENSER (BOTH (Al ERBOXES)

I MM0214143 MM2 76 0214143 SC-1B HYDROLANCE SC-i B CONDENSER (BOTH WATERBOXES) 13 09APR04 11:00A 17APR04 15:59 11_I CCMOSD NSER (DEAERATINGt024`143 80303383!

6B. VALVE LEA

'BY. REPAIR 1

MM0303383 MMV 76 0303383 SC-00966B SC-966B - VALVE LEAKING BY. REPAIR 20 09APR04 I 1:00A 20APR04 10:59 IN

.I I..

I I,

II T 9949102?,.Pi.REPLACE EXTR C1 ON BELLOWS (N 1

TG9949102N ITGG 76 9949102 TG-01-Ti LP1-REPLACE EXTRACTION BELLOWES (NIGHTS) 58 13APR04 00:OOA 23APR04 00:59

-S)

I I

I I

I A600.20EI IEFGtZE AND CAL U?

=QIPMENT

-4 4-4-4.

4

4.

4-4 1

CE-1600-20 CE8 76 0213472 R-1 ENERGIZE AND CAL UNDERHEAD INSPECTION EQUIPMENT 26 13APR04 02:OOA 19APR04 14:59 DErHEAD INSPECTIN I

I Il I

In T* :t 4 7 0 PEI tFc RM HP SPINDLE I 01 DR BORE INSPEC 4l-T1 1

TG-30470 TGG 76 0302153 TG-01-T PERFORM HP SPINDLE ROTOR BORE INSPECTION-PT2 36 13APR04 120APR04 09:OOA 1

11:59

.0.

h I

I I

I I _

I

~

I A

.1.

-A Run Date 16APR04 15:38l LT-51 PRIORITY PUBLICATION-ES l

Sheet I of II I

Primavera Systems, Inc l

FL-50 Priority Working Publication l

after 16APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 16APR04 12:00 U

RESP WO WO EQID I

DESCRIPTION 1 RD1 ES EF 1A7PR

___ST

. 1S 80.2210

.2.4-1-61§ 8.10012.1.16.18,20.22 0.2. 4

.6. 8 tO121O t4.16l 1

TG9949102D TGG 76 9949102 TG-01-T1 LPI-REPLACE EXTRACTION BELLOW, (DAYS)-PT2 57 13APR04 09:OOA 23APR04 08:59 1-4&99441n2rdPi REPLACE EXTRACTION BELLOWS (DAYSI47r2 5 df=A~~

I.I

_~

,+

9_,

I I T.

z SUPPOR1

)VIDE CRANE, RlI GE R. AND TOOLRO(

,UPPORT(PT2) 4 4

1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.

RIGGER. AND TOOLROOM SUPPORT(PT2) 267 13APR04 09:00A 01MAY04 18:59 4

1 TG0302133 TGG 76 0302133 MS-02026 MS-2026 - OVERHAUL LH STOP VALVE-PT2 15 13APR04 12:00A 17APR04 16:59 r

I

  • -226 - OVERHAUL I H! TOP VALVE-PT2 I.A b

5.2127 - OVERHAUL I

TOP VALVE-PT2 TY

=

r 1

TG0302134 TGG 76 0302134 MS-02027 MS-2027 - OVERHAUL RH STOP VALVE-PT2 15 13APR04 12:OOA 17APR04 16:59 I

pz-

  • 1 i

A02137791 :D. 145 BODY TO BO9 NE

'T

.RBINE LEFT HAND S JRBINE RIGHT HAND ro, 0302133 P0302134

-I I

r LEAK I

MM0213779 MMV 76 0213779 FD-00145 1FDA145 BODY TO BONNET LEAK 22 13APR04 20:OOA 20APR04 21:59 I

I I g

E '0301956E1 CURRENT TEST AM GENERATOR I

I

.LL I

1 EP0301956 EPT 76 0301956 HX-001A EDDY CURRENT TEST STEAM GENERATOR A 1B5 14APR04 00:OOA 25APR04 16:59 I -

I -

I Li 4

4 4-1 1

E '0301957E CURRENT TEST lAM GENERATOR I I

EP0301957 EPT 76 0301957 HX-001B EDDY CURRENT TEST STEAM GENERATOR B 185 14APR04 00:WOA 25APR04 16:59

___--_I I

TG0215004 TGG 76 0215004 HX-054B HX-54B - INSTALL NEW 4

14APR04 16APR04 EH COOLER 09:OOA 15:59 E53U CT ER' B - INSTALL NEV iO-HYDRAULIC P FICE MAINT SUPF Et Ull COOLER COOLER021500d

-EQ VERIFYING 1

IC0400553A IC1 76 0400553 SERVICE SERVICE MAINT SUPPORT-EQ VERIFYING 42 14APR04 09:WOA 23APR04 13:59 I

-appmvec 10407T802 tec 1 spec ST-Restar PERFORM TROU CL SLU not reqd SHOOTING AND I

-

I I

4 I

EM0407780 EM 76 0407780 Z-013 Z-013 PERFORM TROUBLESHOOTING AND REPAIR 8

14APR04 13:OOA 16APR04 21:59 EF iWTAIfMI'Cl dAM49InARf77Y I0304877Q LKER MAINTENA 1200.14

-r t

i F

0 EM0304877 EM 76 0304877 A52-DHVR.1 BREAKER MAINTENANCE 1200-14 8

14APR04 19:W0A 17APR04 22:59 I

W4.16 KVI1200 AiPN IC56TURBI?

JBE OIL SYSTEM IC '5;6)

-r t-i--t 4

1 F

ACUUM BREA LUBF OIn= S~lQ (I

1 IC5.5 IC2 76 0300848 ICP-05.006 TURBINE LUBE OIL SYSTEM (ICP 5.6) 8 14APR04 22:OOA 18APR04 04:59 i

i i

i I

( _TU+

i u

odINdLUBE OILSY

)302376T'.2? 4 RELOCATE SVY TCI 1

IC0302376 1C2 76 0302376 TS-02134 TS.2134 RELOCATE SWITCH 137 14APR04 I 06MAY04 22:OOA 21:59 I

I J.

I

_ _ _ _ _ I I.

I..

__ _ _ __ _I__

i RunDate 16APR l

LT-51 PRIORITY PUBLICATION-ES u Da PmaveratSes 16msAnc.

FL-50 Priority Working Publication ll

after 16APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 16APR04 12:00 U I ID RESP WO WO EQID DESCRIPTION RD ES EF APR

_ST 2__

8

_102 0

  • 2.4.6 8 1_0_12_14_16_1 I

I OL1 jjD 4.16.1 Bl~.Di20221 zA.ii4QI+/-Id' 1

IC5.52-1 IC2 76 0300872 ICP-05.052 ICP 5.52 SECONDARY TEMPERATURE INST 137 14APR04 23:OOA 01MAY04 21:59 s.52.ilCP $.52LSECONDARY TE4PEIATURE INST r

I0301145 iB5. CFC COIL IN EF NAL INSPICLEANI NG

_ _ =

1 MM0301145 MMI 76 0301145 HX-01585 HX-15B5. CFC COIL INTERNAL INSPICLEANING 10 15APR04 0200A 17APR04 20:59 I

ECONTAINMENT ACIDl1NT RECIRC Ht q0301140 ISB6 - CFC COIL I Im1 RNAL INSPICLEA qIh 4

4 4-4 4.

1 MM0301146 MMI 76 0301146 HX.01586 HX-01586-CFC COIL INTERNAL INSPICLEANING 10 15APR04 02:WOA 17APR04 20:59 xI i

I-l4 CONTAINMENT ACdID4NT RECIRC H I I4 1

MM0301148 l

MM1 76 0301148 HX-015B8 HX-1568. CFC COIL INTERNAL INSPICLEANING 10 15APR04 02:OOA 17APR04 20:59 903011i4 1X4iB8, CFC COIL INtEIJNAL INSPICLEANI NGL i

lrr~

=

I AltnrtKrr

  • __ __

H4 10214171' r-1I 1, INSPECT AND LU RICATE FAN BEJ IGS

_I

,H l

l T

1 MM0214171 MM1 75 0214171 W-u01B1 W-1B1. INSPECTAND LUBRICATE FAN BEARINGS 30 15APR04 02:00A 19APR04 22:59 I

I 1

IC9948487 ICV 76 9948487 FD-02513B I FD-2513B POST 2

15APR04 16APR04 REPAIR DIAGNOSTIC 03:OOA 21:59

~W21064# X:1 1

MM0214064 MM1 76 0214064 HX-0158 HX-15B, MOTOR COOLING COIL INTERNAL INSPECTION 10 15APR04 10:OOA 16APR04 23:59

_11 139 POST REPAI

  • HX-211 HP FM iB. MOTOR COO!

i!W-1B1 AC(

IINSPECT INNEI ESSURE TURBINE IA - EDDY CURRI IN,

IDI ST 031 AGNOSTIC B DUMP TO CONE COIL INTERNAL NT RECIRC FAN I EAM GLAND CASI 2153 INSPECT SA LP F 1

TG-30510 TGG 76 0302153 TG-01-T CLEAN IINSPECT 3

15APR04 16APR04 INNER STEAM GLAND I11:OOA 14:59 1CASINGS MD1 0 Cu

MHIG-0101 9a6H PF c-c

EN SG N!I 3ER CONTROL99484I PECTION OR COOLING COIL0 EATER r

140 1

EP0301963 EPT 76 0301963 HX-021A HX-021A - EDDY CURRENT INSPECT SA LP FW HEATER 27 15APR04 18:OOA 17APR04 18:59 i -

L._ I I

I, it HP FEEDWATER HEAT R A0301963

_4 C4.1CjCP 4. IC ELTA TSPI CAL B.

I IC4.1C IC2 76 0300824 ICP-04.001 ICP4.ICDELTATSPI CALIB 39 15APR04 21:00A 22APR04 03:59 I -ML..

m l I

_~~~

I TG-9040 TGG 76 0302150 TG-01 INSPECTTURBINE 4

16APR04 16APR04 THRUST BEARING 08:OOA 15:59 I

NG-SCIASRV EPT 75 0301978 SC-1A SC-tA - EDDY 5

16APR04 16APR04 CURRENT REVIEW I 08:OOA 16:59 RERUN (1AS)

_I sNSI EC LTU BII ON IfZBFA

_h DlAS rTURBINE THRU JE GENERATOR ((

A - EDDY CURR

)ENSER (DEAERA

~ B INTERNALS RI TURE SEPARATO flN rP EARING ERIC; SEE COMP(

REVIEW I RERUN

.)0301978 IRS (SHELL SIDE)

=HEATER0302109 INE

'(1 NTS)0302150

%S) 1 TGHX22BRP I TOG 76 0302109 HX-022B MSR B INTERNALS I REPAIRS (SHELL SIDE) 5 16APR04 116APR04 08:WOA 16:59 I

I Run Date 16APRo415:381 LT-51 PRIORITY PUBLICATION-ES l

Sheet 3 of 11 C tPmavera Systems, Inc.

I FL-50 Priority Working Publication T

I I

after 16APR04 12:00 I

U1R28 WORKING SCHEDULE after 16APR04 12:00 U

ID RESP WO WO EQID I

DESCRIPTION IRDI ES EF APR S T i

i 1

_ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _I I

CEDIVSURCH CEI 76 0.400396 JI-FOREBAY INSPECT & CLEAN SURGE CHAMBER I SEAL WELL 17 16APFR04 09:00A 1UAPMU4 08:59 mrVSURCfl N~PECT & CLEAN 5UK~jE CHAMULB I 54AL[VVYLL r

i i-

-m 1+-

1 TG03021358 TGG 76 0302135 MS-02033-O MS-2033 -REINSTALL 5

16APR04 16APR04 LH GOV VALVE 10:OOA 16:59 OPERATOR 1

CAMP-113A CH HX-001A CAMP-113 SAMPLE A 3

16APR04 16APR04 STEAM GENERATOR 11:00A 14:59 (NO SPARGE) 1 T-8447-H WCC 0018447 TG-01-T 1 TU TG-01-T REV6.03-1 2

16APR04 16APR04 12:00 13:59 1

T-8451-H WCC 0018451 T-36 1 LO T-36 EPT REV.1-2 16APR04 16APR04 12:00 13:59 I

T-8453-H WCC 0018453 T-36 I LO T-36 MM REV1-1 2

16APR04 16APR04 12:00 13:59 1

T-9689-R WCC 0009689 T-36 1 LO T.36 MM REVO-1 2

16APR04 16APRo4 12:00 13:59 1

T-9697-R WCC 009697 HX-001B 1 MS HX-1B WLU MMV 2

16APR04 16APR04 REVO-1 12:00 13:59 1

TGHX22ARP TGG 76 0302108 HX-022A MSR A INTERNALS 5

16APR04 16APR04 REPAIRS (SHELL 12:00 16:59 SIDE)PT2 1

IT300ABR OPS HX-001B PRE JOB BRIEF FOR I

16APR04 16APR04 IT-300B 13:00 13:59 1

lT-300BSMP CH O-IT-0300A SAMPLE S/G HX-18 3

16APR04 16APR04 T PER IT-300B 14:00-16:59 1

01124-10 OPS HX-001A DRAIN A SIG 12 16APR04 17APR0 COMPLETELY 15:00 04:59 I

MP-113 S w-1t 1 TU T(

1W441 L(

1 LOT.

3441 L(

1WI LOT-6_9-R 1 L(

_1 LOT-7-1 M i 1MS H 300ABRPR U

00BSMP

_A 24-IODRJ

.00 5 0V15 0215cIT 2033 - REINSTA IRBINE LOWER ILE A STEAM GE

.01 -T REV6.03-1

-T REV6.03-1 001 16 EPT REV1-1 PT REV1-100184!

16 MM REVI-1 AM REVI-1 001845 16 MM REV0.1 AM REV0-1 000968

(-it13 WLU MMV RE 3 WLU MMV REVO 1 A INTERNALS RI TURE SEPARATOl B BRIEF FOR IT-:

PLE SIG HX-1B Pi MAIN FEED LINE SIG COMPLETEI LY INSPECT THRI INE GENERATOR UI-7F1 GOv VALVE OPE HAND GOVERNO kTOR (NO SPARC I

09697 IRS (SHELL SIDE)

=HEATER0302108 3

VL300S 1

CK VALVES (COLI IN 1t#

OR OPERATOR0302135 rra

)S fUTDOWN)

Li

JA RI 1

TG-9050 TGG 76 0302150 TG-01 VISUALLY INSPECT THRUST BEARING COMPONENTS 1

16APR04 I 16APR04 16:00 16:59 I BEARING COMPONEINTS NERIC: SEE COMI'OliENTS)

I __

I I.......

Run Date 16APR04 15:38 l

LT-51 PRIORITY PUBLICATION-ES Sheet 4 of II Primavera SIstemsInc l

FL-50 Priority Working Publication

after 16APRO4 12.00 I

U1R28 WORKING SCHEDULE I

after 16APRO4 12.,00 Ul

'ID EI I

w W

EQID I

DESCRIPTION I RE) IE I

EF I

APR ST11 17 18 TG-9070 TGG 76 0302150 TG-01 CLEAN THRUST BEARING COMPONENTS 4

16APR04 17:00 16APR04 20:59 030215Ci1 IT.300%F L 1

IT-300B OPS 77 0215905 O-IT-0300B FILL B S/G TO MSIV 6

16APR04 17APR04 AND PRESSURIZE TO 17:00 00:59 100 PSIG 1

TGRF-230 TGG 76 0215878 O-RF.230 EH FILTER 8

16APR04 17APR04 CHANGEOUT AND 17:00 00:59 MAGNETIC 1

PM-BRIEFI ADM ADMIN OCC INTERACTIVE 2

16APR04 16APR04 TURNOVER and 18:00 19:59 FOLLOWUP 1

TG-30511 TGG 76 0302153 TG-01-T

-LEAN/INSPECTIREPAIF 10 16APR04 17APR04 OUTER STEAM GLAND 19:00-08:59 CASINGS 1

CE300869SI CE4 76 0300869 ICP-05.049 BUILD SCAFFOLDING 8

16APR04 17APR04 ICP 5A9 SEC CONTROL 20:00*

03:59 VALVES I

TG-9100 TGG 76 0302150 TG-01 ASSEMBLE TURBINE 20 16APR04 19APR04 THRUST BEARING 21:00 20:59 1

IC5.18-1 IC2 76 0300856 ICP-05.018 RSC CNTL SYS CAL 28 16APR04 21APR04 21:00-00:59 1

T-8436-R WCC 0018436 Z-013 1 Z Z-13 TBL REV2-1 1

16APR04 16APR04 22:00 22:59 1

EZMRCP-K1 EM 76 0215205 P-00IB-M JIT INFO SHARING FOR 2 16APR04 16APR04 P-B MOTOR LIFT 22:00 23:59 1

MM-8480C3 MM1 76 0214134 R-1 REMOVE REMAINING 4

16APR04 17APR04 STUDS / CLOSE STUD 22:00 01:59 HOLES I

I EZMRCP-K2 EM 76 0215205 P-001B-M P-1B PRE-JOB BRIEF 2

17APR04 17APR04 FOR MOTOR MOVE 00:00 01:59 n'4xnO I

GRF.230E 02158T7i

'M4BRIEF' TG-305 03021 CE3008 I F IC N THRUST BEARI ITURBINE GENE I SIG TO MSIV AN

~8 SG MA

.TER CHANGEOU EH FILTE INTERACTIVE Ti

.EANIINSPECTIRE IG OMPONENTS A OR (GENERIC: SE F RESSURIZE TO I N EED LINE CHECK r

0D MAGNETIC R HANGEOUT AND IR OVER and FOLLC PA R OUTER STEAM 1HIGH PRESSUR IN ICP 5.49 SEC CO Ot: DARY PLANT CO?

BI E THRUST BEARI OMPONENTS)

SIG YVES (COLD SHUTDOI 2'NETIC PLUG INSPEC P

U41D CASINGS JRBINE oL VALVES OL VALVES JNN

-ia 1UILD SCAFFOLr 030o86 _

S E I TC 1OASSEMBLE TUF I03p21 IC

.jRSC CNTL SYS l:Az DI 08 lf fM 7

EZM MM.

t2 148 211 VI ZMC iCl "I Z Z-13 TBL F t3d1 Z Z-13 TBL

.KIJIT INFO SHAF 2OREACTOR RWP: RCP Sea 10 3REMOVE REM 13REACT lCP4C2P B PRE, 21520!0REACT RWP: RCP 2125991CC-761A.

2125991P-Imi cO IM UN DR 10!

DR

'A IA REV2-1 FOR P.1B MOTO LANT PUMP MOI intenance ING STUDS I CLO VESSEL AND ASS BRIEF FOR MOT(

COOLANT PUMP I I Maintenance IR LEAK ON DIAPI ICP THERMAL BA orL ZRI FT 3TUD HOLES ILY MOVE OR

,GM

..R COOLING RETURI 1

IC0212599 lCV 76 0212599 CC-00761A-I ICC-761A-O AIR LEAK ON DIAPHRAGM 4

17APR04 117APRo4 00:00-03:59 ERATO Run Date 1APR0415:38I LT-51 PRIORlIY PUBLICATION-ES Sheot5of11 O Primavera Systems, Inc.

FL-50 Priority Working Publication I

after 16APR04 12:00 U1R28 WORKING SCHEDULE I

after 16APR04 12:00 U I ID RES WO IWO IED DESCRIPTION IRDI ES EF 11 1 a

_ _ST l21.1f,20,2210. 2. 4.4 6. 8.10112,14,1861970.22 0..2. 4. 6, 8,10112,14,16l1 1

IC10.10B IC 76 0300885 ICP.10.010 B SIG INSTRUMENT BLOWDOWN 5

17APR04 01:00 17APR04 05:59 1

EZMRCP-K EM 76 0215205 P-OOIB-M P1 B MOVE MOTOR 6

17APR04 17APR04 FROM PUMP TO STAND 02:00 09:59 1

AM-BRIEF2 ADM OCC INTERACTIVE 2

17APR04 17APR04 TURNOVER and 06:00-07:59 FOLLOWUP I

TGHX22CVIS TGG 76 0302110 HX-022C MSR C INTERNALS 10 17APR04 17APR04 INSPECTION (SHELL 07:00 16:59 SIDE) 1 MM-8480RA MMI 76 0214134 R-1 JIT INFO SHARING.

1 17APR04 17APR04 CAVITY SEAL RING &

08:00 08:59 TOP HAT 1

IT-30081 OPS 77 0215905 O-IT-0300B RAISE B SrG TO 500 2

17APR04 17APR04 PSIG IAW IT-300B 08:00 09:59 1

TG0302151 TGG 76 0302151 TG-01 AUTOSTOP OIL RELIEF 20 17APR04 19APR04 VALVES OVERHAUL 08:00' 07:59 1

MM-8480RB MMI 76 0214134 R-1 IPTE BRIEF. INSTALL I

17APR04 17APRo4 CAVITY SEAL RING &

09:00 09:59 TOP HAT 1

TG-30580 TGG 76 0302153 TG-01-T MEASURE HP OUTER 2

17APR04 17APR04

_TM GLD CLEARANCES 09:00 10:59 1

TG0302155 TGG 76 0302155 TG-01-T2 LP2 TURBINE 40 17APR04 20APR04 CRAWL-THROUGH 09:00-08:59 INSPECTION 1

IT-300B2 OPS 77 0215905 0-IT0300B CS-476M & CS-476-BB 3

17APR04 17APR04 SEAT LEAKAGE TEST 10:00 12:59 1

MM-8480R1 MMI 76 0214134 R-1 INSTALL CAVnIY SEAL 4

17APR04 17APR04 RING 10:00 13:59 IC10.1066 SI/G IN 030088 EZMRCP4-KMI 021520 RWP: F AM-BRIEP TGHX22CN 03021 MM-848 021i IT-3C 021!

TG030 TS SG VE r1p X,

VA t

MENT BLOWDO TRANSMITTERS -

MOTOR FROM PI EREACTOR CC Seal Maintenance INTERACTIVE F SR C INTERNALS IMF R.I IN.!

IWDOWN, FILUNG At TO STAND NT PUMP MOTOR OVER and FOLLOWU DECTION (SHELL SID rURE SEPARATOR R p.

ENTING 1

WAO l'It Rl 134 05 154 JIT INFO SHARINI EREACTOR VES' RAISE B SIG TO I WB SG MAIN FE WUTOSTOP OIL R 0'1 EL ED EU

-Hi rol ATER HAT AVITY SEAL RING &

WND ASSEMBLY SIG IAW IT-3001B INE CHECK VALVES F VALVES OVERHAL rCC L

LD SHTDOVt4 030i 51

_ 2 _

MM8 80 BlPTE BRIEF, IN TA CAVITY SEAL RIN

& rOP HAT 02 41 WREACTOR VE S AND ASSEMBLY TG- 05 d0MEASURE HP 0 R STM GLD CLEARA C S 03 21 QHIGH PRES UF TURBINE TG03 21 sLP2 TURBINE C L-THROUGH INSPEcntN 03 21 M

MM

-3' 341 21 P1 DEBS~6AIA & C 906=

SG MW DRIINSTAL~L CAV 13~iREACII 3-005ESTABLISH S4 TY 6R qP

'6-B8 SEAT LEAKAGI EED LINE CHECK VAI EAL RING JESSEL AND ASSEMI 0 INITIAL CONDITIOI VE IST VE (COLD SHUI ILt IS.

1 RPID-005 OPS O-RP-001D ESTABLISH RP ID INmAL CONDmONS 4

17APR04 I 17APR04 11:00 14:59

.U I

AIA.A I

Run Date 16APR0415:381 LT-51 PRIORITY PUBLICATION-ES Sheet6of11 O Prlmavera Systems, Inc.

I FL.50 Priority Working Publication I

after 16APRO4 12:00 I

U1R28 WORKING SCHEDULE after 16APR04 12:00 U

ID lPESPl f

An A

WOtoWRESEaID DESCRIPTION RD ES EF 11 lIn A

f17~

is

~

lA I

I......

I I-I fu L 1,l.

'Z

.Z fI0101a]III 1

MM0214052 MM1 76 0214052 HX-001A HX-1A, OPEN SG HANDHOLES 10 17APR04 11:00*

17APR04 22:59 MI C)2I 40 5 1

CAMP-113B CH HX-001B CAMP-113 SAMPLE B 3

17APR04 17APR04 STEAM GENERATOR 13:00 15:59 (NO SPARGE) 1 TG-30695 TGG 76 0302153 TG01-T CLEAN GOVERNOR 20 17APR04 19APR04 PEDESTAL BASE-PT2 13:00 12:59 1

MM-8480R2 MM1 76 0214134 R-1 CHECK SANDBOX &

I 17APR04 17APR04 TOP HAT COVER BOLT 14:00 14:59 TORQUE 1

MM-8480D3 MM1 76 0214134 R-1 JIT INFO SHARING 2

17APR04 17APR04 PRIOR TO HEAD LIFT 15:00 16:59 1

RPID-010 OPS O-RP-OOID FILL LOWER CAVITY 5

17APR04 17APR04 PER RP-1D 15:00 21:59 1

01124-20 OPS HX-001B DRAIN B SIG 12 17APR04 18APR04 COMPLETELY 16:00 05:59 I

MM-8480D MM1 76 0214134 R1 IPTE BRIEF FOR HEAD 2

17APR04 17APR04 LIFT 17:00 20:59 1

0123A-10 OPS01-23A INSTALL PORTABLE 3

17APR04 17APR04 CAVITY FILTER UNIT 17:00 21:59 (TRI-NUKE) 1 0123A-15 EM 01-23A PHASE CHECK AND 3

17APR04 17APR04 START TRI NUKE 17:00 21:59 FILTRATION UNIT 1

PM-BRIEF2 ADM OCC INTERACTIVE 2

17APR04 17APR04 TURNOVER and 18:00-19:59 FOLLOWUP 1

T-0711-H WCC 0010711 Z-024A 1 RC Z-24A RMP-9096 1

17APR04 17APR04 MM REVO-1 22:00 22:59

A? P-I13BCAMP.

r-muCI_F

.L.-J.

.__ -.- RIZZI ril-Ir LICNrNUECT TUK

TALUCONNECT C TAWPCONNECT PRI iNr;U3U15 AM-8480R2CHI 0214134R MM-8480D3JI 02141341 RPI D-001 OFI 01124-2(

MM-845(

02141:

0123A.1 aNS 1Y FILTER UN

)123A-15sPAS TY FILTER UN PM-BRIE IATION FOR F lIA 1

£ZUiZZL "I

Z Iff 4,

)PEY S xHANDHOLES INSTEAM GENERJ 113 SA PLE r STEAM GENEI WN RNOR PEDESTAL B ECI St NDBOX & TOP HATC EA T RVESSELANDASSE IT I FO SHARING PRIOR TO OR AGTOR VESSEL AND A' ILL.0IER CAVITY PER RP-M1_ -

FILL LOWER CAV VD StG COMPLETELY lod BRIEF FOR HEAD LIF iRREACTOR VESSEL TA L RTABLE CAVTY FIL E C 'E K AND START TRI NU F2C CC NTERACTIVE TURNO 1 07 1t I RC Z-24A RMP-4 01 71131 RC Z-24A RMF tP1v '0! 2SET CLOSURE FOR F REFI IEl NG_

Is AT ZE I

=1 I S

pR (NO SPARC

-PT2 E

L U 1 lIllleJJ.1JIP'4 a

)VI

'B' IE.8 SE D

I

R BOLT TORC Y

D UFT ABLY t VERIFY DRA

,-1 IN!

IN!

AV AV rkNt

~E I 09EI

-90' EA,

'ASSEMBLY UNIT (TRI.NUIl ILTRATION U1 and FOLLOWI MM REV0-1 6MMREVO-1

.TOR HEAD Ul I

RPIA-052 OPS O-RP-001A I SET CLOSURE FOR REACTOR HEAD LIFT 3

17APR04 I 18APR04 22:00 00:59 PA Run Date 16APR04 15:38l LT.51 PRIORITY PUBLICATION-ES Sheet 7 of II C Primavera Systems, Inc.

FL-50 Priority Working Publication T

I after 16APR04 12:00 I

U1R28 WORKING SCHEDULE after 16APR04 12:00 U

EPW O

Et DESCRIPTION RD ES IEF APR

__ST I

1002,14,16,18.2n.221 0

2,

  • 4 6 8 j10j2.l.s1q.6 2n-221 0.2.
4. 6 l 8 10112ilA16.-1 1

EM-84800 EM 78 0214134 R-1 DISCONNECT PATCH CABLES FOR DEDICATED TICS I

18APR04 00:00 18APR04 00:59 REACTOR VE 1

NRC-CALL-7 ADM MILESTONE O.D. CALL NRC TO I

18APR04 18APR04 WITNESS REACTOR 00:00 00:59 HEAD UFT I

MM-8480D1 MMI 76 0214134 R-1 MOVE REACTOR 4

18APR04 18APR04 VESSEL HEAD TO 01:00 04:59 RHLDA 1

HEADLIFT PPG MILESTONE REACTOR VESSEL 0

18APR04 HEAD LIFT 03:00 I

MM-848581 MM3 76 0214119 P-00tB PLACE BACKSEAT I

18APR04 18APR04 COLLECTION SYS IN 04:00 04:59 SERVICE (8 FT.)

1 CAVFILUIT OPS 77 0215926 o-ITr0760 JIT INFO SHARING FOR I

18APR04 18APR04 CAVITY FILL & IT-760 05:00 05:59 I

T-3426-H WCC 0013428 P-001B 1 RC P-1B RMP 2

18APR04 18APR04 900248/19 MM REVO-1 05:00 08:59 1

AM-BRIEF3 ADM OCC INTERACTIVE 2

18APR04 18APR04 TURNOVER and 06:00' 07:59 FOLLOWUP 1

rT760-BRF OPS 77 0215926 O-rT-0T60 BRIEF PRIOR TO HH SI 1

18APR04 18APR04 CHECK FULL FLOW 08:00 08:59 TEST PREPS I

CESH81-SI CE4 PACKAGE 81 BUILD SCAFFOLDING 6

18APR04 18APR04 FOR SHIELDING -

08:00' 13:59 RHLDA SHADOW 1

CESH82-SI CE4 PACKAGE 82 BUILD SCAFFOLDING 8

18APR04 18APRo4 FOR SHIELDING -

08:00 13:59 RHLDA SHADOW 1

CE-1600-05 CE4 76 0213472 R-1 BUILD SCAFFOLDING 12 18APR04 18APR04 TO SUPPORT 1600 08:00 21:59 INSPECTION A1 INI REACTOF

?rY MONITOR PU 1 HIGH HEAD SI IR UNIT 1 HIGH HE 2

HI EM.848ODDISCOt

'EL AND ASSEME NRC-CALL-70.D.

MM-848 SSEL AND ASSEN OPERATING STAl 84155 1PLACE BA REACTOR COOL/

CAVFILLJ

CK VALVES FLOI lB RMP 900248/19 AM-BRIEFX 60-ORFORIEF PRI I CHECK VALVES
H81-SIUILD SCW
H82-SIBUILD SC)

CE4600.05BUILD ZEACTOR VESSEI RI CT PATCH CABLES FC 121413.4 1L NRC TO WITNESS F I

AOVE REACTOR VESS (021413 l

RWP: Reacto HEADUFT REACTOF ILESTONE+

EAT COLLECTION SI PUMP0214119 INFO SHARING FOR ST (RF)0215924l 26-RC P-1 B RMP REV0-1 001342EU NTERACTIVE TURNO U

lHH SI CHECK FUL W TEST (RF)021592E ILDING FOR SHIELDIIN LDING FOR SHIELDI FFOLDING TO SUPPO DIC-IIATED I TOR HEAD Li 4EAD TO R ad ULft SSEL HEAD U bSERVICE (S Fl FIL & IT-7

..8 l9 MM REJ and FOLLOW1 OW TEST PRI pHLDA SHADC HILDA SHADC 00o INSPECnC

..1 v_,^.__

F D

CE

-.1-ii

: ii -

-11 A_..NFR n1 I

RP4A-030 I EM O-RP-004A CLEAR WALKWAY FOR MANIPULATOR 2

18APR04 09:00 18APR04 10:59 4A 030CLEAR WALKWA' RC IMANIPULAT, I

)I Run Date 1SAPR041S:38s LT-51 PRIORITY PUBLICATION-ES Sheet8of11 C Primavera Systems, Inc.

I FL-50 Priority Working Publication I

after 16APR04 12:00 l

U1R28 WORKING SCHEDULE I

after 16APR04 12:00 U

I RESI WOI WO I

EQID I

DESCRIPTION 1 RD ES I

EF APR ST

0202210, 2.4 161 8 1001 r.16820.2210. 2.._ 6 8 110112.d14,1 1

RP1A-060 OPS O-RP-001A FlLL CAVITY FOR ROD UNLATCH 3

18APR04 09:00 18APR04 11:59 FILL UI UNIT I HIGH H 1

IT-760-A OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 6

18APR04 18APR04 FULL FLOW TEST 09:00 14:59 PREPS 1

MM-8485K MM3 76 0214119 P-001B P-1B. ALIGN SEAL 1

18APR04 18APR04 COLLECTION TO 12:00 12:59 CAVITY RMP9002-8 1

0123A-20 OPS01-23A INMATE CAVITY 11 8APR04 18APR04 PURIFICATION 12:00 12:59 1

T-6594-R WCC 0016594 T-36 1 LO T-36 EPT REVO-1 I

18APR04 18APR04 12:00 12:59 1 EM0302132A EM 76 0302132 LO-00291 P-059B - DE-TERM 2

18APR04 18APR04 AIRSIDE SEAL OIL BtU 12:00-13:59 PUMP MOTOR I

MM0214099 MM2 76 0214099 HX-056A HX-056A - OPEN SGFP 2

18APR04 18APR04 OIL COOLER 12:00 13:59 I

RPSHo78-1 RPI PACKAGE 78 INSTALL SHIELDING O 3

18APR04 18APR04 REGEN FOR CV-296 12:00-14:59 I

IC425N36-1 IC5 76 0300838 ICP-04.025 ICP 4.25 NI IR N-36 CAL 4 18APR04 18APR04 12:00 15:59 1

O-RT-035A OPS 77 0215973 O-RT-035 PRE O-RT.035, HOT 4

18APR04 18APR04 LEG SAMPLE LINE 12.00 15:59 1

IC5.73A-1 ICI 76 0300878 ICP-05.073 ICP-5.73 T-34A 5

18APR04 18APR04 ACCUMULATOR LEVEL 12:00-16:59 XMTR'S RESTART 1

EM0216164Z EM 76 0216164 ISOL PHASE REMOVE BUS LINKS 8

18APR04 18APR04

'ALL BUT I PER PHASE 12:00 21:59 (RESTART)

PE IV I 'MC Z CAVITY FOR UN mT760o-A" SI CHECK VAL M-8485KP-11. A R

302132AP-059B.

TURBINE Oil F

RPSHOI INTATION SYSTE O.R HOT Li

5.73A.11CP-. 7 3 T-ACCUMULATOF 61642REMOVE SI 1P1A-060ILL CA

.lHING RODS (RP-1 HEAD SI CHECK FU

.OW TEST (RF) 02159 SEAL COLLECTION T OR COOLANT PUMPI 0123A-2UNmATE C IATE CAVITY PURIFIC T-6594-R1 LO T-36 EPT REVO-1 C ERM AIRSIDE SEAL 0 tESSURE REDUCINGC 214099HX-056A - OPE?

% SGFP OIL COOLERC STALL SHIELDING ON IC425N36-11CI ITERMEDIATE RANGC ISAPRE O-RT-035. HO AMPLE LINE (P-28A)C ACCUMULATOR LEVI V/EL TRANSMITTERSC VP: Containment Gene JNKS "ALL BUT I PEPI ISOL PHASE DUCT(

MOV ACTUATOR CHI UNDANT ISOL OPERC F0 ROD UNLATI

?-

I TEbWnST PREI 1 CIVrIY RMP900I 21 119 vr Y PURIFiCATI AT ONN LO T-36 EPT REVI D1 594 LB `U PUMP MOTOF 30 132 I SFP OIL COOUS 21' 099E RE EN FOR CV-2 CS NI IR NJ38 C 30(83E ri!G SAMPLE ELI 21! 973 WIMTRS RESTA 306C 8711l 2al ea Maintenan P &SE- (RESTA I

,C.OUT(RESTAr 21 1

NUCLEARINSTFM El P-14A CONT.

I 02 PF I

EM0215183A IEMV 76 0215183 I SI-00860A-SI-86OA-0 MOV ACTUATOR CHECK-OUT (RESTART, 10I 18APR04 I 18APR04 12:00 23:59 EM02151083ASI46 A

AY PUMP DISCH EE I

.L Run Date 16APR04 15:38l LT-51 PRIORITY PUBLICATION-ES l

Sheet 9 of 11 O Primavera Systems, Inc.

I FL-50 Priority Working PublIcation T

after 16APRO4 12:00 1

U1R28 WORKING SCHEDULE I

afterl6APRO412.00 U IID__RESF__

WO I WO I

EQID DESCRIPTION IRDI ES 6

EF I

APR

_S I_

S 120.22 0.2.4 1 6_ 8._1_ 12_14.16 1820.22t 0._2.4A. 6 18 0112,14.161:

1 IC0407776 IC 71 0407776 N-431 iN-31 NOISE SPIKES 10 18APR04 12:00 18APR04 23:59 1

MM0214054 MM1 76 0214054 HX-001B HX-1 B. OPEN SG 10 18APR04 1sAPRw4 HANDHOLES 12:00 23:59 0

EM0301792 EM 76 0301792 A52-DHVR-3 BREAKER 24 18APR04 19APR04 MAINTENANCE 3000-01 12:00 15:59 (A52-01) 1 1C4.iJ ICI 76 0300831 ICP-04.001 PZR LVIL AND FIRST 16 18APR04 20APR04 STAGE PRESS CAL 12:00 09:59 1

IC5.19-1 ICI 76 0300857 ICP-05.019 COND STEAM DUMP 32 18APR04 23APR04 CNTL SYS CAL 12:00' 11:59 RESTART 1

MM0306054 MM2 76 0306054 P-028A P-028A -CONTINUE 90 1 8APR04 28APRo4 OVERHAUL MAIN FEED 12:00 11:59 PUMP I

1C5.54-1 IC5 76 0300874 ICP-05.054 ICP 5.54 SECONDARY 71 18APR04 29APR04 LOW RANGE 12:00 10:59 PRESSURE RESTART 1

IC9944161 ICS 76 9944161 DPS-05933 IDPS-5933 INSTALL 71 18APR04 29APR04 SNUBBERS 12:00 10:59 1

IC5.7-1 IC5 76 0300849 ICP-05.007 ICP 5.7 EH CNTL CAL 112 18APR04 04MAY04 THRU STEP 4.49.11 12:00 11:59 RESTART t

lC5.49DAY1 ICV 76 0300869 ICP-05.049 ICP 5.49 SEC CONTROL 160 18APR04 06MAY04 VALVES 12:00 09:59 1

IC5.47-1 ICI 76 0300867 ICP-05.047 SECONDARY LEVEL 178 18APR04 08MAY04 CONTROLLERS AND 12:00 09:59 SWIr 1

RPSH08141 RP1 PACKAGE 81 INSTALL SHADOW 3

18APR04 18APR04 SHIELDING (FROM RX 14:00 16:59 HEAD)

RP/SAFEGUAR SECONDARYPI SECON NI SO EMW030 4.16 KV/3000, JR1 TM

)S AN NNALOG RACKS F IC5.194 MM03060s4P-° STEAM G

-5. 54.11CP 5.54 SE r LOW RANGE PR 9-1t2 DRN BOTTL IC5.7.11CP I CTRO-HYDRAULI(

SECONDARY Pi ICSA7-1 8 ZY LEVEL CONTRI RPSH0814N!

RPSH0824NS C4 8A

_Nl co IC0407776

.E RANGE CHANNEL(

MM0214054HX11B OF 3TEAM GENERATORC BREAKER MAINTENAI VACUUM BREAKERC 1JPZR LVIL AND FIRSI LVL/1ST STG PRESSC tD STEAM DUMP CNTI AM DUMP CONTROLC

  • CONTINUE OVERHAI RATOR FEED PUMPC YDARY LOW RANGE F URE INSTRUMENTS C 1C99441611DPS-5933 1 GH DPS INTERLOCKS H CNTL CAL THRU ST IVERNOR (OUTAGE)C
5.49AY1lCP 5.49 SE(

T CONTROL VALVESC

)NDARY LEVEL CONT TRS AND SWITCHES C LL SHADOW SHIELDI?

L SHIELDING FOR D0-1 NOISE SPIK 776le SSG HANDHOLE 3W00-01 (A524 T7920 AGE PRESS C, 4831w4 S CAL RESTAI lAIN FEED PUI

SURE RESTAI 5874q ALL SNUBBEI l181

.49.11 RESTAI

)NTROL VALVI 186_

LERS AND SV 867_

FROM RX HEA FROM RX HEA M

~LI

.* E AN EC, ILL 0TA 1

RPSH0824 RPI PACKAGE 82 INSTALL SHIELDING FOR D-FAN (FROM RX HEAD) 3 18APR04 I 18APR04 14:00 16:59 AL Run Date 16APR04 15:381 LT-51 PRIORITY PUBLICATION-ES Sheet 10 of 11 O Primavera Systems, Inc.

I FL-50 Priority Working Publication T

after 16APR04 12:00 U1R28 WORKING SCHEDULE j after 16APR04 12:00 U

ID RESP WO WO EOID DESCRIPTION RD ES EF 16 7 APR 8

_ST I

.12_14 16 2

?0.2210. 2. 4 8 1012.14.

m 20.2210.2. 4. 6 8 1Ol1Zzi4iM 1

0156-020 OPS 01-56 FILL TRANSFER CANAL 16 18APR04 19APR04 0156-020FIT1 NSE A

14:00 09:59 UE L TRANSFER SYSTE N CANAL IT -760-B OPS 77 0215926 0-IT-0760 HIGH HEAD SI CHECK 4

18APR04 18APR04 IT 76' 48 HGH HEAD Si CHE K WLLFLOWTE FULL FLOW TEST 15:00 20:59 UNI-1 iGH HEAD SI CH C VALVES FLOWTEST 021592 1

IC4.26N41 ICI 76 0300839 ICP-04.026 ICP 4.26 NIS PR 19 18APR04 22APR04 IC4.26N41ICP 4.26 IS R CAUBRATI(

CALIBRATION 16:00 10:59 NU U AR INSTRUMENT TI N SYSTEM POWER F jN E 0300839 1

TG0306774 TGG 76 0306774 LO-00254 I LO-254 -

6 18APR04 1IAPR04 TG0306741 0.5 - REPACK/GLAND

'OL.OWER COCKIt REPACKIGLAND 17:00' 22:59 P 59. AIR SIDE SEAL C IL UMP DISCHARGE HE D R IS030677 FOLLOWER COCKED 1

01100-40 OPS T-034A DRAIN SI 12 18APR04 19APR04 Oi100-0DRAIN StA C MULATORT ACCUMULATOR T-34A 17:00 08:59 31 EPT 76 0301963 HX-021A HX-021A-EDDY 24 18APR04 19APR4 EP03019 3

-021A3

-EDDY C RMVEW/RER CURRENT 17:00' 16:59 HP FEEDWATER HS TE I A030196 REVIEWIRERUN Run Date 16APR04 15:38 LT-51 PRIORITY PUBLICATION-ES Sheet 11 of 11 O Pdmavera Systems, Inc.

FL-50 Priority Working Publication

after 16APR04 12:00 lWORKWEEK SCHEDULE thru 18APR04 1700 RESP S WO EQID DESCRIPTION RD ES EF RISK Resrce MSM MF TIES APR Y'

ST ST ID

.6.9 112615618211 Q.

.6.9 18815.812110 3.6.

9 -12,15 CE6 M 77 SEC SEC SUPPORT MR 123 05APR04 07MAY04 DR-N ML-N 926 3

60 05APR04 CE02109 rSECSUPPORTMR9' 1-11PB 99-1 PB 07:OOA 14:59 ORT3-N R-L 07:OOA

.re-ap z

te spec ST - Rest irt CL not reqd CEO M 76 SEC SEC. INSTALL NEW 123 05APR04. 07MAY04 DR-N ML-N 926 3

60 05APR04 E02109 SEC,:INSTALL NEW IQUIP MR 99.011 'E EQUIP MR 99 E 07:00A 14:59 ORT3-N R-L 07:00A

_re-app ted h spec ST - Rest rt CL not reqd CH P

77 HEM-SAMPI RCS DO TSR 3.4.5.1 9

11APR04 17APR04 DR-N ML-N 3

287 11APR04 rHO307 nRCS I TSR 3.4.5.1 05:OOA 11:59 ORT3-N R-L 05:00A h_ =MISC CHEMISTRY SA PLING 03005107

_re-apprr ted tehspec ST - Rest irt CL not reqd CH IP 77 CHEM-SAMPI RCS CL TSR 3.4.5.2 9

11APR04 17APR0-4 DR-N ML-N 3

287 11APR04 CHo3nn4 7RCS CL TSR 3A.5.2l 07:00A 11:59 ORT3-N R-L 07:OOA

_C M

I S

C HEMISTRY SA PLING0300497 re-apprc led tech spec ST - Rest ir CL not req'd CH P 77 HEM-SAMPI RCS CL TSR 3.4.5.2 9

12APR04 17APR04 DR-N ML-N 3

287 12APR04 CHo3003 CS bCL TSR 3A.5.2 05:OOA 11:59 ORT3-N R-L 05:OOA

_-2MISC CHEMISTRY S PLING 0300357

_re-apprc red tech spec ST-Rest 3rt CL not reqd CH P n

EM-SAMPI RCS DO TSR 3.4.5.1 9

12APR04 17APR04 DR-N ML-N 3

287 12APR04 H0 oRCS bo TSR 3.9.5.1 05:WOA 11:59 ORT3-N R-L 05:OOA

_M ISC ¢HEMISTRY SA PLING 03003700

_re-apprc red Imp spec ST - Rest rt CL rnot reqd CH P 77

HEM-SAMPI RCS BORON SR 3.9.1.1 9

12APRW4 17APR04 DR-N ML-N 3

287 12APR°4 nHwn RSBRON SR 3.9.'.1 05:OOA 11:59 ORT3-N R-L 05:00A

_M I

S IC CHEMISTRY SAt PLING0300400 Pre-apprc _ed te_ _ spec ST - RestIrt CL not req'd CH P 77 HEM-SAMPL RCS CL TSR 3.4.5.2 58 18APR04 24APR04 DR-Y ML-Y 3

224 19APR04 I

CH030 3 58RCS CL TSFq 08:00-11:59 ORT3-N R-L OT:00' I

MISC CHEMISTRY, SAMPLING 030 35 Pre-approved CH IP 77

,HEM-SAMP RCS DO TSR 3.4.5.1 58 18APR04 24APR04 DR-Y ML-Y 3

224 19APR04 ICH030 371RCS DO TSR 08.00.

11:59 ORT3-N R-L 07:00' M SC CHEMISTRY, SAMPLING 030 371 Pre-approveo CH P 77 HEM-SAMPI RCS BORON SR 3.9.1.1 58 18APR04 24APR04 DR-Y ML-Y 3

224 19APR04 ICH030 0RCS BORO 08:00' 11:59 ORT3-N R-L 07:001 M SC CHEMISTRY SAMPLING0301 401_

_Pe-approved CH P 77

HEM-SAMPL RCS CL TSR 3.4.52 58 18APR04 24APR04 DR-Y ML-Y 3

224 19APR04 CH030 BRCS CL TSN:

08:00-11:59 ORT3-N R-L 07:00-M SC CHEMISTRY, SAMPLING030 49 Pre-approvesl CH P 77 HEM-SAMPI RCSDOTSR3.4.5.1 58 18APR04 24APR04 DR-Y ML-Y 3

224 19APR04 l

CH030 5 11RCSDOTSR 08:00-11:59 ORT3-N R-L 07:00-M SC CHEMISTR' SAMPLING030 511 Pre-approve4 Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING Ul R28 l

Sheet 1 of 4 C Primavera Systems. Inc.

I FL-52 Workweek Activities during Ul R28

after 16APR04 12:00 WORKWEEK SCHEDULE

-I thru 18APR04 1700 RESP Tl WO EQID DESCRIPTION RD ES EF RISK ResrCe MSM MF TI ES APR

~YS~ID J21p1 I2 I17 i 0318 IY ST ID

.6*9 1121,8,O

  • 3.6.*9i12..18.211 0.3 *6.

9112.15 FG1 l 76 DOOR-065 REPLACE MORTISE 4

16APR04.16APR04 DR-YML-Y 451 3

16APR04 G030 EPUACE MORTISE.OCKSET LOCKSET 09:OOA 10:59A ORT3-V R-L 0900 a

FE SHUTDOWN ARE S FIREISEC/HELB/BULLET RESI TAN0307324 P

pproved tech spec ST Restart CL not red FG3 p 77 SERVICE FLAMMABLE STORAGE 3 14APR04 16APR04 DR-Y ML-Y 453 3

293 14APR04 F3 MABLE STORA GE CABINET IN;PECT1ON 0 IDE PA CABINET INSPECTION 12:00A 14:59 ORT3-Y R-L.

12:OOA MISC EQUIPMENT REPAIRISERVICE0309950 OU.SI_

PAre-app d tech spec ST - Rest rt CL not reqd ICt 76 ICP-06.028 LEFM ELECTRONICS 1

16APR04 16APR04 DR-Y ML-Y 330 3

230 16APR04 0C302 LEFM ELECTRONICS REBOOT REBOOT 09:00A 12:59 ORT3-Y R-L 09:00 LEFM ELECTRONICS REBOOT0302523

. Pre pproved te spec ST Restart CL not req6d GUE F-MIM-A-milml 1111:01 Ull ki l 11,!-

Li1 MM2 M 75 YS-03587 2YS-3587 REPLACE 24 16APR04 17APR04

441, 3

87 REPLACE TRAINER STRAINER 12:00 15:59 I

30,91 030486 MM2 h 75 YS-03589 2YS-3589 REPLACE 24 17APR04 18APR04

410, 3

0 MM030486 2YS-3589 REPLA E STRAINER STRAINER 16:00 21:59 430.913 MM2 76 Z-014 Z-014 -WIRE ROPE 6

18APR04 18APR04 DR-NML-N 09660 3 0

18WR04 MMO2 1238Z-014-WIqE INSPECTION 09:00I 14:59 ORT3-N R-LI 441 09:00I 02P123 1_

MiSL i

1

  • S EU-iE OP1 77 TS-RE-004 AXIAL FLUX 2

17APR04 17APR04 DR-N ML-N 3

229 17APR04 C0021607oAXIAL FLUX DIFFEREICE AND QUAD OWER DIFFERENCE AND 00:00I 01:59 ORT3-N R-L 00:00*

1 021607ltAXI L FLUX DIFFERENCE AND QUAD POWER TILT R II QUAD POWER I

P-p roved tech sPeC ST - Restart CL tot req'd OPt 77 O-PC023.5 CHARGING PUMP 3

17APR04 17APR04 DR-N ML-N 3

228 17APR04 dpO2¶6049CHAR ING PUMP ROtATION PM ROTATION PM 00:00I 02:59 ORT3-N R-LI 00:00*

0216049WC ARGING PUMP POTATIONPR1ENTIVE MAINTT Pre-nap t

speCST - Restart CL at reqd OPI l7 O-PC-MIDS OPERATIONS MID 49 17APR04 23APR04 DR-Y ML-Y 3

182 16APR04 Qp02¶5354°PE TIONS MIDSHIFTWEEKLYRO NE SHIFTWEEKLY 00:00I 06:59 1 ORT3-N R-L I I

I I00M00

,02153N IPre-ap

)roved tech speCST - Restart CL sot reqd OP1 P 77 O-PC-049.7 WEEKLYVERIFICATION I

18APR04 18APR04 DR-N ML-N 3

223 18APR04 CIPO21539&NEEK Y VERIFICATIOl OF FACADE FREEZE 00:00 00:59 ORT3-N R-LI 00:00*

I021539aiFAC DE FREEZE PR9 IIIPr ovapved tech spec'<

Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 Sheet 2 of 4 O Primavera Systems. Inc l

FL-52 Workweek Activities during U1 R28 I

after 16APR04 12:00 WORKWEEK SCHEDULE thru 18APR04 1700 RESPET WO l EID DESCRIPTION RD ES EF RISK Resrre MSM MF TI ES 16 17 18 Yg ST

_ID 1.6,9 I 12.15.18.211 0, 3 6

9 112,15.18, 211 0 3

6.9 i 12, 1 E:_

OP2 _

76 0-PC-DAYS OPERATIONS DAY 24 13APR04 1 9APR04 DR-N ML-N 3

206 13APR04 OPERATIONS DAY S 4IFT WEEKLY ROUnNE SHIFT WEEKLY 08:OOA 14:59 ORT3-N R-L 08:00A PO=

ROUTINE re-appn d Ied I

spec ST - Rest rt CL not req d OP2 P 77 TS-ECCS-00 SAFEGUARD SYSTEMS I

17APR04 17APR04 DR-N ML-N 3

226 17APR04 0P021 l21SAFEGUARt SYSTEMS VA VE AND LOCK:

VALVE AND LOCK 08:00 08:59 ORT3-N R-L 08:00:

021 121ISAFEGUA8D SYSTEMS V LVE AND LOCK.

Pre-approved tech spec ST -

estart CL not re4l OP2 77 OPC043.1 CLEAN AIR 2

17APR04 17APR04 DR-N ML-N 3

225 17APR04 OP021 527CLEAN AIR EREATHERSIOI STRAINER ON, BREATHERS/OIL 08:00-09:59 ORT3-N R-L 08:00 021 527MAIR BREATHER CLEANIN STRAINER ON Pre-approveo tech spec ST -

estart CL not re4 OP2,p 70 G-01-GOV OBTAIN G-1 EDG 1

18APR04 18APR04 DR-N ML-N 3

622 18APR04 OOBTAIN G-0 GOVERNOR OIL 08E00 08:59 ORT3-N R-L 08:00' 021 441lG41 EDG

_SAMPLE Pre-approved OP2 77 O-PC-012.1 G-01 EDGVIBRATION I

18APR04 18APR04 DR-N ML-N 3

622 18APR04 IP021 4G-01 EDOVl (QUARTERLY) 08:00 08:59 ORT3-N R-L 08:00-021 4G4-1 EMED Pre-approvesl OP2 77 O-PC-012.3 G-01 COOLANT I

18APR04 18APR04 DR-N ML-N 3

622 18APR04

.P021 gO-1 COOLA SAMPLING 08:00-08:59 ORT3-N R-L 08:00-021 91a"i EMEI l

Pre-approver OP2 77 O-TS-081 TS-81. G-01 6

18APR04 18APR04 DR-N MI-N CCE 3

0 18APR04 IP021 53TS81,-G-01 EMERGENCY DIESEL 08 00-13:59 ORT3-N R-M 08:00 021 4Spi Pre-approved EUA_ -

a__

OP3 P 77 O-PC-SWING OPS SWING SHIFT 35 14APR04 20APR04 DR-N ML-N 3

196 14APR04 OP0215 SOPS NO SHIFTV EEKLY ROUTINt WEEKLY ROUTINE 16:00A 22:59 ORT3-N R-L 16:00A Pre-appc ted tedi spec ST - Res rt CLnot remqd OP3 TG-01 DRAIN U2 MAIN 1

16APR04 16APR04 524 3

0 17APR04 U2C NDR002DRAIN U2 MAI ELECTRICAL GENERATOR PE R PC 21.3 ELECTRICAL 18:00 18:59 04:00 n.

21.3 PrePapproved t ch spec ST - Re~tart CL not reqd OP3 77 O-PC-078.3 MONTHLY NORTH I

17APR04 17APR04 DR-N ML-N 3

223 17APR04 OP021561 OONY NORTI SERvICE BUIL?

SERVICE BUILDING 16:00-16:59 ORT3-N R-L 16:00-

.021 561 MONTHLY NOR H SERVICE BLID Pre-approved tect spec ST - Restart OP3 P 77 TS-CCW-001 CC SYSTEM VALVE I

18APR04 18APR04 DR-N ML-N 3

216 18APR04 OP0216154 POSITION CHECKS 16:00-16:59 ORT3-N R-L 16:00-0216159*

P, OP3 IP 77 O-IT-0014.

IT-14. FO TRANSFER 3

18APR04 18APR04 DR-N ML-N K04.

3 214 18APR04 0P021561 SYSTEM PUMPS/

16:00 18:59 ORT3-N R-M 530 16:005 021561 Run Date 16APR04 15:351 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 l

Sheet 3 of 4 O Primavera Systems. Inc.

FL-52 Workweek Activities during Ul R28 I

after 16APR04 12:00 WORKWEEK SCHEDULE thru 18APR04 1700 ESPTl WO EOID DESCRIPTION RD ES EF RISK Resrce MSM MF TI ES 16 t

APR 18 I~

T.

D 6* 9 i1215.18.211 0, 3 o 9 i 12. 15. 1R 211 O. 3, 1§ OP3 77 O-IT-0100.

IT-100. SEAL LKG TEST 3 18APR04 18APR04 DR-N ML-N 3

214 18APR04

.P021 5 8j4fr OF DA-100 AND 16:00' 15:59 ORT3-N R-L 16:00' 021561 I

0]11 15E az __ -

  • E

_ *!~~l_

WCC tT Z-14 O Z Z-14 MM REVO-1 1

18APR04 18APR04 1201238 3 0

18APR04 T-96,04H ZZ-14 MM 08:00' 08:59 530 08:00j 000! 66Cl0 Z Z-14 Mh Pre-.approved WCC MT Z-14 OZZ-14MMREVO-1 I 1IAPR04 I1APR04 D20123 3 615 18APR04 15:00 15:59 15:00 00966oEI; Run Date 16APR04 15:35 LT-52 WORKWEEK ACTIVIES DURING U1R28 Sheet4of4 o Prlmavera system, Inc.

FL-52 Workweek Activities during U1 R28

Run Date 16APR04 15:47 Work Activity Risk Assignment Shettof 1 U

ACT WO IGRP HPE EQUIPMENT Activity Cal DUR START FINISH APR ID ST RISK Description ID 1D21 0 21 2t 4

1221 O 1

EZMRCP-K 76 EM DR-Y ML-Y P-DO1D-M P1B MOVE MOTOR FROM U

6 17APR04 17APRU4 HREACTOR COOLANT PUMP MOTOR rRN R-H PUMP TO STAND 02:00 09:59 0215205 - 128EM I

MM0214052 76 MM1 DR-N ML-N HX-001A HX-1A, OPEN SG U

10 17APR04 17APR04 WD:0STEAM GENERATOR ORT3-N R-M HANDHOLES 11:00-22:59 0214052 - 128MM 1

MM-848001 76 MM1 DR-N ML-N R-1 MOVE REACTOR VESSEL U

4 18APR04 18APR04 IREACTOR VESSEL AND ASSEMBLY I

ORT3-Y R-H HEAD TO RHLDA 01:00 04:59 0214134 - 128MM 1

MM0214054 76 MM1 DR-N ML-N HX-WO1B HX-1B. OPEN SG U

10 18APR04 18APR04

[X]STEAM GENERATOR I ORT3-N R-M HANDHOLES 12:00 23:59 0214054 - 128MM 1I 9

-E-ll

-II 1

MM-8485B1 76 MM3 DR-Y ML-Y P-0018 PLACE BACKSEAT U

1 18APR04 18APR04 IREACTOR COOLANT PUMP ORT3-Y R-M COLLECTION SYS IN 04:00 04:59 0214119 - 128MM 1

MM-8485K 76 MM3 DR-N ML-N P-001B P-1B. ALIGN SEAL U

1 18APR04 18APR04 IREACTOR COOLANT PUMP ORT3-N R-M COLLECTION TO CAVITY 12:00 12:59 0214119 - 128MM 0

OP0215453 77 OP2 DR-N ML-N 0-TS-081 TS-81. G-01 EMERGENCY U

6 18APR04 18APR04 OG-01 EMERGENCY DIESEL GENERATOR MONTHLY ORT3-N R-M DIESEL 08:00-13:59 0215453 - B05Al 0

OP0215612 77 OP3 DR-N ML-N OT-

-0014.1 IT-14. FO TRANSFER 3

3 18APR04 18APR04 O-01I EDG FUEL OIL TRANSFER SYSTEM PUMPSIVALV ORT3-N R-M SYSTEM PUMPS/

16:00' 18:59 0215612 - BOSA1 1 1 RPIA-060 OPS DR-N Mt-N O-RP-001A FILL CAVflY FOR ROD U 13 1APR0 18APR04 IFILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A)

I ORT3-N R-M UNLATCH 09:00 l_11:59 1280P

_ l NMC I WE LT-81 HUMAN ERROR RISK BARCHART

-rn 1

,.I

-met I

FL-81 HUMAN ERROR POTENTIAL O5 PmAver Svstems In#-